CN208469434U - Band cavern and stream ramp piling and layout of stones artificial hillock - Google Patents

Band cavern and stream ramp piling and layout of stones artificial hillock Download PDF

Info

Publication number
CN208469434U
CN208469434U CN201820695370.5U CN201820695370U CN208469434U CN 208469434 U CN208469434 U CN 208469434U CN 201820695370 U CN201820695370 U CN 201820695370U CN 208469434 U CN208469434 U CN 208469434U
Authority
CN
China
Prior art keywords
artificial hillock
piling
layout
stones
ramp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820695370.5U
Other languages
Chinese (zh)
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Jiangrun Technology Co Ltd
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201820695370.5U priority Critical patent/CN208469434U/en
Application granted granted Critical
Publication of CN208469434U publication Critical patent/CN208469434U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of band caverns and stream ramp piling and layout of stones artificial hillock, including regularization mountain-climbing road steel skeleton, cavern, regularization streams ramp skeleton, pea gravel concreten ramp, plant raw cave, fixed steelframe of being formed, chimeric piling and layout of stones and mortar-chalked joint, regularization ramp steel skeleton and regularization streams ramp skeleton is arranged in piling and layout of stones artificial hillock top, wall stone hook and circumferential piling and layout of stones platform is arranged in artificial hillock side, chimeric piling and layout of stones is arranged in circumferential piling and layout of stones platform upper, cavern is set inside artificial hillock, and raw cave is planted in the setting of artificial hillock top;Gutter is arranged in slope foot.The beneficial effects of the utility model are: the utility model is arranged on artificial hillock top plants raw cave and plant sward blanket, the aesthetic characteristic of artificial hillock is improved;Stream ramp is arranged in artificial hillock top, the water on piling and layout of stones artificial hillock massif can be made quickly to be discharged, while can also beautify artificial hillock moulding;Artificial hillock slope surface is arranged circumferential piling and layout of stones platform and marks time, and can increase the service performance of artificial hillock.

Description

Band cavern and stream ramp piling and layout of stones artificial hillock
Technical field
The utility model relates to a kind of ramp piling and layout of stones artificial hillock, in particular to a kind of band cavern and stream ramp piling and layout of stones artificial hillock.
Background technique
The historic Landscapes design of China is focused on for man-made tourist site and nature landscape being combined together very much, so, When addressing Garden Architecture, the physiognomy framework around garden architecture is attached great importance to, also, the gardens of Chinese style are mostly with mountain Based on water, and other landscapes are then used as the setoff of landscape.One complete garden landscape is exactly by self-assembling formation Landscape and man-made tourist site combine, and therefore, scenery with hills and waters landform is indispensable important component for garden landscape.It is false Mountain has various Landscaping functions, such as constitutes the main scape or landform skeleton in gardens, divides and organizes garden space, arrange front yard Natural style flower stand is arranged in institute, revetment, slope protection, earth-retaining.Richness can also be combined into garden architecture, garden road, place and ornamental plant Increase the nature joy of life so as to reducing artificial atmospher in the view of variation, merge garden architecture into physiognomy framework.Therefore, false Mountain becomes one of the feature for showing Chinese natural mountain-water garden.
The more general plate of artificial hillock appearance form at present can not give people a kind of visual effect mixed the spurious with the genuine, current form of construction work Cause rockery that can not mutually unify with natural environment around.
In consideration of it, single in order to improve traditional artificial hillock appearance and modeling, landscape can not mutually be unified with natural environment around etc. is asked Topic, it would be highly desirable to invent a kind of simply and effectively band cavern and stream ramp piling and layout of stones artificial hillock, propose the construction quality and construction of piling and layout of stones artificial hillock Efficiency.
Utility model content
The purpose of the utility model is to overcome deficiency in the prior art, a kind of band cavern is provided and stream ramp piling and layout of stones is false Mountain.
This band cavern and stream ramp piling and layout of stones artificial hillock, including regularization mountain-climbing road steel skeleton, cavern, regularization streams slope Raw cave, fixed steelframe of being formed, chimeric piling and layout of stones and mortar-chalked joint, the setting of piling and layout of stones artificial hillock top are planted in road skeleton, pea gravel concreten ramp Wall stone hook and circumferential piling and layout of stones platform, ring is arranged in regularization mountain-climbing road steel skeleton and regularization streams ramp skeleton, artificial hillock side Chimeric piling and layout of stones is set to piling and layout of stones platform upper, cavern is set inside artificial hillock, raw cave is planted in the setting of artificial hillock top;Slope foot setting draining Ditch.
As preferred: along artificial hillock slope surface setting regularization mountain-climbing road steel skeleton, regularization mountain-climbing road steel skeleton top setting Step surface stone.
As preferred: cavern being arranged inside artificial hillock, cavern includes cavern arched framework, cavern vault and cavern side wall.
As preferred: regularization streams ramp skeleton, the setting of regularization streams ramp skeleton top being arranged in artificial hillock slope surface Waterproof layer covers pea gravel concreten ramp on waterproof layer.
As preferred: raw cave is planted in the setting of artificial hillock top, is planted and is planted shrub in raw cave, and shrub is fixed with fixed steelframe of being formed, It is laid on hillside and plants sward blanket.
As preferred: artificial hillock slope surface is arranged wall stone and links up with, and wall stone links up with top and circumferential piling and layout of stones platform is arranged.
The beneficial effects of the utility model are:
(1) the utility model is arranged on artificial hillock top plants raw cave and plant sward blanket, improves the aesthetic characteristic of artificial hillock.
(2) stream ramp is arranged in artificial hillock top, the water on piling and layout of stones artificial hillock massif can be made quickly to be discharged, while can also beautify Artificial hillock moulding.
(3) artificial hillock slope surface is arranged circumferential piling and layout of stones platform and marks time, and can increase the service performance of artificial hillock.
Detailed description of the invention
Fig. 1 is the utility model band cavern and stream ramp piling and layout of stones artificial hillock structural schematic diagram;
Description of symbols: the gutter 17-, 31- regularization mountain-climbing road steel skeleton, 32- step surface stone, 33- cavern side wall, 34- cavern arched framework, 35- cavern vault, 36- regularization streams ramp skeleton, 37- waterproof layer, 38- pea gravel concreten slope Road, 39-, which plant raw cave, 40- is formed fixes steelframe, 41- wall stone hook, 42- circumferential direction piling and layout of stones platform, 43- chimeric piling and layout of stones, 44- mortar Jointing, 45- plant sward blanket.
Specific embodiment
The utility model is described further below with reference to embodiment.The explanation of following embodiments is only intended to help to manage Solve the utility model.It should be pointed out that for those skilled in the art, not departing from the utility model principle Under the premise of, several improvements and modifications can be made to this utility model, these improvement and modification also fall into the utility model In scope of protection of the claims.
Technical requirements, stone jointing technical requirements etc. are filled out in the construction of artificial hillock piling and layout of stones, and the utility model is not repeated, and emphasis illustrates The embodiment of the utility model and structure.
The band cavern and stream ramp piling and layout of stones artificial hillock, including regularization mountain-climbing road steel skeleton 31, cavern, regularization small stream It flows ramp skeleton 36, pea gravel concreten ramp 38, plant raw cave 39, fixed steelframe 40 of being formed, chimeric piling and layout of stones 43 and mortar-chalked joint 44, Regularization mountain-climbing road steel skeleton 31 and regularization streams ramp skeleton 36 is arranged in piling and layout of stones artificial hillock top, and artificial hillock side is arranged wall stone and hangs Chimeric piling and layout of stones 43 is arranged in hook 41 and circumferential piling and layout of stones platform 42, circumferential 42 top of piling and layout of stones platform, setting cavern inside artificial hillock, on artificial hillock Raw cave 39 is planted in portion's setting;Gutter 17 is arranged in slope foot.
The wide 1.5m in ramp, riser height 15cm, tread run 25cm, top are laid with 5cm thickness step surface stone 32;Streams ramp Wide 40cm, depth 20cm, SBS waterproof layer 37 of constructing.Along artificial hillock slope surface setting regularization mountain-climbing road steel skeleton 31, regularization mountain-climbing Step surface stone 32 is arranged in steel skeleton 31 top in road.
Cavern is set inside artificial hillock, and cavern includes cavern arched framework 34, cavern vault 35 and cavern side wall 33.Cavern hole High 2.5m, wide 1.5m.
Regularization streams ramp skeleton 36 is set in artificial hillock slope surface, and waterproof layer is arranged in skeleton 36 top in regularization streams ramp 37, pea gravel concreten ramp 38 is covered on waterproof layer 37.
Raw cave 39 is planted in the setting of artificial hillock top, is planted and is planted shrub in raw cave 39, and shrub is fixed with fixed steelframe 40 of being formed, hillside Sward blanket 45 is planted in upper laying.Plant raw cave 39 cave depth 1m, cross-sectional width 1m, inside plantation podocarpus.
Artificial hillock slope surface is arranged wall stone and links up with 41, and wall stone links up with 41 tops and circumferential piling and layout of stones platform 42 is arranged.

Claims (6)

1. a kind of band cavern and stream ramp piling and layout of stones artificial hillock, it is characterised in that including regularization mountain-climbing road steel skeleton (31), cavern, Regularization streams ramp skeleton (36), plants raw cave (39), is formed fixed steelframe (40), is chimeric folded at pea gravel concreten ramp (38) Regularization mountain-climbing road steel skeleton (31) and regularization streams ramp bone is arranged in stone (43) and mortar-chalked joint (44), piling and layout of stones artificial hillock top Frame (36), artificial hillock side are arranged wall stone and link up with (41) and circumferential piling and layout of stones platform (42), and circumferential piling and layout of stones platform (42) top setting is embedding It closes piling and layout of stones (43), cavern is set inside artificial hillock, raw cave (39) are planted in the setting of artificial hillock top;Gutter (17) are arranged in slope foot.
2. band cavern according to claim 1 and stream ramp piling and layout of stones artificial hillock, it is characterised in that fixed along the setting of artificial hillock slope surface Typeization is climbed the mountain road steel skeleton (31), regularization mountain-climbing road steel skeleton (31) top setting step surface stone (32).
3. band cavern according to claim 1 and stream ramp piling and layout of stones artificial hillock, it is characterised in that cavern is set inside artificial hillock, Cavern includes cavern arched framework (34), cavern vault (35) and cavern side wall (33).
4. band cavern according to claim 1 and stream ramp piling and layout of stones artificial hillock, it is characterised in that it is fixed to be arranged in artificial hillock slope surface Waterproof layer (37) are arranged in type streams ramp skeleton (36), regularization streams ramp skeleton (36) top, and waterproof layer covers on (37) Lid pea gravel concreten ramp (38).
5. band cavern according to claim 1 and stream ramp piling and layout of stones artificial hillock, it is characterised in that life is planted in the setting of artificial hillock top Plantation shrub in raw cave (39) is planted in cave (39), and fixed steelframe (40) are fixed, and sward blanket is planted in laying on hillside with being formed for shrub (45)。
6. band cavern according to claim 1 and stream ramp piling and layout of stones artificial hillock, it is characterised in that wall stone is arranged in artificial hillock slope surface It links up with (41), wall stone links up with (41) top and circumferential piling and layout of stones platform (42) is arranged.
CN201820695370.5U 2018-05-10 2018-05-10 Band cavern and stream ramp piling and layout of stones artificial hillock Active CN208469434U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820695370.5U CN208469434U (en) 2018-05-10 2018-05-10 Band cavern and stream ramp piling and layout of stones artificial hillock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820695370.5U CN208469434U (en) 2018-05-10 2018-05-10 Band cavern and stream ramp piling and layout of stones artificial hillock

Publications (1)

Publication Number Publication Date
CN208469434U true CN208469434U (en) 2019-02-05

Family

ID=65221025

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820695370.5U Active CN208469434U (en) 2018-05-10 2018-05-10 Band cavern and stream ramp piling and layout of stones artificial hillock

Country Status (1)

Country Link
CN (1) CN208469434U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102317257B1 (en) * 2020-05-19 2021-10-25 주식회사 자연들판 artificial mountain with cave

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102317257B1 (en) * 2020-05-19 2021-10-25 주식회사 자연들판 artificial mountain with cave

Similar Documents

Publication Publication Date Title
CN104878767B (en) Rock slope concrete for plant growth is combined the construction method of ecoscape protection with moulding stone
CN102150596B (en) Method for constructing water saving type landscape plant community
CN106088109B (en) Discarded pit slope ecological recovery covers green construction method
KR101281559B1 (en) Multipurpose block for plants to express variety wall
CN208533453U (en) A kind of gabion type landscape revetment conducive to urban water-body reparation
CN204780949U (en) Rock slope is planted living concrete and is moulded stone and combines ecological landscape protective structure
CN204244770U (en) A kind of greenery patches, garden road mima type microrelief structure
CN105340614A (en) Novel hard slope lattice ecological afforestation structure and method
CN207392130U (en) A kind of ecology block stone revetment structure
CN110093898A (en) Self-stabilization type fish-scale pit Ecological Retaining Wall
CN206189344U (en) Existing stereoplasm shore protection ecological landscape ization transformation structure
CN208469434U (en) Band cavern and stream ramp piling and layout of stones artificial hillock
CN109267626A (en) A kind of landscape ecology rainwater recycle utilizes system
CN207553353U (en) A kind of Multifunctional demonstration feature wall
CN207700203U (en) A kind of pile plate wall supporting construction with ecological protective functions
CN108656831A (en) Combined type skeleton piling and layout of stones moulds mountain and construction method
CN205711591U (en) A kind of Novel garden brick
CN207944642U (en) A kind of garden landscape walking step
CN209652901U (en) A kind of restoration of the ecosystem structure for building stones mining area
CN108103878A (en) A kind of ecological floor file structure
CN207812465U (en) A kind of landscape ecology bank protection
CN107653892A (en) A kind of ecological revetment system based on plant root species form
CN109989523A (en) A kind of clear water moulding green concrete column Nest architecture and way
CN207904867U (en) A kind of cross interlocking-type slope protection block
CN209047095U (en) A kind of ecology tree pool structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant