CN208468683U CN201820780461.9U CN201820780461U CN208468683U CN 208468683 U CN208468683 U CN 208468683U CN 201820780461 U CN201820780461 U CN 201820780461U CN 208468683 U CN208468683 U CN 208468683U
Authority
CN
China
Prior art keywords
frame
pier shaft
equipment
pipeline
spray
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820780461.9U
Other languages
Chinese (zh)
Inventor
刘怀刚
陈传磊
谢马贤
高世强
肖向荣
彭寄望
杨杰
赵升辉
陶坡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Road and Bridge South China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201820780461.9U priority Critical patent/CN208468683U/en
Application granted granted Critical
Publication of CN208468683U publication Critical patent/CN208468683U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of equipment of pier shaft spray maintenance, the equipment include at least it is corresponding circumferentially around pier shaft and be fixed on the frame of pier shaft, be fixed on the frame for water supply pipeline and connect communicating pipe between the pipeline and water pump, spray head is connected on the tube body of the pipeline or offers hole for water spraying, and the frame is fixed on the basic mode of pier shaft so that frame is mobile with basic mode.The equipment is by around pier shaft and being fixed on the frame on pier shaft, the structures such as cooperation pipeline, water pump, communicating pipe, spray head or hole for water spraying, can be realized concrete three-dimensional, whole to pier shaft in real time or part and conserves.Frame can also follow basic mode to climb, that is, have the spray care action synchronous with pouring.Cooperate the time and the time of pouring of concrete curing, material and system complexity are built in saving.The equipment can be built simply with repeated application, and structural reduction can also save artificial and operating procedure.

Description

The equipment of pier shaft spray maintenance
Technical field
The utility model relates generally to building, construction applications, especially concrete curing field, more particularly to a kind of pier The equipment of body spray maintenance.
Background technique
Currently, after concreting demoulding, construction personnel generallys use plastic film packet during pier construction It wraps up in, cooperates the means of trickle irrigation health.The pier shaft of demoulding is wrapped up using plastic film, if then disposing solid carbon dioxide in pier top position Bucket or water tank are perforated around bucket bottom or water tank bottom, and concrete curing water passes through perforation outflow, then by pier top to penetrate into package thin Health is realized in film.The prior art needs construction personnel during concrete curing, and inner bucket water amount, concrete curing are observed in timing It need to be replenished in time when water deficiency, to guarantee the continuity of health.Due to needing that bucket could be placed after removing basic mode, mix Coagulate the maintenance of soil often can not real-time perfoming, the maintenance quality of the concrete of pier shaft lower part is less desirable.
It is on the other hand larger for section or there are the irregular surfaces such as decorative groove, variable cross-section or the shaft of high pier in section, Package plastic film is not easy to operate.Irregular surface or pier shaft shape are also easy to directly pierce through plastic film, influence subsequent The process of trickle irrigation maintenance.
Further, the broad water area such as commonly used by the sea, rivers side of bridge construction, this kind of region wind speed compared with Fastly, wind-force is larger.When wind-force is excessive, plastic film is not fixed easily, and is easy damaged damage.Simultaneously plastic film service life compared with It is short, and maintenance requires to lay new plastic film every time, causes white pollution, it is unfriendly to environment.
Separately into bucket or water tank when make-up water source, construction personnel is needed to climb pier shaft up and down.If in pier shaft to turning over Curing concrete during mould is constructed, needs to continue on crane lifting healthcare barrel, more inconvenient, and there is certain danger Danger.If supplementing concrete curing water not in time, it will influence the maintenance quality of concrete.
Utility model content
The equipment that the utility model is directed to a kind of pier shaft spray maintenance, can partially solve the above problems.
The utility model provides a kind of equipment of pier shaft spray maintenance, and the equipment includes at least corresponding circumferentially around pier shaft And be fixed on the frame of pier shaft, be fixed on the frame for water supply pipeline and connect company between the pipeline and water pump Siphunculus connects spray head on the tube body of the pipeline or offers hole for water spraying, and the frame is fixed on the basic mode of pier shaft so that frame Frame is mobile with basic mode.
Preferably, the frame is fixedly connected by connection framework with the bracket of pier shaft.
Preferably, the frame is connected under the basic mode by least one fixed form of hook, tied rope, frenulum Side.
Preferably, the frame selects at least one component composition of angle steel, round tube, spoke.
Preferably, the frame includes at least two layers of subframe, and subframe is distributed along pier shaft vertical axis;And/or sub- frame The rope or bracket for being fixedly connected are additionally provided between frame;And/or the pipeline on subframe also passes through multi-pass Guan Lian It connects.
Preferably, the pipeline be equipped with card slot, accommodation groove, primary and secondary hole at least one location structure, to be used for and frame Frame positioning, the spray head or hole for water spraying are towards pier shaft.
Preferably, the water pump realizes water supply by being connected to the pipeline communicating pipe;And/or several pipelines Between connected by multi-pass pipe, the water pump passes through the communicating pipe one of piped water supply thereto.
Preferably, the water pump includes feed pump and the booster pump that connect with feed pump, and booster pump is arranged in the frame On frame and one or multi-channel pipeline therein is connected to enhance hydraulic pressure.
Preferably, the equipment further includes timer and the valve by timer control, and the control of timer union valve door is single Road or the on-off for combining multiple tracks pipeline.
Preferably, camera is additionally provided on the frame for observing pier shaft;And/or biography is additionally provided on the frame Sensor is with the maintenance state for detecting pier shaft.
Preferably, when the basic mode is removed, the frame passes through the connector overlapped in frame in length and breadth and is fixed on pier At the top of body.
The utility model provides a kind of equipment of pier shaft spray maintenance, can preferably solve partial technical problems, and have It has the advantage that:
(1) a kind of equipment of pier shaft spray maintenance involved in the utility model, by existing around pier shaft or setting At the top of pier shaft and it is fixed on the frame on pier shaft, the structures such as cooperation pipeline, water pump, communicating pipe, spray head or hole for water spraying can be realized Concrete three-dimensional, whole to pier shaft in real time or part conserves;
(2) a kind of equipment of pier shaft spray maintenance, the frame involved in the utility model can also follow basic mode to climb It rises, that is, there is the spray care action synchronous with pouring.The time and the time of pouring for cooperating concrete curing, can suitably it subtract Material and system complexity are built in the laying of subframe, saving in few frame;
(3) a kind of equipment of the spray of pier shaft involved in the utility model maintenance can simplify knot by the way that subframe is arranged Structure, and to multistage pier shaft or the pier shaft in different phase realizes synchronous maintenance;
(4) equipment of the spray of a kind of pier shaft involved in the utility model maintenance passes through multi-pass Guan Lian between the pipeline It connects, the quantity for drawing communicating pipe from water pump can be reduced, simplify structure, excessive structure is avoided to cause field management chaotic.Into one Step applies the multi-pass pipe by the section of tubing on subframe, can realize the maintenance respectively between multi-region in part;
(5) in a kind of equipment of the spray of pier shaft involved in the utility model maintenance, the frame and basic mode or pier shaft top The fixed form in portion achieves a fixed connection by using the compound or single fixed form such as bracket, hook.It is set in frame On pipeline can rely on stable frame, pipeline keep stability to a certain extent, resist certain wind speed, avoid in wind The lower not yet molding concrete structure of impact is blown, is damaged;
(6) in a kind of equipment of the spray of pier shaft involved in the utility model maintenance, the pipeline and frame pass through positioning Structure, it is relatively fixed between realization pipeline and frame, it is also easily removable.Relatively-stationary pipeline and frame can be spray head, spray Water hole provides determining angle and position setting, it is ensured that under the premise of largely towards pier shaft, avoids as far as possible The structures such as frame are sprayed, the structures such as corrosion frame is avoided, extends the service life of equipment;
(7) a kind of equipment of pier shaft spray maintenance involved in the utility model, by being provided with booster pump, to enhance Hydraulic pressure.In order to control spray time, realization is accurately controlled spray maintenance process, also by being provided with timer and and timing The valve that device is connected, valve can realize the purpose being precisely controlled, further by the on-off of control single track or multiple tracks pipeline Being additionally provided with the equipment such as camera, sensor can individually reach information at master control or operation, can also cooperate the valve Using equipment will have the function of automatic identification, judgement, the entire spray progress of control and final maintenance effect, can save and apply The quantity of worker person mitigates the burden of construction team;
(8) equipment of the spray of a kind of pier shaft involved in the utility model maintenance, angle steel, bracket, extension in the material of building The materials such as hook, steel stock rope are easy to get at the construction field (site), therefore the equipment builds deflation, and material is easy to get, can reduce described The construction cost of equipment.
Detailed description of the invention
The utility model is above-mentioned and/or additional aspect and advantage from the following description of the accompanying drawings of embodiments will Become obvious and be readily appreciated that, in which:
Fig. 1 is a kind of integral device structural representation of pier shaft spray maintenance in embodiment 1;
Fig. 2 is the overlooking structure diagram of the first subframe of the first frame in embodiment 1;
Fig. 3 is the schematic diagram of the section structure of first frame at A-A in Fig. 1;
Fig. 4 is the schematic diagram of the section structure of first pipe in Fig. 3;
Fig. 5 is a kind of overall system structure schematic diagram of pier shaft spray maintenance in embodiment 2;
Fig. 6 is the overlooking structure diagram of the second frame in embodiment 2;
Fig. 7 is the schematic diagram of the section structure of second frame at B-B in Fig. 5.
Specific embodiment
The embodiments of the present invention are described below in detail, examples of the embodiments are shown in the accompanying drawings.Below by The embodiment being described with reference to the drawings is exemplary, and is only used for explaining the utility model, and cannot be construed to the utility model Limitation.For the ease of showing that a kind of practice of construction structure of equipment that pier shaft spray conserves, following embodiments will introduce Pier shaft and specific component part (including basic mode etc.) make the equipment application and equipment room connection relationship of the pier shaft spray maintenance It shows and more sufficiently and is easy to understand, it is notable that the protection scope of the utility model is not by being limited.
Embodiment 1
Referring to FIG. 1, Fig. 1 illustrates the equipment 1 of the pier shaft spray maintenance of the present embodiment, for the ease of showing the pier shaft Spray maintenance equipment 1 practical application, also introduced in Fig. 1 half pier shaft 2A and on half pier shaft 2A over-form construction base Mould 2A-1.Half pier shaft 2A of meaning refers to the structure not bound still in Construction State herein, and dotted line is signified in half pier shaft 2A Not yet casting concrete region.
Corresponding the first frame 11 circumferentially around half pier shaft 2A of equipment 1 of the pier shaft spray maintenance, first frame 11 are fixed on the basic mode 2A-1 on half pier shaft 2A.The equipment 1 of the pier shaft spray maintenance further includes being fixed on first frame The first communicating pipe between first pipe 12 in 11 and for water supply, and the connection first pipe 12 and the first water pump 13 14.Please auxiliary reference Fig. 3, Fig. 3 be sectional view at the A-A of the first subframe 111 in Fig. 1, can show the tool of first pipe 12 Body structure, it can be observed that offering hole for water spraying 121 on the tube body of the first pipe 12.First frame 11 is fixed on half The basic mode 2A-1 of pier shaft 2A is so that the first frame 11 is mobile with basic mode 2A-1.
In the present embodiment, the building method of the first subframe 111 in the first frame 11 of one kind is illustratively provided.Tool The structure of the first subframe of body 111, incorporated by reference to Fig. 1 referring to Fig. 2.Fig. 2 is the overlooking structure diagram of the first subframe 111.The The first frame body of frame structure 1111 that one subframe 111 is mainly enclosed including surrounding, inside be laid with abutting or be fixed on It is enclosed in the first of half pier shaft 2A (Fig. 1) and encloses frame 1115 in frame 1114 and second, enclosed in first in frame 1114 and second and enclose frame 1115 vertical connect into inside the first sub- framework frame 1111 enclose frame structure.The first frame body 1111 with it is described interior It encloses to be vertically connected with first between frame structure and put more energy into and frame 1112 and second put more energy into frame 1113, described second puts more energy into the company of frame 1113 It is connected to enclose in the four corners and first of the first frame body 1111 and be enclosed in frame 1114 and second between 1115 perpendicular joints of frame.The Two subframes 112 build layout and can refer to the first subframe 111.
Specifically, with continued reference to FIG. 1, first frame 11 passes through 113 end of connecting bracket 113 and connecting bracket Hook 114 be affiliated on basic mode 2A-1.It is connected between the first frame 11 and half pier shaft 2A by bracket 113, thus One frame 11 can connect in half pier shaft 2A (namely basic mode 2A-1).In other possible embodiments, first frame Frame 11 can also by steel wire cable, tied rope, frenulum, welding bracket etc. to provide flexible connection or rigidly connected connection Part realizes the connection between the first frame 11 and basic mode 2A-1.The first frame 11 after connecting with basic mode 2A-1 has with basic mode The function that 2A-1 climbs.
Specifically referring to FIG. 3, Fig. 3 is diagrammatic cross-section of the Fig. 1 at A-A.First frame 11 uses L-type angle The structural behaviour of steel, angle steel is excellent, possesses stronger anti-shear performance, can also provide certain sky to accommodate first pipe 12 Between.In the present embodiment, by taking the first frame 11 as an example, the first pipe 12 can rely on the both wings steel plate of L-type angle steel simultaneously It is placed between both wings steel plate.In other possible embodiments, first frame 11 can also by round tube, semi-circular tube, The structure compositions such as spoke.In the present embodiment, L-type angle steel, which passes through, dismountable connection type group such as welds or is bolted At the first frame 11.
Specifically with continued reference to FIG. 1, first frame 11 includes at least two layers of subframe.In the present embodiment, it is The brief connection relationship shown between subframe and subframe (including first sub first frame 111, the second subframe 112) Specific structure, only show most succinct implementation in Fig. 1, i.e., described first frame 11 is by the first subframe 111 and Two subframes 112 composition.In other possible embodiments, the subframe vertical distribution of the first frame 11 is formed in half pier shaft 2A everywhere, to need to spray the region of maintenance on corresponding half pier shaft 2A.Further specifically, the subframe is dispensed along described Everywhere in half pier shaft 2A vertical axis.The vertical axis of the half pier shaft 2A refers to the axis substantially symmetrical about its central axis of half pier shaft 2A.? In irregular building, the subframe, which can be distributed, is covered on the body position that building needs to spray.
Specifically, the steel stock for being fixedly connected is additionally provided between first subframe 111 and the second subframe 112 Rope 116, the second subframe 112 are lifted on the first subframe 111 by steel stock rope 116.In other possible embodiments, Connection between the subframe is referred to the connection structure using the first frame 11 and basic mode 2A-1.Certainly, between subframe It can be established a connection by the way of bracket connection.
Specifically, between subframe (by taking the first frame 111 and the second subframe 112 as an example), two layers first pipe 12 Connection is with the connection of multi-pass pipe 115.Multi-pass pipe 115 can reduce by the first communicating pipe 14 to transmit ejecting liquid to a certain degree Quantity.In other possible embodiments, multi-pass pipe 115 can assist similar first frame 11 L-type angle steel or other Supporting element with support fixed function, multi-pass pipe 115 can also be connected on steel stock rope 116, to save connection structure.
Specifically, the specific structure of first pipe 12 is illustrated please continue to refer to Fig. 3 and Fig. 4, Fig. 4.With first in Fig. 3 For cooperation between subframe 111 and first pipe 12, it can be observed how first subframe 111 and the from Fig. 3 It is achieved a fixed connection by way of primary and secondary hole between one pipeline 12.If referring to FIG. 4, being offered on 12 tube body of first pipe Dry hole for water spraying 121 and the first tube body connecting plate 123 offer the connection of the first tube body on the first tube body connecting plate 123 Hole 122.The structure of first pipe 12 is corresponded to, offers the first frame attachment plate 1111, first frame on the first subframe 111 The first frame coupling hole 1112 of corresponding first tube body connecting hole 122 is offered on frame connecting plate 1111.First frame connects It is completely overlapping in the present embodiment to connect hole 1112 and the first tube body connecting hole 122.First frame coupling hole 1112 and first Tube body connecting hole 122 constitutes the connection structure in primary and secondary hole, and is connected with the fixed company of the modes such as bolt or binding frenulum wherein It connects.The spray apertures 121 opened up in the first pipe 12 are directed toward the region for needing to spray, and backwards to the first subframe 111.Spray It drenches the installation position in hole 121 and towards angle design, ejecting liquid can be made all to spray in concrete curing as far as possible Region and the structure for avoiding the first subframe 111 are able to ascend concrete curing effect and maintenance efficiency.In the present embodiment In, first frame coupling hole 1112 can also be overlapped partially with the first tube body connecting hole 122, it is only necessary to which there are for such as spiral shell The region that the connectors such as bolt, frenulum pass through.
Specifically with continued reference to FIG. 1, the first pipe 12 between the subframe is connected by multi-pass pipe 115, to realize To circulation of the ejecting liquid in pipeline, under the connection effect of the multi-pass pipe 115, first water pump 13 can pass through one Pipeline --- the first communicating pipe 14 supply is realized to any road first pipe 12 on the first frame 11.In view of high-altitude water The influence of pressure, the first water pump 13 can also be by the first communicating pipes of multiple groups 14 to the multiple tracks first pipe 12 being laid on subframe It supplies water.
Specifically, first water pump 13 includes feed pump and the booster pump being connected with feed pump.In the present embodiment In, booster pump can be set on the first frame 11.More specifically, the booster pump can be placed on the first subframe 111 with And second subframe 112, ground can also be set.The booster pump can connect multiple tracks first pipe 12, can also only connect Connect be located at compared with high-altitude wherein together or liquid pump to overcome is transported to high-altitude bring pressure difference by part first pipe 12.
Specifically, the equipment 1 of the pier shaft spray maintenance further includes the valve for having timer and being controlled by the timer Door.Timer controls the on-off of single track or multiple tracks first pipe 12 together with valve.More specifically, the timer and Valve is arranged on the first water pump 13 to mitigate the load on frame.The spray that timer cooperation valve can control concrete is supported The time is protected, to realize that the concrete spray maintenance of science arranges.On-off section of tubing can save ejecting liquid, be not required to simultaneously At once unwanted first frame 11 is removed, is removed together after whole complete can be waited, reduces operating procedure.The present embodiment In, illustratively provide the period planning of spray.The timer cooperation valve can control valve make-and-break time 10min, i.e., every 10min spray is primary, and the duration sprayed every time is 3min.
Specifically, be additionally provided on first frame 11 camera for observe half pier shaft 2A.Specifically, first frame The sensor for detecting half pier shaft 2A maintenance state is additionally provided on frame 11.In the present embodiment, the camera and sensing Device can be reached at ground handling operator or at master control room by transmission of wireless signals mode.If the camera and sensing Device uses wire transmission mode, in company with the first communicating pipe 14 or can depend on half pier shaft 2A and reaches ground.The sensing implement body Ground may include the single or integrated applications such as infrared detector, heat of hydration meter, temperature sensor, hardness transducer to detect Concrete curing stage, the sensor for conserving state.The sensor can also cooperate with the valve or timer further Control the on-off of single track or more to pipeline.
Embodiment 2
The present embodiment provides a kind of systems 3 of pier shaft spray maintenance applied at the top of pier shaft 2B, for the ease of showing institute The practical application for stating the system 3 of pier shaft spray maintenance, also introduces full pier shaft 2B in Fig. 5.Signified full pier shaft 2B refers to herein It is to have poured the structure to bind.The second frame that the corresponding top in full pier shaft 2B of system 3 of the pier shaft spray maintenance is laid Frame 31, second frame 31 is fixed and covers the top area of full pier shaft 2B.The pier shaft sprays the system 3 conserved Second water pump 33 and the second communicating pipe 34 for connecting the second water pump 33.
Fig. 6 is specifically please referred on the basis of Fig. 5, the present embodiment illustratively shows the side of building of the second frame 31 Formula.Second frame 31 includes the second frame body 311 and several support members and fixed bracket.The support member includes first Support frame 312 and the second support frame 313, the fixed bracket include the first fixed frame 314 and the second fixed frame 315.Institute The first fixed frame 314 and the overlapping laying of the second fixed frame 315 are stated, and entire second frame 31 is made to be fixed on full pier shaft 2B (figure 5) top provides fixed face for the second frame 31.First support frame 312 be vertically connected at the second frame body 311 and On first fixed frame 314, the first support frame of part 312 is also connect with the second fixed frame 315.Described second support frame, 313 one end It is connected to the quadrangle of the second frame body 311, the other end is connected to 315 junction of the first fixed frame 314 and the second fixed frame.At it In its possible embodiment, the second frame body 311, the first support frame 312, the second support frame 313, the first fixed frame 314, The installation position of two fixed frames 315 can and appropriate reconstruction different according to the structure of installation site.Due to full pier shaft 2B (Fig. 5) Top often lacks support and wind speed is very fast, therefore needs to carry out reinforcing appropriate to the second frame 31.Second frame 31 Forming and build mode to be only is not unique reinforcing mode and to build mode illustratively.
Specifically, referring to FIG. 7, Fig. 7 illustrates the sectional view in Fig. 5 at B-B, the second frame 31 and the second pipe are illustrated The connection relationship and specific structure in road 32.The system 3 of the pier shaft spray maintenance further includes being fixed on second frame 31 Second pipe 32 interior and for water supply, second communicating pipe 34 connects the second water pump 33 and second pipe 32.
In the present embodiment, the tube body of the second pipe 32 is connected with spray head 321, on the tube body of the second pipe 32 It is provided with tube body positioning groove 322.Accordingly, cooperate tube body positioning groove 322, on the second frame body 311 of the second frame 31 Offer frame positioning protrusion 3111, tube body positioning groove 322 and 3111 appropriateness of frame positioning protrusion are interference fitted, and make described the Two pipelines 32 are fixed on frame body 31.In the present embodiment, the tube body positioning groove 322 is laid in close to frame body 31 Position, the frame positioning protrusion 3111 are laid in close to the position of second pipe 32.
In the present embodiment, second frame body 311 is also equipped with rope locating slot in the port of L-type angle steel both wings 3112, rope locating slot 3112 can accommodate the positioning element of binding second pipe 32, and can limit the position of positioning element It sets, positioning element can be using components such as bandage, frenulum, ropes.
In the present embodiment, mold is poured since full pier shaft 2B can be removed first after concreting is bound, used In the system 3 that the pier shaft spray of spray conserves, more preferably embodiment is that the second frame 32 is fixed on to the top of full pier shaft 2B To cooperate actual condition of construction.After (or after the completion of pier shaft structure pours) the pier shaft basic mode dismounting for pouring, institute The second frame 31 is stated by overlapping on the first support frame 312, the second support frame 313, the first fixed frame inside the second frame 31 314, the connectors such as second fixed frame 315 are fixed on the top of full pier shaft 2B.
It is worth noting that, the part-structure of embodiment 1 and embodiment 2 is can be replaced mutually application or mixing utilization 's.The system 3 of pier shaft spray maintenance in the equipment 1 and embodiment 2 of pier shaft spray maintenance in embodiment 1, part or whole Body can be with use in conjunction in same pier shaft structure or other building structure with similar structures and spray demand.Above-mentioned reality The differentiation statement for applying example 1 and embodiment 2 is convenient and succinct just for the sake of description, does not constitute and substantially implements to two The differentiation of scheme.The independence or use in conjunction of the full content of embodiment 1 and embodiment 2, belong to the skill of the utility model Within art aspects.
Specifically, first pipe 12, second pipe 32, the first frame coupling hole 1112, the first tube body connecting hole 122, pipe The structures such as body positioning groove 322, frame positioning protrusion 3111, spray head 321, hole for water spraying 121, rope locating slot 3112 are not merely It is limited to unique collocation form of embodiment 1 and embodiment 2.The position of said combination and structure application, only demonstration are originally practical The technical solution that novel part is covered.In the embodiment of the utility model coverage, it single can use or mixing is applied, together When above structure can both apply the position at the top of the corresponding full pier shaft 2B of system 2, can also apply in pier shaft spray maintenance Position below at the top of the corresponding half pier shaft 2A of equipment 1.
Further, the frame mode of building of the second frame 31 is equally applicable or is applied to the by adaptability reform One frame 11, the mode of building of the first frame 11 can also be such that the first frame 11 applies at the top of full pier shaft 2B.First frame First frame body 1111 of the first subframe 111 and the interior frame structure that encloses can be laid staggeredly with suitable in vertical height in 11 The construction needs at the top of full pier shaft 2B are answered, the application of half pier shaft 2B can also be extended to.
In addition to first pipe 12 and the first subframe 111 and second pipe 32 and 31 two kinds of exemplary orientations of the second frame Except structure.In other possible embodiments, it is also provided with accommodation groove etc. on pipeline and is equally used for cooperation frame use Location structure, to limit spray head 321 and hole for water spraying 121 towards the position of half pier shaft 2A or full pier shaft 2B.
Similarly, for half pier shaft 2A, the subframe of the first frame 11 (including the first subframe 111 and the second sub- frame Frame 112) number of plies setting, subframe spacing etc., be merely illustrative displaying.In the possible application of the utility model, Ke Yigen According to the overmolded speed of half pier shaft 2A, the specification using concrete, water content, in conjunction with items such as local meteorological condition, gas epidemic disasters Part further adjusts the parameters such as spray flow, spray time, spray interval, spray end time.
In the present embodiment, pipeline (including first pipe 12, second pipe 32), (the first communicating pipe 14, second communicating pipe Communicating pipe 34), the tubular body of the transport ejecting liquid such as multi-pass pipe 115 can using hard PVC pipe, hose or other convenient for this The tubing of utility model application shape.Plastic flexible pipe is used in the present embodiment, preferably in order to be bonded the first frame 11, the second frame The specific structure of frame 31.
In the utility model, the equipment 1 of pier shaft spray maintenance by the first frame 11 around half pier shaft 2A or Person's system 2 is arranged at the top of full pier shaft 2B and is fixed on the second frame 31 on full pier shaft 2B, and cooperation pipeline is (including but not limited to First pipe 12 and second pipe 32), the first water pump 13, the second water pump 33, the first communicating pipe 14, the second communicating pipe 34, spray First 321, the structures such as hole for water spraying 121 can be realized the whole or local concrete of three-dimensional, real-time double of pier shaft 2A or full pier shaft 2B It is conserved.First frame 11 can also follow basic mode 2A-1 to climb, that is, have the spray care action synchronous with pouring. The time and the time of pouring for cooperating concrete curing, the laying of subframe in frame can be suitably reduced, material is built in saving And system complexity.Further, the first frame 11 is due to being provided with subframe in the equipment 1 that the pier shaft spray conserves (by taking the first subframe 111, the second subframe 112 as an example) can simplify structure, and to half pier shaft 2A of multistage or in difference The pier shaft in stage realizes synchronous maintenance.
Further, the pipeline in the equipment 1 of the pier shaft spray maintenance is (with the first subframe 111, the second subframe For pipeline on 112) between connected by multi-pass pipe 115, can reduce from the first water pump 13 and draw first communicating pipe 14 Quantity.In order to adapt to the difference of maintenance state, the multi-pass pipe 115 can be applied in the section of tubing on the subframe of part, it is real Maintenance respectively between existing multi-region.Further, between first frame 11 with the fixation at the top of basic mode 2A-1 or half pier shaft 2A Mode achieves a fixed connection by using the compound or single fixed form such as bracket, hook, is set on the first frame 11 First pipe 12 can rely on the first stable frame 11, keep stability to a certain extent, resist certain wind speed, avoid First pipe 12 strikes the concrete structure of not yet curing molding under the blowing of wind, damages.First subframe 111, it is connected between the second subframe 112 by steel stock rope 116 or bracket, can more easily connect subframe, avoided multiple Miscellaneous welding and etc..Similarly, the second pipe 32 on the second frame 31 makes second pipe by being fixed at the top of full pier shaft 2B 32 are stably fixed at the top of full pier shaft 2B in itself, can spray for pier shaft and provide stable environment.
In order to match and fix with the specific structure of the first frame 11, the first frame 11 has made one with first pipe 12 Fixed to be transformed, in the utility model and embodiment 1, the first pipe 12 and the first frame 11 pass through location structure --- and first Frame coupling hole 1112, the first tube body connecting hole 122, it is relatively fixed between realization first pipe 12 and the first frame 11, also easily In disassembly.Relatively-stationary first pipe 12 and the first frame 11 can provide determining angle and position for hole for water spraying 121 Setting, it is ensured that under the premise of largely half pier shaft 2A of direction, make to spray improved efficiency.
In order to match and fix with the specific structure of the second frame 31, the second frame 31 is also made with second pipe 32 Certain to be transformed, in the utility model and embodiment 2, the second pipe 32 and the second frame 31 pass through location structure --- pipe Body positioning groove 322, frame positioning protrusion 3111, it is relatively fixed between realization second pipe 32 and the second frame 31, it is also easy to Disassembly.Relatively-stationary second pipe 32 and the second frame 31 can provide determining angle and position for spray head 321 and set It sets, it is ensured that under the premise of largely towards full pier shaft 2B, make to spray improved efficiency.
In order to adapt to the concrete spray maintenance in high-altitude, in order to overcome high-altitude bring pressure difference, the utility model and The equipment 1 of the pier shaft spray maintenance of embodiment 1 is also provided with booster pump, to enhance hydraulic pressure.In order to control spray time, realize It is accurately controlled spray maintenance process, the equipment 1 of pier shaft spray maintenance is additionally provided with timer and is connected with timer Valve, valve can realize the purpose being precisely controlled by the on-off of control single track or multiple tracks pipeline.Pier shaft in embodiment 2 The system 3 for spraying maintenance is also referred to the setting of the equipment 1 of pier shaft spray maintenance, adds booster pump to meet 1 full pier shaft 2B The requirement of top high-altitude conveying.
Further, the equipment 1 of pier shaft spray maintenance is additionally provided with the equipment such as camera, sensor, can be by information list Solely reach at master control or operation, can also cooperate the valve application, the equipment 1 of pier shaft spray maintenance will have automatic identification, Judgement, the entire function of spraying progress and final maintenance effect of control, can save the quantity of construction personnel, mitigate construction team Burden.Embodiment 2 pier shaft spray maintenance system 3, can also according at the top of full pier shaft 2B position and actual demand, Add the equipment such as camera and the sensor for guarding maintenance state.
The above is only some embodiments of the utility model, it is noted that for the common skill of the art For art personnel, without departing from the principle of this utility model, can also make several improvements and retouch, these improve and Retouching also should be regarded as the protection scope of the utility model.

Claims (11)

1. a kind of equipment of pier shaft spray maintenance, it is characterised in that: the equipment includes at least corresponding circumferentially around pier shaft and solid Due to pier shaft frame, be fixed on the frame for water supply pipeline and connect connection between the pipeline and water pump It manages, spray head is connected on the tube body of the pipeline or offers hole for water spraying, the frame is fixed on the basic mode of pier shaft so that frame It is mobile with basic mode.
2. a kind of equipment of pier shaft spray maintenance as described in claim 1, it is characterised in that: the frame passes through connection framework It is fixedly connected with the bracket of pier shaft.
3. a kind of equipment of pier shaft spray maintenance as described in claim 1, it is characterised in that: the frame is by linking up with, tying up It restricts, at least one fixed form of frenulum is connected to below the basic mode.
4. a kind of equipment of pier shaft spray maintenance as described in claim 1, it is characterised in that: the frame selects angle steel, circle At least one component composition of pipe, spoke.
5. a kind of equipment of pier shaft spray maintenance as described in claim 1, it is characterised in that: the frame includes at least two layers Subframe, subframe are distributed along pier shaft vertical axis;And/or rope or branch for being fixedly connected are additionally provided between subframe Frame;And/or the pipeline on subframe also passes through multi-pass pipe and connects.
6. a kind of equipment of pier shaft spray maintenance as described in claim 1, it is characterised in that: the pipeline be equipped with card slot, Accommodation groove, primary and secondary hole at least one location structure, with for positioning with frame, the spray head or hole for water spraying are towards pier shaft.
7. a kind of equipment of pier shaft spray maintenance as described in claim 1, it is characterised in that: the water pump is connected by communicating pipe The pipeline is connected to realize and supply water;And/or several pipeline enclosures are connected by multi-pass pipe, the water pump passes through the company Siphunculus one of piped water supply thereto.
8. a kind of equipment of pier shaft spray maintenance as described in claim 1, it is characterised in that: the water pump include feed pump with And the booster pump connecting with feed pump, booster pump are arranged on said frame and connect one or multi-channel pipeline therein to enhance Hydraulic pressure.
9. a kind of equipment of pier shaft spray maintenance as described in claim 1, it is characterised in that: the equipment further includes timer With the valve controlled by timer, timer union valve door controls single track or combines the on-off of multiple tracks pipeline.
10. a kind of equipment of pier shaft spray maintenance as described in claim 1, it is characterised in that: be additionally provided with and take the photograph on the frame As head is for observing pier shaft;And/or sensor is additionally provided on the frame with the maintenance state for detecting pier shaft.
11. a kind of equipment of pier shaft spray maintenance as described in claim 1, it is characterised in that: when the basic mode is removed, institute Frame is stated to be fixed at the top of pier shaft by the connector overlapped in frame in length and breadth.
CN201820780461.9U 2018-05-23 2018-05-23 The equipment of pier shaft spray maintenance Active CN208468683U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820780461.9U CN208468683U (en) 2018-05-23 2018-05-23 The equipment of pier shaft spray maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820780461.9U CN208468683U (en) 2018-05-23 2018-05-23 The equipment of pier shaft spray maintenance

Publications (1)

Publication Number Publication Date
CN208468683U true CN208468683U (en) 2019-02-05

Family

ID=65218425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820780461.9U Active CN208468683U (en) 2018-05-23 2018-05-23 The equipment of pier shaft spray maintenance

Country Status (1)

Country Link
CN (1) CN208468683U (en)

Similar Documents

Publication Publication Date Title
CN109137976A (en) Municipal administration synthesis pipe gallery hydraulic jumbo and its construction method
CN207468504U (en) A kind of mobile spray curing system of pier stud
WO1998013556A1 (en) Method of production of large tank, system using such large tank and submerged tunneling method using the tank
CN105952228B (en) A kind of interior tank deck is the double-layer storage tank construction method of flat furred ceiling
CN108276024A (en) A kind of climbing form system adhesion type intelligence spray maintenance device and its maintenance process
CN105908887A (en) Airbag core mold component cast hollow floor construction method
CN208468683U (en) The equipment of pier shaft spray maintenance
CN206941595U (en) Rotary digging stake irrigates concrete catheter connection device
CN109083195B (en) Comprehensive pipe gallery waterproof system and construction method thereof
CN110029684A (en) A kind of clear mud construction method of jacket basis circumferential weld and system
CN216517006U (en) Automatic atomizing and maintaining device for chimney
CN106586725A (en) Water pipe automatic winding cart
US5816424A (en) Retrofit underground storage tank
CN210042881U (en) Degradable liquid mulching film spraying device
CN105421780B (en) A kind of construction method of prefabricated concrete structure
CN215168249U (en) Outer wall automatic spray maintenance system
CN213951977U (en) Health preserving equipment suitable for long-span prestressing force continuous rigid frame section concrete
CN209429166U (en) A kind of municipal administration synthesis pipe gallery hydraulic jumbo
CN204646700U (en) Small-sized agricultural land engineering irrigation integrated pump station
CN209429167U (en) A kind of pipe gallery construction template component
CN210636832U (en) Movable type sprays maintenance canopy
CN209797795U (en) solar spraying device for maintaining pier body
CN210341975U (en) Major diameter single pile steel-pipe pile interpolation changeover portion grouting construction system
CN106284415A (en) A kind of water intake caisson hang floating construction method
CN208151237U (en) A kind of climbing form system adhesion type intelligence spray maintenance device

Legal Events