CN109137976A - Municipal administration synthesis pipe gallery hydraulic jumbo and its construction method - Google Patents

Municipal administration synthesis pipe gallery hydraulic jumbo and its construction method Download PDF

Info

Publication number
CN109137976A
CN109137976A CN201811072364.5A CN201811072364A CN109137976A CN 109137976 A CN109137976 A CN 109137976A CN 201811072364 A CN201811072364 A CN 201811072364A CN 109137976 A CN109137976 A CN 109137976A
Authority
CN
China
Prior art keywords
trolley
supporting element
external mold
internal model
pipe gallery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811072364.5A
Other languages
Chinese (zh)
Inventor
张昌安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHEC Dong Meng Engineering Co Ltd
Original Assignee
CCCC SHEC Dong Meng Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHEC Dong Meng Engineering Co Ltd filed Critical CCCC SHEC Dong Meng Engineering Co Ltd
Priority to CN201811072364.5A priority Critical patent/CN109137976A/en
Publication of CN109137976A publication Critical patent/CN109137976A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention provides a kind of municipal administration synthesis pipe gallery hydraulic jumbo and its construction method, the hydraulic jumbo include: internal model, external mold, the inner template trolley being arranged in below internal model, the inner template support component for being used to support internal model, the exterior sheathing trolley being arranged in below external mold, for inner template trolley walking internal model trolley track, for exterior sheathing trolley walking external mold trolley track;Inner template support component is arranged on interior formwork jumbo, and inner template support component is for dismounting or support internal mould;Internal model trolley track is laid on the piping lane bottom plate for having poured completion, and external mold trolley track is located at the two sides of piping lane bottom plate, and exterior sheathing trolley straddles on piping lane bottom plate, and external mold is arranged on outer formwork jumbo.Construction method of the invention applies above-mentioned hydraulic jumbo.Compared with traditional assembled formwork, the present invention solves that formwork edge joint is more, overall stiffness is small, spillage easily occurs, the common quality defects such as the mould that rises, moreover, the present invention, which is also greatly reduced roof plate template, removes difficult and security risk.

Description

Municipal administration synthesis pipe gallery hydraulic jumbo and its construction method
Technical field
The present invention relates to municipal administration synthesis pipe gallery construction field more particularly to municipal administration synthesis pipe gallery hydraulic jumbos and its construction party Method.
Background technique
Piping lane, which refers to, is built in structures and affiliated facility that Urban Underground is used to accommodate two classes and the above municipal engineering pipeline, The also referred to as comprehensive corridor of underground urban duct, i.e., build a tunnel space in Urban Underground, by electric power, communication, combustion gas, confession The various utilities pipelines such as heat, plumbing are integrated in one, and are equipped with special access hole, hoisting port and monitoring system, implement unified rule It draws, Uniting, unified construction and management, is the important infrastructure and " lifeline " for ensureing city operations.It is to implement system One planning, design, construction and maintenance are built in municipal administration of the Urban Underground for being laid with municipal public use pipeline and postulate and apply.
Currently, piping lane construction mostly uses greatly the corridor body casting method of cast-in-place sectional shelf-unit mode, working procedure is more, needs big The artificial, material etc. of amount, bothersome laborious, globality is looked into, concrete presentation quality is difficult to control.
Therefore, occurs city integrated piping lane self-propelled hydraulic trolley on the market.Such as: Patent No. 201720818721.2 patent of invention, discloses a kind of city integrated piping lane self-propelled hydraulic trolley formwork, including external mold and Internal model forms the cavity for pouring between the two;Internal model includes mobile device, support construction and inner template, and support construction is used for Mobile device and inner template are connected, and inner template is supported, inner template outer surface is " ㄇ " type structure;External mold includes left and right Two parts, respectively with the two sides spaced set of inner template;Inner template and outer intermode are provided with attachment device.Although the patent Save manpower and material resources, but since external mold is made of left and right two parts, split type external mold, which exists, tears lacking for low efficiency open using peace It falls into.
Such as the patent of invention of Patent No. 201721414493.9, it discloses a kind of for pipe gallery cast-in-place concrete The formwork jumbo of slding form operation, including template system, trolley vehicle frame, side stay mechanism, lifting body and walking mechanism, the mould Plate body is made of backform component and side form component, and the backform component is arranged right above trolley vehicle frame and connects with trolley vehicle frame It connects, the side form component setting is connect in trolley vehicle frame two sides and by side stay mechanism with trolley vehicle frame.The patent is at each Bulk set shaped steel formwork is used on vehicle, makes the casting space that gallery wall among piping lane is formed between the side template of adjacent trolley, and Using the effect of support mechanism on the upside of each trolley, the reliability of formwork structure support ensure that.However, the patent, which exists, is not easy demoulding The shortcomings that.
In view of this, it is necessary to city integrated piping lane self-propelled hydraulic trolley in the prior art be improved, with solution The certainly above problem.
Summary of the invention
The purpose of the present invention is to provide a kind of municipal administration synthesis pipe gallery hydraulic jumbo and its construction methods, by internal model, outside The cooperation of mould, inner template trolley, exterior sheathing trolley, using integral hydraulic formwork jumbo wall and top plate one-time-concreting at Type accelerates construction speed, has saved labour.
Realize that the technical solution of the object of the invention is as follows:
Municipal administration synthesis pipe gallery hydraulic jumbo, comprising: internal model, external mold are formed comprehensive for pouring municipal administration between the internal model and external mold Close the casting area of piping lane wall and top plate, further includes: be arranged in the inner template trolley below the internal model, be used to support it is described The inner template support component of internal model, the exterior sheathing trolley being arranged in below the external mold, the interior die station walked for inner template trolley Track road, the external mold trolley track walked for exterior sheathing trolley;
The inner template support component is arranged on interior formwork jumbo, and the inner template support component is in removing or supporting Mould;
The internal model trolley track is laid on the piping lane bottom plate for having poured completion, and the external mold trolley track is located at piping lane bottom The two sides of plate, the exterior sheathing trolley straddle on piping lane bottom plate, and the external mold is arranged on outer formwork jumbo.
Compared with traditional assembled formwork, the present invention not only solves that existing formwork edge joint is more, overall stiffness is small, easily goes out The common quality defects such as existing spillage, the mould that rises, moreover, the present invention, which is also greatly reduced roof plate template, removes difficult and security risk.Using Integral hydraulic formwork jumbo forms wall and top plate one-time-concreting, accelerates construction speed, has saved labour.In addition, this Invention solves the problems, such as template and circulation material level, vertical transport using integral hydraulic formwork jumbo.
Above-mentioned municipal administration synthesis pipe gallery hydraulic jumbo, the external mold be "" type en-block construction, the side wall of the external mold with The side wall of exterior sheathing trolley is detachably secured connection.Integrally-built external mold reduces piece, in casting process It is not likely to produce spillage phenomenon.
Above-mentioned municipal administration synthesis pipe gallery hydraulic jumbo, the internal model include two pieces of side forms, one piece of backform, two pieces of side forms Positioned at the two sides of backform, two pieces of side forms are fixedly connected with the outer wall of inner template trolley respectively, and the backform is located at side form Top.The traversing hydraulic cylinder control side form of two groups of side forms is flexible, two groups of jack-up hydraulic ram control top template liftings, two groups of angles Mould hydraulic cylinder controls angle mould opening and closing, is mounted with two sets of overall movement oil cylinders on chassis, adjusts trolley right and left inside piping lane To guarantee that interior mould trolley passes through inside piping lane.Four sets of movable motors of interior mould trolley lower part installation, every power 3kw, Traction chassis movement in orbit.
Above-mentioned municipal administration synthesis pipe gallery hydraulic jumbo, the inner template trolley are located at the inside of internal model, the support device It include: the first supporting element, the second supporting element, third supporting element for being used to support backform, second supporting element and third support Part supports a side form respectively, and first supporting element, the second supporting element, third supporting element are separately positioned on inner template trolley On.
Above-mentioned municipal administration synthesis pipe gallery hydraulic jumbo, the internal model further include two pieces of chamfering moulds, and the chamfering mould is located at side The top of mould, and chamfering mould is located at the lower section of backform, and the vertical section of the chamfering mould is contacted with side form, the water of the chamfering mould Flat section is contacted with backform.
Above-mentioned municipal administration synthesis pipe gallery hydraulic jumbo, the support device further include the 4th supporting element and the 5th supporting element, 4th supporting element and the 5th supporting element support a chamfering mould respectively, and the 4th supporting element and the 5th supporting element are set respectively It sets on interior formwork jumbo.
Above-mentioned municipal administration synthesis pipe gallery hydraulic jumbo, the first supporting element, the second supporting element, third supporting element, the 4th support Part and the 5th supporting element are hydraulic cylinder.The traversing hydraulic cylinder control side form of two groups of side forms of the invention is flexible, two groups of jacking liquid The template lifting of compressing cylinder control top, two groups of angle mould hydraulic cylinder control angle moulds are opened and closed, and two sets of overall movements are mounted on chassis Oil cylinder adjusts trolley left and right directions inside piping lane, to guarantee that interior mould trolley passes through inside piping lane.Interior mould trolley lower part Four sets of movable motors, every power 3kw, traction chassis movement in orbit are installed.About two groups hydraulic cylinders control external mold liter Drop, two groups of traversing hydraulic cylinder control external molds or so are flexible, then are aided with joining beam and declutcher control lever transmitting, close mould and demoulding to realize. The movable motor of four sets of power 1.5kw is installed in outer mould trolley lower part, draws external mold trolley movement in orbit.
Above-mentioned municipal administration synthesis pipe gallery hydraulic jumbo, the piping lane bottom plate include bottom plate ontology, are located at bottom plate ontology two sides The foot of a wall, the internal model and external mold are contacted with the side wall of the foot of a wall respectively, so that forming casting area between internal model, external mold, the foot of a wall.
A kind of municipal administration synthesis pipe gallery construction method uses above-mentioned municipal administration synthesis pipe gallery hydraulic jumbo, comprising the following steps:
Step 1: pouring bottom plate: first assembling reinforcement pours the bottom plate and the foot of a wall of municipal administration synthesis pipe gallery again, solidifying to bottom plate and the foot of a wall Gu;
Step 2: installation municipal administration synthesis pipe gallery hydraulic jumbo: internal model trolley track is first installed on the bottom plate that step 1 has poured, Exterior sheathing trolley track is installed in the outside of bottom plate, the inner template trolley for being equipped with inner template is then placed on inner template trolley On track;The exterior sheathing trolley for being equipped with exterior sheathing is placed on exterior sheathing trolley track, finally fix inner template trolley and Exterior sheathing trolley makes to form casting area between inner template and exterior sheathing;
Step 3: pouring municipal administration synthesis pipe gallery: the casting concrete into casting area makes to form wall and corridor in casting area Top;
Step 4: demoulding: first recycling chamfering mould, then recycling side form recycles backform, preferably de- external mold.
A kind of above-mentioned municipal administration synthesis pipe gallery construction method, the step 4 specifically:
1) the contraction power for relying on the 4th supporting element and the 5th supporting element, withdraws chamfering formwork;
2) the second supporting element and third supporting element are adjusted, side form is withdrawn;
3) the first supporting element is shunk, backform is withdrawn;
4) concrete that oil cylinder is overhanging, drives declutcher control lever that template disengaging is made to pour completion is adjusted by traversing template.
Compared with prior art, the beneficial effects of the present invention are:
1, compared with traditional assembled formwork, the present invention solves that formwork edge joint is more, overall stiffness is small, spillage easily occurs, rise mould Equal common quality defects, moreover, the present invention, which is also greatly reduced roof plate template, removes difficult and security risk;
2, the present invention forms wall and top plate one-time-concreting using integral hydraulic formwork jumbo, accelerates construction speed, saves About labour;
3, the present invention solves the problems, such as template and circulation material level, vertical transport using integral hydraulic formwork jumbo;
4, in internal model hydraulic system of the invention, the traversing hydraulic cylinder control side form of two groups of side forms is flexible, two groups of jacking hydraulic oil The template lifting of cylinder control top, two groups of angle mould hydraulic cylinder control angle moulds are opened and closed, and are mounted with two sets of overall movement oil cylinders on chassis, Trolley left and right directions inside piping lane is adjusted, to guarantee that interior mould trolley passes through inside piping lane.Interior mould trolley lower part installation Four sets of movable motors, every power 3kw, traction chassis movement in orbit.
5, in external mold hydraulic system of the invention, about two groups hydraulic cylinder control external mold liftings, two groups of traversing hydraulic oil It is flexible that cylinder controls external mold or so, then is aided with joining beam and declutcher control lever transmitting, closes mould and demoulding to realize.Outer mould trolley lower part installation four The movable motor of power 1.5kw is covered, draws external mold trolley movement in orbit.
Detailed description of the invention
Fig. 1 be internal model, inner template trolley, inner template support component junction structural schematic diagram;
Fig. 2 is the structural schematic diagram that side form is connect with chamfering mould;
Fig. 3 is the structural schematic diagram of external mold, exterior sheathing trolley;
Fig. 4 is municipal administration synthesis pipe gallery construction flow chart.
In figure, 1, inner template trolley;2, oil cylinder is moved integrally;3, jacking cylinder;4, oil cylinder is laterally adjusted;5, external mold pallet Vehicle;51, declutcher control lever;52, connecting rod;53, traversing mould adjusts oil cylinder;54, upper and lower mould adjusts oil cylinder;100, side form;200, chamfering Mould;300, backform;400, external mold;500, bottom plate ontology;600, the foot of a wall.
Specific embodiment
The present invention is described in detail for each embodiment shown in reference to the accompanying drawing, but it should be stated that, these Embodiment is not limitation of the present invention, those of ordinary skill in the art according to these embodiments made by function, method, Or equivalent transformation or substitution in structure, all belong to the scope of protection of the present invention within.
In the description of the present embodiment, it is to be understood that term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description the invention and simplifies description, rather than indicate Or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot understand For the limitation to the invention.
In addition, term " first ", " second ", " third " etc. are used for description purposes only, it is not understood to indicate or imply Relative importance or the quantity for implicitly indicating indicated technical characteristic.The feature of " first ", " second " etc. is defined as a result, It can explicitly or implicitly include one or more of the features.In the description of the invention, unless otherwise indicated, The meaning of " plurality " is two or more.
Term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, be also possible to removable Connection is unloaded, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be in Between medium be indirectly connected, can be the connection inside two elements.For the ordinary skill in the art, can pass through Concrete condition understands concrete meaning of the above-mentioned term in the invention.
Embodiment 1:
It please join shown in Fig. 3, municipal administration synthesis pipe gallery hydraulic jumbo, comprising: internal model, external mold are formed between internal model and external mold for pouring Build the casting area of municipal administration synthesis pipe gallery wall and top plate, further includes: the inner template trolley 1 below internal model is set, is used for branch The inner template support component for supportting internal model, the exterior sheathing trolley 5 being arranged in below external mold, the interior die station walked for inner template trolley 1 Track road, the external mold trolley track walked for exterior sheathing trolley 5;
Inner template support component is arranged on interior formwork jumbo 1, and inner template support component is for dismounting or support internal mould;
Internal model trolley track is laid on the piping lane bottom plate for having poured completion, and external mold trolley track is located at the two of piping lane bottom plate Side, exterior sheathing trolley 5 straddle on piping lane bottom plate, and external mold is arranged on outer formwork jumbo 5.
As shown in figure 3, external mold be "" type en-block construction, the side wall of external mold and the side wall of exterior sheathing trolley 5 are with detachable Mode be fixedly connected.As shown in Figure 1, internal model includes two pieces of side forms, 100, one pieces of backforms 300, two pieces of side forms 100 are located at backform 300 two sides, two pieces of side forms 100 are fixedly connected with the outer wall of inner template trolley 1 respectively, and backform 300 is located at the upper of side form 100 Side.Inner template trolley 1 is located at the inside of internal model, and support device includes: the first supporting element for being used to support backform 300, second Support member, third supporting element, the second supporting element and third supporting element support a side form 100, the first supporting element, the second support respectively Part, third supporting element are separately positioned on inner template trolley 1.As depicted in figs. 1 and 2, internal model further includes two pieces of chamfering moulds 200, Chamfering mould 200 is located at the top of side form 100, and chamfering mould 200 is located at the lower section of backform 300, the vertical section of chamfering mould 200 with Side form 100 contacts, and the horizontal segment of chamfering mould 200 is contacted with backform 300.Support device further includes the 4th supporting element and the 5th support Part, the 4th supporting element and the 5th supporting element support a chamfering mould 200 respectively, and the 4th supporting element and the 5th supporting element are respectively set On interior formwork jumbo 1.Wherein, the first supporting element, the second supporting element, third supporting element, the 4th supporting element and the 5th supporting element It is hydraulic cylinder.
As shown in figure 3, piping lane bottom plate includes bottom plate ontology 500, the foot of a wall 600 positioned at 500 two sides of bottom plate ontology, internal model and External mold is contacted with the side wall of the foot of a wall 600 respectively, so that forming casting area between internal model, external mold, the foot of a wall 600.
The present embodiment also discloses a kind of construction method of municipal administration synthesis pipe gallery, comprehensive to municipal administration shown in Fig. 3 using Fig. 1 The process of piping lane trolley, the construction method is as shown in Figure 4, comprising the following steps:
Step 1: pouring bottom plate: first assembling reinforcement pours the bottom plate and the foot of a wall 600 of municipal administration synthesis pipe gallery again, to bottom plate and the foot of a wall 600 solidifications;
Step 2: installation municipal administration synthesis pipe gallery hydraulic jumbo: internal model trolley track is first installed on the bottom plate that step 1 has poured, 5 track of exterior sheathing trolley is installed in the outside of bottom plate, the inner template trolley 1 for being equipped with inner template is then placed on internal model pallet On 1 track of vehicle;The exterior sheathing trolley 5 for being equipped with exterior sheathing is placed on 5 track of exterior sheathing trolley, internal model pallet is finally fixed Vehicle 1 and exterior sheathing trolley 5, make to form casting area between inner template and exterior sheathing;
Step 3: pouring municipal administration synthesis pipe gallery: the casting concrete into casting area makes to form wall and corridor in casting area Top;
Step 4: demoulding: first recycling chamfering mould 200, then recycling side form 100 recycles backform 300, preferably de- external mold.
Wherein, step 4 specifically:
1) the contraction power for relying on the 4th supporting element and the 5th supporting element, withdraws 200 plate of chamfering mould;
2) the second supporting element and third supporting element are adjusted, side form 100 is withdrawn;
3) the first supporting element is shunk, backform 300 is withdrawn;
4) concrete that oil cylinder is overhanging, drives declutcher control lever that template disengaging is made to pour completion is adjusted by traversing template.
Compared with traditional assembled formwork, the present embodiment solves that formwork edge joint is more, overall stiffness is small, easily occur spillage, Rise the common quality defects such as mould, is stranded moreover, the municipal administration synthesis pipe gallery hydraulic jumbo of the present embodiment is also greatly reduced roof plate template and removes Difficult and security risk;The present embodiment forms wall and top plate one-time-concreting using integral hydraulic formwork jumbo, accelerates and applies Work progress, has saved labour;The present embodiment solves template using integral hydraulic formwork jumbo and circulation material is horizontal, vertical Transportation problem.
Embodiment 2:
The present embodiment is constructed using integral hydraulic formwork jumbo, pipe gallery wall and the molding of top plate one-time-concreting.Internal model is by 5 Block template composition: 2 pieces of side form 100+2 block chamfering mould 200+1 block backforms 300, external mold be monolith large form, template good integrity, Peace tears work efficiency height open, and safe and practical, internal model panel uses composite stainless steel panel, improves the presentation quality of pipe gallery interior wall. Municipal administration synthesis pipe gallery hydraulic jumbo Design of length is 5m, and municipal administration synthesis pipe gallery hydraulic jumbo divides inner template trolley 1 and external mold pallet Vehicle 5, municipal administration synthesis pipe gallery hydraulic jumbo include running gear, rack main body, hydraulic system, internal model, external mold and back Le, top cross Beam support etc..
It compared with traditional assembled formwork, solves that formwork edge joint is more, overall stiffness is small, spillage easily occurs, the matter such as the mould that rises Common fault is measured, moreover, greatly reducing roof plate template removes difficult and security risk;Using integral hydraulic formwork jumbo wall It is formed with top plate one-time-concreting, accelerates construction speed, saved labour.Solves template using integral hydraulic formwork jumbo And circulation material is horizontal, vertical transport problem;Internal model hydraulic system: the two groups of traversing hydraulic cylinder of side form 100 control side forms 100 are stretched Contracting, two groups of jack-up hydraulic ram control top template liftings, two groups of angle mould hydraulic cylinders control angle mould opening and closing, are mounted on chassis Two sets of overall movement oil cylinders 2 adjust trolley left and right directions inside piping lane, to guarantee that interior mould trolley is smoothly led to inside piping lane It crosses.Interior mould trolley lower part is installed by four sets of movable motors, every power 3kw, traction chassis movement in orbit.External mold hydraulic pressure system System: the control external molds lifting of about two groups hydraulic cylinders, two groups of traversing hydraulic cylinders control external molds or so are flexible, then be aided with joining beam with Declutcher control lever transmitting closes mould and demoulding to realize.The movable motor of four sets of power 1.5kw is installed in outer mould trolley lower part, in orbit Draw external mold trolley movement.
The municipal administration synthesis pipe gallery hydraulic jumbo of the present embodiment is suitable for the pipe gallery main body of cut and cover method list cabin rectangular cross section Concreting process.Since municipal administration synthesis pipe gallery hydraulic jumbo is that monoblock type is formed punching block, section not malleable, so the work Method is suitable for the longer pipe gallery work progress of standard section;Since municipal administration synthesis pipe gallery hydraulic jumbo weight is big, mainly It by motor driven, moves forward in orbit, so the engineering method is suitable for the pipe gallery of iterative method from one end to the other side In work progress.
Municipal administration synthesis pipe gallery hydraulic jumbo is in place in construction location, and the top template of internal model is jacked by internal model hydraulic system To absolute altitude, two side wall templates arrive piping lane internal diameter width by traversing oil cylinder transversal stretching, two angle moulds by hydraulic cylinder with Interlocking bar rotation increases, and is closed with backform 300.External mold by hydraulic cylinder on girder, joining beam and declutcher control lever carry out laterally and Vertical adjustment makes the structure outside of the spacing piping lane side wall of two sides exterior sheathing by hydraulic system, top cross-bar support system Width, external mold upper height will guarantee the top thickness of piping lane.Corridor body structural concrete is constructed using " excavation and cast-in-place " method, is divided to two It is secondary to pour, bottom plate and the foot of a wall 600 of height 30cm are poured using common templates for the first time, second using hydraulic municipal integrated pipe Corridor hydraulic jumbo pours side wall and top plate, improves the globality of concrete structure, and steel plate for sealing water is arranged at construction joint with antiseep Water improves impervious function.
Referring to municipal administration synthesis pipe gallery hydraulic jumbo construction flow chart shown in Fig. 4, in which:
1, preparation of construction and bottom slab concreting, track laying
(1) it is familiar with design drawing before construction, works out special construction plan, pre-job training and technology, peace are carried out to construction manager It tells somebody what one's real intentions are entirely.
(2) check whether construction site accomplishes that road, water, electricity are unimpeded, operating reserves is carried out in smooth construction site.
(3) hydraulic municipal administration synthesis pipe gallery hydraulic jumbo is transported to construction site, assembly debugging trolley, the good template of grinding process Surface.
(4) municipal administration synthesis pipe gallery hydraulic jumbo operation manual is worked out, guidance is giveed training to manipulator.
(5) after the completion of roadbed earth moving, setting-out, excavation pit, root are carried out to pipe gallery position by survey crew Slope ratio is determined according to soil property, and the generally stable soil body, by the slope 1:0.5 than excavating, the poor frangible section of soil property is opened by the slope 1:0.75 ratio It digs, encounters drift sand section, by 1:1.25 slope, or beat steel-pipe pile, rotary churning pile supporting.
(6) piping lane contains body first time bottom board and above 30cm the foot of a wall 600, and template carries out assembled, spelling using steel form Seam is sealed with foam adhesive tape.Bottom plate is poured using water-tight concrete, pump truck feeding, shock club vibration compacting, covers geotextiles Health is laid with trolley track according to middle line and absolute altitude after concrete strength reaches code requirement intensity, it is desirable that standard channel steel is used, Gauge and trolley wheel are away from consistent.
2, trolley internal model is in place
(1) assembled debugging trolley, template surface carry out grinding process, adjustment method are as follows: by trolley walking beyond will pour The position of corridor body structure 20cm opens hydraulic device, corridor body structural top template and side form 100 is supported to place, and checks template Straight degree, verticality and height difference of seam piece etc., it is ensured that indices reach technical requirements.
(2) interior mould trolley runs to designated position, requires slowly, at the uniform velocity in distraction procedure under motor driven;In order to make It is preferably demoulded after trolley lining cutting, and keeps the bright and clean cunning of concrete surface bright, release agent should be used, release agent generally has professional demoulding Agent, machine oil etc..
(3) before trolley is fixed, it is necessary to by being accurately positioned, keep municipal administration synthesis pipe gallery hydraulic jumbo flat by hydraulic system Move, jacking and side form 100, angle mould expansion and etc., keep trolley profile cross dimensions consistent with the size of design requirement.
(4) small boss at the form joint that can not be adjusted is polished with hand-held grinder, is eliminated with the methods such as putty are smeared Gap.
3, reinforcement fabrication and binding
(1) reinforcement fabrication: being processed and installed by design drawing top plate and side wall reinforcing bar, same specification reinforcing bar is arranged in pairs or groups and plans as a whole blanking, It avoids wasting, to meet the requirement of structure size and protective layer, reinforcing bar is processed using steel bar meter field is unified, and it is existing to be transported to construction , completion is bound in foundation pit by reinforcing bar teams and groups.
(2) reinforcement installation:
1. the anchorage length of reinforcing bar, the lap of splice should meet national regulation and design requirement, electric welder must take appointment with certificate.
2. reinforcing bar encounters hole, putting up cavity reinforcing rib is answered.
3. carrying out each steel pipe buried in advance part, roof eyelets, the ground connection pre-buried installation of steel plate, installation site is accurate, securely steady It is fixed;
4. carrying out the welding of lightning protection reinforcing bar by design requirement and being grounded the pre-buried of steel plate.
(3) cover to reinforcement controls
Thickness of protection tier: it is 50mm that bottom plate, top plate, side wall, which meet native face,.Using prefabricated cement mortar bedding block, cushion block cloth Setting spacing is 0.8m, arranges in blossom type, forbids trampling on reinforcing bar after construction, to prevent reinforcing bar local pressure is overweight from leading Cause displacement or cushion block damage.
(4) buried rubber fastening band in being set at the subsiding crack among wall, a circle sets back sticking type rubber on the outside of subsiding crack Waterstop, buried steel plate for sealing water in the construction joint setting at the foot of a wall 600.
4, trolley external mold is in place
(1) after the completion of top plate and side wall reinforcement installation, outer mould trolley runs to designated position, distraction procedure under motor driven It is middle to require slowly, at the uniform velocity, oil cylinder contraction can be adjusted when walking by bolster and lift 100 plate of outer side mold.
(2) outer side mold 100 closes mould: adjusting oil cylinder by traversing template and shrinks, declutcher control lever is driven to make template in place, adjusts Template is aligned with internal model, its spacing 35cm, is fastened using sealing up screw and internal model, and top is fastened outside two sides using dedicated pull rod Mould.
5, pour concrete is constructed
(1) concrete pouring practice is carried out continuously, and pre-buried parts scenarios check at any time in operation process prevent from shifting.
(2) it should be layered, symmetrically be poured when body concrete is contained in casting, every thickness degree is no more than 50cm, and it is reciprocal back and forth between each wall, it follows Ring carries out.
(3) around built-in fitting and deformation joint two sides, should reinforce shocking;It avoids directly contacting with reinforcing bar, built-in fitting when vibrating.
(4) in concreting process, special messenger should be set and be responsible for running check, the shape for adjusting template and position;To branch Frame should be reinforced checking, safeguard;Template should take immediate steps if any deformation is lost shape, it is ensured that template support safety, until concrete It pours and finishes.
(5) concrete casting complete covers geotextiles and sprinkling maintenance as early as possible after receiving slurry, keeps concrete surface wet Profit, avoids causing very much face checking greatly because of the heat of hydration, the time for health of sprinkling water is no less than 7 days.
6, it demoulds
Concrete strength can be with form removal, when removing municipal administration synthesis pipe gallery hydraulic jumbo after being greater than design strength 75%, it is necessary to Jack is shunk by several times, never disposable forced stripper mechanism.
Interior moulding/demoulding withdraws 200 plate of chamfering mould step 1: by contraction of hydraulic pressure bar power.
Outer side mold 100 demoulds: it is overhanging by traversing template adjusting oil cylinder, drive declutcher control lever that template is made to be detached from concrete Face.Oil cylinder contraction can be adjusted when walking by bolster and lifts 100 plate of outer side mold.
Template integrally demoulds, and then moves forward to next station by its walking of remote control control, repeats above-mentioned work.
7, trolley maintains
The elastic situation that each position bolt, pin are checked after the completion of one working cycles, reexamines tightly various connecting pieces Gu maintenance facility on schedule.
Municipal administration synthesis pipe gallery hydraulic jumbo rack main part in traction does not need to remove, and does not need to grasp in trolley space Make personnel, reduces security risk;Main body rack rear top surface in place and side form closure, and top-bottom cross operation is not present, and reduce Security risk, it is highly-safe, hence it is evident that reduce security risk coefficient, make one departing from dangerous and severe operating environment.Separately Outside, inner and outer template construction complete set of equipments uses large overall template, and good integrity of constructing reduces the splicing of small template, is conducive to Internal closely knit and exterior appearance, it is whole without splicing gap, be conducive to the waterproof and crack resistence of pipe gallery.
Hydraulic template trolley construction principle be using hydraulic device carry out formwork erection, by wire drawing bar by internal model with External mold tenses, and after containing body concrete casting complete and reaching some strength, unloads to wire drawing bar, withdrawal hydraulic stem, inside and outside moulding/demoulding, Then it on fixed rail, is constructed by the principle that motor drives forwards, a length of the cycle is 10m.In integrated pipe In the construction of corridor, with structure is reliable, easy to operate, movement speed is fast, mechanization degree is high, forming surface is smooth, is saved with material, labor The advantages such as power consumption is few, average unit cost is low, but that there is also operating technologies is strong, the disadvantages of needing professional technician to operate.
Main technical parameter: first is that for the rigidity for guaranteeing template, local deformation, distortion will not occur, extending trolley makes It is not less than 3mm with the thickness in period, template.Second is that template should be in conjunction with tight, adjacent forms height difference≤2mm, it is ensured that concrete table Surface evenness≤5mm.Third is that the power of motor of trolley assembly should meet the needs of trolley walking.Fourth is that hydraulic cylinder is equipped with quantity It is actually needed with being able to satisfy as standard, 0 ~ 100mm of telescopic extensions.
2 sets of 10m hydraulic template trolleys are put into construction altogether to carry out containing the casting of body concrete.Pipe gallery sequence of construction: base Cheat excavation → pattern foundation pit supporting structure → base treatment → bed course casting → mortar leveling → water-proofing treatment → mortar cover → Bottom Board Steel Muscle welding → bottom plate and the above 30cm of bottom plate contain body casting → hydraulic template trolley internal model it is in place → contain body reinforcement welding → hydraulic Formwork jumbo external mold is in place → contain the casting of body concrete.Wherein, bottom plate and the above 30cm of bottom plate are contained body casting and are poured using small punching block is combined Note, residue contains body and concrete roof uses hydraulic template trolley one-time cast-forming.It is long that pipe gallery contains body concrete piecemeal Degree is controlled by 10m, and local curvature's larger part is controlled by 5m.Abutment wall divergence is sewn on away from the high 0.3m of base surface, when construction, if Buried steel plate water stopper in setting, single cycle concrete amount are about 41.69m3, single cycle working time average out to 3.5d.
Municipal administration synthesis pipe gallery hydraulic jumbo can generally save manpower and machine cost, while can greatly shorten template Set-up time, so as to effectively improve construction speed, since the globality of template is preferable, it is ensured that the quality of corridor body, the skill Art be able to solve excavation and cast-in-place construction in how the problem of rapid construction, social benefit and economic value with higher.
When carrying out pipe gallery culvert body casting using hydraulic template trolley construction technology, die-filling, demoulding speed is than traditional Fast 2 ~ 3 times of template assembly in bulk;Know from the investigation and analysis of duration statistical result: using full hall scaffold construction one section coagulation of every completion The average duration of soil casting is about 6d, and constructs every average duration for completing section concrete casting about using hydraulic template trolley For 3.5d, the construction period is substantially reduced.
From construction quality comparative analysis: full hall scaffold construction is since the area of single form is small, and form joint is more, mixed Phenomena such as being easy to appear spillage, running pulp when solidifying soil casting, causes concrete comb pitted skin and other issues.Hydraulic template trolley is whole Body size is big, rigidity is big, reduces buckle and steel pipe combination process in an assembling process, essentially eliminates form joint to coagulation The influence of soil property amount is detected through test section construction site, using hydraulic template trolley casting concrete contain body, molding effect and Quality improves a lot than conventional template technology, and concrete surface flatness, the finish of moulding by casting, which have, significantly to be mentioned Height, concrete surface quality are obviously improved.
The series of detailed descriptions listed above only for feasible embodiment of the invention specifically Protection scope bright, that they are not intended to limit the invention, it is all without departing from equivalent implementations made by technical spirit of the present invention Or change should all be included in the protection scope of the present invention.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (10)

1. municipal administration synthesis pipe gallery hydraulic jumbo, comprising: internal model, external mold (400) are formed between the internal model and external mold (400) and used In the casting area for pouring municipal administration synthesis pipe gallery wall and top plate, which is characterized in that further include: it is arranged in below the internal model Inner template trolley (1), the inner template support component for being used to support the internal model, the external mold being arranged below the external mold (400) Pallet vehicle (5), for inner template trolley (1) walking internal model trolley track, for exterior sheathing trolley (5) walking external mold (400) platform Track road;
The inner template support component is arranged on interior formwork jumbo (1), and the inner template support component is for removing or supporting Internal model;
The internal model trolley track is laid on the piping lane bottom plate for having poured completion, and external mold (400) trolley track is located at The two sides of piping lane bottom plate, the exterior sheathing trolley (5) straddle on piping lane bottom plate, and the external mold (400) is arranged in outer Schaltisch On vehicle (5).
2. municipal administration synthesis pipe gallery hydraulic jumbo as described in claim 1, which is characterized in that the external mold (400) be "" type En-block construction, the side wall of the external mold (400) is detachably secured with the side wall of exterior sheathing trolley (5) to be connect.
3. municipal administration synthesis pipe gallery hydraulic jumbo as claimed in claim 1 or 2, which is characterized in that the internal model includes two pieces of sides Mould (100), one piece of backform (300), two pieces of side forms (100) are located at the two sides of backform (300), two pieces of side forms (100) It is fixedly connected respectively with the outer wall of inner template trolley (1), the backform (300) is located at the top of side form (100).
4. municipal administration synthesis pipe gallery hydraulic jumbo as claimed in claim 3, which is characterized in that the inner template trolley (1) is located at The inside of internal model, the support device include: to be used to support the first supporting element, the second supporting element, the third support of backform (300) Part, second supporting element and third supporting element support a side form (100) respectively, first supporting element, the second supporting element, Third supporting element is separately positioned on inner template trolley (1).
5. municipal administration synthesis pipe gallery hydraulic jumbo as claimed in claim 3, which is characterized in that the internal model further includes two pieces of chamferings Mould (200), the chamfering mould (200) is located at the top of side form (100), and chamfering mould (200) is located under backform (300) Side, the vertical section of the chamfering mould (200) are contacted with side form (100), the horizontal segment of the chamfering mould (200) and backform (300) Contact.
6. municipal administration synthesis pipe gallery hydraulic jumbo as claimed in claim 5, which is characterized in that the support device further includes the 4th Supporting element and the 5th supporting element, the 4th supporting element and the 5th supporting element support a chamfering mould (200) respectively, and the described 4th Supporting element and the 5th supporting element are separately positioned on inner template trolley (1).
7. the municipal administration synthesis pipe gallery hydraulic jumbo according to claim 4 or 6, which is characterized in that the first supporting element, second Support member, third supporting element, the 4th supporting element and the 5th supporting element are hydraulic cylinder.
8. municipal administration synthesis pipe gallery hydraulic jumbo according to claim 1, which is characterized in that the piping lane bottom plate includes bottom plate Ontology (500), the foot of a wall (600) for being located at bottom plate ontology (500) two sides, the internal model and external mold (400) respectively with the foot of a wall (600) Side wall contact so that internal model, external mold (400), the foot of a wall form casting area between (600).
9. municipal administration synthesis pipe gallery construction method uses the described in any item municipal administration synthesis pipe gallery hydraulic jumbos of claim 1-8, packet Include following steps:
Step 1: pouring bottom plate: first assembling reinforcement pours the bottom plate and the foot of a wall (600) of municipal administration synthesis pipe gallery again, to bottom plate and wall Root (600) solidification;
Step 2: installation municipal administration synthesis pipe gallery hydraulic jumbo: internal model trolley track is first installed on the bottom plate that step 1 has poured, Exterior sheathing trolley (5) track is installed in the outside of bottom plate, the inner template trolley (1) for being equipped with inner template is then placed on internal model On pallet vehicle (1) track;The exterior sheathing trolley (5) for being equipped with external mold (400) plate is placed on exterior sheathing trolley (5) track, Inner template trolley (1) and exterior sheathing trolley (5) are finally fixed, makes to form casting area between inner template and external mold (400) plate;
Step 3: pouring municipal administration synthesis pipe gallery: the casting concrete into casting area makes to form wall and corridor in casting area Top;
Step 4: demoulding: first recycling chamfering mould (200), recycling side form (100) then recycles backform (300), preferably de- outer Mould (400).
10. municipal administration synthesis pipe gallery construction method as claimed in claim 9, which is characterized in that the step 4 specifically:
1) the contraction power for relying on the 4th supporting element and the 5th supporting element, withdraws chamfering mould (200) plate;
2) the second supporting element and third supporting element are adjusted, is withdrawn side form (100);
3) the first supporting element is shunk, is withdrawn backform (300);
4) concrete that oil cylinder is overhanging, drives declutcher control lever that template disengaging is made to pour completion is adjusted by traversing template.
CN201811072364.5A 2018-09-14 2018-09-14 Municipal administration synthesis pipe gallery hydraulic jumbo and its construction method Pending CN109137976A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811072364.5A CN109137976A (en) 2018-09-14 2018-09-14 Municipal administration synthesis pipe gallery hydraulic jumbo and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811072364.5A CN109137976A (en) 2018-09-14 2018-09-14 Municipal administration synthesis pipe gallery hydraulic jumbo and its construction method

Publications (1)

Publication Number Publication Date
CN109137976A true CN109137976A (en) 2019-01-04

Family

ID=64825293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811072364.5A Pending CN109137976A (en) 2018-09-14 2018-09-14 Municipal administration synthesis pipe gallery hydraulic jumbo and its construction method

Country Status (1)

Country Link
CN (1) CN109137976A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930627A (en) * 2019-03-27 2019-06-25 中交二公局东萌工程有限公司 A kind of municipal administration synthesis pipe gallery hydraulic template trolley and construction method
CN110984219A (en) * 2019-12-03 2020-04-10 中国建筑第七工程局有限公司 Integrated quick-dismantling pipe gallery construction trolley and construction method thereof
CN111058481A (en) * 2020-01-08 2020-04-24 武汉致远市政建设工程有限公司 Comprehensive pipe gallery system based on sponge city and construction method thereof
CN111705957A (en) * 2020-06-28 2020-09-25 河南森宇建筑工程有限公司 High-strength shear wall and high-verticality construction method
CN112593573A (en) * 2020-11-02 2021-04-02 北京城建设计发展集团股份有限公司 Underground pipe gallery concrete formwork system and using method thereof
CN112726665A (en) * 2020-12-29 2021-04-30 海门市帕源路桥建设有限公司 Installation and construction method for bottom plate short wall formwork
CN112779929A (en) * 2021-02-08 2021-05-11 北京场道市政工程集团有限公司 Pouring and installing method of comprehensive pipe gallery
CN113323013A (en) * 2021-04-27 2021-08-31 四川康兴茂环保科技有限公司 Construction method for on-site segmental casting type concrete gallery and water storage tank
CN113463683A (en) * 2021-05-21 2021-10-01 重庆川九建设有限责任公司 Double-pipe gallery slip form trolley and double-pipe gallery construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103133011A (en) * 2011-11-28 2013-06-05 中建七局安装工程有限公司 Construction device and construction method of hydraulic pressure steel mould trolley monolithic conduit pipe body
CN104895584A (en) * 2015-04-28 2015-09-09 金中天集团港航有限公司 Modularization steel die trolley and construction process thereof
CN107165192A (en) * 2017-06-16 2017-09-15 中建七局安装工程有限公司 A kind of pipe gallery segmentation brake type shaped steel door frame and its construction
CN107882064A (en) * 2017-10-30 2018-04-06 成都建工路桥建设有限公司 A kind of formwork jumbo and slding form operation method for pipe gallery cast-in-place concrete slding form operation
CN209429166U (en) * 2018-09-14 2019-09-24 中交二公局东萌工程有限公司 A kind of municipal administration synthesis pipe gallery hydraulic jumbo

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103133011A (en) * 2011-11-28 2013-06-05 中建七局安装工程有限公司 Construction device and construction method of hydraulic pressure steel mould trolley monolithic conduit pipe body
CN104895584A (en) * 2015-04-28 2015-09-09 金中天集团港航有限公司 Modularization steel die trolley and construction process thereof
CN107165192A (en) * 2017-06-16 2017-09-15 中建七局安装工程有限公司 A kind of pipe gallery segmentation brake type shaped steel door frame and its construction
CN107882064A (en) * 2017-10-30 2018-04-06 成都建工路桥建设有限公司 A kind of formwork jumbo and slding form operation method for pipe gallery cast-in-place concrete slding form operation
CN209429166U (en) * 2018-09-14 2019-09-24 中交二公局东萌工程有限公司 A kind of municipal administration synthesis pipe gallery hydraulic jumbo

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930627A (en) * 2019-03-27 2019-06-25 中交二公局东萌工程有限公司 A kind of municipal administration synthesis pipe gallery hydraulic template trolley and construction method
CN110984219A (en) * 2019-12-03 2020-04-10 中国建筑第七工程局有限公司 Integrated quick-dismantling pipe gallery construction trolley and construction method thereof
CN111058481A (en) * 2020-01-08 2020-04-24 武汉致远市政建设工程有限公司 Comprehensive pipe gallery system based on sponge city and construction method thereof
CN111705957A (en) * 2020-06-28 2020-09-25 河南森宇建筑工程有限公司 High-strength shear wall and high-verticality construction method
CN112593573A (en) * 2020-11-02 2021-04-02 北京城建设计发展集团股份有限公司 Underground pipe gallery concrete formwork system and using method thereof
CN112726665A (en) * 2020-12-29 2021-04-30 海门市帕源路桥建设有限公司 Installation and construction method for bottom plate short wall formwork
CN112726665B (en) * 2020-12-29 2023-01-20 海门市帕源路桥建设有限公司 Installation and construction method for bottom plate short wall formwork
CN112779929A (en) * 2021-02-08 2021-05-11 北京场道市政工程集团有限公司 Pouring and installing method of comprehensive pipe gallery
CN113323013A (en) * 2021-04-27 2021-08-31 四川康兴茂环保科技有限公司 Construction method for on-site segmental casting type concrete gallery and water storage tank
CN113463683A (en) * 2021-05-21 2021-10-01 重庆川九建设有限责任公司 Double-pipe gallery slip form trolley and double-pipe gallery construction method

Similar Documents

Publication Publication Date Title
CN109137976A (en) Municipal administration synthesis pipe gallery hydraulic jumbo and its construction method
CN105134253B (en) Tunnel inverted arch composite entity template and pouring construction method
CN106245674A (en) Hollow wallboard mixes prefabricated assembled pipe gallery and construction method thereof
CN109235499A (en) A kind of open cut hypogee Standard formula construction method
CN103485288B (en) A kind ofly pass through both wired double-deck jacking culvert construction technology
CN106346595A (en) Vertical molding mold and system and application method for concrete utility tunnel
CN109403374A (en) Factorial construction method for open trench tunnel integral tunnel lining
CN107489098B (en) Concrete prefabricated welding type guardrail and installation construction method
CN108149706A (en) A kind of cast-in-place hidden girder and the prefabricated assembled pipe gallery and its construction method of superimposed sheet splicing
CN108004925B (en) Prestress reinforced concrete circular arch tower construction method
CN106979021B (en) Large-section loess tunnel excavates and preliminary bracing quick closure cyclization method
CN102704949A (en) No-pull rod side wall construction method for underground tunnel and formwork trolley for construction
CN202596743U (en) Formwork trolley for underground tunnel pull-rod-free side wall construction
CN108086353A (en) A kind of hollow wallboard spliced with cast-in-place hidden girder mixes prefabricated assembled pipe gallery and its construction method
CN110512524A (en) A kind of bridge pier column safe construction method
CN108716189A (en) Large span T-steel structure beam sections for joining island bridge install closure method
CN207829006U (en) Sizing moves retaining wall mould bases
CN109736847A (en) Primary concreting concrete inverted arch and its construction method
CN108086354A (en) A kind of prefabricated assembled pipe gallery spliced with cast-in-place hidden girder and its construction method
CN109610509A (en) A kind of the adjustable die system and construction method of pipe gallery automatic control section
CN209429167U (en) A kind of pipe gallery construction template component
CN110195413A (en) A kind of box culvert construct method based on mould trolley in movable type
CN203174510U (en) Movable assembly type hanging basket for bridge anti-collision guardrail construction and formwork for construction
CN109869164A (en) Combination hydraulic formwork jumbo pours the construction method of porous separate tunnel
CN107386246B (en) A kind of lock chamber wall Construction Through Form on Traveler method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190104

RJ01 Rejection of invention patent application after publication