CN208456096U - Net device is chosen outside a kind of builder's jack - Google Patents
Net device is chosen outside a kind of builder's jack Download PDFInfo
- Publication number
- CN208456096U CN208456096U CN201820410531.1U CN201820410531U CN208456096U CN 208456096 U CN208456096 U CN 208456096U CN 201820410531 U CN201820410531 U CN 201820410531U CN 208456096 U CN208456096 U CN 208456096U
- Authority
- CN
- China
- Prior art keywords
- steel
- fixture
- builder
- dictyosome
- connector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Net device is chosen outside a kind of builder's jack, it include the framework body and be located on framework body for installing the I-steel for choosing net outside that scaffold is formed, the fixture group being oppositely arranged one on the other is provided on the I-steel, the fixture group includes upper fixture and lower fixture, tight wirerope is connected between the upper fixture and lower fixture, several fixture groups are distributed on the length direction of the I-steel and form steel wire, dictyosome frame, fixed mesh on the dictyosome frame are equipped on the steel wire.In prune job, operator removes the more dictyosome frame of rubbish, the rubbish on grid is cleared up in safety zone, in replacement operation, damaged dictyosome frame is removed, then the grid on dictyosome frame is replaced, the cost for replacing damaged grid is reduced, grid forms block structure by dictyosome frame, reduces the outer working strength for choosing net of cleaning, by reducing the difficulty of construction of operator, the personal safety of operator ensure that.
Description
Technical field
The utility model relates to the safety device fields of architectural engineering, and in particular to net dress is chosen outside a kind of builder's jack
It sets.
Background technique
Choosing net outside is the protection for facing side Seeding location for eminence, and main preventing high altitude faces side pendant object risk, while being height
Idle job personnel provide safety guarantee.
Usually construction is through net above steel pipe, then steel pipe is fixed on scaffold, when choose outside net it is damaged or above
When many rubbish of rubbish, cleaning when, is time-consuming and takes a lot of work, and there are improvements for the prior art.
Utility model content
In order to solve the above technical problems, grid passes through the utility model proposes net device is chosen outside a kind of builder's jack
Dictyosome frame forms block structure, need to only choose outside to remove on the net by dictyosome frame in replacement, cleaning and be replaced or cleared up,
The outer working strength for choosing net of cleaning is substantially reduced, the difficulty of construction of operator is reduced, ensure that the personal safety of operator.
In order to achieve the above objectives, the technical solution of the utility model is as follows: net device is chosen outside a kind of builder's jack, including
There is the framework body of scaffold formation and be located on framework body for installing the I-steel for choosing net outside, is provided on the I-steel
The fixture group being oppositely arranged one on the other, the fixture group include upper fixture and lower fixture, the upper fixture and lower fixture it
Between be connected with tight wirerope, several fixture groups are distributed on the length direction of the I-steel and form steel wires, the steel
Dictyosome frame, fixed mesh on the dictyosome frame are equipped on silk screen.
By using above-mentioned technical proposal, fixture group is distributed along the length direction of I-steel, by several fixture groups and
Wirerope formed steel wire, dictyosome frame is laid on framework body by steel wire, in prune job, operator by rubbish compared with
More dictyosome frames are removed, and are cleared up in safety zone the rubbish on grid, and guarantee operator is in construction significantly
Safety;In replacement operation, damaged dictyosome frame is removed, the grid on dictyosome frame is then replaced, instead of existing
Grid is integrally laid in technology, reduces the cost for replacing damaged grid, and grid forms block structure by dictyosome frame, significantly
Reducing the outer working strength for choosing net of cleaning ensure that the personal safety of operator by reducing the difficulty of construction of operator.
The utility model is further arranged to: the upper fixture and lower fixture include clamp body, and the clamp body is in
Along the block structure of I-steel length direction extension, the T-slot extended along I-steel length direction is offered on the clamp body,
The clamp body is connected on I-steel by T-slot.
By using above-mentioned technical proposal, the T-slot opened up on clamp body is corresponding with the structure of I-steel, is convenient for operator
Clamp body is connected on I-steel, while T-slot is it is also ensured that fixing intensity of the clamp body on I-steel, guarantees outer choose
The stability of net device.
The utility model is further arranged to: supporting for the I-steel wing plate plate face is provided perpendicular in the upper fixture
Connecting bolt, the abutting bolt are threadedly engaged with upper fixture, after the abutting bolt is abutted with the I-steel wing plate plate face, institute
Upper fixture is stated to be fixed on the I-steel.
By using above-mentioned technical proposal, the abutting bolt being threadedly engaged with upper fixture is fixed on upper fixture by abutting
It on I-steel, is on the one hand built convenient for choosing the early period of net device outside, on the other hand avoiding wirerope, position occurs when in use
Change.
The utility model is further arranged to: the lower fixture sliding is arranged on the I-steel, on the lower fixture
Be extended with the oblique pull column perpendicular to the I-steel web plate face, the wirerope-winding it is fixed on oblique pull column.
By using above-mentioned technical proposal, the position that wirerope is conveniently adjusted on I-steel is arranged in lower fixture sliding, just
Keep lower fixture corresponding with upper fixture in the position that operator adjusts lower fixture, lower fixture extends along perpendicular to I-steel web plate face
Oblique pull column be convenient for choosing early period of net device outside and build, be fixedly connected convenient for wirerope with lower fixture.
The utility model is further arranged to: the dictyosome frame includes the horizon bar extended along I-steel length direction
And the vertical bar perpendicular to horizon bar, be respectively arranged in the vertical bar at the horizon bar length direction both ends sleeve with
Connector, the connector are oppositely arranged one by one with sleeve, and the adjacent dictyosome frame is turned by the cooperation of connector and sleeve
Dynamic connection.
By using above-mentioned technical proposal, adjacent dictyosome frame makes several dictyosome frames by connector and sleeve connection
It puts up as an entirety, avoids adjacent dictyosome frame from being subjected to displacement, improve the stability of adjacent dictyosome frame;Adjacent dictyosome
Frame member setting, removes single dictyosome frame convenient for operator, improves operating efficiency.
The utility model is further arranged to: the sleeve and connector along vertical bar length direction at least provided with two
A, the sleeve, the axis direction of connector are parallel with the length of vertical bar.
By using above-mentioned technical proposal, adjacent dictyosome frame is rotated along the length direction of vertical bar, in overall pulling down,
Several dictyosome frames improve the outer dismounting effect for choosing net device by being stacked together after sleeve and connector foldable integral
Rate improves the efficiency of construction operation.
The utility model is further arranged to: the U-shaped setting of connector, and the connector includes two to set in parallel
The first shaft and the second shaft set, first shaft and the second shaft are integrally formed by the connecting rod of circular arc type, described
First shaft is fixedly connected with vertical bar, second shaft and sleeve clearance fit.
By using above-mentioned technical proposal, the connector of U-shaped setting is convenient for the dismounting of adjacent dictyosome frame, is clearing up
Or when replacement, operator pushes dictyosome frame that can remove single dictyosome frame towards far from the movement of connecting rod side, convenient for making
Dealer clears up grid damaged on the rubbish on dictyosome frame or replacement dictyosome frame.
In conclusion the utility model has the effect that
1, upper fixture is fixed on I-steel by abutting bolt, and wirerope is fixed by brace and lower fixture, is convenient for
Installation of the net device on I-steel is chosen outside, improves installation effectiveness;
2, adjacent dictyosome frame is rotatablely connected by connector and sleeve, is on the one hand folded adjacent dictyosome frame and is put
It sets, improves the efficiency for removing dictyosome frame, on the other hand, convenient for the dismounting of independent dictyosome frame, clear up rubbish convenient for operator
Or replacement grid.
Detailed description of the invention
It, below will be to embodiment or the prior art in order to illustrate more clearly of the technical scheme in the embodiment of the utility model
Attached drawing needed in description is briefly described.
Fig. 1 is the overall structure diagram that net device is chosen outside a kind of builder's jack;
Fig. 2 is the structural schematic diagram of upper fixture;
Fig. 3 is the structural schematic diagram of lower fixture;
Fig. 4 is the structural schematic diagram of dictyosome frame;
Fig. 5 is structural schematic diagram when dictyosome frame folds.
In figure: 1, I-steel;2, fixture group;21, upper fixture;22, lower fixture;3, wirerope;4, dictyosome frame;41, water
Flat bar;42, vertical bar;5, grid;6, clamp body;61, T-slot;7, bolt is abutted;8, oblique pull column;9, sleeve;10, it connects
Part;101, the first shaft;102, the second shaft;103, connecting rod.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing.
As shown in Figure 1, choosing net device outside a kind of builder's jack, the framework body of scaffold formation is ridden upon, in framework body
On for installing choose the I-steel 1 of net outside, the fixture group 2 being oppositely arranged one on the other is provided on I-steel 1, fixture group 2 is wrapped
Upper fixture 21 and lower fixture 22 have been included, tight wirerope 3, I-steel 1 are connected between the upper fixture 21 and lower fixture 22
Length direction on several fixture groups 2 be distributed with form steel wires, dictyosome frame 4 is equipped on steel wire, on dictyosome frame 4
Fixed mesh 5.
In conjunction with shown in Fig. 2 and Fig. 3, upper fixture 21 and lower fixture 22 include clamp body 6, and clamp body 6 is in along I-steel
The block structure that 1 length direction extends offers the T-slot 61T extended along 1 length direction of I-steel, clamp body on clamp body 6
6 are connected on I-steel 1 by T-slot 61T;I-steel 1 includes the web being vertically arranged and horizontally disposed wing plate, on
It is provided perpendicular to the abutting bolt 7 of 1 wing plate plate face of I-steel on fixture 21, abuts bolt 7 and is threadedly engaged with upper fixture 21,
Upper fixture 21 after bolt 7 is abutted with 1 wing plate plate face of I-steel is abutted to be fixed on I-steel 1;The lower sliding of fixture 22 is arranged in work
On word steel 1, the oblique pull column 8 perpendicular to 1 web plate face of I-steel is extended on lower fixture 22, wirerope 3 is fastened and oblique pull
On column 8.
As shown in Figure 1 and Figure 4, dictyosome frame 4 includes the horizon bar 41 extended along 1 length direction of I-steel and vertical
In being respectively arranged with sleeve 9 and connector in the vertical bar 42 of horizon bar 41, the vertical bar 42 at 41 length direction both ends of horizon bar
10, connector 10 is oppositely arranged one by one with sleeve 9, and adjacent dictyosome frame 4 is rotated by the cooperation of connector 10 and sleeve 9 to be connected
It connects;Sleeve 9 and connector 10 along vertical bar 42 length direction at least provided with two, the axis side of sleeve 9, connector 10
To parallel with the length of vertical bar 42, the U-shaped setting of connector 10, connector 10 includes two first axles disposed in parallel
Bar 101 and the second shaft 102, the first shaft 101 and the second shaft 102 are integrally formed by the connecting rod 103 of circular arc type, the
One shaft 101 is fixedly connected with vertical bar 42, the second shaft 102 and 9 clearance fit of sleeve;As shown in connection with fig. 5, in dictyosome frame
When 4 dismounting, operator folds several dictyosome frames 4 mutually by rotating single dictyosome frame 4, removes dictyosome frame with raising
Efficiency when 4 reduces workload when operator removes dictyosome frame 4.
Specific implementation process:
Step 1: when operator chooses net device outside setting up, upper fixture 21 is first fixed on I-steel 1 by operator, is passed through
The position for abutting the fixed upper fixture 21 of bolt 7, wirerope 3 is fixed in upper fixture 21, the I-shaped of upper fixture 21 will be fixed with
Steel 1 is mounted on the framework body of scaffold formation;
Step 2: lower fixture 22 is fixed on another I-steel 1 by operator, under the position of fixture 22 makes under then adjusting
Fixture 22 is corresponding with upper fixture 21, and wirerope 3 is fastened on oblique pull column 8;
Step 3: repeat the above steps 1 and 2 I-steel 1 length direction be distributed multiple groups, make wirerope 3 formed steel wire
Net;
Step 4: dictyosome frame 4 is placed on steel wire by operator;
In step 4, adjacent dictyosome frame 4 is connect by the connector 10 of U-shaped with sleeve 9, is formed on steel wire
One entirety;In cleaning or replacement operation, pushing single dictyosome frame 4 to move along 9 axis direction of sleeve can incite somebody to action operator
Single dictyosome frame 4 is removed, and the cleaning of rubbish or the replacement of damaged grid 5 on dictyosome frame 4 are completed.
It should be pointed out that for those of ordinary skill in the art, before not departing from the concept of the present invention
It puts, various modifications and improvements can be made, and these are all within the protection scope of the present invention.
Claims (7)
- It include framework body and be located on framework body for pacifying that scaffold is formed 1. choosing net device outside a kind of builder's jack The outer I-steel (1) for choosing net of dress, which is characterized in that be provided with the fixture group being oppositely arranged one on the other on the I-steel (1) (2), the fixture group (2) includes upper fixture (21) and lower fixture (22), between the upper fixture (21) and lower fixture (22) It is connected with tight wirerope (3), several fixture groups (2) is distributed on the length direction of the I-steel (1) and form steel wire, It is equipped on the steel wire dictyosome frame (4), fixed mesh (5) on the dictyosome frame (4).
- 2. choosing net device outside a kind of builder's jack according to claim 1, which is characterized in that the upper fixture (21) and Lower fixture (22) includes clamp body (6), and the clamp body (6) is in the block structure extended along I-steel (1) length direction, The T-slot (61T) extended along I-steel (1) length direction is offered on the clamp body (6), the clamp body (6) passes through T-type Slot (61T) is connected on I-steel (1).
- 3. choosing net device outside a kind of builder's jack according to claim 2, which is characterized in that on the upper fixture (21) It is provided perpendicular to the abutting bolt (7) of the I-steel (1) wing plate plate face, the abutting bolt (7) and upper fixture (21) spiral shell Line cooperation, after the abutting bolt (7) abuts with the I-steel (1) wing plate plate face, the upper fixture (21) is fixed on described On I-steel (1).
- 4. choosing net device outside a kind of builder's jack according to claim 3, which is characterized in that the lower fixture (22) is sliding It moves and is arranged on the I-steel (1), be extended on the lower fixture (22) perpendicular to the oblique of the I-steel (1) web plate face Stay column (8), the wirerope (3) be fastened on oblique pull column (8).
- 5. choosing net device outside a kind of builder's jack according to any one of claims 1 to 4, which is characterized in that the dictyosome Frame (4) includes along the horizon bar (41) of I-steel (1) length direction extension and perpendicular to the vertical bar of horizon bar (41) (42), sleeve (9) and connector are respectively arranged in the vertical bar (42) at horizon bar (41) the length direction both ends (10), the connector (10) is oppositely arranged one by one with sleeve (9), the adjacent dictyosome frame (4) by connector (10) with The cooperation of sleeve (9) is rotatablely connected.
- 6. choosing net device outside a kind of builder's jack according to claim 5, which is characterized in that the sleeve (9) and company Fitting (10) along vertical bar (42) length direction at least provided with two, the sleeve (9), connector (10) axis direction It is parallel with the length of vertical bar (42).
- 7. choosing net device outside a kind of builder's jack according to claim 6, which is characterized in that the connector (10) is in U-shaped setting, the connector (10) includes two first shafts (101) disposed in parallel and the second shaft (102), and described the One shaft (101) and the second shaft (102) are integrally formed by the connecting rod (103) of circular arc type, first shaft (101) with Vertical bar (42) is fixedly connected, second shaft (102) and sleeve (9) clearance fit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820410531.1U CN208456096U (en) | 2018-03-26 | 2018-03-26 | Net device is chosen outside a kind of builder's jack |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820410531.1U CN208456096U (en) | 2018-03-26 | 2018-03-26 | Net device is chosen outside a kind of builder's jack |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208456096U true CN208456096U (en) | 2019-02-01 |
Family
ID=65156089
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820410531.1U Expired - Fee Related CN208456096U (en) | 2018-03-26 | 2018-03-26 | Net device is chosen outside a kind of builder's jack |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208456096U (en) |
-
2018
- 2018-03-26 CN CN201820410531.1U patent/CN208456096U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206016226U (en) | Tool type scaffold interlayer guard system | |
CN101597958B (en) | Template system capable of internally erecting and detaching mould | |
CN202626845U (en) | Bridge erection machine carrying bracket | |
CN105484502A (en) | Combination installation method for steel structure roofing purlins and support bars of industrial factory building | |
CN103206075B (en) | Suspension platform for construction of steel reinforced concrete cantilever structure | |
CN211899582U (en) | Hanging flower basket device is used in construction of roof steel construction platform glass curtain wall | |
CN208456096U (en) | Net device is chosen outside a kind of builder's jack | |
CN104060851B (en) | Supporting construction and construction method for arch rib roof truss sliding construction | |
CN201284551Y (en) | Suspension type simple platform for work high above ground | |
CN205397785U (en) | Construction elevator attaches wall interval superelevation subassembly | |
CN204417000U (en) | A kind of movable stand for the dismounting of limitation Space Facilities | |
CN105926917A (en) | Suspension platform for construction of steel structure cornice exterior facing, and construction method and detaching method of suspension platform | |
CN205314515U (en) | Scaffold of building a wall | |
CN207919454U (en) | A kind of suspended type hydraulic support assembly | |
CN107879261A (en) | Inclined type arched trash rack hoisting device and hoisting method | |
CN209025409U (en) | A kind of novel modularized scaffold | |
CN207377096U (en) | Overlength large girder scaffold building structure | |
CN208718350U (en) | Inner guide type elevating scaffold attached wall support base | |
CN208650551U (en) | A kind of construction and decoration floor tile provision for disengagement | |
CN207265523U (en) | A kind of special tooling for being used to replace busbar line | |
CN208502694U (en) | A kind of oil pipe lifting machine | |
CN206487128U (en) | A kind of Guiding Support Elevating Scaffold | |
CN207581238U (en) | Tilting arch trash rack hoist device | |
CN208363547U (en) | A kind of assembly scaffold for concrete column construction | |
CN110014521A (en) | Bar planting assistor and its construction method at the top of secondary structure constructional column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190201 |
|
CF01 | Termination of patent right due to non-payment of annual fee |