CN208396309U - A kind of concrete component formwork opposite-pulling device and concrete component template component - Google Patents

A kind of concrete component formwork opposite-pulling device and concrete component template component Download PDF

Info

Publication number
CN208396309U
CN208396309U CN201821027723.0U CN201821027723U CN208396309U CN 208396309 U CN208396309 U CN 208396309U CN 201821027723 U CN201821027723 U CN 201821027723U CN 208396309 U CN208396309 U CN 208396309U
Authority
CN
China
Prior art keywords
component
concrete
supporting sleeve
concrete component
split bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821027723.0U
Other languages
Chinese (zh)
Inventor
肖超
谢佳伟
陈鹤瑛
傅金阳
汤显煌
阳军生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
China Construction Tunnel Construction Co Ltd
Original Assignee
Central South University
China Construction Tunnel Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University, China Construction Tunnel Construction Co Ltd filed Critical Central South University
Priority to CN201821027723.0U priority Critical patent/CN208396309U/en
Application granted granted Critical
Publication of CN208396309U publication Critical patent/CN208396309U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of concrete component formwork opposite-pulling device and concrete component template components, including split bolt component, supporting sleeve and water-swellable casing, supporting sleeve is actively socketed on the screw rod of split bolt group, and water-swellable casing is actively socketed on supporting sleeve.The utility model has the advantages of simple structure, it is economical and practical, each building block can directly utilize finished product, swift and convenient to operate, after concreting, split bolt component and supporting sleeve can facilitate extraction, and then indwelling is wherein for water-swellable casing, the hole that screw rod is formed there through can be gradually expanded and then sealed after absorbing the moisture in concrete, to achieve the effect that waterproof sealing, can bear high hydraulic pressure effect.

Description

A kind of concrete component formwork opposite-pulling device and concrete component template component
Technical field
The utility model relates to technical field of building construction more particularly to a kind of concrete component formwork opposite-pulling device and mix Solidifying soil component template component.
Background technique
In building construction process, pouring for concrete component is needed using template forming, in general, the use of wooden template It is easy in the process because of the excessive and swollen moding shape of inner concrete pressure, therefore, will use split bolt with effectively reinforcing template, It is also possible to guarantee that concrete section size meets design requirement by split bolt with the size of fine-tuning template.
But concrete component higher for seepage resistance demand, it can be had the following problems using when split bolt:
1, split bolt is stayed in into inside concrete after form removal, both ends exposed portion is cut off, this method is easy It is leaked because of the bolt corrosion of inside concrete, while cut off operation increases labor intensity and input cost.
2, it is socketed pvc pipe outside split bolt, extracts split bolt out after form removal, leaves split bolt hole and PVC Pipe, then will appear serious infiltration phenomenon, generally require and be filled again using mortar, and between mortar and pvc pipe by It is easy to eventually lead to infiltration phenomenon there are subtle gap in unlike material.
Utility model content
The utility model aim is to provide a kind of can prevent because leading to the concrete of infiltration using split bolt Component template is to drawing device and concrete component template component, to solve the above problems.
To achieve the above object, the utility model discloses a kind of concrete component formwork opposite-pulling device first, including right Bolt assembly, supporting sleeve and water-swellable casing, the supporting sleeve is drawn to be actively socketed on the screw rod of split bolt component, The water-swellable casing is actively socketed on the supporting sleeve.
Further, the split bolt component further includes the pulling buckle that can be socketed on the screw rod and nut, the spiral shell The both ends of bar are provided with the screw thread that can be connect with nut.
Further, be provided with can be with the matched arc bayonet of circular pipe outer wall at the both ends of the pulling buckle.
Further, the water-swellable casing is EPDM hydro-expansive rubber casing.
Further, the supporting sleeve is plastic support casing.
Then, the utility model discloses a kind of concrete component formwork opposite-pulling devices, including mixing described in above scheme Solidifying soil component template further includes steel pipe, the lumps of wood and bamboo slab rubber to drawing device, and multiple bamboo slab rubbers form one for pouring coagulation Soil pours chamber, and the screw rod pours chamber described in and water-swellable casing setting pours intracavitary, the side described Wood, steel pipe pour chamber being orderly arranged outside each to bamboo slab rubber from described, and the pulling buckle is held on the steel pipe so that the side Wood is close to the bamboo slab rubber, at least one end of the supporting sleeve extends to the outside of the bamboo slab rubber.
Further, the both ends of the supporting sleeve all extend to the outside of the bamboo slab rubber.
Further, the split bolt component is set as two groups in the short transverse for pouring chamber.
Compared with the prior art, the advantages of the utility model are:
1, the utility model has the advantages of simple structure, economical and practical, and each building block can directly utilize finished product, side swift to operate Just.
2, for the utility model after concreting, split bolt component and supporting sleeve can facilitate extraction, and meet water Then indwelling wherein, can gradually expand after absorbing the moisture in concrete and then sealing screw rod is formed there through expansion sleeve Hole, to achieve the effect that waterproof sealing, Sealing period is long and stablizes, in addition, can also bear high hydraulic pressure effect.
Below with reference to accompanying drawings, the utility model is described in further detail.
Detailed description of the invention
The attached drawing constituted part of this application is used to provide a further understanding of the present invention, the utility model Illustrative embodiments and their description are not constituteed improper limits to the present invention for explaining the utility model.In attached drawing In:
Fig. 1 is the structural schematic diagram of concrete component formwork opposite-pulling device disclosed in the utility model embodiment;
Fig. 2 is the structural schematic diagram of concrete component template component disclosed in the utility model embodiment.
Marginal data:
1, screw rod;2, nut;3, pulling buckle;4, supporting sleeve;5, water-swellable casing;6, bamboo slab rubber;7, the lumps of wood;8, steel Pipe;9, chamber is poured.
Specific embodiment
The embodiments of the present invention are described in detail below in conjunction with attached drawing, but the utility model can be by right It is required that the multitude of different ways for limiting and covering is implemented.
As Figure 1-Figure 2, the utility model discloses a kind of concrete component formwork opposite-pulling devices, including split bolt Component, supporting sleeve 4 (surfaces externally and internally is smooth) and water-swellable casing 5, wherein split bolt component include screw rod 1, with The matched pulling buckle 3 of screw rod 1 and nut 2, wherein the both ends of screw rod 1 are provided with the screw thread that can be connect with nut 2, and supporting sleeve 4 It is actively socketed on the screw rod 1 of split bolt group, water-swellable casing 5 is actively socketed on supporting sleeve 4.In the present embodiment In, supporting sleeve 4 uses PVC plastic material, and water-swellable casing 5 is that (its expansion rate is or not EPDM hydro-expansive rubber casing Less than 200%), and be provided with can be with the matched arc bayonet of circular pipe outer wall, to hold tubing at the both ends of pulling buckle 3.
Then, present embodiment discloses a kind of concrete component moulds for applying above-mentioned concrete component formwork opposite-pulling device Board group part, the template component further include steel pipe 8 (diameter is φ 48mm), the lumps of wood 7 (cross sectional dimensions is 100mm × 100mm) and Bamboo slab rubber 6, multiple bamboo slab rubbers 6 form one and pour chamber 9 for casting concrete, and concrete component formwork opposite-pulling device, which runs through, to be poured The bamboo slab rubber 6 (opposite through-hole is provided on bamboo slab rubber 6) of chamber 9 being oppositely arranged is built, the lumps of wood 7, steel pipe 8 are from chamber 9 is poured to bamboo Offset plate 6 is orderly arranged outside each, i.e., for screw rod 1 through chamber 9 is poured and the setting of water-swellable casing 5 is pouring in chamber 9, pulling buckle 3 is tight It is buckled on steel pipe 8 so that the lumps of wood 7 is close to bamboo slab rubber 6.
In use, the split bolt component for being socketed with supporting sleeve 4 and water-swellable casing 5 is installed on bamboo slab rubber 6, Wherein, the both ends of supporting sleeve 4 all extend to the outside of bamboo slab rubber 6, (anti-to the protection of screw rod 1 when in order to concrete casting Only cement scouring etc.) and concrete primary solidification after smooth extraction, while also can avoid the band in extraction process of screw rod 1 Water-swellable casing 5 out, and the length of water-swellable casing 5 is less than the distance between the bamboo slab rubber 6 being oppositely arranged, in order to swollen Do not expose after swollen.Then the fitting of the lumps of wood 7 is installed to and pours 9 two sides of chamber, then pulling buckle 3 and nut 2 are successively installed, in this process In ensure that each pulling buckle 3 holds two steel pipes 8 (each arc bayonet blocks a steel pipe 8) so that the bamboo glue of two sides Plate 6 is in that concrete is then poured in chamber 9 to pouring to the trend for pouring chamber 9 and drawing close, after band forming and hardening, can successively dismantle, Extract split bolt component and supporting sleeve 4 out, and water-swellable casing 5 can then expand wherein and then reach filling sealing coagulation The effect of native component.
The above is only the preferred embodiments of the utility model, are not intended to limit the utility model, for this field Technical staff for, various modifications and changes may be made to the present invention.Within the spirit and principle of the utility model, Any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (8)

1. a kind of concrete component formwork opposite-pulling device, which is characterized in that including split bolt component, supporting sleeve (4) and meet Water expansion sleeve (5), the supporting sleeve (4) are actively socketed on the screw rod (1) of split bolt component, the water-swellable set Pipe (5) is actively socketed on the supporting sleeve (4).
2. concrete component formwork opposite-pulling device according to claim 1, which is characterized in that the split bolt component is also Including the pulling buckle (3) that can be socketed on the screw rod (1) and nut (2), the both ends of the screw rod (1) are provided with energy and nut (2) screw thread connected.
3. concrete component formwork opposite-pulling device according to claim 2, which is characterized in that the both ends of the pulling buckle (3) Being provided with can be with the matched arc bayonet of circular pipe outer wall.
4. concrete component formwork opposite-pulling device according to claim 3, which is characterized in that the water-swellable casing It (5) is EPDM hydro-expansive rubber casing.
5. concrete component formwork opposite-pulling device according to claim 4, which is characterized in that the supporting sleeve (4) is Plastic support casing.
6. a kind of concrete component template component, including any concrete component template of the claims 2-5 to drawing Device, which is characterized in that further include steel pipe (8), the lumps of wood (7) and bamboo slab rubber (6), multiple bamboo slab rubbers (6) form one and are used for Casting concrete pours chamber (9), and the screw rod (1) pours chamber (9) described in and the water-swellable casing (5) setting exists Described to pour in chamber (9), the lumps of wood (7), steel pipe (8) pour chamber (9) being orderly arranged outside each to bamboo slab rubber (6) from described, The pulling buckle (3) is held on the steel pipe (8) so that the lumps of wood (7) is close to the bamboo slab rubber (6), the supporting sleeve (4) at least one end extends to the outside of the bamboo slab rubber (6).
7. concrete component template component according to claim 6, which is characterized in that the both ends of the supporting sleeve (4) All extend to the outside of the bamboo slab rubber (6).
8. concrete component template component according to claim 7, which is characterized in that the split bolt component is described It pours and is set as two groups in the short transverse of chamber (9).
CN201821027723.0U 2018-06-29 2018-06-29 A kind of concrete component formwork opposite-pulling device and concrete component template component Active CN208396309U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821027723.0U CN208396309U (en) 2018-06-29 2018-06-29 A kind of concrete component formwork opposite-pulling device and concrete component template component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821027723.0U CN208396309U (en) 2018-06-29 2018-06-29 A kind of concrete component formwork opposite-pulling device and concrete component template component

Publications (1)

Publication Number Publication Date
CN208396309U true CN208396309U (en) 2019-01-18

Family

ID=65130133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821027723.0U Active CN208396309U (en) 2018-06-29 2018-06-29 A kind of concrete component formwork opposite-pulling device and concrete component template component

Country Status (1)

Country Link
CN (1) CN208396309U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113638598A (en) * 2021-09-14 2021-11-12 浙江大学 Anti-radiation concrete opposite-pulling bolt with reserved labyrinth-type holes and construction method
CN114838888A (en) * 2022-05-30 2022-08-02 镇江市给排水管理处 Ultra-large-diameter reinforced concrete pipe jacking multi-pipe-section internal water pressure test method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113638598A (en) * 2021-09-14 2021-11-12 浙江大学 Anti-radiation concrete opposite-pulling bolt with reserved labyrinth-type holes and construction method
CN114838888A (en) * 2022-05-30 2022-08-02 镇江市给排水管理处 Ultra-large-diameter reinforced concrete pipe jacking multi-pipe-section internal water pressure test method

Similar Documents

Publication Publication Date Title
CN202391019U (en) End part thickened grouting connector of steel bar
CN201202890Y (en) Novel flexible water-proof sleeve pipe for pipeline mounting construction
CN208763667U (en) Convenient for the inverted arch template counter support screw rod efficiently constructed
CN208396309U (en) A kind of concrete component formwork opposite-pulling device and concrete component template component
CN204040078U (en) A kind of alter-pouring strips mould plate installs structure
CN204551547U (en) Outer wall of basement vertical ater-casting plugging device
CN109537894B (en) Grouting construction method for assembled wall
CN206706844U (en) A kind of alter-pouring strips mould plate installs construction
CN206110671U (en) Novel to drawing screw rod sleeve pipe
CN208668642U (en) A kind of plugging structure of screw hole
CN203334285U (en) Underground concrete structure engineering seam waterproof preparation grouting system
CN108222656A (en) The construction method of Prefabricated enclosure wall
CN106381883A (en) Seepage-proof construction method for through-wall rod
CN204626772U (en) A kind of rapidly-assembled double L-shaped lightweight inner partition wall plate
CN211647427U (en) Anti-seepage plugging structure for screw hole of concrete shear wall
CN107237436A (en) A kind of method of temporarily fixing during cavity floor construction
CN208072393U (en) A kind of pile pile of the built-in slip casting pipe with piecing devices
CN203546919U (en) Split bolt hole structure for filling concrete shear wall
CN201386377Y (en) Special rapid hole plugging gun for concrete exterior wall bolt holes
CN207998875U (en) A kind of basement post-pouring zone prefabricated retaining wall
CN202324617U (en) Sleeve for sealing scaffold wall-passing hole
CN201358582Y (en) Construction is with interior vaulting of shear force wall template support
CN203821787U (en) Reserved pipeline mold in brick wall
CN203201148U (en) Combined inner support of wall formwork
CN205955208U (en) Multi -functional split bolt sleeve pipe