CN207998875U CN201820249444.2U CN201820249444U CN207998875U CN 207998875 U CN207998875 U CN 207998875U CN 201820249444 U CN201820249444 U CN 201820249444U CN 207998875 U CN207998875 U CN 207998875U
Authority
CN
China
Prior art keywords
prefabricated
retaining wall
fixed
prefabricated board
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820249444.2U
Other languages
Chinese (zh)
Inventor
姚家平
廖红玉
吴红来
陈建国
周游
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201820249444.2U priority Critical patent/CN207998875U/en
Application granted granted Critical
Publication of CN207998875U publication Critical patent/CN207998875U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A kind of basement post-pouring zone prefabricated retaining wall, it is provided with waterstop in the exterior wall of basement, the prefabricated retaining wall is arranged in the outside of exterior wall for blocking post-cast strip, the retaining wall includes multiple compact arranged prefabricated boards successively from top to bottom, the left and right sides of each prefabricated board is the slope of 45° angle, it is provided with bar-mat reinforcement in prefabricated board, four fixed steel bars are provided on each prefabricated board, one end and the bar-mat reinforcement of the fixed steel bars are fixed, the other end is fixed with outer reinforcing bar within the walls.The utility model is prefabricated, and prefabricated board both sides carry 45 ° of slopes, facilitates later stage laying water-proof coiled material, saves material, and simplicity quick for installation is extremely suitable for engineering site, requires swift and violent high-volume to construct under background in capital construction, can greatly improve efficiency;The common quality defects such as levelling, the angle painting of the mould that rises, spillage, plastering, wall in the construction technologies such as traditional masonry, template are prevented, without picking chisel and secondary plastering, construction quality is high.

Description

A kind of basement post-pouring zone prefabricated retaining wall
Technical field
The utility model is related to the realm of building construction, and in particular to a kind of basement post-pouring zone prefabricated retaining wall.
Background technology
For poured band of outer wall of basement, there are two types of construction methods at present:When after post-cast strip concrete has poured 60 days, then It is conserved, then can just do external wall waterproof and backfill, extend the construction period, influence construction site layout;It is poured after second is that It is closed in advance using brick setting at band, waterproof construction, backfill is done after plastering press polish is levelling.
There are many both the above method shortcoming, and method one is to drag to extend post-cast strip processing time, delay external wall waterproof And the backfill construction time, method is second is that post-cast strip periphery is surrounded post-cast strip with brick masonry, you can backfill reaches It pours when requiring that pouring construction, the method are not only elapsed time and waste material again again, backfill soil pressure can be caused big building Body destroys and can cause the leakage and other issues of later stage anti-water destruct.
Utility model content
Technical problem to be solved in the utility model is, for the above-mentioned prior art the existing post empiricism period The problem of length, waste material, provide a kind of basement post-pouring zone prefabricated retaining wall.
Technical solution used by the utility model is:
A kind of basement post-pouring zone prefabricated retaining wall is provided with waterstop, the prefabricated gear in the exterior wall of basement Cob wall is arranged in the outside of exterior wall for blocking post-cast strip, and the retaining wall includes multiple compact arranged pre- successively from top to bottom Making sheet, the left and right sides of each prefabricated board are the slope of 45° angle, are provided with bar-mat reinforcement in prefabricated board, are arranged on each prefabricated board There are four fixed steel bars, one end and the bar-mat reinforcement of the fixed steel bars are fixed, the other end is fixed with outer reinforcing bar within the walls.
According to said program, the fixed steel bars are bent to right angle with the fixed one end of bar-mat reinforcement.
Having the beneficial effect that acquired by the utility model:
1. the utility model is prefabricated, prefabricated board both sides carry 45 ° of slopes, facilitate later stage laying water-proof coiled material, remove from The material of plaster leveling and artificial, saves material, simplicity quick for installation is extremely suitable for engineering site, is required in capital construction fast Under violent high-volume construction background, efficiency can be greatlyd improve;
It is looked for 2. the utility model has prevented the mould that rises, spillage, plastering, wall in the construction technologies such as traditional masonry, template The common quality defects such as flat, angle painting, without picking chisel and secondary plastering, construction quality is high.
Description of the drawings
Fig. 1 is the overlooking structure diagram of the utility model;
Fig. 2 is that schematic diagram is arranged in fixed steel bars in prefabricated board;
Fig. 3 is the A direction views of Fig. 2;
In figure:1- exterior walls, 2- waterstops, 3- prefabricated boards, the post-cast strips 4-.
Specific implementation mode
The utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in Figs. 1-3, a kind of basement post-pouring zone prefabricated retaining wall, the exterior wall 1 of basement are present embodiments provided In be provided with waterstop 2, prefabricated retaining wall is arranged in the outside of exterior wall 1 for blocking post-cast strip 4, retaining wall include it is multiple from Compact arranged prefabricated board 3, the left and right sides of each prefabricated board 3 are the slope of 45° angle successively under, are arranged in prefabricated board 3 Have bar-mat reinforcement, be provided with four fixed steel bars on each prefabricated board 3, one end and the bar-mat reinforcement of fixed steel bars fix, the other end with Reinforcing bar in exterior wall 1 is fixed.
Waterstop 2 is set in the exterior wall 1 of basement, is common knowledge structure, the purpose is to allow underground water to be poured along front and back Gap leakage caused by the concrete built.
Fixed steel bars are bent to right angle with the fixed one end of bar-mat reinforcement, and effect is to increase fixed steel bars and steel on bar-mat reinforcement The contact number of muscle reinforces fixing intensity.
The slope of 45° angle is set in 3 left and right sides of prefabricated board, facilitates later stage laying water-proof coiled material, eliminates plastering and look for Flat material makes basement post-pouring zone block completion in advance, shortens the time with manually;It can accomplish good naturality envelope It is stifled, and good seal performance waterproof quality is obviously improved;After prefabricated board 3 installs, using water proofing grout filling chink, directly Waterproof matrix laying and backfill can be carried out by connecing.
In the present embodiment, every piece of prefabricated board 3 long 1200mm, wide 600mm, thickness 60mm.
Bar-mat reinforcement uses the step of threads steel of 6mm, long wide direction that a reinforcing bar, long side two ends are arranged every 200mm Locate 45 ° of bar bending.
It should be understood that above-described embodiment is merely to illustrate the utility model rather than limitation the scope of the utility model.This Field technology personnel after reading the content taught by the present invention, can make the utility model various changes or repair Change, without departing from the spirit and scope of technical solutions of the utility model, the claim model in the utility model should all be covered In enclosing.

Claims (2)

1. a kind of basement post-pouring zone prefabricated retaining wall, it is provided with waterstop (2) in the exterior wall (1) of basement, feature exists In:Prefabricated retaining wall setting in the outside of exterior wall (1) for blocking post-cast strip (4), the retaining wall include it is multiple from Compact arranged prefabricated board (3), the left and right sides of each prefabricated board (3) are the slope of 45° angle, prefabricated board (3) successively under It is inside provided with bar-mat reinforcement, four fixed steel bars are provided on each prefabricated board (3), one end of the fixed steel bars and bar-mat reinforcement are solid Reinforcing bar in the fixed, other end and exterior wall (1) is fixed.
2. basement post-pouring zone prefabricated retaining wall according to claim 1, it is characterised in that:The fixed steel bars and steel The fixed one end of muscle net is bent to right angle.
CN201820249444.2U 2018-02-12 2018-02-12 A kind of basement post-pouring zone prefabricated retaining wall Expired - Fee Related CN207998875U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820249444.2U CN207998875U (en) 2018-02-12 2018-02-12 A kind of basement post-pouring zone prefabricated retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820249444.2U CN207998875U (en) 2018-02-12 2018-02-12 A kind of basement post-pouring zone prefabricated retaining wall

Publications (1)

Publication Number Publication Date
CN207998875U true CN207998875U (en) 2018-10-23

Family

ID=63837469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820249444.2U Expired - Fee Related CN207998875U (en) 2018-02-12 2018-02-12 A kind of basement post-pouring zone prefabricated retaining wall

Country Status (1)

Country Link
CN (1) CN207998875U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114635453A (en) * 2022-02-28 2022-06-17 浙江金立建设有限公司 Construction process for post-cast strip variable cross-section prefabricated retaining plate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114635453A (en) * 2022-02-28 2022-06-17 浙江金立建设有限公司 Construction process for post-cast strip variable cross-section prefabricated retaining plate

Similar Documents

Publication Publication Date Title
CN205653820U (en) Basement post -cast strip advances plugging device
CN201280725Y (en) Post-casting construction precast slab for basement of buildings
CN205296388U (en) Apron is sealed to garage wall post -cast strip
CN209723052U (en) The prefabricated plate advanced water-stopping of poured band of outer wall of basement backfills structure
CN109826239A (en) A kind of poured band of outer wall of basement structure and its construction method
CN204551547U (en) Outer wall of basement vertical ater-casting plugging device
CN207998875U (en) A kind of basement post-pouring zone prefabricated retaining wall
CN206859272U (en) The interim block structure of outer wall of basement pouring after settlement
CN207144012U (en) A kind of post-cast strip prefabricated board barricade
CN209989847U (en) Shear force wall post-cast strip prefabricated plate closing device
CN215926411U (en) Narrow space post-cast strip formwork device in advance
CN206655313U (en) A kind of vertical post-cast strip plugging structure of basement
CN208056127U (en) A kind of basement shear wall post-cast strip prefabricated board
CN206916767U (en) A kind of prefabricated assembled elevator basis
CN206800665U (en) A kind of basement side wall late poured band structure
CN215630069U (en) Waterproof integrated prefabricated component for independent basement foundation
CN211774798U (en) Wall body corner constructional column exempts from formwork structure
CN107142956A (en) A kind of prefabricated assembled elevator basis
CN110206070A (en) A kind of basement wall post-cast strip protection wall construction method
CN112814041A (en) Disassembly-free template for underground outer wall advanced water stop post-cast strip and construction method
CN203373784U (en) Vertical post-cast strip plugging structure of basement
CN206768879U (en) A kind of poured band of outer wall of basement structure
CN201183998Y (en) Alkali-proof through-wall trench structure
CN215052902U (en) Novel prefabricated tubular pile
CN220888741U (en) Basement outer wall post-pouring strip advanced plugging structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181023