CN107237436A - A kind of method of temporarily fixing during cavity floor construction - Google Patents

A kind of method of temporarily fixing during cavity floor construction Download PDF

Info

Publication number
CN107237436A
CN107237436A CN201710397883.8A CN201710397883A CN107237436A CN 107237436 A CN107237436 A CN 107237436A CN 201710397883 A CN201710397883 A CN 201710397883A CN 107237436 A CN107237436 A CN 107237436A
Authority
CN
China
Prior art keywords
connecting rod
floor
prefabricated diaphragm
temporarily fixing
floor slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710397883.8A
Other languages
Chinese (zh)
Other versions
CN107237436B (en
Inventor
张凤勇
孙健杰
张旭阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201710397883.8A priority Critical patent/CN107237436B/en
Publication of CN107237436A publication Critical patent/CN107237436A/en
Application granted granted Critical
Publication of CN107237436B publication Critical patent/CN107237436B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/326Floor structures wholly cast in situ with or without form units or reinforcements with hollow filling elements

Abstract

A kind of method of temporarily fixing when the present invention is specifically cavity floor construction;It is characterized in that:Including:Support body is set up in floor aspect and support body surface completely spreads floor slab bottoms template;Connecting seat is set in the bottom surface of floor slab bottoms template, cushion block is set in the top surface of floor slab bottoms template;Prefabricated diaphragm capsule is set above cushion block;Connection sheet is set at the top of prefabricated diaphragm capsule in the way of transverse and longitudinal is interlocked, and two pieces of adjacent prefabricated diaphragm capsules are connected by the connection sheet;Connecting rod is inserted between the connecting rod and prefabricated diaphragm capsule, the connecting rod is threadedly coupled with connecting seat, in this way, all prefabricated diaphragm capsules are fixed in floor slab bottoms template, it is ensured that it is not moved or deformed in work progress.And subsequently reserve hole in floor slab bottoms and be also beneficial to quickly drain the ponding inside cavity floor, and then be conducive to improving construction quality.

Description

A kind of method of temporarily fixing during cavity floor construction
Technical field
The present invention relates to method of temporarily fixing during a kind of the realm of building construction, specifically cavity floor construction.
Background technology
In general cavity floor work progress, using galvanized wire colligation cavity diaphragm capsule to fix, difficulty of construction is big and solid more Determine effect to be difficult to ensure that.Diaphragm capsule can enter a small amount of ponding in construction, and conventional construction method is difficult to exclude.
The content of the invention
It is an object of the present invention to provide a kind of servicing unit, it is conducive to the fixation of cavity diaphragm capsule and ensures matter of constructing Amount.
In order to achieve the above object, the present invention is realized in:
A kind of method of temporarily fixing during cavity floor construction, including cushion block, connecting rod, connecting seat and connection sheet, it is described interim Fixing means is specifically included:
Step 1, set up support body in floor aspect and support body surface completely spreads floor slab bottoms template, form cavity floor construction plane;
Step 2, the bottom surface setting connecting seat in floor slab bottoms template,
Step 3, the top surface setting cushion block in floor slab bottoms template;
Step 4, prefabricated diaphragm capsule is set above cushion block;
Step 5, connection sheet is set at the top of prefabricated diaphragm capsule in the way of transverse and longitudinal is interlocked, the connection sheet is by adjacent two pieces Prefabricated diaphragm capsule is connected;
Connecting rod is inserted between step 6, the connecting rod and prefabricated diaphragm capsule, the connecting rod is threadedly coupled with connecting seat, in this way, All prefabricated diaphragm capsules are fixed in floor slab bottoms template, it is ensured that it is not moved or deformed in work progress.
In method of temporarily fixing when described cavity floor is constructed, work progress, the installation of prefabricated diaphragm capsule, according to design Drawing interspersed progress synchronous with reinforcing bar colligation, removes connecting rod and connection sheet, finally by floor coagulation in time after concreting Native superficial compaction troweling completes whole processes.
Method of temporarily fixing when described cavity floor is constructed, every group of prefabricated diaphragm capsule is drilled with 4 holes, and the hole, which gives, matches somebody with somebody Close connection sheet and connecting rod and all prefabricated diaphragm capsules are connected to become an entirety by connecting seat.
Method of temporarily fixing when described cavity floor is constructed, connecting rod is made by justifying connecting rod;Its top is T-shaped hand Handle, the effect of installation and removal is reached for the bar that is rotatably connected;Its lower end is used for and the connection of bottom template provided with screw thread.
Method of temporarily fixing when described cavity floor is constructed, after connecting rod is removed, the hole of floor slab tops utilizes mixed Solidifying grave is closed, and floor bottom hole is remained with beneficial to the ponding drained in construction into cavity, is conducive to improving engineering matter Amount, is finally closed using cement mortar.
Multiple prefabricated diaphragm capsules are connected with each other and form an entirety by this method of temporarily fixing, are so subsequently pouring coagulation It is difficult to be subjected to displacement prefabricated diaphragm capsule during native operation, so as to ensure that the quality of floor slab construction, and is subsequently reserved in floor slab bottoms Hole is also beneficial to quickly drain the ponding inside cavity floor, and then is conducive to improving construction quality.
Brief description of the drawings
Fig. 1 cavity floors construction steel plate strip distribution schematic diagram.
Fig. 2 cavity floor constructing device scheme of installations.
Fig. 3 steel plate strip schematic diagrames.
Fig. 4 T-shaped handle fixed connecting rod organigrams.
Fig. 5 has hole concrete pad organigram.
Fig. 6 nut limit device schematic diagrames.
Embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in Fig. 1 ~ Fig. 6, method of temporarily fixing during a kind of cavity floor construction, including cushion block 4, connecting rod 5, connection Seat 6 and connection sheet 2, the method for temporarily fixing are specifically included:
Step 1, set up support body in floor aspect and support body surface completely spreads floor slab bottoms template 3, form cavity floor construction plane;
Step 2, the bottom surface setting connecting seat 6 in floor slab bottoms template 3,
Step 3, the top surface setting cushion block 4 in floor slab bottoms template 3;
Step 4, the prefabricated diaphragm capsule 1 of setting above cushion block 4;
Step 5, at the top of prefabricated diaphragm capsule 1 connection sheet 2 is set in the way of transverse and longitudinal is interlocked, the connection sheet 2 will be adjacent Two pieces of prefabricated diaphragm capsules 1 are connected;
Connecting rod 5 is inserted between step 6, the connecting rod 2 and prefabricated diaphragm capsule 1, the connecting rod 5 is threadedly coupled with connecting seat 6, In this way, all prefabricated diaphragm capsules 1 are fixed in floor slab bottoms template 3, it is ensured that it is not moved or deformed in work progress.
In method of temporarily fixing during described cavity floor construction, work progress, the installation of prefabricated diaphragm capsule 1, according to setting Drawing interspersed progress synchronous with reinforcing bar colligation is counted, connecting rod 5 and connection sheet 6 are removed after concreting in time, finally by floor Concrete surface compacting troweling completes whole processes.
Method of temporarily fixing when described cavity floor is constructed, every group of prefabricated diaphragm capsule 1 is drilled with 4 holes, and the hole gives All prefabricated diaphragm capsules 1 are connected to become an entirety by mating connection piece 2 and connecting rod 5 and connecting seat 6.
Method of temporarily fixing when described cavity floor is constructed, connecting rod 5 is made by circle connecting rod;Its top is T-shaped Handle, the effect of installation and removal is reached for the bar that is rotatably connected;Its lower end is used for and the connection of bottom template provided with screw thread.
Method of temporarily fixing when described cavity floor is constructed, after connecting rod 5 is removed, the hole of floor slab tops utilizes mixed Solidifying grave is closed, and floor bottom hole is remained with beneficial to the ponding drained in construction into cavity, is conducive to improving engineering matter Amount, is finally closed using cement mortar.

Claims (5)

1. method of temporarily fixing during a kind of cavity floor construction, it is characterized in that:Including cushion block, connecting rod, connecting seat and connection Piece, the method for temporarily fixing is specifically included:
Step 1, set up support body in floor aspect and support body surface completely spreads floor slab bottoms template, form cavity floor construction plane;
Step 2, the bottom surface setting connecting seat in floor slab bottoms template,
Step 3, the top surface setting cushion block in floor slab bottoms template;
Step 4, prefabricated diaphragm capsule is set above cushion block;
Step 5, connection sheet is set at the top of prefabricated diaphragm capsule in the way of transverse and longitudinal is interlocked, the connection sheet is by adjacent two pieces Prefabricated diaphragm capsule is connected;
Connecting rod is inserted between step 6, the connecting rod and prefabricated diaphragm capsule, the connecting rod is threadedly coupled with connecting seat, in this way, All prefabricated diaphragm capsules are fixed in floor slab bottoms template, it is ensured that it is not moved or deformed in work progress.
2. method of temporarily fixing during cavity floor construction according to claim 1, it is characterized in that:In work progress, in advance The installation of molding box, according to design drawing it is synchronous with reinforcing bar colligation it is interspersed carry out, removed in time after concreting connecting rod and Connection sheet, finally completes whole processes by floorslab concrete superficial compaction troweling.
3. method of temporarily fixing during cavity floor construction according to claim 1, it is characterized in that:Every group of prefabricated diaphragm capsule is bored There are 4 holes, the hole gives mating connection piece and connecting rod and connecting seat that all prefabricated diaphragm capsules are connected to become into an entirety.
4. method of temporarily fixing during cavity floor construction according to claim 1, it is characterized in that:Connecting rod is by justifying connection Bar makes;Its top is T-handle, and the effect of installation and removal is reached for the bar that is rotatably connected;Its lower end is used for provided with screw thread With the connection of bottom template.
5. method of temporarily fixing during cavity floor construction according to claim 1, it is characterized in that:After connecting rod is removed, The hole of floor slab tops utilizes concrete enclosing, and floor bottom hole is remained with beneficial to the product drained in construction into cavity Water, is conducive to improving construction quality, is finally closed using cement mortar.
CN201710397883.8A 2017-05-31 2017-05-31 A kind of method of temporarily fixing when cavity floor is constructed Active CN107237436B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710397883.8A CN107237436B (en) 2017-05-31 2017-05-31 A kind of method of temporarily fixing when cavity floor is constructed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710397883.8A CN107237436B (en) 2017-05-31 2017-05-31 A kind of method of temporarily fixing when cavity floor is constructed

Publications (2)

Publication Number Publication Date
CN107237436A true CN107237436A (en) 2017-10-10
CN107237436B CN107237436B (en) 2019-07-30

Family

ID=59985944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710397883.8A Active CN107237436B (en) 2017-05-31 2017-05-31 A kind of method of temporarily fixing when cavity floor is constructed

Country Status (1)

Country Link
CN (1) CN107237436B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867964A (en) * 2018-06-14 2018-11-23 中国冶集团有限公司 The thin-walled square chest that the closely knit construction method of cassette ceiling anti-floating and this method use
CN109680856A (en) * 2018-12-28 2019-04-26 淮北矿业(集团)工程建设有限责任公司 A kind of fixing card and its construction method for plaster mould box

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0452600B1 (en) * 1990-03-20 1995-08-23 Fukuvi Chemical Industry Co., Ltd. Double structured floors and panels for use in double floors
CN1136336A (en) * 1994-08-19 1996-11-20 马芝纳力克技术公司 Method and apparatus for erecting building structures
CN1789608A (en) * 2004-12-18 2006-06-21 邱则有 Hollow reinforced concrete slab
CN101831963A (en) * 2009-01-09 2010-09-15 冯刚克 Novel multipurpose composite insulation board and construction method and processing device thereof
CN204590360U (en) * 2015-03-25 2015-08-26 湖北大成空间科技股份有限公司 A kind of cavity plate continuously

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0452600B1 (en) * 1990-03-20 1995-08-23 Fukuvi Chemical Industry Co., Ltd. Double structured floors and panels for use in double floors
CN1136336A (en) * 1994-08-19 1996-11-20 马芝纳力克技术公司 Method and apparatus for erecting building structures
CN1789608A (en) * 2004-12-18 2006-06-21 邱则有 Hollow reinforced concrete slab
CN101831963A (en) * 2009-01-09 2010-09-15 冯刚克 Novel multipurpose composite insulation board and construction method and processing device thereof
CN204590360U (en) * 2015-03-25 2015-08-26 湖北大成空间科技股份有限公司 A kind of cavity plate continuously

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867964A (en) * 2018-06-14 2018-11-23 中国冶集团有限公司 The thin-walled square chest that the closely knit construction method of cassette ceiling anti-floating and this method use
CN109680856A (en) * 2018-12-28 2019-04-26 淮北矿业(集团)工程建设有限责任公司 A kind of fixing card and its construction method for plaster mould box

Also Published As

Publication number Publication date
CN107237436B (en) 2019-07-30

Similar Documents

Publication Publication Date Title
CN206174120U (en) Prefabricated constructional column and structure thereof
CN103306389A (en) Dry-hang external wall insulation board and novel application thereof as dismounting-free building template
CN109469349A (en) A kind of floor strengthening reconstruction method for adding reinforced concrete secondary beam
CN103556819A (en) Construction method for reserving constructional column holes in beam plate
CN106930523A (en) A kind of concrete structure catch pit detachable template reinforcement technique
CN107237436A (en) A kind of method of temporarily fixing during cavity floor construction
CN206917087U (en) A kind of prefabricated assembling type reinforced concrete framework open tubular column and its making mould
CN106351376A (en) Construction method of garage roof
CN205976167U (en) Based on cast -in -place floor structures of detachable positioning control spare
CN103568109A (en) Hole forming method of precast concrete hollow component
CN208343121U (en) Prefabricated assembled steel structure concrete wallboard mould
CN105697019A (en) Vertical shaft wall cast-in-place concrete joint and formwork device and construction method of vertical shaft wall cast-in-place concrete joint
CN205677235U (en) A kind of prefabricated anti-bank constructing structure applied in toilet
CN202509764U (en) Template bracing structure for constructional column
CN201406834Y (en) Reserved opening die for top plate
CN209163138U (en) A kind of reservation device of the floor reserved steel bar for climbing formwork for construction
CN207469596U (en) A kind of beam column outer rim is exempted to tear concrete mold open
CN203412124U (en) Dry-hanging external wall insulation board serving as detaching-free building template
CN203361643U (en) Removing-free and dabbing-free template provided with preformed holes
CN104131697B (en) Tool type formwork system for kitchen and bath concrete waterproof guide wall and construction method of tool type formwork system
CN105781103A (en) Capital inverted-triangular formwork erecting and pouring method
CN106968334A (en) A kind of construction method of cast-in-place concrete framework secondary structure constructional column
CN211340832U (en) Foundation structure of mobile house
CN104631675B (en) A kind of two-sided prefabricated superimposed sheet
CN203755682U (en) Secondary pouring form board constructing structure for small opening of concrete structure floor slab

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant