Prior art keywords
connecting rod
floor
prefabricated diaphragm
temporarily fixing
floor slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710397883.8A
Other languages
Chinese (zh)
Other versions
CN107237436A (en
Inventor
张凤勇
孙健杰
张旭阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201710397883.8A priority Critical patent/CN107237436B/en
Publication of CN107237436A publication Critical patent/CN107237436A/en
Application granted granted Critical
Publication of CN107237436B publication Critical patent/CN107237436B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/326Floor structures wholly cast in situ with or without form units or reinforcements with hollow filling elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

Method of temporarily fixing when specifically a kind of cavity floor construction of the invention;It is characterized in that: including: to set up frame body in floor level simultaneously completely to spread floor slab bottoms template in frame body surface;Attachment base is set in the bottom surface of floor slab bottoms template, cushion block is set in the top surface of floor slab bottoms template;Prefabricated diaphragm capsule is set above cushion block;Connection sheet is set according to transverse and longitudinal staggered mode at the top of prefabricated diaphragm capsule, two pieces of adjacent prefabricated diaphragm capsules are connected by the connection sheet;Connecting rod is inserted between the connecting rod and prefabricated diaphragm capsule, the connecting rod is threadedly coupled with attachment base, in this way, all prefabricated diaphragm capsules are fixed in floor slab bottoms template, it is ensured that it does not occur mobile in the construction process or deforms.And it is subsequent reserve hole in floor slab bottoms and be also beneficial to quickly drain the ponding inside cavity floor, and then be conducive to improve construction quality.

Description

A kind of method of temporarily fixing when cavity floor is constructed
Technical field
The present invention relates to the realm of building construction, method of temporarily fixing when specifically a kind of cavity floor is constructed.
Background technique
In general cavity floor work progress, galvanized wire is mostly used to bind in order to fix cavity diaphragm capsule, difficulty of construction is big and solid Determine effect to be difficult to ensure.Diaphragm capsule can enter a small amount of ponding in construction, and conventional construction method is difficult to exclude.
Summary of the invention
The object of the present invention is to provide a kind of auxiliary devices, are conducive to the fixation of cavity diaphragm capsule and guarantee matter of constructing Amount.
In order to achieve the above object, the present invention is implemented as follows:
A kind of method of temporarily fixing when cavity floor is constructed, including cushion block, connecting rod, attachment base and connection sheet, it is described Method of temporarily fixing specifically includes:
Step 1, setting up frame body in floor level, simultaneously frame body surface completely spreads floor slab bottoms template, and it is flat to form cavity floor construction Face;
Attachment base is arranged in the bottom surface of floor slab bottoms template in step 2,
Cushion block is arranged in the top surface of floor slab bottoms template in step 3;
Prefabricated diaphragm capsule is arranged in step 4 above cushion block;
Connection sheet is arranged according to the staggered mode of transverse and longitudinal at the top of prefabricated diaphragm capsule in step 5, and the connection sheet will be adjacent Two pieces of prefabricated diaphragm capsules are connected;
Connecting rod is inserted between step 6, the connecting rod and prefabricated diaphragm capsule, the connecting rod is threadedly coupled with attachment base, In this way, all prefabricated diaphragm capsules are fixed in floor slab bottoms template, it is ensured that it does not occur mobile in the construction process or deforms.
Method of temporarily fixing when the described cavity floor construction, in work progress, the installation of prefabricated diaphragm capsule, according to design Drawing interspersed progress synchronous with reinforcing bar binding, removes connecting rod and connection sheet, finally by floor coagulation in time after concreting Native superficial compaction troweling completes whole processes.
The method of temporarily fixing when cavity floor is constructed, every group of prefabricated diaphragm capsule are drilled with 4 holes, which, which gives, matches It closes connection sheet and connecting rod and attachment base and all prefabricated diaphragm capsules is connected to become an entirety.
The method of temporarily fixing when cavity floor is constructed, connecting rod are made by justifying connecting rod;Its top is T shape hand Handle has the function that installation and removal for rotating connecting rod;Its lower end is equipped with screw thread for connecting with bottom template.
The method of temporarily fixing when cavity floor is constructed, after connecting rod is removed, the hole of floor slab tops utilizes mixed Solidifying grave closes, and floor lower part hole remains with the ponding for being conducive to drain and entering cavity in construction, is conducive to improve engineering matter Amount is finally closed using cement mortar.
Multiple prefabricated diaphragm capsules are connected with each other and are formed an entirety by this method of temporarily fixing, so pour coagulation subsequent It is not easy to be subjected to displacement prefabricated diaphragm capsule when native operation, to ensure that the quality of floor slab construction, and subsequent be reserved in floor slab bottoms Hole is also beneficial to quickly drain the ponding inside cavity floor, and then is conducive to improve construction quality.
Detailed description of the invention
Fig. 1 cavity floor construction steel plate strip distribution schematic diagram.
Fig. 2 cavity floor constructing device scheme of installation.
Fig. 3 steel plate strip schematic diagram.
Fig. 4 T shape handle fixed connecting rod organigram.
Fig. 5 has hole concrete pad organigram.
Fig. 6 nut limit device schematic diagram.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in Fig. 1 ~ Fig. 6, a kind of cavity floor construct when method of temporarily fixing, including cushion block 4, connecting rod 5, connection Seat 6 and connection sheet 2, the method for temporarily fixing specifically include:
Step 1, setting up frame body in floor level, simultaneously frame body surface completely spreads floor slab bottoms template 3, forms cavity floor construction Plane;
Attachment base 6 is arranged in the bottom surface of floor slab bottoms template 3 in step 2,
Cushion block 4 is arranged in the top surface of floor slab bottoms template 3 in step 3;
Prefabricated diaphragm capsule 1 is arranged in step 4 above cushion block 4;
Connection sheet 2 is arranged according to the staggered mode of transverse and longitudinal at the top of prefabricated diaphragm capsule 1 in step 5, and the connection sheet 2 is by phase Two pieces of adjacent prefabricated diaphragm capsules 1 are connected;
Connecting rod 5, the connecting rod 5 and 6 screw thread of attachment base are inserted between step 6, the connection sheet 2 and prefabricated diaphragm capsule 1 Connection, in this way, all prefabricated diaphragm capsules 1 are fixed in floor slab bottoms template 3, it is ensured that its do not occur in the construction process it is mobile or Deformation.
Method of temporarily fixing when the described cavity floor construction, in work progress, the installation of prefabricated diaphragm capsule 1, according to setting Drawing interspersed progress synchronous with reinforcing bar binding is counted, connecting rod 5 and connection sheet 6 are removed after concreting in time, finally by floor Concrete surface is compacted troweling and completes whole processes.
The method of temporarily fixing when cavity floor is constructed, every group of prefabricated diaphragm capsule 1 are drilled with 4 holes, which gives All prefabricated diaphragm capsules 1 are connected to become an entirety by mating connection piece 2 and connecting rod 5 and attachment base 6.
The method of temporarily fixing when cavity floor is constructed, connecting rod 5 are made by circle connecting rod;Its top is T shape Handle has the function that installation and removal for rotating connecting rod;Its lower end is equipped with screw thread for connecting with bottom template.
The method of temporarily fixing when cavity floor is constructed, after connecting rod 5 is removed, the hole of floor slab tops utilizes mixed Solidifying grave closes, and floor lower part hole remains with the ponding for being conducive to drain and entering cavity in construction, is conducive to improve engineering matter Amount is finally closed using cement mortar.

Claims (5)

  1. Method of temporarily fixing when 1. a kind of cavity floor is constructed, it is characterized in that: including cushion block, connecting rod, attachment base and connection Piece, the method for temporarily fixing specifically include:
    Step 1, setting up frame body in floor level, simultaneously frame body surface completely spreads floor slab bottoms template, forms cavity floor construction plane;
    Attachment base is arranged in the bottom surface of floor slab bottoms template in step 2,
    Cushion block is arranged in the top surface of floor slab bottoms template in step 3;
    Prefabricated diaphragm capsule is arranged in step 4 above cushion block;
    Connection sheet is arranged according to the staggered mode of transverse and longitudinal at the top of prefabricated diaphragm capsule in step 5, and the connection sheet is by adjacent two pieces Prefabricated diaphragm capsule is connected;
    Connecting rod is inserted between step 6, the connecting rod and prefabricated diaphragm capsule, the connecting rod is threadedly coupled with attachment base, in this way, All prefabricated diaphragm capsules are fixed in floor slab bottoms template, it is ensured that it does not occur mobile in the construction process or deforms.
  2. Method of temporarily fixing when 2. cavity floor according to claim 1 is constructed, it is characterized in that: in work progress, in advance The installation of molding box, according to design drawing interspersed progress synchronous with reinforcing bar binding, removed in time after concreting connecting rod and Floorslab concrete superficial compaction troweling is finally completed whole processes by connection sheet.
  3. Method of temporarily fixing when 3. cavity floor according to claim 1 is constructed, it is characterized in that: every group of prefabricated diaphragm capsule bores There are 4 holes, which gives mating connection piece and connecting rod and attachment base and all prefabricated diaphragm capsules are connected to become an entirety.
  4. Method of temporarily fixing when 4. cavity floor according to claim 1 is constructed, it is characterized in that: connecting rod is by justifying connection Bar production;Its top is T-handle, has the function that installation and removal for rotating connecting rod;Its lower end is used for equipped with screw thread It is connected with bottom template.
  5. Method of temporarily fixing when 5. cavity floor according to claim 1 is constructed, it is characterized in that: after connecting rod is removed, The hole of floor slab tops utilizes concrete enclosing, and floor lower part hole remains with the product for being conducive to drain and entering cavity in construction Water is conducive to improve construction quality, finally be closed using cement mortar.
CN201710397883.8A 2017-05-31 2017-05-31 A kind of method of temporarily fixing when cavity floor is constructed Active CN107237436B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710397883.8A CN107237436B (en) 2017-05-31 2017-05-31 A kind of method of temporarily fixing when cavity floor is constructed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710397883.8A CN107237436B (en) 2017-05-31 2017-05-31 A kind of method of temporarily fixing when cavity floor is constructed

Publications (2)

Publication Number Publication Date
CN107237436A CN107237436A (en) 2017-10-10
CN107237436B true CN107237436B (en) 2019-07-30

Family

ID=59985944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710397883.8A Active CN107237436B (en) 2017-05-31 2017-05-31 A kind of method of temporarily fixing when cavity floor is constructed

Country Status (1)

Country Link
CN (1) CN107237436B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867964A (en) * 2018-06-14 2018-11-23 中国冶集团有限公司 The thin-walled square chest that the closely knit construction method of cassette ceiling anti-floating and this method use
CN109680856A (en) * 2018-12-28 2019-04-26 淮北矿业(集团)工程建设有限责任公司 A kind of fixing card and its construction method for plaster mould box

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0452600B1 (en) * 1990-03-20 1995-08-23 Fukuvi Chemical Industry Co., Ltd. Double structured floors and panels for use in double floors
CN1136336A (en) * 1994-08-19 1996-11-20 马芝纳力克技术公司 Method and apparatus for erecting building structures
CN1789608A (en) * 2004-12-18 2006-06-21 邱则有 Hollow reinforced concrete slab
CN101831963A (en) * 2009-01-09 2010-09-15 冯刚克 Novel multipurpose composite insulation board and construction method and processing device thereof
CN204590360U (en) * 2015-03-25 2015-08-26 湖北大成空间科技股份有限公司 A kind of cavity plate continuously

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0452600B1 (en) * 1990-03-20 1995-08-23 Fukuvi Chemical Industry Co., Ltd. Double structured floors and panels for use in double floors
CN1136336A (en) * 1994-08-19 1996-11-20 马芝纳力克技术公司 Method and apparatus for erecting building structures
CN1789608A (en) * 2004-12-18 2006-06-21 邱则有 Hollow reinforced concrete slab
CN101831963A (en) * 2009-01-09 2010-09-15 冯刚克 Novel multipurpose composite insulation board and construction method and processing device thereof
CN204590360U (en) * 2015-03-25 2015-08-26 湖北大成空间科技股份有限公司 A kind of cavity plate continuously

Also Published As

Publication number Publication date
CN107237436A (en) 2017-10-10

Similar Documents

Publication Publication Date Title
CN103291001B (en) Control method and the mould therefor of floor reinforced bar mesh surface protection layer thickness
CN203247600U (en) Equipment foundation bolt preformed hole die
CN107237436B (en) A kind of method of temporarily fixing when cavity floor is constructed
CN106930523A (en) A kind of concrete structure catch pit detachable template reinforcement technique
CN108457469A (en) A kind of concrete structure construction method with assembled masonry filler wall
CN103568109A (en) Hole forming method of precast concrete hollow component
CN206917087U (en) A kind of prefabricated assembling type reinforced concrete framework open tubular column and its making mould
CN105881733A (en) Prefabricated reinforced concrete component and manufacturing method thereof
CN205935383U (en) Precast concrete shear force wall
CN208343121U (en) Prefabricated assembled steel structure concrete wallboard mould
CN205474843U (en) Prefabricated T beam -ends head mould board
CN204199332U (en) A kind of late poured band structure
CN203782577U (en) Template assembly for anti-collision wall settlement joint construction
CN104074354A (en) Plate-insertion type cast-in-place staircase template and use method of plate-insertion type cast-in-place staircase template
CN202509764U (en) Template bracing structure for constructional column
CN105781103A (en) Capital inverted-triangular formwork erecting and pouring method
CN207526118U (en) For pre-buried and closure unwrapping wire hole unwrapping wire punch die
CN207469596U (en) A kind of beam column outer rim is exempted to tear concrete mold open
CN203361643U (en) Removing-free and dabbing-free template provided with preformed holes
CN104131697B (en) Tool type formwork system for kitchen and bath concrete waterproof guide wall and construction method of tool type formwork system
CN205035732U (en) Interim support of combined type bridge
CN211340832U (en) Foundation structure of mobile house
CN209723594U (en) A kind of positioning of assembled architecture reinforcing bar and check device
CN203755682U (en) Secondary pouring form board constructing structure for small opening of concrete structure floor slab
CN209179203U (en) Column and basic connection component and frame structure system

Legal Events

Date Code Title Description