CN208396069U - 一种预制组合剪力墙强连接节点 - Google Patents

一种预制组合剪力墙强连接节点 Download PDF

Info

Publication number
CN208396069U
CN208396069U CN201820927100.2U CN201820927100U CN208396069U CN 208396069 U CN208396069 U CN 208396069U CN 201820927100 U CN201820927100 U CN 201820927100U CN 208396069 U CN208396069 U CN 208396069U
Authority
CN
China
Prior art keywords
shear wall
steel plate
welded
stretching
wing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820927100.2U
Other languages
English (en)
Inventor
徐国军
杨宇焜
宋生志
张莉莉
蒋路
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Green Building Integration Technology Co Ltd
Original Assignee
Zhejiang Green Building Integration Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Green Building Integration Technology Co Ltd filed Critical Zhejiang Green Building Integration Technology Co Ltd
Priority to CN201820927100.2U priority Critical patent/CN208396069U/zh
Application granted granted Critical
Publication of CN208396069U publication Critical patent/CN208396069U/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本实用新型涉及一种预制组合剪力墙强连接节点,其包括第一剪力墙以及第二剪力墙;其中,所述第一剪力墙和第二剪力墙呈L型拼接;所述第二剪力墙的端部焊接有第一伸出钢板和第二伸出钢板;所述第一伸出钢板和第二伸出钢板分别焊接于第一剪力墙上;所述第二伸出钢板和第一剪力墙之间焊接有拉条;所述拉条两侧、第一伸出钢板和第二伸出钢板之间填充有现浇混凝土。本实用新型的预制组合剪力墙强连接节点具有拼接方便,连接可靠,且传力明确等诸多优点。

Description

一种预制组合剪力墙强连接节点
【技术领域】
本实用新型涉及一种建筑构件的连接结构,具体涉及一种预制组合剪力墙强连接节点,属于建筑工程技术领域。
【背景技术】
二十世纪八十年代,欧洲提出的一种新型钢-混凝土部分组合构件,其截面的基本型式是在钢构件的翼缘间填充混凝土。这种钢与混凝土组合的概念应用在剪力墙结构即钢混部分组合(PEC)剪力墙构件。
然而,在实际工程中常常用到L型剪力墙构件,但是L型PEC构件的工厂拼装预制工序复杂耗时。
因此,为解决上述技术问题,确有必要提供一种创新的预制组合剪力墙强连接节点,以克服现有技术中的所述缺陷。
【实用新型内容】
为解决上述问题,本实用新型的目的在于提供一种拼接方便,连接可靠,且传力明确的预制组合剪力墙强连接节点。
为实现上述目的,本实用新型采取的技术方案为:一种预制组合剪力墙强连接节点,其包括第一剪力墙以及第二剪力墙;其中,所述第一剪力墙和第二剪力墙呈L型拼接;所述第二剪力墙的端部焊接有第一伸出钢板和第二伸出钢板;所述第一伸出钢板和第二伸出钢板分别焊接于第一剪力墙上;所述第二伸出钢板和第一剪力墙之间焊接有拉条;所述拉条两侧、第一伸出钢板和第二伸出钢板之间填充有现浇混凝土。
本实用新型的预制组合剪力墙强连接节点进一步设置为:所述第一剪力墙和第二剪力墙均包括钢骨架、焊接扁钢以及填充混凝土;其中,所述钢骨架由腹板、翼缘以及肋板焊接而成,所述翼缘垂直焊接于腹板的两端;所述肋板垂直焊接于腹板的两侧;所述焊接扁钢焊接在翼缘和肋板之间、以及肋板和肋板之间;所述填充混凝土填充于翼缘之间。
本实用新型的预制组合剪力墙强连接节点进一步设置为:所述第一伸出钢板和第二伸出钢板焊接于第二剪力墙的翼缘的端部;所述第一伸出钢板的端部焊接于第一剪力墙的翼缘上;所述第二伸出钢板的端部焊接于第一剪力墙的腹板上。
本实用新型的预制组合剪力墙强连接节点还设置为:所述拉条垂直焊接在第二伸出钢板和第一剪力墙的肋板之间。
与现有技术相比,本实用新型具有如下有益效果:
1、实现两段部分组合剪力墙L型可靠连接。
2、传力路径明确,抗侧刚度得到有效保证。
3、施工简单方便,省时省力。
【附图说明】
图1是本实用新型的预制组合剪力墙强连接节点的剖面图。
图2是图1沿A-A的剖面图。
图3是图1中的第一剪力墙的剖面图。
图4是图3沿B-B的剖面图。
图5是图1中的第二剪力墙的剖面图。
图6是图3沿C-C的剖面图。
图7是第二剪力墙焊接伸出钢板后的剖面图。
图8是第一剪力墙和第二剪力墙拼接后未填充现浇混凝土的剖面图。
【具体实施方式】
请参阅说明书附图1至附图8所示,本实用新型为一种预制组合剪力墙强连接节点,其由第一剪力墙1以及第二剪力墙2等几部分组成。其中,所述第一剪力墙1和第二剪力墙2呈L型拼接。
具体的说,所述第二剪力墙2的端部焊接有第一伸出钢板3和第二伸出钢板4。所述第一伸出钢板3和第二伸出钢板4分别焊接于第一剪力墙1上。所述第二伸出钢板4和第一剪力墙1之间焊接有拉条5。所述拉条5两侧、第一伸出钢板3和第二伸出钢板4之间填充有现浇混凝土6。
进一步的,所述第一剪力墙1和第二剪力墙2均由钢骨架7、焊接扁钢8以及填充混凝土9组成。其中,所述钢骨架7由腹板71、翼缘72以及肋板73焊接而成,所述翼缘72垂直焊接于腹板71的两端。所述肋板73垂直焊接于腹板71的两侧。所述焊接扁钢8焊接在翼缘72和肋板73之间、以及相邻肋板73之间,以增强钢骨架7的结构强度。所述填充混凝土9填充于翼缘72之间。
所述第一伸出钢板3和第二伸出钢板4具体焊接于第二剪力墙2的翼缘72的端部,并和翼缘72相垂直。所述第一伸出钢板3的端部焊接于第一剪力墙1的翼缘72上。所述第二伸出钢板4的端部焊接于第一剪力墙1的腹板71上。而所述拉条5垂直焊接在第二伸出钢板4和第一剪力墙1的肋板73之间。
本实用新型的预制组合剪力墙强连接节点的制作步骤如下:
1),预制第一剪力墙1和第二剪力墙2;
2),在第二剪力墙2的其中一翼缘72的端部焊接第一伸出钢板3和第二伸出钢板4;
3),在施工现场将第一伸出钢板3和第二伸出钢板4分别焊接于第一剪力墙1的翼缘72和腹板71上;
4),在第二伸出钢板4和第一剪力墙1的肋板73之间焊接拉条5;
5),在拉条5的外侧支护模板;
6),在拉条5两侧、第一伸出钢板3和第二伸出钢板4之间浇筑现浇混凝土6,最终形成所述连接节点。
以上的具体实施方式仅为本创作的较佳实施例,并不用以限制本创作,凡在本创作的精神及原则之内所做的任何修改、等同替换、改进等,均应包含在本创作的保护范围之内。

Claims (4)

1.一种预制组合剪力墙强连接节点,其特征在于:包括第一剪力墙以及第二剪力墙;其中,所述第一剪力墙和第二剪力墙呈L型拼接;所述第二剪力墙的端部焊接有第一伸出钢板和第二伸出钢板;所述第一伸出钢板和第二伸出钢板分别焊接于第一剪力墙上;所述第二伸出钢板和第一剪力墙之间焊接有拉条;所述拉条两侧、第一伸出钢板和第二伸出钢板之间填充有现浇混凝土。
2.如权利要求1所述的预制组合剪力墙强连接节点,其特征在于:所述第一剪力墙和第二剪力墙均包括钢骨架、焊接扁钢以及填充混凝土;其中,所述钢骨架由腹板、翼缘以及肋板焊接而成,所述翼缘垂直焊接于腹板的两端;所述肋板垂直焊接于腹板的两侧;所述焊接扁钢焊接在翼缘和肋板之间、以及肋板和肋板之间;所述填充混凝土填充于翼缘之间。
3.如权利要求2所述的预制组合剪力墙强连接节点,其特征在于:所述第一伸出钢板和第二伸出钢板焊接于第二剪力墙的翼缘的端部;所述第一伸出钢板的端部焊接于第一剪力墙的翼缘上;所述第二伸出钢板的端部焊接于第一剪力墙的腹板上。
4.如权利要求3所述的预制组合剪力墙强连接节点,其特征在于:所述拉条垂直焊接在第二伸出钢板和第一剪力墙的肋板之间。
CN201820927100.2U 2018-06-15 2018-06-15 一种预制组合剪力墙强连接节点 Active CN208396069U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820927100.2U CN208396069U (zh) 2018-06-15 2018-06-15 一种预制组合剪力墙强连接节点

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820927100.2U CN208396069U (zh) 2018-06-15 2018-06-15 一种预制组合剪力墙强连接节点

Publications (1)

Publication Number Publication Date
CN208396069U true CN208396069U (zh) 2019-01-18

Family

ID=65132317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820927100.2U Active CN208396069U (zh) 2018-06-15 2018-06-15 一种预制组合剪力墙强连接节点

Country Status (1)

Country Link
CN (1) CN208396069U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113718995A (zh) * 2021-07-15 2021-11-30 浙江绿筑集成科技有限公司 一种新型l型部分包覆钢混凝土组合剪力墙施工工艺

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113718995A (zh) * 2021-07-15 2021-11-30 浙江绿筑集成科技有限公司 一种新型l型部分包覆钢混凝土组合剪力墙施工工艺

Similar Documents

Publication Publication Date Title
CN105863111B (zh) 内嵌预制混凝土剪力墙同时抗弯的钢框架构造
CN204781368U (zh) 新型钢梁-混凝土柱钢节点及预制件
CN104251038A (zh) 一种外包钢板-混凝土组合连梁及其施工方法
CN102995756B (zh) 矩形钢管混凝土柱-箱梁全螺栓连接节点及施工方法
CN105275092A (zh) 一种型钢混凝土梁与外包钢板组合剪力墙耗能型节点
CN104294920B (zh) 一种u形钢混凝土组合梁与异形钢管混凝土柱的节点组件及制备方法
CN207176940U (zh) 一种钢管混凝土柱‑钢梁装配式空间节点
CN203546912U (zh) 一种槽型钢连接型矩形钢管混凝土柱与钢梁的穿筋式节点
CN205502246U (zh) 一种外包钢混凝土组合梁-钢管柱连接节点
CN208396069U (zh) 一种预制组合剪力墙强连接节点
CN204418389U (zh) 一种方钢管混凝土柱与工字型钢梁端板嵌入式连接结构
CN107419810A (zh) 一种矩形钢管混凝土柱与梁板式楼盖连接装置及其施工工艺
CN203462587U (zh) 一种角钢连接型矩形钢管混凝土柱与钢梁穿筋式连接节点
CN104153463B (zh) 装配整体式框架体系及其施工方法
CN203514531U (zh) 一种带内隔板方钢管混凝土柱与钢梁节点连接结构
CN203782889U (zh) 一种钢骨混凝土十字形柱-钢梁连接节点
CN207892021U (zh) 一种新型装配式钢-再生混凝土混合框架结构体系
CN206722094U (zh) 一种矩形钢管混凝土柱与梁板式楼盖连接装置
CN206681262U (zh) 一种多层预制方钢管混凝土连梁
CN207228355U (zh) 一种装配式钢板混凝土组合墙与钢筋桁架楼承板连接构造
CN204676710U (zh) 劲性梁柱节点核心区柱钢板箍结构
CN205530819U (zh) 一种内嵌预制混凝土剪力墙同时抗弯的钢框架构造
CN205776898U (zh) 整体装配式钢筋混凝土剪力墙结构体系
CN208396075U (zh) 一种预制组合剪力墙弱连接节点
CN203782890U (zh) 一种钢骨混凝土t形柱-钢梁连接节点

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Qinhuangdao Seiko Green Building Integrated Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2019330000017

Denomination of utility model: Strong connected node of prefabricated compound shear wall

Granted publication date: 20190118

License type: Common License

Record date: 20190917

Assignee: Dongyue Green Building Integrated Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2019330000016

Denomination of utility model: Strong connected node of prefabricated compound shear wall

Granted publication date: 20190118

License type: Common License

Record date: 20190917

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan Green Building Technology Development Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2019330000015

Denomination of utility model: Strong connected node of prefabricated compound shear wall

Granted publication date: 20190118

License type: Common License

Record date: 20190919

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Shandong Tianyuan Jinggong Green Integrated Building Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2020330000115

Denomination of utility model: A kind of precast composite shear wall strong connection node

Granted publication date: 20190118

License type: Common License

Record date: 20201216

EE01 Entry into force of recordation of patent licensing contract

Assignee: Anhui Zhihong Precision Construction Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023990000037

Denomination of utility model: A kind of prefabricated composite shear wall strong connection joint

Granted publication date: 20190118

License type: Common License

Record date: 20230113

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Jiangxi Huahong Jinggong Steel Structure Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023980034645

Denomination of utility model: A prefabricated composite shear wall strong connection node

Granted publication date: 20190118

License type: Common License

Record date: 20230413

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Jiangsu Lvjian Jinggong Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023980034833

Denomination of utility model: A prefabricated composite shear wall strong connection node

Granted publication date: 20190118

License type: Common License

Record date: 20230421

EE01 Entry into force of recordation of patent licensing contract