CN104153463B - 装配整体式框架体系及其施工方法 - Google Patents
装配整体式框架体系及其施工方法 Download PDFInfo
- Publication number
- CN104153463B CN104153463B CN201410393315.7A CN201410393315A CN104153463B CN 104153463 B CN104153463 B CN 104153463B CN 201410393315 A CN201410393315 A CN 201410393315A CN 104153463 B CN104153463 B CN 104153463B
- Authority
- CN
- China
- Prior art keywords
- concrete
- node
- prefabricated
- cast
- steel plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 11
- 239000004567 concrete Substances 0.000 claims abstract description 69
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 58
- 239000010959 steel Substances 0.000 claims abstract description 58
- 239000000203 mixture Substances 0.000 claims description 31
- 210000003205 Muscles Anatomy 0.000 claims description 9
- 239000000463 material Substances 0.000 claims description 7
- 210000000614 Ribs Anatomy 0.000 claims description 6
- 238000009408 flooring Methods 0.000 claims description 6
- 238000005259 measurement Methods 0.000 claims description 6
- 238000003780 insertion Methods 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 3
- 238000002789 length control Methods 0.000 claims description 3
- 239000003550 marker Substances 0.000 claims description 3
- 238000010008 shearing Methods 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 210000004080 Milk Anatomy 0.000 claims 1
- 239000008267 milk Substances 0.000 claims 1
- 235000013336 milk Nutrition 0.000 claims 1
- 210000001503 Joints Anatomy 0.000 abstract description 2
- 239000002344 surface layer Substances 0.000 abstract description 2
- 239000002131 composite material Substances 0.000 abstract 5
- 230000003247 decreasing Effects 0.000 abstract 1
- 238000011065 in-situ storage Methods 0.000 abstract 1
- 239000011150 reinforced concrete Substances 0.000 abstract 1
- 108010093413 Prophet of Pit-1 protein Proteins 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000006011 modification reaction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000003014 reinforcing Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410393315.7A CN104153463B (zh) | 2014-08-11 | 2014-08-11 | 装配整体式框架体系及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410393315.7A CN104153463B (zh) | 2014-08-11 | 2014-08-11 | 装配整体式框架体系及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104153463A CN104153463A (zh) | 2014-11-19 |
CN104153463B true CN104153463B (zh) | 2017-03-22 |
Family
ID=51879077
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410393315.7A Active CN104153463B (zh) | 2014-08-11 | 2014-08-11 | 装配整体式框架体系及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104153463B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121034A (zh) * | 2016-08-12 | 2016-11-16 | 长沙远大住宅工业集团股份有限公司 | 一种无梁实心楼盖体系的叠合装配整体式地下室 |
CN106245766B (zh) * | 2016-09-23 | 2018-07-03 | 沈阳建筑大学 | 自膨胀摩擦型钢管连接结构及组装方法 |
CN108589915A (zh) * | 2018-05-07 | 2018-09-28 | 东北林业大学 | 一种装配式混凝土柱外置钢板对拉连接节点及其施工方法 |
CN109057004A (zh) * | 2018-08-06 | 2018-12-21 | 东北石油大学 | 一种装配式钢-混凝土组合框架及其连接安装方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2250731A (en) * | 1990-08-09 | 1992-06-17 | Mitsubishi Heavy Ind Ltd | Apparatus and method of constructing a building |
CN2777087Y (zh) * | 2005-01-04 | 2006-05-03 | 华南理工大学 | 一种组合梁与混凝土柱节点结构 |
CN102418385A (zh) * | 2010-09-28 | 2012-04-18 | 杨峰 | 一种新型钢筋砼预制整浇房屋结构体系及施工方法 |
AU2013101343A4 (en) * | 2012-10-18 | 2013-11-07 | Merhi, Khalil Nasser | Methods, systems and components for multi-storey building construction |
CN203347007U (zh) * | 2013-06-09 | 2013-12-18 | 中冶建筑研究总院有限公司 | 钢-混凝土板柱结构体系 |
CN203361354U (zh) * | 2013-07-08 | 2013-12-25 | 山东中通钢构建筑股份有限公司 | 一种梁柱节点连接装置 |
-
2014
- 2014-08-11 CN CN201410393315.7A patent/CN104153463B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2250731A (en) * | 1990-08-09 | 1992-06-17 | Mitsubishi Heavy Ind Ltd | Apparatus and method of constructing a building |
CN2777087Y (zh) * | 2005-01-04 | 2006-05-03 | 华南理工大学 | 一种组合梁与混凝土柱节点结构 |
CN102418385A (zh) * | 2010-09-28 | 2012-04-18 | 杨峰 | 一种新型钢筋砼预制整浇房屋结构体系及施工方法 |
AU2013101343A4 (en) * | 2012-10-18 | 2013-11-07 | Merhi, Khalil Nasser | Methods, systems and components for multi-storey building construction |
CN203347007U (zh) * | 2013-06-09 | 2013-12-18 | 中冶建筑研究总院有限公司 | 钢-混凝土板柱结构体系 |
CN203361354U (zh) * | 2013-07-08 | 2013-12-25 | 山东中通钢构建筑股份有限公司 | 一种梁柱节点连接装置 |
Also Published As
Publication number | Publication date |
---|---|
CN104153463A (zh) | 2014-11-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2015110081A1 (zh) | 双向连续双梁构成的三维轻钢构架 | |
CN107227822A (zh) | 一种钢管与缀板组合的建筑柱及其施工工艺 | |
CN104153463B (zh) | 装配整体式框架体系及其施工方法 | |
CN101215855A (zh) | 一种组合梁 | |
CN101914952A (zh) | 中空钢管混凝土柱与钢梁的连接节点及其施工方法 | |
CN105863111B (zh) | 内嵌预制混凝土剪力墙同时抗弯的钢框架构造 | |
CN108756061A (zh) | 一种部分预制装配预应力型钢混凝土混合梁及施工方法 | |
CN103850363B (zh) | 预制通孔装配式钢筋混凝土剪力墙的施工方法 | |
CN206707124U (zh) | 带有钢结构接头的预制装配式钢筋混凝土构件 | |
CN107700667A (zh) | 一种预制楼板与钢梁下翼缘连接节点 | |
CN103711329A (zh) | 外贴钢骨混凝土框架法加固结构的方法 | |
CN108518003A (zh) | 可拆卸预制装配式钢-混凝土组合梁板 | |
CN104294920B (zh) | 一种u形钢混凝土组合梁与异形钢管混凝土柱的节点组件及制备方法 | |
CN207419803U (zh) | 一种叠合楼板与钢梁的高强度连接结构 | |
CN208105477U (zh) | 装配式钢管混凝土柱-独立基础-混凝土圈梁l形连接节点 | |
CN107965053B (zh) | 一种立柱与连系梁组合抗震的框架结构及其施工方法 | |
CN102071747A (zh) | 方钢管混凝土柱与钢筋混凝土楼盖连接的节点及制作方法 | |
CN108301562A (zh) | 装配式钢管混凝土柱-独立基础-混凝土圈梁十字形连接节点 | |
CN108301545A (zh) | 一种带立体桁架临时支撑的装配式大模块叠合梁板结构 | |
CN107023078B (zh) | 装配现浇组合式叠合箱网梁楼盖及施工方法 | |
CN107419824A (zh) | 再生式钢骨架全预制剪力墙结构体系及施工方法 | |
CN208533863U (zh) | 一种钢筋混凝土预制小梁 | |
CN208023735U (zh) | 装配式钢管混凝土柱-独立基础-混凝土圈梁t形连接节点 | |
CN208363421U (zh) | 装配式钢管混凝土柱-独立基础-混凝土圈梁十字形连接节点 | |
CN207892021U (zh) | 一种新型装配式钢-再生混凝土混合框架结构体系 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Yusong Inventor after: Lu Bingqiang Inventor after: Cheng Shilong Inventor after: Zhang Guangzhong Inventor after: Xiao Yimin Inventor after: Zhang Xinliang Inventor after: Zhang Xingyong Inventor after: Lu Yumou Inventor after: Xiao Guirong Inventor after: Yu Dingkui Inventor before: Zhang Jun Inventor before: Dong Niancai Inventor before: Chen Yaogang Inventor before: Yuan Qinbiao |
|
COR | Change of bibliographic data | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20170221 Address after: 225267 Huashan Road, Jiangdu District, Jiangsu, No. 460, No. Applicant after: Jiangsu Shanghai Construction Group Co., Ltd. Address before: Changle Town Jiangsu city Nantong province Zhongnan group 226124 5 floor East Applicant before: Jiangsu Zhongnan Construction Industry Group Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |