CN208331448U - A kind of pumping plant water outlet steel tube track holder device of rapid construction - Google Patents

A kind of pumping plant water outlet steel tube track holder device of rapid construction Download PDF

Info

Publication number
CN208331448U
CN208331448U CN201820988491.9U CN201820988491U CN208331448U CN 208331448 U CN208331448 U CN 208331448U CN 201820988491 U CN201820988491 U CN 201820988491U CN 208331448 U CN208331448 U CN 208331448U
Authority
CN
China
Prior art keywords
track
water outlet
steel pipe
construction
bracket plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820988491.9U
Other languages
Chinese (zh)
Inventor
张珉珉
张祖银
李建恒
倪高宇
夏应锋
张定研
焦伟
王思军
张铭
张师玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Yedu Water Conservancy And Hydropower Construction Co Ltd
Original Assignee
Hubei Yedu Water Conservancy And Hydropower Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Yedu Water Conservancy And Hydropower Construction Co Ltd filed Critical Hubei Yedu Water Conservancy And Hydropower Construction Co Ltd
Priority to CN201820988491.9U priority Critical patent/CN208331448U/en
Application granted granted Critical
Publication of CN208331448U publication Critical patent/CN208331448U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to a kind of pumping plants of rapid construction to be discharged steel tube track holder device, belong to rivers lift pumping station and be discharged steel tube track technical field of construction.It is made of water outlet steel pipe, track and bracket component, bracket component is packed on concrete floor, steel-pipe welding is discharged in the U-shaped steel plate of bracket component upper end, two tracks are symmetrically packed on the bracket component of water outlet steel pipe two sides by briquetting, and the bracket component is made of U-bracket plate, steel pipe, track.The utility model will be discharged steel pipe and track is transported after workshop machine-shaping to building site, at the scene casting concrete one-pass molding, short time limit, shortens the construction period 50% or more than conventional method construction, engineering can build up current year operation for the year and be benefited.Solving conventional method is first to pour U-type groove concrete cradle, then pours the fill concrete in U-type groove again, and underwater portion construction must could be completed 2 year construction time, causes the problem of centainly losing to the agricultural production of current year.

Description

A kind of pumping plant water outlet steel tube track holder device of rapid construction
Technical field
The utility model relates to a kind of pumping plants of rapid construction to be discharged steel tube track holder device, belong to rivers lift pumping station and go out Water steel tube track technical field of construction.
Background technique
It, will in order to make full use of ChangJiang River to build more lift pumping stations along the Yangtze River to the irrigation effect of agricultural Yangtze River Water, which is irrigated by lifting water to a higher level with a water pump, etc., irrigates farmland into channel.The existing lift pumping station built along the Yangtze River generallys use Cable Railway shape Formula, previous arrangement and method for construction is: in order to guarantee the construction time, first having to fill high cofferdam water retaining, then carries out intake pool base Hole excavation → bottom cushion concreting → baseplate reinforcing bar peace → underplate concrete pours → and underplate concrete reaches certain (48 hours or more) production U-type groove wall steel bars, built-in fitting peace → U-type groove wall form installation → U-type groove coagulation after intensity Soil pours → Pipe installing → attached metal installing engineering → U-type groove in the second stage of fill concrete pour, long construction period, water Lower pipeline construction needs effective working day 170 days or more.Once and when construction in the Changjiang river spring water level go up in advance, cofferdam is overflowed It floods, can only be stepped back to water level and restore cofferdam again, again dewatering excavation foundation pit.On the other hand, the steel pipe of pipeline connects installation It is to be welded on the slope of building site, material splicing, human weld's work are difficult to meet because of the limitation by instrument and equipment and place The required precision of design.Former arrangement and method for construction does high cofferdam and there is unrestrained weir and the security risk on dam, to race against time in quality It is difficult to ensure again;Therefore, in order to not only guarantee construction quality, but also evade security risk, lift pumping station is built all under normal circumstances 2 year duration is needed, engineering cannot be benefited for the year, not only seriously affect the agricultural production in irrigated area, but also increase construction cost.
Summary of the invention
The purpose of this utility model is that in view of the above shortcomings of the prior art, providing a kind of by water outlet steel pipe and track In advance in workshop machine-shaping, while being welded on water outlet steel pipe in workshop with U-bracket plate, then steel pipe will be discharged And track finished product is transported onto building site, then poured in place concrete one-pass molding both can guarantee construction quality and construction safety, One times of work efficiency can be improved again, saves the duration, realized that engineering current year is benefited, reducingd the construction costs;It is highly suitable for rivers slope surface rail Building for road cable car type lift pumping station, is especially limited by river level, it is desirable that the engineering of underwater construction short time limit, pumping plant water outlet Steel tube track holder device can realize rapid construction.
The utility model is to realize above-mentioned purpose by the following technical solutions:
A kind of pumping plant of rapid construction is discharged steel tube track holder device, it by water outlet steel pipe, track and U-bracket plate, Reinforcing bar, pre-embedded bolt, built-in fitting and briquetting are constituted, it is characterised in that: water outlet steel pipe is packed on U-bracket plate, U-bracket plate For rectangle structure, production has reinforced hole on U-bracket plate, and two tracks are symmetrically packed in water outlet steel pipe two sides by briquetting The bracket component of water outlet steel pipe and track is formed on U-bracket plate;Bracket component is packed on the concrete floor poured, pump One end of vehicle is equipped with wirerope and is slided in orbit by the realization of pump house hoist engine, and pump truck upper-loading has immersible pump and by embracing Rail device is buckled on two tracks;Reinforcing bar is penetrated in each U-bracket plate by the reinforced hole on U-bracket plate, and will with stirrup The casting that concrete is carried out after reinforcing bar binding and fixing, is put into concrete top for pre-embedded bolt and built-in fitting when casting.
The beneficial effect of the utility model compared with prior art is:
1, the pumping plant water outlet steel tube track holder device use of the rapid construction will be discharged steel pipe and track and produce in advance Workshop machine-shaping, while U-bracket plate being welded on water outlet steel pipe in workshop, then steel tube track bracket component is transported Defeated to arrive building site, then poured in place concrete one-pass molding, the construction period is short, shortens the construction period 50% or more than previous methods construction, The time is saved, engineering can build up current year operation for the year and be benefited.Solving conventional method is first to pour U-type groove concrete cradle, to Concrete carries out water outlet penstock installation after reaching some strength, then pours the fill concrete in U-type groove again.Such as the Changjiang river winter When Ji Shuiwei cannot persistently drop to ideal working water level, underwater portion construction must could be completed 2 year construction time, to current year Agricultural production cause certain loss.
2, the U-type groove steel pipe arrangement and method for construction of opposite previous methods reduces compared to concrete cross section area, greatly reduces mixed Solidifying soil and amount of reinforcement, decrease artificial dosage, have saved engineering cost, and economic benefit and social benefit ten are clearly demarcated It is aobvious.
3, the water outlet steel pipe of the pumping plant water outlet steel tube track holder device of the rapid construction and track are in advance in workshop Machine-shaping, the machining accuracy of production is higher, welding quality is more preferable, not only increases working efficiency, moreover it is possible to guarantee construction quality And construction safety.
4, water outlet steel pipe, track and the bracket component of the pumping plant water outlet steel tube track holder device of the rapid construction are in workshop Mechanized Processing is more more environmentally friendly than manual manufacture at the scene, more efficient, reduces injury of the pernicious gas to worker, reduces remnants Being scattered for waste is stretched, and environmental pollution is effectively mitigated.
Detailed description of the invention
Fig. 1 is that a kind of pumping plant of rapid construction is discharged the structural representation that pump truck is housed on the track of steel tube track holder device Figure;
Fig. 2 is the structural schematic diagram that a kind of pumping plant of rapid construction is discharged the cross section of steel tube track holder device;
Fig. 3 is that a kind of pumping plant of rapid construction is discharged water outlet steel pipe, track and the U-bracket plate of steel tube track holder device Structural schematic diagram after installation.
In figure: 1, water outlet steel pipe, 2, track, 3, pump truck, 4, wirerope, 5, U-bracket plate, 6, reinforcing bar, 7, reinforced hole, 8, Pre-embedded bolt, 9, built-in fitting, 10, briquetting.
Specific embodiment
The pumping plant of the rapid construction is discharged steel tube track holder device, it by water outlet steel pipe 1, track 2, U-bracket plate 5, Reinforcing bar 6, pre-embedded bolt 8, built-in fitting 9 and briquetting 10 are constituted, and water outlet steel pipe 1 is packed on U-bracket plate 5, and U-bracket plate 5 is Rectangle structure, production has reinforced hole 7 on U-bracket plate 5, and two tracks 2 are symmetrically packed in 1 liang of steel pipe of water outlet by briquetting 10 The bracket component of water outlet steel pipe and track is formed on the U-bracket plate 5 of side;Bracket component is packed in the concrete floor poured On, one end of pump truck 2 is equipped with wirerope 4 and is slided on track 2 by the realization of pump house hoist engine, equipped with diving on pump truck 2 It pumps and is buckled on two tracks by embracing rail device;Reinforcing bar 6 penetrates each U-bracket plate 5 by the reinforced hole 7 on U-bracket plate 5 In, and the casting of concrete will be carried out with stirrup after 6 binding and fixing of reinforcing bar, pre-embedded bolt 8 and built-in fitting 9 are put into mixed by when casting Solidifying soil top.
The manufacturing process of the pumping plant water outlet steel tube track holder device of the rapid construction is as follows:
The first step, first workshop be by diameter 110 cm, length be 6m steel pipe according to length needed for water outlet steel pipe 1 Degree carries out welding processing to water outlet steel pipe 1, while carrying out welding processing to track 2 according to length needed for track 2, then producing Workshop will be welded on water outlet steel pipe 1 with a thickness of the U-bracket plate 5 of 3cm by design requirement.
The water outlet steel pipe 1 for being welded with U-bracket plate 5 and track 2 made are transported to building site and are placed on bottom by second step It on plate, is mounted on bottom plate by design requirement, and pipeline is done and is connected and fixed after leveling straightening is checked with the built-in fitting on bottom plate.
Third step penetrates reinforcing bar 6 in each U-bracket plate 5 by the reinforced hole 7 on U-bracket plate 5, then will with stirrup The casting that concrete is carried out after 6 binding and fixing of reinforcing bar, is put into concrete for pre-embedded bolt 8 and built-in fitting 9 when being poured into top Top is fixed tightly on concrete upon the setting of the concrete.
4th step, after concrete setting, two tracks 2 are symmetrically packed in water outlet steel pipe 1 two sides by briquetting 10 On bracket component, the water outlet steel tube track holder device of pumping plant completes;Pump truck 3 is mounted in two by embracing rail device again On track 2, wirerope 4 is loaded on pump truck 2 and completes pumping plant installation.
The above is the preferred embodiment of the utility model, and the example above illustrates the not reality to the utility model Matter content makes any form of restriction, and person of an ordinary skill in the technical field is after having read this specification according to this reality It is taken off with novel technical spirit to any simple modification or deformation made by the above specific embodiment, and possibly also with above-mentioned The technology contents shown are changed or are modified to the equivalent embodiment of equivalent variations, still fall within technical solutions of the utility model In range, without departing from the spirit and scope of the utility model.

Claims (1)

1. a kind of pumping plant of rapid construction is discharged steel tube track holder device, it is by water outlet steel pipe (1), track (2), U-bracket Plate (5), reinforcing bar (6), pre-embedded bolt (8), built-in fitting (9) and briquetting (10) are constituted, it is characterised in that: water outlet steel pipe (1) is fixedly mounted with On U-bracket plate (5), U-bracket plate (5) is rectangle structure, and making on U-bracket plate (5) has reinforced hole (7), two Track (2) is symmetrically packed on the U-bracket plate (5) of water outlet steel pipe (1) two sides by briquetting (10) and forms water outlet steel pipe and rail The bracket component in road;Bracket component is packed on the concrete floor poured, and one end of pump truck (3) is equipped with wirerope (4) And slided on track (2) by the realization of pump house hoist engine, two are buckled in equipped with immersible pump on pump truck (3) and by embracing rail device On track;Reinforcing bar (6) is penetrated in each U-bracket plate (5) by the reinforced hole (7) on U-bracket plate (5), and with stirrup by steel The casting that concrete is carried out after muscle (6) binding and fixing, is put into concrete top for pre-embedded bolt (8) and built-in fitting (9) when casting.
CN201820988491.9U 2018-06-26 2018-06-26 A kind of pumping plant water outlet steel tube track holder device of rapid construction Expired - Fee Related CN208331448U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820988491.9U CN208331448U (en) 2018-06-26 2018-06-26 A kind of pumping plant water outlet steel tube track holder device of rapid construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820988491.9U CN208331448U (en) 2018-06-26 2018-06-26 A kind of pumping plant water outlet steel tube track holder device of rapid construction

Publications (1)

Publication Number Publication Date
CN208331448U true CN208331448U (en) 2019-01-04

Family

ID=64768866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820988491.9U Expired - Fee Related CN208331448U (en) 2018-06-26 2018-06-26 A kind of pumping plant water outlet steel tube track holder device of rapid construction

Country Status (1)

Country Link
CN (1) CN208331448U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108679310A (en) * 2018-06-26 2018-10-19 湖北郢都水利水电建设有限公司 A kind of pumping plant water outlet steel tube track holder device of rapid construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108679310A (en) * 2018-06-26 2018-10-19 湖北郢都水利水电建设有限公司 A kind of pumping plant water outlet steel tube track holder device of rapid construction

Similar Documents

Publication Publication Date Title
CN105544575B (en) A kind of bottom concrete construction method under water of use steel truss reinforcement
CN109208632A (en) A kind of precast hollow module block type concrete retaining wall
CN108301440A (en) With waterproof, the underground pipe gallery construction method of drain function
CN208331448U (en) A kind of pumping plant water outlet steel tube track holder device of rapid construction
CN112694230A (en) Comprehensive treatment method for high-garbage-content rotten and aged sludge pond
CN206428752U (en) Multifunctional diving pumping plant oblique pull suspension type fixes corollary apparatus
CN219547838U (en) Frame lattice beam structure without template
CN102900078A (en) Anticorrosive preformed pile and manufacturing and constructing method thereof
CN108679310A (en) A kind of pumping plant water outlet steel tube track holder device of rapid construction
CN209066480U (en) A kind of precast hollow module block type concrete retaining wall
CN203905331U (en) Cast-in-place plate-type staircase with seamless steps
CN205296164U (en) Fill ability of swimming slip form construction device
CN205711980U (en) A kind of chute cast-in-place construction device
Shiryaeva et al. Mathematical justification constructive solutions project to modernize sewage treatment plants in the HPP
CN201686965U (en) Cast-in-situ reinforced concrete strobe for diversion tunnel
CN211445327U (en) Organic contaminated site groundwater remediation system
CN209260687U (en) A kind of assembled marine hydrology station structure
CN209397926U (en) A kind of elevator fence operation platform structure
CN208280156U (en) The non-fully pile foundation cushion cap under precipitation state inside a kind of foundation pit
CN207121902U (en) Multilevel hierarchy post jacking armored concrete pretensioned prestressing hollow square pile
CN201362341Y (en) Twin-hull pontoon for treating soft ground
CN101644040A (en) Flow guide and navigation pier structure and construction method thereof
CN111827239A (en) Construction method of assembled berthing pier
CN201021658Y (en) Hydraulic pressure water supply device
CN217782295U (en) Simple and easy apron is contained

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190104