CN102900078A - Anticorrosive preformed pile and manufacturing and constructing method thereof - Google Patents

Anticorrosive preformed pile and manufacturing and constructing method thereof Download PDF

Info

Publication number
CN102900078A
CN102900078A CN2011102219151A CN201110221915A CN102900078A CN 102900078 A CN102900078 A CN 102900078A CN 2011102219151 A CN2011102219151 A CN 2011102219151A CN 201110221915 A CN201110221915 A CN 201110221915A CN 102900078 A CN102900078 A CN 102900078A
Authority
CN
China
Prior art keywords
pile
pile body
preformed
gravel
sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102219151A
Other languages
Chinese (zh)
Inventor
邹宗煊
邹荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011102219151A priority Critical patent/CN102900078A/en
Publication of CN102900078A publication Critical patent/CN102900078A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses an anticorrosive preformed pile which is characterized in that pile links 0.5-25 cm greater than a pile body in diameter are arranged on the pile body of the preformed pile at intervals of 0.3 4 m; and the pile body is coated with waterproof asphalt, and 0.5-25cm thick sand or gravel is coated outside the waterproof asphalt. A manufacturing and constructing method of the anticorrosive preformed pile comprises the following steps of: binding a steel reinforcement cage and putting the steel reinforcement cage into a preformed pile template with the pile links, pouring concrete; after the desired strength of the concrete is achieved, spraying the waterproof asphalt to the pile body or lifting and putting the pile body into a holt melt asphalt tank to be soaked in the waterproof asphalt; lifting the pile body by a pile machine and standing the pile body in a pile position; heaping sand or gravel on the pile position; and piling or pressing the pile body into the soil so that the pile tip and the pile links on the pile body squeeze away the soil layer and the sand or the gravel, and then the soil, the sand or the gravel are conveniently filled around of the pile. The anticorrosive preformed pile and the steel reinforcement are prevented from being corroded by underground water; the bearing capability of the pile is improved, the drainage of stressed water in the soil layer is accelerated, the solidification of the soil around the pile is sped up, and the frictional force of the soil around the pile is improved; and the anticorrosive preformed pile is suitable for building foundation engineering in newly developed saline-alkali regions or new coastal reclamation regions in China.

Description

A kind of anti-corrosion precast pile and making job practices thereof
Technical field
The present invention relates to the building foundation field, relate in particular to a kind of anti-corrosion precast pile and make job practices.
Background technology
Along with China's urban construction scale constantly enlarges, the town site growing tension, the salt-soda soil development and use that many cities are had to famine is boundless and indistinct are perhaps reclaimed fields from the sea.In large stretch of salt-soda soil that China coast exists, contain SO in the underground water 4 2-, CO 2 -, HCO 3, CL-has corrosivity to concrete and rebar.Such as 8 water samples of thermoelectric engineering place, newly developed area, the Bohai Sea, China Resources, Cangzhou, Hebei underground water, detect through monitoring water environment experimental center, Hebei province, in appraisal report (numbering HSB2009WJW066), claim, this place underground water pH value 5.70-6.93, slant acidity contains CL -142521.1-51052.3, contain SO 4 2-13038.4-6047.1, be deep-etching to concrete structure, be weak corrosion to the reinforcing bar in the reinforced concrete structure, be moderate corrosion to steel work.
On, the Underwater Engineering new technology new results exchanging meeting underground at the national Second Committee that on June 1st, 2011 held in Tianjin; have R﹠D institution to think through several years trace detection: less expensive, effective measures are after the tubular pile concrete topping is brought up to 4cm by 3cm; bring up to 6cm, tubular pile concrete intensity is mentioned C80 by C60 again.This measure is than existing polyurethane or polyureas economy of smearing every square meter unit price 100-250 unit in preformed pile or pile tube outside, but this can only delay degree that concrete structure and reinforcing bar be corroded and prolong the time that is corroded, and can't stop concrete structure and reinforcing bar is corroded.
Summary of the invention
The invention provides a kind of anti-corrosion precast pile and make job practices, can prevent economical, effectively that the concrete and rebar of preformed pile from being corroded by underground water, the stress water that produces in the silt soil strata that piling is caused is discharged along all sand of stake or sandy gravel stratum, accelerated the dehydrating and curing of all mucky soils of stake, improve all native frictional resistances of stake, the bearing capacity of stake is increased substantially.
The technical solution adopted in the present invention is: a kind of anti-corrosion precast pile is the same with prior art, all include cross sections and be square or rectangle or circular long column shape steel concrete pile body, it is characterized in that, on the preformed pile pile body, every 0.3-4m pile section than the large 0.5-25cm of pile body diameter is arranged, the wide 0.5-25cm of pile section, pile section is provided with the longitudinal drainage hole, and the steel concrete pile body scribbles water proofing asphalt, and pitch has the thick sand of 0.5-25cm or gravel or fine grain building waste outward.
The making job practices of above-mentioned a kind of anti-corrosion precast pile is characterized in that may further comprise the steps successively:
1., the reinforcing cage in the colligation preformed pile;
2., the reinforcing cage that colligation is good is placed in the preformed pile template with pile section cast pile concrete and maintenance;
3., after concrete strength reaches, hang in to cross in the hot-melt asphalt groove at the pile body spray or with pile body and soak water proofing asphalt;
4., stand on the stake position the upper heap sand in stake position or gravel or fine grain building waste by the stake machine pile body of slinging;
5., pile body is squeezed into or is pressed in the soil by the stake machine, the pile top on the pile body, pile section are squeezed and are opened soil layer, and sand or gravel or fine grain building waste just filling guarantee that in stake week water proofing asphalt is not frayed when pile body enters soil layer.
A kind of anti-corrosion precast pile compared with prior art, has following remarkable advantage: can prevent economical, effectively that the concrete and rebar of preformed pile is not corroded by underground water, can also increase substantially the bearing capacity of preformed pile, stress water is discharged along all sand of stake or sandy gravel stratum in the silt soil strata that quickening piling causes, accelerated the curing of all mucky soils of stake, improve all native frictional resistances of stake, the present invention is applicable to China coast varieties in saline-alkali areas newly developed or newly reclaims fields from the sea the building foundation engineering in area.
The invention will be further described below in conjunction with accompanying drawing 1 and specific embodiment.
Description of drawings
Fig. 1 is embodiment of the invention schematic diagram.
Among the figure: 1. miscellaneous fill, 2. cushion cap, 3. pile body, 4. pile section, 5. drain hole, 6. layer of sand, 7. mud, 8. water proofing asphalt, 9. pile top, 10. argillic horizon, 11. polyureas.
The specific embodiment
Figure 1 shows that exemplary embodiments of the present invention, it is square long column shape steel concrete pile body (3) that a kind of anti-corrosion precast pile includes cross sections, and every 2m pile section (4) than the large 10cm of pile body (3) is arranged pile body (3) is upper, the wide 10cm of pile section (4), pile section (4) is provided with longitudinal drainage hole (5), scribble pitch (8) on pile body (3) and the pile section (4), pitch (8) is outer the thick back-up sand of 10cm (6), and pile top (9) surface scribbles polyureas (11).
Below brief description embodiment makes construction sequence:
1., the reinforcing cage in the colligation preformed pile;
2., the template of mounting strap pile section (4) and pour into a mould pile body (3) concrete and maintenance;
3., after concrete strength reaches, pile body (3) hung in to cross in the hot-melt asphalt groove soak water proofing asphalt;
4., stand on the stake position the upper heap sand in stake position by the stake machine pile body (3) of slinging;
5., by the stake machine pile body (3) is squeezed into soil layer (1,7,10) in, during pile section (4) on the pile body (3) is buried sand (6) band, pile body (3) periphery of filling between pile section (4), reaching water proofing asphalt (8) is not worn when pile body (3) enters soil layer (1,7,10).Namely finish the making construction of an anti-corrosion precast pile, go round and begin again, finish the construction of all anti-corrosion precast piles.

Claims (2)

1. an anti-corrosion precast pile is the same with prior art, all include cross sections and be square or rectangle or circular long column shape steel concrete pile body, it is characterized in that, on the preformed pile pile body, every 0.3-4m pile section than the large 0.5-25cm of pile body diameter is arranged, the wide 0.5-25cm of pile section, pile section is provided with the longitudinal drainage hole, and the steel concrete pile body scribbles water proofing asphalt, and pitch has the thick sand of 0.5-25cm or gravel or fine grain building waste outward.
2. the making job practices of an anti-corrosion precast pile is characterized in that may further comprise the steps successively:
1., the reinforcing cage in the colligation preformed pile;
2., the reinforcing cage that colligation is good is placed in the preformed pile template with pile section cast pile concrete and maintenance;
3., after concrete strength reaches, hang in to cross in the hot-melt asphalt groove at the pile body spray or with pile body and soak water proofing asphalt;
4., stand on the stake position the upper heap sand in stake position or gravel or fine grain building waste by the stake machine pile body of slinging;
5., pile body is squeezed into or is pressed in the soil by the stake machine, the pile top on the pile body, pile section are squeezed and are opened soil layer, sand or gravel or fine grain building waste just filling in stake week.
CN2011102219151A 2011-07-26 2011-07-26 Anticorrosive preformed pile and manufacturing and constructing method thereof Pending CN102900078A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102219151A CN102900078A (en) 2011-07-26 2011-07-26 Anticorrosive preformed pile and manufacturing and constructing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102219151A CN102900078A (en) 2011-07-26 2011-07-26 Anticorrosive preformed pile and manufacturing and constructing method thereof

Publications (1)

Publication Number Publication Date
CN102900078A true CN102900078A (en) 2013-01-30

Family

ID=47572545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102219151A Pending CN102900078A (en) 2011-07-26 2011-07-26 Anticorrosive preformed pile and manufacturing and constructing method thereof

Country Status (1)

Country Link
CN (1) CN102900078A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103526753A (en) * 2013-10-24 2014-01-22 华煜建设集团有限公司 Anti-corrosion precast pile
CN104389305A (en) * 2014-11-18 2015-03-04 中淳高科桩业股份有限公司 Sand-filled bamboo-joint pile and construction method thereof
CN104878784A (en) * 2015-05-22 2015-09-02 中国十七冶集团有限公司 Construction method for preventing preformed pile in mucky soil layer from moving horizontally
CN105648872A (en) * 2016-02-03 2016-06-08 济南轨道交通集团有限公司 Device and construction method for prefabricated seepage column
CN106592586A (en) * 2016-12-03 2017-04-26 浙江大学 Prefabricated pile with external hoops and filled with sand-gravel aggregates, and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004316380A (en) * 2003-04-11 2004-11-11 Tetsuo Kesen Method for mounting pile and its mounting device
CN201087416Y (en) * 2007-08-23 2008-07-16 郭兆泉 Pile for pre-stress enlarging end, resisting to pulling and vibration, and foundation soil processing
CN101343871A (en) * 2008-08-22 2009-01-14 北京航空航天大学 Composite pile with high permanent stability protection layer and its production and construction method
CN201321612Y (en) * 2008-12-25 2009-10-07 大连金广建设集团有限公司 Prestressing pipe pile for buildings
CN101581095A (en) * 2009-06-11 2009-11-18 福建省大地管桩有限公司 Anti-corrosive pre-stressed concrete pipe pile foundation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004316380A (en) * 2003-04-11 2004-11-11 Tetsuo Kesen Method for mounting pile and its mounting device
CN201087416Y (en) * 2007-08-23 2008-07-16 郭兆泉 Pile for pre-stress enlarging end, resisting to pulling and vibration, and foundation soil processing
CN101343871A (en) * 2008-08-22 2009-01-14 北京航空航天大学 Composite pile with high permanent stability protection layer and its production and construction method
CN201321612Y (en) * 2008-12-25 2009-10-07 大连金广建设集团有限公司 Prestressing pipe pile for buildings
CN101581095A (en) * 2009-06-11 2009-11-18 福建省大地管桩有限公司 Anti-corrosive pre-stressed concrete pipe pile foundation

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103526753A (en) * 2013-10-24 2014-01-22 华煜建设集团有限公司 Anti-corrosion precast pile
CN104389305A (en) * 2014-11-18 2015-03-04 中淳高科桩业股份有限公司 Sand-filled bamboo-joint pile and construction method thereof
CN104878784A (en) * 2015-05-22 2015-09-02 中国十七冶集团有限公司 Construction method for preventing preformed pile in mucky soil layer from moving horizontally
CN105648872A (en) * 2016-02-03 2016-06-08 济南轨道交通集团有限公司 Device and construction method for prefabricated seepage column
CN106592586A (en) * 2016-12-03 2017-04-26 浙江大学 Prefabricated pile with external hoops and filled with sand-gravel aggregates, and construction method thereof
CN106592586B (en) * 2016-12-03 2018-12-04 浙江大学 Additional cuff back-up sand building stones prefabricated pile and its construction method

Similar Documents

Publication Publication Date Title
CN102518135B (en) Horizontal jet grouting soil anchor and castinplace pile Composite Foundation Pit supporting construction engineering method
CN103774514B (en) A kind of prefabricated tubular pile embankment structure and construction method thereof
CN102900078A (en) Anticorrosive preformed pile and manufacturing and constructing method thereof
CN101544022B (en) Preparation method for preformed hole fender pile
CN102839680A (en) High slope earthwork and support engineering construction method
CN101597888B (en) Construction method of municipal drainage culvert sinking trough
CN105200983A (en) PVC pipe and thick wall steel tube composite hollow recycled concrete pile
CN104762956B (en) Method for forming pile based on construction waste recycled aggregate
CN202323865U (en) Novel revetment combined structure
CN203684022U (en) Prefabricated pipe pile embankment structure
CN201339186Y (en) Soft rock concrete replacement pile composite foundation
CN108755675A (en) A kind of steel-pipe pile pile cover structure and the construction method for improving steel-pipe pile corrosion resistance
CN205776282U (en) A kind of immersed tube tunnel rebuilds cofferdam structure
CN202175948U (en) Anti-corrosion precast pile
CN106149751A (en) Utilize the method that quick lime brick quarrel compaction pile reinforces building construction ground
CN202787247U (en) PHC (prestressed high-strength concrete) pile and steel pipe pile composited pile for long piled wharfs
CN208803460U (en) A kind of enhancing cement mixing method intercepts water the Prefabricated Concrete sheet pile of effect
CN104088288B (en) The preparation method of container caisson and application thereof
CN102966095A (en) Compound pile cast with concrete on site and filled with sand and construction method thereof
CN207260082U (en) Active service refutes bank revetment and increases structure
CN101787696B (en) Pile filling technology of large-diameter bagged concrete
CN205421303U (en) High water level silt ground water treatment facilities falls
CN212561494U (en) Prestressed anchor rod pile for reinforcing foundation through rotary spraying, powder spraying or stirring pile
CN111691528B (en) Natural disaster risk prevention system
CN202298605U (en) Cast-in-place concrete and sand filling compound pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130130