CN201087416Y - Pile for pre-stress enlarging end, resisting to pulling and vibration, and foundation soil processing - Google Patents

Pile for pre-stress enlarging end, resisting to pulling and vibration, and foundation soil processing Download PDF

Info

Publication number
CN201087416Y
CN201087416Y CNU2007201049218U CN200720104921U CN201087416Y CN 201087416 Y CN201087416 Y CN 201087416Y CN U2007201049218 U CNU2007201049218 U CN U2007201049218U CN 200720104921 U CN200720104921 U CN 200720104921U CN 201087416 Y CN201087416 Y CN 201087416Y
Authority
CN
China
Prior art keywords
pile
plucking
foundation
resistance
shockproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201049218U
Other languages
Chinese (zh)
Inventor
曹沂风
郭兆泉
路鹏
胡靓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction Engineering Group Co., Ltd.
Original Assignee
郭兆泉
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 郭兆泉 filed Critical 郭兆泉
Priority to CNU2007201049218U priority Critical patent/CN201087416Y/en
Application granted granted Critical
Publication of CN201087416Y publication Critical patent/CN201087416Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

A pile foundation of prestressed expansion, anti-pulling, quakeproof and groundwork soil treatment is characterized in that a concrete hoop is arranged at the round stone layer of a prestressed pipe pile body. At least four anti-pulling steel bars with hooks are arranged at the bottom of a prestressed pipe pile, to form a reinforced concrete expansion. The utility model uses the traditional construction of the pipe pile to form a reinforced concrete enlarged pile, thereby effectively raising the end bearing capability, the anti-pulling power and the carrying capacity, and enhancing the quakeproof performance. The piles consist of hollow concrete prestressed or nonprestressed piles provided with a plurality of smooth or indented planes with round, square, triangle, polygon and corrugated cross-sections.

Description

Prestressing force expands the pile foundation of head, resistance to plucking, shockproof, double foundation soil processing
Technical field:
The utility model relates to pile for prestressed pipe, is the pile foundation that a kind of prestressing force expands head, resistance to plucking, shockproof, double foundation soil processing.
Background technology:
The tradition pile for prestressed pipe is no matter squeeze into formula or forced, and is all little because of the bottom section, and the end load is very undesirable.Be to obtain bigger bearing capacity, often very dark pile driving construction so, just increased the pile foundation cost.
Summary of the invention:
The purpose of this utility model is to propose the pile foundation that a kind of prestressing force expands head, resistance to plucking, shockproof, double foundation soil processing, and it uses traditional tube pile construction to become the steel concrete expanded head pile, has effectively improved end load, uplift resistance, bearing capacity and enhancing shockproof properties.
The purpose of this utility model reaches by following technical measures:
A kind of prestressing force expands the pile foundation of head, resistance to plucking, shockproof, double foundation soil processing, being in the gravel layer position on the pile body of pile for prestressed pipe, thickness is arranged is 50mm, it highly is the concrete ring of 400~600mm, the pile for prestressed pipe bottom is welded to the resistance to plucking reinforcing bar of few four band crotches, forms the steel concrete enlarged footing.
Screw thread resistance to plucking reinforcing bar is preferably welded in described pile tube bottom.
The light face pile body of described pile for prestressed pipe for adopting template with holes to make.
Described pile for prestressed pipe is for adopting groove face pile body with holes and that the groove face die plate is made.
The pile body external surface of described pile for prestressed pipe has certain thickness tamper, and whole pile body is evenly distributed with drain hole in the pile lining upper edge, and drain hole is communicated with vertical hollow passageway and the husky lining in the pile body.
The utility model adopts applicant's disclosed vibration sinking tube ram machine construction pile for prestressed pipe in ZL2005 20022672.9, do the steel concrete enlarged footing in its bottom, again on pile body the construction a plurality of concrete rings, other two the patent tampers and the drain hole technology that cooperate us again, a traditional light face prestressed concrete pipe pile just becomes the low prestressing force of cost and expands head, resistance to plucking, shockproof and had the pile foundation of improving the foundation soil physico-mechanical properties concurrently.There is the hollow concrete prestressing force or the non-prestressed stake of circle, square, triangle, polygon, multiple light face such as corrugated or groove face in the cross section of this stake.
The utility model proposes the pile foundation that the prestressing force that comes expands head, resistance to plucking, shockproof, double foundation soil processing, construct into the steel concrete enlarged footing in the pile for prestressed pipe bottom, thereby improve the novel pile foundation of its end load and other performance parameter, and have the pile foundation that the physico-mechanical properties of foundation soil is handled concurrently.
Description of drawings:
Fig. 1 is a structural representation of the present utility model.
The specific embodiment:
Reaching embodiment in conjunction with the accompanying drawings describes.
1, under the situation of former pile for prestressed pipe parameter constant, there is concrete ring 2 at the position that is in gravel layer 3 on the pile body 1 of pile for prestressed pipe, pile body 1 external surface has certain thickness tamper 4, the pile body of pile tube is evenly made drain hole 5 at the whole pile body in pile lining upper edge, and drain hole is communicated with vertical hollow passageway 7 and the husky lining in the pile body.The bottom welding is no less than the indented bars 6 of four band crotches, and length is about 300~500mm.
2, vibration sinking tube pours into and expands a concrete to projected depth; The light face of the band drain hole that will make with the template of light face with holes or groove face or the pile for prestressed pipe pile body of groove face hang in the immersed tube, and vibration pipe-drawing expands head formation naturally.In order to ensure the quality of products, anti-again inserting several times is till pile for prestressed pipe top absolute altitude meets design requirement.Add sand in the tube drawing process and form tamper, add concrete and form concrete ring, and the continuous anti-compacting of inserting, till immersed tube is extracted ground.

Claims (6)

1. a prestressing force expands the pile foundation of head, resistance to plucking, shockproof, the foundation soil processing of holding concurrently, it is characterized in that: being in the gravel layer position on the pile body of pile for prestressed pipe has concrete ring, the pile for prestressed pipe bottom is welded to the resistance to plucking reinforcing bar of few four band crotches, forms the steel concrete enlarged footing.
2. prestressing force according to claim 1 expands the pile foundation of head, resistance to plucking, shockproof, double foundation soil processing, it is characterized in that: pile tube bottom weldering screw thread resistance to plucking reinforcing bar.
3. prestressing force according to claim 1 expands the pile foundation of head, resistance to plucking, shockproof, double foundation soil processing, and it is characterized in that: the thickness of concrete ring is 50mm, highly is 400~600mm.
4. prestressing force according to claim 1 expands the pile foundation of head, resistance to plucking, shockproof, double foundation soil processing, it is characterized in that: the light face pile body of pile for prestressed pipe for adopting template with holes to make.
5. prestressing force according to claim 1 expands the pile foundation of head, resistance to plucking, shockproof, double foundation soil processing, it is characterized in that: pile for prestressed pipe is for adopting groove face pile body with holes and that the groove face die plate is made.
6. expand the pile foundation of heads, resistance to plucking, shockproof, the foundation soil processing of holding concurrently according to claim 4 or 5 described prestressing force, it is characterized in that: the pile body external surface of pile for prestressed pipe has certain thickness tamper, whole pile body is evenly distributed with drain hole in the pile lining upper edge, and drain hole is communicated with vertical hollow passageway and the husky lining in the pile body.
CNU2007201049218U 2007-08-23 2007-08-23 Pile for pre-stress enlarging end, resisting to pulling and vibration, and foundation soil processing Expired - Fee Related CN201087416Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201049218U CN201087416Y (en) 2007-08-23 2007-08-23 Pile for pre-stress enlarging end, resisting to pulling and vibration, and foundation soil processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201049218U CN201087416Y (en) 2007-08-23 2007-08-23 Pile for pre-stress enlarging end, resisting to pulling and vibration, and foundation soil processing

Publications (1)

Publication Number Publication Date
CN201087416Y true CN201087416Y (en) 2008-07-16

Family

ID=39635010

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201049218U Expired - Fee Related CN201087416Y (en) 2007-08-23 2007-08-23 Pile for pre-stress enlarging end, resisting to pulling and vibration, and foundation soil processing

Country Status (1)

Country Link
CN (1) CN201087416Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761074B (en) * 2008-10-10 2012-01-25 上海强劲地基工程股份有限公司 Method for improving bearing capacity and tensile capacity of tubular pile end
CN102900078A (en) * 2011-07-26 2013-01-30 邹宗煊 Anticorrosive preformed pile and manufacturing and constructing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761074B (en) * 2008-10-10 2012-01-25 上海强劲地基工程股份有限公司 Method for improving bearing capacity and tensile capacity of tubular pile end
CN102900078A (en) * 2011-07-26 2013-01-30 邹宗煊 Anticorrosive preformed pile and manufacturing and constructing method thereof

Similar Documents

Publication Publication Date Title
JP5932124B1 (en) Steel pipe pile construction method
CN103015396A (en) Construction method of soft foundation
CN205954656U (en) Double -layer steel manages cement pipe column foundation
CN201730091U (en) Cast-in-situ pile
CN102286970A (en) Whole process construction method of driven cast-in-place piles and special device for same
CN101307597B (en) Prestressing force pipe pile precast pile tip and its production process
CN107489144B (en) Reinforcing tubular pile
CN101936004A (en) Precast expanding pile as well as construction method and construction mechanical equipment thereof
CN201087416Y (en) Pile for pre-stress enlarging end, resisting to pulling and vibration, and foundation soil processing
CN202187340U (en) Socketed pile with concrete-filled steel tube core column
CN110616705B (en) Wedge type pile head with pile side bearing force and pile forming construction method
CN102140795A (en) Steel pile tip of prestressed concrete pipe pile
CN110206020B (en) Prefabricated snowflake type concrete steel sheet pile and construction method thereof
CN110670579A (en) Hoop pile for pile foundation engineering and foundation treatment and construction process thereof
CN202280054U (en) Foundation with multiple enlarged ends of power transmission line iron tower
CN213952209U (en) PSB finish rolling screw-thread steel pipe pile prestressing force anti-floating pile structure
CN201762705U (en) Prefabricated extruding and expanding pile
CN105908738B (en) Heavy-gauge steel and the hollow friction pile of Combined concrete and its construction method
CN201538965U (en) Bushing disc pile
CN106113224A (en) A kind of opening concrete hollow pile tube and using method
CN203270563U (en) V-shaped fender post
CN203129133U (en) Centrifugal poured prestressed steel bar concrete H-shaped section support pile
CN207193953U (en) A kind of reinforced concrete tubular pile of outer rim
CN2729151Y (en) High-strength hollow pile top
CN206956724U (en) A kind of anti-float roof bolt stump

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: YUNNAN CONSTRUCTION ENGINEERING GROUP GENERAL CO.

Free format text: FORMER OWNER: GUO ZHAOQUAN

Effective date: 20081114

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20081114

Address after: Building 36, Dongfeng East Road, Yunnan, Kunming, China: 650051

Patentee after: Yunnan Construction Engineering Group Corporation

Address before: 1, unit 23, East rose garden, Expo Road, Panlong District, Yunnan, Kunming province 501, postcode: 650224

Patentee before: Guo Zhaoquan

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 650051 Kunming Dongfeng East Road, No. 36 building, Yunnan

Patentee after: Yunnan Construction Engineering Group Co., Ltd.

Address before: 650051 Kunming Dongfeng East Road, No. 36 building, Yunnan

Patentee before: Yunnan Construction Engineering Group Corporation

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080716

Termination date: 20160823