CN108755675A - A kind of steel-pipe pile pile cover structure and the construction method for improving steel-pipe pile corrosion resistance - Google Patents

A kind of steel-pipe pile pile cover structure and the construction method for improving steel-pipe pile corrosion resistance Download PDF

Info

Publication number
CN108755675A
CN108755675A CN201810788004.9A CN201810788004A CN108755675A CN 108755675 A CN108755675 A CN 108755675A CN 201810788004 A CN201810788004 A CN 201810788004A CN 108755675 A CN108755675 A CN 108755675A
Authority
CN
China
Prior art keywords
steel
pile
pipe pile
prefabricated
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810788004.9A
Other languages
Chinese (zh)
Inventor
金志良
金璐
张建红
叶祥记
王翔
王伟
张玉萍
原娟
邹青
高万国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbour Consultants Co Ltd
Original Assignee
CCCC First Harbour Consultants Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbour Consultants Co Ltd filed Critical CCCC First Harbour Consultants Co Ltd
Priority to CN201810788004.9A priority Critical patent/CN108755675A/en
Publication of CN108755675A publication Critical patent/CN108755675A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/223Details of top sections of foundation piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/60Piles with protecting cases
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/68Mould-pipes or other moulds for making bulkheads or elements thereof

Abstract

The invention discloses a kind of steel-pipe pile pile cover structure, including prefabricated steel-pipe pile and harbour beam, pre-buried main reinforcement and core grouted concrete in prefabricated steel-pipe pile are equipped with stirrup on the outside of main reinforcement;Harbour beam is formed by prefabricated crossbeam, prefabricated longeron, the cast-in-place connector concrete of the longitudinal and transverse beam of harbour, prefabricated pile cover and reinforced concrete sleeve are equipped at the top of prefabricated steel-pipe pile, and it is rigidly connected with prefabricated steel-pipe pile by core grouted concrete in prefabricated steel-pipe pile and cast-in-place pile cover connector concrete, reinforced concrete sleeve blocks clay between bottom end circumference and the gap of prefabricated steel-pipe pile and winds geotextile layer on clay, and the top preset of prefabricated pile cover has anti-corrosion injected hole.Anti-corrosion material is injected by anti-corrosion injected hole in the gap between steel-pipe pile and reinforced concrete sleeve.Present invention has the advantages that:In addition steel tube pile structure need not increase the corrosion-resistant wall thickness of steel-pipe pile in splash zone and fluctuation of water table section;It can be without anti-corrosion of steel pipe pile application and cathodic protection.

Description

A kind of steel-pipe pile pile cover structure and the construction method for improving steel-pipe pile corrosion resistance
Technical field
The present invention relates to the STEEL TUBE PILE WHARF of port engineering and the design fields of off-lying sea hydraulic structure steel pipe pile foundation, special It is not related to a kind of raising steel-pipe pile in splash zone, the pile cover structure and construction method of fluctuation of water table area corrosion resistance.
Background technology
Steel tube pile structure be port and pier engineering and off-lying sea hydraulic structure engineering pass through frequently with one of structure type.One As splash zone of the construction usually residing for steel-pipe pile, in addition fluctuation of water table section increases certain wall thickness make as steel-pipe pile The corrosion thickness reserved with the phase, while the measures such as derusting, the setting cathodic protection of anticorrosion with painting coating are also taken on the outside of steel-pipe pile. When the wall thickness difference of a steel-pipe pile, pile foundation welding processing is complicated and steel using amount is big, and generally use is waterborne after the completion of pile sinking The cast-in-place rectangular pile cap structure of formwork supporting plate, working procedure is more, and concrete amount is larger, and by hydrometeorology, geological conditions and Human factor influences, and the cast-in-place generally more prefabricated pile cover of pile cover concrete construction quality is slightly worse.
Certain engineering projects are especially overseas Wharf Engineering, often have in structure design from domestic pile foundation wharfs it is different it Locate, the pile foundation wharfs in some areas are got used to very long (100~200m is even longer) using dock structure longitudinal divisions in the world Complete straight stake steel tube pile structure.According to state, the construction experiences of outer and inner tube stake harbour, it is in splash zone and fluctuation of water table section Steel-pipe pile although after taking the safeguard procedures such as derusting, anticorrosion with painting coating, cathodic protection or being very easy to occur serious Corrosion problem, be steel tube pile structure be easiest to corrosion damage weak link.Harbour be completed after operation if to splash zone and Fluctuation of water table section carries out the maintenance work after pile foundation corrosion, and the harbour stopping service time is longer, and maintenance effect is also ideal not to the utmost, Increase maintenance and the operation cost of harbour.To adapt to the construction in sea, inside and outside marine engineering, strengthen port engineering and off-lying sea water conservancy project Building steel-pipe pile in splash zone, the Anticorrosive Durability Design of fluctuation of water table section, reduce or prevent STEEL TUBE PILE WHARF and Pile foundation maintenance work of the off-lying sea hydraulic structure during operation, improves the efficiency of operation of harbour, it is necessary to existing steel-pipe pile The anticorrosive measure designed in splash zone and fluctuation of water table section further is enhanced.
Invention content
It is corrosion-resistant in splash zone, fluctuation of water table area that technical problem to be solved by the invention is to provide a kind of raising steel-pipe piles The pile cover structure and construction method of property.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:A kind of steel-pipe pile pile cover structure, including steel Pile pile, prefabricated pile cover and reinforced concrete sleeve, concrete sleeve (bottom end surrounding) block clay between steel-pipe pile gap and twine The pressure injection anti-corrosion material epoxy resin mortar in gap between geotextiles, reinforced concrete sleeve and steel-pipe pile improves steel Anti-corrosion ability of the pile pile in splash zone and fluctuation of water table section.
The technologies such as grouting pressure require can refer in gap《Marine traffic engineering concrete design specification》JTS 151-2011 and 《Marine traffic engineering concrete construction specification》Requirement construction in relation to post-tensioned prestressing beam slip casting in JTS 202-2011.
The vertical extension h1 of reinforced concrete sleeve can be according to the use of local hydrometeorology, geological conditions and harbour It is required that according to《Port engineering Pile Foundation Code》The 6.3 anticorrosion relevant provisions of (JTS 167-4-2012) and《Harbour engineering steel knot Structure anticorrosion technique specification》The regulation of (JTS 153-3) determines.When pile cover thickness h 2 can be installed according to beam in length and breadth pile cover stress by It calculates and determines.
The beneficial effects of the invention are as follows:Steel-pipe pile can be effectively prevented, serious rust occurs in splash zone, fluctuation of water table section The problem of erosion, structure type is simple, easily operated, and construction quality is guaranteed.Using the corrosion-resistant pile cover structure of the steel-pipe pile with Traditional cast-in-situ steel reinforced concrete pile cover compares its cost ratio, is compared by taking the pile foundation of a pile diameter 1.5m wall thickness 18mm as an example It is 1:1.04;
The invention is to ensure the safe and reliable of harbour and off-lying sea hydraulic structure steel tube pile structure and steel-pipe pile can be improved In the corrosion resistance of splash zone and fluctuation of water table section, reduce or prevent the section steel-pipe pile harbour run during corrode after Maintenance work, improve the efficiency of operation of harbour.After applying the present invention, steel-pipe pile is in splash zone, the use of fluctuation of water table section Generally no less than 50 years service life.The present invention has in the STEEL TUBE PILE WHARF of port engineering and off-lying sea hydraulic structure steel tube pile structure There is the dissemination of reality;
After applying the present invention, in addition steel tube pile structure need not increase the resistance to of steel-pipe pile in splash zone and fluctuation of water table section Corrode wall thickness.It can be without anti-corrosion of steel pipe pile application and cathodic protection.Although for many years it was verified that port engineering and off-lying sea In hydraulic structure engineering, it is in splash zone and the following water of fluctuation of water table section with the steel-pipe pile corrosion in foundation soil very Slowly, the steel-pipe pile of usually this range still needs to that corresponding anticorrosive coating and cathodic protection etc. is taken to arrange according to the design requirement of structure It applies.
Description of the drawings
Fig. 1 is the Plane Installation figure of pile cover structure of the present invention;
Fig. 2 is the installation cross-section diagram of pile cover structure of the present invention;
Fig. 3 is the prefabricated pile cover cross-section diagram of the present invention;
Fig. 4 is the prefabricated pile cover plan view of the present invention;
Fig. 5-1,5-2 are steel tube pile structure figure of the present invention, cross-section diagram;
Fig. 6 is the cast-in-place connector concrete structure plan view of the pile cover top longitudinal and transverse beam of harbour.
In figure:
1, steel-pipe pile 2, prefabricated pile cover and reinforced concrete sleeve
3, core grouted concrete 4, concrete sleeve underseal close clay and winding geotextile layer in steel-pipe pile
5, pile cover top anti-corrosion injected hole 6, anti-corrosion slip casting
7, pre-buried main reinforcement 8 in steel-pipe pile, stirrup on the outside of main reinforcement in steel-pipe pile
9, cast-in-place pile cover connector concrete 10, prefabricated crossbeam
11, prefabricated longeron 12, in length and breadth, the cast-in-place connector concrete of beam.
Specific implementation mode
Invention is further described in detail with reference to the accompanying drawings and detailed description:
As shown in Figures 1 to 6, a kind of steel-pipe pile pile cover structure, including steel-pipe pile, prefabricated pile cover and reinforced concrete soil suite Pipe, concrete sleeve (bottom end surrounding) block clay winding geotextiles, reinforced concrete sleeve and steel between steel-pipe pile gap Pressure injection anti-corrosion material (epoxy resin mortar) in gap between pile pile improves steel-pipe pile in splash zone and fluctuation of water table section Anti-corrosion ability.
Prefabricated steel-pipe pile 1 is according to design requirement injection in a marine wherein Pile Foundation of Wharf.Prefabricated pile cover and reinforcing bar Concrete sleeve 2 is the pile cover structure being sleeved at the top of steel-pipe pile, and effect is easy for the longitudinal and transverse beam both ends of harbour and is placed in pile cover On.Core grouted concrete 3 in steel-pipe pile are that STEEL TUBE PILE WHARF is usually provided at a certain range of core grouted concrete of stake top, effect It is so that pile foundation is connected with harbour superstructure by embedded bar.Concrete sleeve underseal closes clay and winding geotextiles 4, Main purpose is the gap blocked between steel-pipe pile and concrete sleeve, prevents from generating spillage phenomenon when perfusion anti-corrosion material.So Afterwards by pile cover top anti-corrosion injected hole 5, anti-corrosion slip casting 6, anti-corrosion slip casting are carried out to the gap between steel-pipe pile and concrete sleeve Material is epoxy resin mortar.
Stirrup 8 on the outside of main reinforcement in pre-buried main reinforcement 7 and steel-pipe pile, is to be embedded in steel-pipe pile to fill core coagulation in steel-pipe pile Reinforcing bar in soil 3, effect be by the sponson of reinforcing bar and prefabricated crossbeam 10, the protruding bar at 11 both ends of prefabricated longeron into Row binding.Prefabricated crossbeam 10, prefabricated longeron 11 are to be mounted on 2 top of prefabricated pile cover and reinforced concrete sleeve according to design requirement Harbour girder system structure, end there are protruding bar and steel-pipe pile in the sponson of pre-buried main reinforcement 7 bound, lead to Cross cast-in-place pile cover connector concrete 9 and in length and breadth, the cast-in-place connector concrete 12 of beam connects into pile foundation and upper part girder system structure just Property node.
The technologies such as grouting pressure require can refer in gap《Marine traffic engineering concrete design specification》JTS 151-2011 and 《Marine traffic engineering concrete construction specification》Requirement construction in relation to post-tensioned prestressing beam slip casting in JTS 202-2011.
The vertical extension h of reinforced concrete sleeve1It can be according to the use of local hydrometeorology, geological conditions and harbour It is required that according to《Port engineering Pile Foundation Code》The 6.3 anticorrosion relevant provisions of (JTS 167-4-2012) and《Harbour engineering steel knot Structure anticorrosion technique specification》The regulation of (JTS 153-3) determines.Pile cover thickness h2When can be installed according to beam in length and breadth pile cover stress by It calculates and determines.

Claims (4)

1. a kind of steel-pipe pile pile cover structure, including:Prefabricated steel-pipe pile and harbour beam, in the prefabricated steel-pipe pile pre-buried main reinforcement and Core grouted concrete, the main reinforcement outside are equipped with stirrup;The harbour beam is formed by prefabricated crossbeam, prefabricated longeron, the harbour The longitudinal and transverse cast-in-place connector concrete of beam, it is characterized in that:Prefabricated pile cover and reinforced concrete soil suite are equipped at the top of prefabricated steel-pipe pile (1) It manages (2), and passes through prefabricated steel-pipe pile (1) interior core grouted concrete (3) and cast-in-place pile cover connector concrete (9) and prefabricated steel-pipe pile (1) it is rigidly connected, the reinforced concrete sleeve (2) blocks clay between bottom end circumference and the gap of prefabricated steel-pipe pile (1) And geotextile layer (4) is wound on clay, the top preset of prefabricated pile cover has anti-corrosion injected hole (5).
2. a kind of steel-pipe pile pile cover structure according to claim 1, it is characterized in that:The prefabricated pile cover and armored concrete Casing (2) is formed as one.
3. a kind of construction method of the pile cover structure of steel-pipe pile according to claim 1 raising steel-pipe pile corrosion resistance, including with Lower step:
1) the prefabricated steel-pipe pile of live injection;
2) prefabricated pile cover and reinforced concrete sleeve are placed at the top of steel-pipe pile;
3) core grouted concrete in steel-pipe pile, cast-in-place pile cover connector concrete are poured into a mould;
4) gap between concrete sleeve bottom end part and steel-pipe pile is blocked under water with closure clay, and winding prevents The geotextiles that clay falls off;
5) the preset anti-corrosion injected hole of the useful elder generation of pile cover pressure into the gap between steel-pipe pile and reinforced concrete sleeve is utilized Anti-corrosion material is perfused;
6) on pile cover place prefabricated crossbeam, prefabricated longeron harbour girder system structure, by beam both ends there are protruding bar and code The longitudinal and transverse cast-in-place connector concrete of beam makes itself and prefabricated steel-pipe pile, prefabricated pile cover and reinforced concrete sleeve form rigid connection Structure.
4. the construction method according to claim 3 for improving steel-pipe pile corrosion resistance, it is characterized in that:Step 5) the anti-corrosion Material is epoxy resin mortar.
CN201810788004.9A 2018-07-18 2018-07-18 A kind of steel-pipe pile pile cover structure and the construction method for improving steel-pipe pile corrosion resistance Pending CN108755675A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810788004.9A CN108755675A (en) 2018-07-18 2018-07-18 A kind of steel-pipe pile pile cover structure and the construction method for improving steel-pipe pile corrosion resistance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810788004.9A CN108755675A (en) 2018-07-18 2018-07-18 A kind of steel-pipe pile pile cover structure and the construction method for improving steel-pipe pile corrosion resistance

Publications (1)

Publication Number Publication Date
CN108755675A true CN108755675A (en) 2018-11-06

Family

ID=63970454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810788004.9A Pending CN108755675A (en) 2018-07-18 2018-07-18 A kind of steel-pipe pile pile cover structure and the construction method for improving steel-pipe pile corrosion resistance

Country Status (1)

Country Link
CN (1) CN108755675A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110656646A (en) * 2019-03-04 2020-01-07 孟玉山 Prefabricated pile cap for composite foundation and construction method thereof
CN112281817A (en) * 2020-11-12 2021-01-29 上海市城市建设设计研究总院(集团)有限公司 Steel precast pile construction method suitable for water level fluctuation area
CN110805031B (en) * 2019-11-14 2021-04-16 广州市第二市政工程有限公司 Cement mixing pile cap and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040042157A (en) * 2002-11-13 2004-05-20 디엠상역 주식회사 Anticorrosive structure of pipelines
KR20100097336A (en) * 2009-02-26 2010-09-03 한국철도기술연구원 Precast concrete cap for pile, and pile having such cap
CN103195057A (en) * 2013-03-27 2013-07-10 天津市市政工程设计研究院 Bridge substructure capable of preventing corrosion of high-concentration salt solution and construction method thereof
CN103967006A (en) * 2014-04-16 2014-08-06 青岛理工大学 Prefabricated sleeve and cast-in-place pile combination used for highly-corrosive environment and construction method thereof
CN105386443A (en) * 2015-10-19 2016-03-09 广西大学 FRP pipe and thick-wall steel pipe compounding hollow recycled concrete pile
CN205975597U (en) * 2016-05-11 2017-02-22 国家电网公司 Regional transmission tower improved generation bored concrete pile basis is used for corroding
CN208884515U (en) * 2018-07-18 2019-05-21 中交第一航务工程勘察设计院有限公司 A kind of steel-pipe pile pile cover structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040042157A (en) * 2002-11-13 2004-05-20 디엠상역 주식회사 Anticorrosive structure of pipelines
KR20100097336A (en) * 2009-02-26 2010-09-03 한국철도기술연구원 Precast concrete cap for pile, and pile having such cap
CN103195057A (en) * 2013-03-27 2013-07-10 天津市市政工程设计研究院 Bridge substructure capable of preventing corrosion of high-concentration salt solution and construction method thereof
CN103967006A (en) * 2014-04-16 2014-08-06 青岛理工大学 Prefabricated sleeve and cast-in-place pile combination used for highly-corrosive environment and construction method thereof
CN105386443A (en) * 2015-10-19 2016-03-09 广西大学 FRP pipe and thick-wall steel pipe compounding hollow recycled concrete pile
CN205975597U (en) * 2016-05-11 2017-02-22 国家电网公司 Regional transmission tower improved generation bored concrete pile basis is used for corroding
CN208884515U (en) * 2018-07-18 2019-05-21 中交第一航务工程勘察设计院有限公司 A kind of steel-pipe pile pile cover structure

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
朱秀娟等: "钢管桩在潮差浪溅区的防腐蚀-玻璃钢护套内灌水泥砂浆防腐蚀", 《水运工程》 *
蔡森等: "混凝土外衬在钢管桩防腐蚀设计与施工中的应用", 《水运工程》 *
韩理安等: "《港口水工建筑物1》", 31 August 2000, 人民交通出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110656646A (en) * 2019-03-04 2020-01-07 孟玉山 Prefabricated pile cap for composite foundation and construction method thereof
CN110805031B (en) * 2019-11-14 2021-04-16 广州市第二市政工程有限公司 Cement mixing pile cap and construction method thereof
CN112281817A (en) * 2020-11-12 2021-01-29 上海市城市建设设计研究总院(集团)有限公司 Steel precast pile construction method suitable for water level fluctuation area

Similar Documents

Publication Publication Date Title
CN208884515U (en) A kind of steel-pipe pile pile cover structure
CN108755675A (en) A kind of steel-pipe pile pile cover structure and the construction method for improving steel-pipe pile corrosion resistance
CN200961263Y (en) Fixed valve locking type reclaimable rockbolt
CN105714819B (en) A kind of outer anchor head multi-protective device of prestress anchorage cable and its fixing means
AU2020374586A1 (en) Novel template-free anti-corrosion UHPC-NC combined bearing platform and construction method therefor
CN104131567A (en) Novel waterstop prefabricated centrifugal rectangular pile retaining structure and construction method thereof
CN109056508A (en) The construction method of the bridge pier of basic protection against erosion, bridge and underwater foundation protection against erosion
CN105200983A (en) PVC pipe and thick wall steel tube composite hollow recycled concrete pile
CN106930338A (en) A kind of reinforcement means of the sleeve of glass under water
CN111676892A (en) Assembly type high-pile wharf node and construction method thereof
Smith Design and specification of marine concrete structures
CN103953036A (en) Construction method of anticorrosion protective sleeve for pipe connection of offshore saline soil electric transmission line pile foundation
CN206971247U (en) A kind of concrete plinth foundation ruggedized construction being placed on Unloading Rock
CN202787247U (en) PHC (prestressed high-strength concrete) pile and steel pipe pile composited pile for long piled wharfs
CN102900078A (en) Anticorrosive preformed pile and manufacturing and constructing method thereof
CN208803460U (en) A kind of enhancing cement mixing method intercepts water the Prefabricated Concrete sheet pile of effect
CN105649115A (en) Reinforced concrete foundation protection method and special device
CN102839660A (en) Composite pile of long piled wharf PHC (prestressed high-strength concrete) pile and steel pipe pile
CN202969414U (en) Bridge-culvert foundation
CN110004959A (en) Concrete cofferdam rapid constructing method and template under circumstance of flowing water
CN211037075U (en) Anti structure of floating of effluent water sump
CN202000306U (en) All-straight-pile wharf structure
CN209099387U (en) Basis is built in a kind of novel anti-corrosion room
CN113914378A (en) Method suitable for preventing water leakage during post-opening pile pressing hole pile sealing
CN204326119U (en) A kind of pile-raft foundation float Structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination