CN208884515U - A kind of steel-pipe pile pile cover structure - Google Patents

A kind of steel-pipe pile pile cover structure Download PDF

Info

Publication number
CN208884515U
CN208884515U CN201821135187.6U CN201821135187U CN208884515U CN 208884515 U CN208884515 U CN 208884515U CN 201821135187 U CN201821135187 U CN 201821135187U CN 208884515 U CN208884515 U CN 208884515U
Authority
CN
China
Prior art keywords
steel
pile
pipe pile
prefabricated
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821135187.6U
Other languages
Chinese (zh)
Inventor
金志良
金璐
张建红
叶祥记
王翔
王伟
张玉萍
原娟
邹青
高万国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbour Consultants Co Ltd
Original Assignee
CCCC First Harbour Consultants Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbour Consultants Co Ltd filed Critical CCCC First Harbour Consultants Co Ltd
Priority to CN201821135187.6U priority Critical patent/CN208884515U/en
Application granted granted Critical
Publication of CN208884515U publication Critical patent/CN208884515U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of steel-pipe pile pile cover structure, including prefabricated steel-pipe pile and harbour beam, pre-buried main reinforcement and core grouted concrete in prefabricated steel-pipe pile are equipped with stirrup on the outside of main reinforcement;Harbour beam is formed by prefabricated crossbeam, prefabricated stringer, the cast-in-place connector concrete of the longitudinal and transverse beam of harbour, prefabricated pile cover and reinforced concrete sleeve are equipped at the top of prefabricated steel-pipe pile, and it is rigidly connected by core grouted concrete in prefabricated steel-pipe pile and cast-in-place pile cover connector concrete and prefabricated steel-pipe pile, reinforced concrete sleeve blocks clay between bottom end circumference and the gap of prefabricated steel-pipe pile and winds geotextile layer on clay, and the top preset of prefabricated pile cover has anti-corrosion injected hole.Anti-corrosion material is injected in the gap between steel-pipe pile and reinforced concrete sleeve by anti-corrosion injected hole.The utility model beneficial effect is: steel tube pile structure does not need the corrosion-resistant wall thickness in addition increasing steel-pipe pile in splash zone and fluctuation of water table section;It can be without anti-corrosion of steel pipe pile coating and cathodic protection.

Description

A kind of steel-pipe pile pile cover structure
Technical field
The utility model relates to the design of the STEEL TUBE PILE WHARF of port engineering and off-lying sea hydraulic structure steel pipe pile foundation necks Domain, in particular to a kind of raising steel-pipe pile is in splash zone, the pile cover structure and construction method of fluctuation of water table area corrosion resistance.
Background technique
Steel tube pile structure be port and pier engineering and off-lying sea hydraulic structure engineering pass through frequently with one of structure type.One As splash zone of the construction usually locating for steel-pipe pile, in addition fluctuation of water table section increases certain wall thickness make as steel-pipe pile The corrosion thickness reserved with the phase, while the measures such as derusting, the setting cathodic protection of anticorrosion with painting coating are also taken on the outside of steel-pipe pile. When the wall thickness difference of a steel-pipe pile, pile foundation welding processing is complicated and steel using amount is big, generallys use after the completion of pile sinking waterborne The cast-in-place rectangular pile cap structure of formwork supporting plate, working procedure is more, and concrete amount is larger, and by hydrometeorology, geological conditions and Human factor influences, and the cast-in-place generally more prefabricated pile cover of pile cover concrete construction quality is slightly worse.
Certain engineering projects are especially overseas Wharf Engineering, often have in structure design from domestic pile foundation wharfs it is different it Place, the pile foundation wharfs in some areas are got used to even longer using the very long i.e. 100--200m of dock structure longitudinal divisions in the world Complete straight stake steel tube pile structure.According to state, the construction experiences of outer and inner tube stake harbour, it is in splash zone and fluctuation of water table section Steel-pipe pile although after taking the safeguard procedures such as derusting, anticorrosion with painting coating, cathodic protection or being very easy to occur serious Corrosion problem, be steel tube pile structure be easiest to corrosion damage weak link.Harbour be completed after operation if to splash zone and Fluctuation of water table section carries out the maintenance work after pile foundation corrosion, and the harbour stopping service time is longer, and maintenance effect is also ideal not to the utmost, Increase the maintenance and operation cost of harbour.For the construction for adapting to sea, inside and outside marine engineering, strengthen port engineering and off-lying sea water conservancy project Building steel-pipe pile in splash zone, the Anticorrosive Durability Design of fluctuation of water table section, reduce or prevent STEEL TUBE PILE WHARF and Pile foundation maintenance work of the off-lying sea hydraulic structure during operation, improves the efficiency of operation of harbour, it is necessary to existing steel-pipe pile The anticorrosive measure designed in splash zone and fluctuation of water table section further is enhanced.
Summary of the invention
It is resistance in splash zone, fluctuation of water table area that the technical problem to be solved by the utility model is to provide a kind of raising steel-pipe piles Corrosive pile cover structure and construction method.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is: a kind of steel-pipe pile pile cover structure, packet Steel-pipe pile, prefabricated pile cover and reinforced concrete sleeve are included, blocks clay between concrete sleeve bottom end surrounding and steel-pipe pile gap And geotextiles are wound on clay, pressure injection anti-corrosion material epoxy resin in gap between reinforced concrete sleeve and steel-pipe pile Mortar improves steel-pipe pile in the anti-corrosion ability of splash zone and fluctuation of water table section.
In gap the technical requirements such as grouting pressure can refer to " marine traffic engineering concrete design specification " JTS 151-2011 and Requirement construction in " marine traffic engineering concrete construction specification " JTS 202-2011 in relation to post-tensioned prestressing beam slip casting.
The vertical extension h1 of reinforced concrete sleeve can be according to the use of local hydrometeorology, geological conditions and harbour It is required that according to the 6.3 anticorrosion relevant provisions and " harbour engineering steel construction of " port engineering Pile Foundation Code " JTS 167-4-2012 Anticorrosion technique specification " JTS 153-3 regulation determine.Pile cover stress is by calculating when pile cover thickness h 2 can be installed according to beam in length and breadth It determines.
Occur sternly the beneficial effects of the utility model are: steel-pipe pile can be effectively prevented in splash zone, fluctuation of water table section The problem of corroding again, structure type is simple, easily operated, and construction quality is guaranteed.Using the corrosion-resistant pile cover knot of the steel-pipe pile Structure its cost ratio compared with traditional cast-in-situ steel reinforced concrete pile cover is carried out by taking the pile foundation of a pile diameter 1.5m wall thickness 18mm as an example Compare for 1:1.04;
The invention is to guarantee the safe and reliable of harbour and off-lying sea hydraulic structure steel tube pile structure and steel-pipe pile can be improved In the corrosion resistance of splash zone and fluctuation of water table section, reduce or prevent the section steel-pipe pile harbour operation during corrode after Maintenance work, improve the efficiency of operation of harbour.After the utility model, steel-pipe pile is in splash zone, fluctuation of water table section Service life is generally no less than 50 years.STEEL TUBE PILE WHARF and off-lying sea hydraulic structure steel-pipe pile of the utility model in port engineering There is the dissemination of reality in structure;
After the utility model, steel tube pile structure does not need in addition to increase steel-pipe pile in splash zone and fluctuation of water table section Corrosion-resistant wall thickness.It can be without anti-corrosion of steel pipe pile coating and cathodic protection.Although many years it was verified that port engineering and In the hydraulic structure engineering of off-lying sea, splash zone and fluctuation of water table section are in be lauched the steel-pipe pile corrosion neutralized in foundation soil Very slowly, the steel-pipe pile of this usual range still needs to take corresponding anticorrosive coating and cathodic protection according to the design requirement of structure Equal measures.
Detailed description of the invention
Fig. 1 is the Plane Installation figure of the utility model pile cover structure;
Fig. 2 is the installation cross-section diagram of the utility model pile cover structure;
Fig. 3 is the prefabricated pile cover cross-section diagram of the utility model;
Fig. 4 is the prefabricated pile cover plan view of the utility model;
Fig. 5-1,5-2 are the utility model steel tube pile structure figure, cross-section diagram;
Fig. 6 is the cast-in-place connector concrete structure plan view of the pile cover top longitudinal and transverse beam of harbour.
In figure:
1, steel-pipe pile 2, prefabricated pile cover and reinforced concrete sleeve
3, core grouted concrete 4, concrete sleeve underseal close clay and winding geotextile layer in steel-pipe pile
5, pile cover top anti-corrosion injected hole 6, anti-corrosion slip casting
7, pre-buried main reinforcement 8 in steel-pipe pile, stirrup on the outside of main reinforcement in steel-pipe pile
9, cast-in-place pile cover connector concrete 10, prefabricated crossbeam
11, prefabricated stringer 12, in length and breadth, the cast-in-place connector concrete of beam.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description:
As shown in Figures 1 to 6, a kind of steel-pipe pile pile cover structure, including steel-pipe pile, prefabricated pile cover and reinforced concrete soil suite Pipe blocks clay and winds geotextiles, reinforced concrete sleeve and steel pipe between concrete sleeve bottom end surrounding and steel-pipe pile gap Pressure injection anti-corrosion material epoxy resin mortar in gap between stake improves steel-pipe pile in the anti-of splash zone and fluctuation of water table section Rotten ability.
Prefabricated steel-pipe pile 1 is according to design requirement injection in a marine wherein Pile Foundation of Wharf.Prefabricated pile cover and reinforcing bar Concrete sleeve 2 is the pile cover structure covered at the top of steel-pipe pile, and effect is easy for the longitudinal and transverse beam both ends of harbour and is placed in pile cover On.Core grouted concrete 3 in steel-pipe pile are that STEEL TUBE PILE WHARF is usually provided at a certain range of core grouted concrete of stake top, effect It is that pile foundation is made to be connected with harbour superstructure by embedded bar.Concrete sleeve underseal closes clay and winds soil on clay Work cloth 4, main purpose are the gaps blocked between steel-pipe pile and concrete sleeve, prevent from generating spillage when perfusion anti-corrosion material Phenomenon.Then by pile cover top anti-corrosion injected hole 5, anti-corrosion slip casting 6 is carried out to the gap between steel-pipe pile and concrete sleeve, is prevented Rotten injecting paste material is epoxy resin mortar.
Stirrup 8 on the outside of main reinforcement in pre-buried main reinforcement 7 and steel-pipe pile, is to be embedded in steel-pipe pile to fill core coagulation in steel-pipe pile Reinforcing bar in soil 3, effect be by the sponson of reinforcing bar and prefabricated crossbeam 10, the protruding bar at prefabricated 11 both ends of stringer into Row binding.Prefabricated crossbeam 10, prefabricated stringer 11 are mounted on prefabricated pile cover and reinforced concrete sleeve 2 according to design requirement The harbour girder system structure in portion, end there are protruding bar and steel-pipe pile in the sponson of pre-buried main reinforcement 7 bound, By cast-in-place pile cover connector concrete 9 and in length and breadth, the cast-in-place connector concrete 12 of beam connects into pile foundation and upper part girder system structure Rigid joint.
In gap the technical requirements such as grouting pressure can refer to " marine traffic engineering concrete design specification " JTS 151-2011 and Requirement construction in " marine traffic engineering concrete construction specification " JTS 202-2011 in relation to post-tensioned prestressing beam slip casting.
The vertical extension h of reinforced concrete sleeve1It can be according to the use of local hydrometeorology, geological conditions and harbour It is required that according to the 6.3 anticorrosion relevant provisions and " harbour engineering steel knot of " port engineering Pile Foundation Code " (JTS 167-4-2012) Structure anticorrosion technique specification " (JTS 153-3) regulation determine.Pile cover thickness h2Can according to beam in length and breadth install when pile cover stress by It calculates and determines.

Claims (2)

1. a kind of steel-pipe pile pile cover structure, comprising: prefabricated steel-pipe pile and harbour beam, in the prefabricated steel-pipe pile pre-buried main reinforcement and Core grouted concrete, the main reinforcement outside are equipped with stirrup;The harbour beam is formed by prefabricated crossbeam, prefabricated stringer, and harbour is longitudinal and transverse The cast-in-place connector concrete of beam, it is characterized in that: prefabricated pile cover and reinforced concrete sleeve (2) are equipped at the top of prefabricated steel-pipe pile (1), And pass through prefabricated steel-pipe pile (1) interior core grouted concrete (3) and cast-in-place pile cover connector concrete (9) and prefabricated steel-pipe pile (1) rigidity Connection, the reinforced concrete sleeve (2) block clay between bottom end circumference and the gap of prefabricated steel-pipe pile (1) and in clay Upper winding geotextile layer (4), the top preset of prefabricated pile cover have anti-corrosion injected hole (5).
2. a kind of steel-pipe pile pile cover structure according to claim 1, it is characterized in that: the prefabricated pile cover and armored concrete Casing (2) is formed as one.
CN201821135187.6U 2018-07-18 2018-07-18 A kind of steel-pipe pile pile cover structure Active CN208884515U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821135187.6U CN208884515U (en) 2018-07-18 2018-07-18 A kind of steel-pipe pile pile cover structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821135187.6U CN208884515U (en) 2018-07-18 2018-07-18 A kind of steel-pipe pile pile cover structure

Publications (1)

Publication Number Publication Date
CN208884515U true CN208884515U (en) 2019-05-21

Family

ID=66506876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821135187.6U Active CN208884515U (en) 2018-07-18 2018-07-18 A kind of steel-pipe pile pile cover structure

Country Status (1)

Country Link
CN (1) CN208884515U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755675A (en) * 2018-07-18 2018-11-06 中交第航务工程勘察设计院有限公司 A kind of steel-pipe pile pile cover structure and the construction method for improving steel-pipe pile corrosion resistance
CN110306546A (en) * 2019-07-24 2019-10-08 南通恒一岩土工程勘察有限公司 A kind of method of repairing and reinforcing pile crown
CN115305908A (en) * 2022-07-25 2022-11-08 甘肃土木工程科学研究院有限公司 Pit type static pressure grouting steel pipe pile guide pit backfilling construction process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755675A (en) * 2018-07-18 2018-11-06 中交第航务工程勘察设计院有限公司 A kind of steel-pipe pile pile cover structure and the construction method for improving steel-pipe pile corrosion resistance
CN110306546A (en) * 2019-07-24 2019-10-08 南通恒一岩土工程勘察有限公司 A kind of method of repairing and reinforcing pile crown
CN115305908A (en) * 2022-07-25 2022-11-08 甘肃土木工程科学研究院有限公司 Pit type static pressure grouting steel pipe pile guide pit backfilling construction process

Similar Documents

Publication Publication Date Title
CN208884515U (en) A kind of steel-pipe pile pile cover structure
CN109457993A (en) A kind of concrete column restoring and fastening method
CN108755675A (en) A kind of steel-pipe pile pile cover structure and the construction method for improving steel-pipe pile corrosion resistance
KR101222070B1 (en) Ocean Pile having FRP Pipe for Splash Zone Corrosion Protection and Construction Method thereof
CN104131567A (en) Novel waterstop prefabricated centrifugal rectangular pile retaining structure and construction method thereof
CN105714819B (en) A kind of outer anchor head multi-protective device of prestress anchorage cable and its fixing means
CN110863520A (en) Construction structure and method for reinforcing pile foundation by using pushing steel sleeve
CN106930338A (en) A kind of reinforcement means of the sleeve of glass under water
CN111676892A (en) Assembly type high-pile wharf node and construction method thereof
CN102995651B (en) Gravity-type onshore/offshore wind turbine foundation with anchor rod
CN206971247U (en) A kind of concrete plinth foundation ruggedized construction being placed on Unloading Rock
CN202787247U (en) PHC (prestressed high-strength concrete) pile and steel pipe pile composited pile for long piled wharfs
CN211472481U (en) Combined enhanced uplift anchor rod device
CN201292528Y (en) Grouting machine
CN202000306U (en) All-straight-pile wharf structure
CN208803460U (en) A kind of enhancing cement mixing method intercepts water the Prefabricated Concrete sheet pile of effect
CN102839660A (en) Composite pile of long piled wharf PHC (prestressed high-strength concrete) pile and steel pipe pile
CN211037075U (en) Anti structure of floating of effluent water sump
CN202969414U (en) Bridge-culvert foundation
CN211228698U (en) Water collecting device for high and steep mountainous area
CN113914378A (en) Method suitable for preventing water leakage during post-opening pile pressing hole pile sealing
CN209099387U (en) Basis is built in a kind of novel anti-corrosion room
CN208733483U (en) A kind of underwater pillarwork of reinforced mesh reinforcement bridge
CN206090608U (en) Seamless port in aquatic worker's concrete composite construction
CN201390962Y (en) Reinforcing steel bar anchor rod anticorrosion structure