CN105544575B - A kind of bottom concrete construction method under water of use steel truss reinforcement - Google Patents

A kind of bottom concrete construction method under water of use steel truss reinforcement Download PDF

Info

Publication number
CN105544575B
CN105544575B CN201510956772.7A CN201510956772A CN105544575B CN 105544575 B CN105544575 B CN 105544575B CN 201510956772 A CN201510956772 A CN 201510956772A CN 105544575 B CN105544575 B CN 105544575B
Authority
CN
China
Prior art keywords
back cover
steel truss
bottom concrete
under water
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510956772.7A
Other languages
Chinese (zh)
Other versions
CN105544575A (en
Inventor
廖正根
尤田
何承海
李桂华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC SHEC Fourth Engineering Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
CCCC SHEC Fourth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, CCCC SHEC Fourth Engineering Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN201510956772.7A priority Critical patent/CN105544575B/en
Publication of CN105544575A publication Critical patent/CN105544575A/en
Application granted granted Critical
Publication of CN105544575B publication Critical patent/CN105544575B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/06Placing concrete under water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater

Abstract

The invention discloses a kind of bottom concrete construction method under water of use steel truss reinforcement, belong to deep foundation pit construction back cover field under water, step is:After cofferdam installs or after ground-connecting-wall is constructed, underwater excavation is to bottom concrete bottom surface absolute altitude in foundation ditch;Live burst or the good steel truss of overall processing on land;Steel truss monoblock or burst lifting decentralization are in place;Back cover platform is set up, central aggregate bin, chute is laid, some back cover conduits are transferred;Ready-mixed concrete is transported to scene;First envelope construction is carried out by root can opening, is then normally poured;Back cover conduit, central aggregate bin, chute and back cover platform are removed after the completion of back cover, waits bottom concrete intensity to be drawn water after reaching design strength.The present invention can play reinforcement effects, the thickness of thinning bottom concrete, so as to reach the purpose for reducing construction cost, and can reduce the difficulty of construction of this kind of bottom concrete under water, it is ensured that the construction quality and construction safety of bottom concrete.

Description

A kind of bottom concrete construction method under water of use steel truss reinforcement
Technical field
The invention belongs in field of bridge construction deep foundation pit construction and urban track traffic construction field interval ventilating shaft In construction, to ensure that dry operating condition is formed in deep basal pit, and a kind of new bottom concrete under water for designing.Suitable for each Class deep foundation pit construction back cover under water.
Background technology
In bridge foundation construction, due to the embedding depth of cushion cap, excavation of foundation pit is deeper, to ensure that cushion cap can form dry operation Construction, underwater concrete need to be poured in cofferdam carries out back cover.Sometimes due to, there is larger water inside and outside cofferdam in cutting depth depth Pressure head, so causes bottom concrete to need to bear larger water pressure, to ensure stress safety, causes bottom concrete under water Thickness it is thicker, correspondingly the depth of the decentralization in cofferdam, the total height in cofferdam, gross weight will also be increased, the excavation in cofferdam Quantities and decentralization difficulty are also significantly increased.Sometimes influenceed by basement strata, the depth of cofferdam decentralization is limited, it is impossible to which satietin is mixed Solidifying soil under water thickness needed for back cover when, thus to carry out arrangement of reinforcement to reach thinning back cover coagulation in bottom concrete under water The thickness purpose of soil, and ensure that bottom concrete meets force request.
In addition, in the ventilating shaft construction of city track traffic engineering interval, because interval ventilating shaft need to also serve as service channel, ventilation Road is simultaneously provided with draining pump house station, thus interval ventilating shaft is often arranged on line elevation lowest part, causes ventilating shaft construction and excavation depth It is deep.If the interval need to pass through the waters such as rivers, ventilating shaft is typically set close to river course embankment.Need to be from interval ventilating shaft in view of shield In pass through, and construction in later period air channel and service channel need to abolish the section of jurisdiction in ventilating shaft, be gushed to prevent section of jurisdiction from occurring water burst after abolishing Husky phenomenon, it is ensured that construction safety, need to pour bottom concrete below shield interval in ventilating shaft.To reduce back cover thickness, reduce Construction cost, arrangement of reinforcement aids in stress in bottom concrete under water.
(1) traditional steel reinforcement cage bottom concrete under water:
As shown in Figures 1 to 3, for ease of construction, difficulty of construction is reduced, bottom concrete typically sets traditional deep basal pit under water It is calculated as plain concrete.But in particular cases, it is considered to reduce cofferdam sinking depth, the weight in cofferdam and earthwork excavated volume in cofferdam, Reduce cofferdam back cover thickness, reduce construction cost, also carry out arrangement of reinforcement in bottom concrete under water sometimes.Traditional way be Steel reinforcement cage is installed in underwater concrete, steel reinforcement cage bottom concrete under water is formed.After during construction being also the good steel reinforcement cage of ground colligation, The lifting decentralization of steel reinforcement cage monoblock is in place.
Steel reinforcement cage is generally divided into upper and lower two-layer reinforced mesh, entirety is formed for ease of steel reinforcement cage, between upper and lower two-layer mesh sheet Some cableways and distributing bar are set.Upper and lower reinforced mesh is constituted by lengthways main steel bar and horizontal cage bar, the big rootlet of cage bar Setting is needed according to stress, cage bar spacing is generally 100~150mm.
(2) limitation of traditional steel reinforcement cage bottom concrete under water:
1) integral hoisting is needed:Steel reinforcement cage needs integral hoisting, it is impossible to which piecemeal lifting carries out assembled integral under water.Due to reinforcing bar Cage is upper and lower double-layer structure, and centre has cableway and distributing bar, therefore steel reinforcement cage can not be carried out as reinforced mesh Overlap joint;Cage bar quantity is more in length and breadth for steel reinforcement cage, and diver docks spreading using connector like that in water without image of Buddha land;Also it is difficult In using welding spreading.
2) lifting is yielding, and hoisting cost is high:During steel reinforcement cage integral hoisting, because steel reinforcement cage area is big, weight weight, therefore need Want large-scale lifting appliance to be lifted, hoisting cost is big, and easily cause steel reinforcement cage deformation.
3) top braces influence steel reinforcement cage integral hoisting:Many foundation ditches or cofferdam are provided with multiple tracks bracing members or steel due to top Reinforced concrete support, cause steel reinforcement cage cannot integral hoisting it is in place.
4) conduit difficulty in place is big:Because bottom concrete needs to be poured using many conduits, and every conduit exists Need to be from basal surface 300mm or so when being poured during first tank, such conduit has to pass through steel reinforcement cage top layer reinforced mesh, due to mesh sheet master Muscle spacing is much smaller than conduit diameter, causes conduit to transfer in place.It is of course possible to consider to be reserved in advance in fabrication of reinforcing cage Good conduit is hole arranged, but because foundation ditch is deeper, what is had reaches 40 meters, and conduit still hardly possible is accurately installed in place.
5) to pull out difficulty big for conduit:After casting concrete, influenceed by concrete lateral pressure, conduit is often amesiality, Against steel reinforcement cage cage bar, conduit is caused to be stuck, it is difficult to be lifted.
6) bottom concrete packing is poor, of poor quality:Because conduit can be only installed at more than steel reinforcement cage bottom mesh sheet, first tank During concreting, because steel reinforcement cage keeps flat and mesh sheet cage bar spacing is smaller, during first tank concreting, bottom concrete is direct Impact is in steel reinforcement cage mesh sheet, and concrete cannot be vibrated using vibrating spear, easily causes concreting leakiness and even produces Raw segregation phenomenon.
7) rising of steel cage, influence bottom concrete stress and subsequent handling construction are easily produced:Due to steel reinforcement cage mesh sheet Cage bar spacing is smaller, easily produces rising of steel cage, so not only influences bottom concrete stress.Ventilating shaft is applied in the middle of shield is interval In work bottom concrete work progress, once in rising of steel cage to shield interval range in bottom concrete, so float Steel reinforcement cage can also influence shield machine smoothly to pass through middle ventilating shaft, intractability is very big.
The content of the invention
It is an object of the invention to:For the limitation of traditional steel reinforcement cage bottom concrete under water, invention is improved, Using new steel truss reinforcement bottom concrete construction method under water, reinforcement effects can be played, thinning bottom concrete Thickness, so as to reach the purpose for reducing construction cost, and can reduce the difficulty of construction of this kind of bottom concrete under water, it is ensured that back cover The construction quality and construction safety of concrete.
The object of the invention is realized by following technical proposals:
A kind of bottom concrete construction method under water of use steel truss reinforcement, step is:
1) after cofferdam installs or after ground-connecting-wall is constructed, underwater excavation is to bottom concrete bottom surface absolute altitude, water in foundation ditch Under carry out substrate leveling;
2) live burst or the good steel truss of overall processing on land:Steel truss is by upper strata support body, lower floor's support body and company Connect, the middle support body of lower floor's support body is constituted, steel truss is latticed, and grid spacing is 1 ± 0.5m, upper and lower layer frame body by The horizontal bars of some horizontal transverse bar members and longitudinal direction cross into network structure, and middle support body is by vertical rod, horizontal chord member Constituted with longitudinal chord member, vertical rod is connected between the transverse bar member of upper and lower layer frame body and horizontal bars crosspoint, horizontal chord member connects It is connected between horizontal adjacent two vertical rod, and connection is in " M " font from beginning to end between each horizontal chord member, longitudinal chord member is connected to longitudinal direction Adjacent two vertical rod between, and between each longitudinal chord member from beginning to end connection be in " M " font;
3) steel truss monoblock or burst lifting decentralization are in place, and the steel truss cold lapping assembly under water of burst is integral;
4) back cover platform is set up, central aggregate bin, chute is laid, is transferred in some back cover conduits to steel truss grid from base 300 ± 50mm of bottom surface;
5) ready-mixed concrete is transported to scene, and bottom concrete is self-compaction underwater concrete under water;In the program, concrete Need not be vibrated using vibrating spear.
6) first envelope construction is carried out by root can opening, is then normally poured;
7) back cover conduit, central aggregate bin, chute and back cover platform are removed after the completion of back cover, waits bottom concrete intensity to reach Drawn water after to design strength.
Alternatively, each rod member of truss is using the processing of I-steel, H profile steel or channel-section steel.
Foregoing main scheme of the invention and its each further selection scheme can be this with independent assortment to form multiple schemes Invention can be used and claimed scheme.
The course of work is:
Beneficial effects of the present invention:Using new steel truss reinforcement, bottom concrete carries out back cover under water, and traditional The construction of steel reinforcement cage bottom concrete is compared to following significant advantage:
1) partition machining, the form of construction work that burst is installed can be selected, it is also possible to which selection is overall according to field condition Processing, the mode of integral hoisting.
2) area of plane and weight of single lifting are relatively small, and steel truss deforms relatively small, lifting appliance when lifting Ability also can be relatively small, and construction cost is relatively low.
3) steel truss is installed is influenceed relatively small by the support at the top of foundation ditch.
4) because steel truss is latticed, steel truss grid spacing is big, and self-compaction, and back cover conduit are flowed beneficial to concrete Install easily in place, more convenient when conduit is pulled out, the probability that conduit is stuck is relatively small.
5) because steel truss grid spacing is big, bottom concrete easily wraps steel truss, and bottom concrete is poured and compared Closely knit, quality is readily obtained guarantee.
6) because steel truss grid spacing is big, the impulsive force in bottom concrete casting process will not make steel truss float, So as to not interfere with the construction of subsequent handling.The especially interval middle ventilating shaft construction of shield uses the back cover under water of steel truss reinforcement Concrete construction, will not produce steel truss cage to float up in shield interval range, shield machine is not interfered with so and is smoothly passed through Between ventilating shaft.So greatly reduce the risk of construction.
Brief description of the drawings
Fig. 1 is traditional steel reinforcement cage bottom concrete elevational schematic view under water;
Fig. 2 is the A-A profiles of Fig. 1;
Fig. 3 is the A drawings of Fig. 2;
Fig. 4 is the steel truss bottom concrete elevational schematic view under water of the embodiment of the present invention;
Fig. 5 is the B-B generalized sections of Fig. 4;
Wherein 1 it is ground-connecting-wall or cofferdam, 2 be steel reinforcement cage, 3 be bottom concrete under water, 4 be back cover bottom absolute altitude, 5 is foundation ditch Interior waterline, 6 be above-ground route, 7 be steel reinforcement cage mesh sheet, 8 be horizontal cage bar, 9 be horizontal bars, 10 be transverse bar member, 11 be vertical Bar, 12 are chord member.
Specific embodiment
Following non-limiting examples are used to illustrate the present invention.
It is by steel truss and back cover under water using the structure of bottom concrete under water of steel truss reinforcement with reference to shown in Fig. 4,5 Concrete 3 is constituted.Receive curved instead of steel reinforcement cage using steel truss and bear tension, to play the mesh of thinning bottom concrete 's.Wherein steel truss is made up of the chord member 12 of some horizontal bars 9, transverse bar member 10, vertical rod 11 and vertical, horizontal, and truss is each Rod member, can be using the processing of I-steel, H profile steel or channel-section steel according to stress needs.Concrete structure is:Steel truss by upper strata support body, The middle support body of lower floor's support body and the upper and lower layer frame body of connection is constituted, and upper and lower layer frame body is by some horizontal transverse bar members 10 Horizontal bars 9 with longitudinal direction cross into network structure, middle support body by vertical rod 11, horizontal chord member 12 and longitudinal direction chord member 12 compositions, vertical rod 11 is connected between the transverse bar member 10 of upper and lower layer frame body and the crosspoint of horizontal bars 9, horizontal chord member 12 It is laterally connected between adjacent two vertical rod 11, and connection from beginning to end is in " M " font, the chord member 12 of longitudinal direction between each horizontal chord member 12 It is longitudinally connected that connection from beginning to end is in " M " font between adjacent two vertical rod 11, and between each longitudinal chord member 12.Due to steel truss net Compartment away from big, under water can piecemeal assembly is integral by the way of cold lapping, therefore steel truss can be according to lifting needs, can Made with burst, also can overall processing.
Steel truss reinforcement underwater concrete structure construction step is as follows:
1) after cofferdam installs or after ground-connecting-wall is constructed, underwater excavation is to bottom concrete bottom surface absolute altitude, water in foundation ditch Under carry out substrate leveling.
2) design drawing is pressed at scene on land, according to design drawing burst or the good steel truss of overall processing, during partition machining It is considered as the lap of splice.
3) steel truss monoblock or piecemeal lifting decentralization are in place, need diver to be installed under water during cold lapping, it is ensured that overlap joint Length meets requirement.
4) back cover platform is set up, central aggregate bin, chute is laid;Transfer in some back cover conduits to steel truss grid from base Bottom surface 300mm or so.
5) the match ratio ready-mixed concrete of bottom concrete under water according to trial is transported to scene.
6) first envelope construction is carried out by root can opening, is then normally poured.
7) back cover conduit, central aggregate bin, chute and back cover platform are removed after the completion of back cover, waits bottom concrete intensity to reach Drawn water after to design strength.
Presently preferred embodiments of the present invention is the foregoing is only, is not intended to limit the invention, it is all in essence of the invention Any modification, equivalent and improvement made within god and principle etc., should be included within the scope of the present invention.

Claims (2)

1. a kind of bottom concrete construction method under water of use steel truss reinforcement, it is characterised in that step is:
1) after cofferdam installs or after ground-connecting-wall is constructed, underwater excavation enters under water to bottom concrete bottom surface absolute altitude in foundation ditch Row substrate is flattened;
2) live burst or the good steel truss of overall processing on land:Steel truss by upper strata support body, lower floor's support body and connection it is upper, The middle support body of lower floor's support body is constituted, and steel truss is latticed, and grid spacing is 1 ± 0.5m, and upper and lower layer frame body is by some horizontal strokes To transverse bar member and the horizontal bars of longitudinal direction cross into network structure, middle support body is by vertical rod, horizontal chord member and longitudinal direction Chord member is constituted, and vertical rod is connected between the transverse bar member of upper and lower layer frame body and horizontal bars crosspoint, and horizontal chord member is connected to horizontal stroke To adjacent two vertical rod between, and between each horizontal chord member connection from beginning to end is in " M " font, longitudinal chord member is connected to longitudinal adjacent Connection from beginning to end is in " M " font between two vertical rods, and between each longitudinal chord member;
3) steel truss monoblock or burst lifting decentralization are in place, and the steel truss cold lapping assembly under water of burst is integral;
4) back cover platform is set up, central aggregate bin, chute is laid, is transferred in some back cover conduits to steel truss grid from basal surface 300±50mm;
5) ready-mixed concrete is transported to scene, and bottom concrete is self-compaction underwater concrete under water;
6) first envelope construction is carried out by root can opening, is then normally poured;
7) back cover conduit, central aggregate bin, chute and back cover platform are removed after the completion of back cover, is waited bottom concrete intensity to reach and is set Drawn water after meter intensity.
2. as claimed in claim 1 using the bottom concrete construction method under water of steel truss reinforcement, it is characterised in that:Truss Each rod member is using the processing of I-steel, H profile steel or channel-section steel.
CN201510956772.7A 2015-12-17 2015-12-17 A kind of bottom concrete construction method under water of use steel truss reinforcement Active CN105544575B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510956772.7A CN105544575B (en) 2015-12-17 2015-12-17 A kind of bottom concrete construction method under water of use steel truss reinforcement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510956772.7A CN105544575B (en) 2015-12-17 2015-12-17 A kind of bottom concrete construction method under water of use steel truss reinforcement

Publications (2)

Publication Number Publication Date
CN105544575A CN105544575A (en) 2016-05-04
CN105544575B true CN105544575B (en) 2017-06-16

Family

ID=55824096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510956772.7A Active CN105544575B (en) 2015-12-17 2015-12-17 A kind of bottom concrete construction method under water of use steel truss reinforcement

Country Status (1)

Country Link
CN (1) CN105544575B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638646B (en) * 2016-10-14 2018-12-07 岩土科技股份有限公司 A kind of construction method of open caisson secondary bottom sealing structure
CN106381879B (en) * 2016-11-04 2018-06-22 四川共拓岩土科技股份有限公司 A kind of big depth of water grout curtain method
CN106638644B (en) * 2016-12-29 2019-05-03 中国葛洲坝集团基础工程有限公司 A kind of deep sand gravel layer provisions for grouting and the method for carrying out comprehensive grouting using the device
CN109763491A (en) * 2018-12-30 2019-05-17 中铁广州工程局集团有限公司 It is a kind of not disperse self-compact concrete in construction method under water
CN110258583A (en) * 2019-06-20 2019-09-20 中铁第四勘察设计院集团有限公司 A kind of underwater excavation foundation pit self-balancing support system and method
CN110374122A (en) * 2019-07-22 2019-10-25 中铁大桥局集团有限公司 A kind of precast-boxed cofferdam sectional type is put more energy into the construction method of back cover structure
CN110565673A (en) * 2019-08-01 2019-12-13 中交二公局第二工程有限公司 reinforced concrete bottom sealing structure of bearing platform in flood beach area and construction method thereof
CN112228089B (en) * 2020-12-14 2021-03-09 北京建工土木工程有限公司 Bottom sealing method in model test of shield method main tunnel inner pump room mechanized construction

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60102430A (en) * 1983-11-09 1985-06-06 Masami Horii Frame retaining wall and frame structure
CN102011442A (en) * 2009-09-07 2011-04-13 初明进 Light steel-concrete combination structure shear wall and manufacturing method thereof
CN101775809B (en) * 2010-01-15 2011-07-20 中铁大桥局集团第五工程有限公司 Construction method of marine self-floating type steel soleplate single-wall suspension box cofferdam and single-wall suspension box cofferdam
CN102064381B (en) * 2010-11-23 2013-03-13 汉王科技股份有限公司 Induction antenna, electromagnetic handwriting device and antenna plate thereof
CN203238646U (en) * 2013-04-17 2013-10-16 中交路桥华南工程有限公司 Casing box with built-in bottom board

Also Published As

Publication number Publication date
CN105544575A (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN105544575B (en) A kind of bottom concrete construction method under water of use steel truss reinforcement
CN106120839B (en) A kind of construction technology of off-lying sea blower foundation embedded rock pile
CN207512745U (en) A kind of caisson device and its foundation pit structure
CN104532813A (en) Overwater building construction platform and erecting method and use method thereof
CN105220703B (en) Enclosing type deepwater platform construction method based on condition of sand backfilling balance method
CN108547641B (en) Substrate reinforcing system of heavy-duty railway tunnel in water-rich weak stratum and construction method thereof
CN101538833B (en) Vertical subsection double-wall steel cofferdam water stopping construction method
CN103806464B (en) Large-scale high ferro station and subway cross top-down construction method up and down
CN105862930A (en) Protection structure on existing tunnel below new underground engineering
CN103321246A (en) Underground diaphragm wall based foundation pit construction method
CN104674863A (en) Method for reinforcing existing municipal pipe gallery within deep foundation pit excavation range
CN105569051A (en) Foundation pit support system of sandy pebble boulder geological stratification and construction method
CN110331727A (en) The supporting construction and construction method that bored concrete pile and diaphram wall combine
CN110952567A (en) Front wall and rear pile composite double-row foundation pit supporting structure and construction method thereof
CN105350526A (en) Method for setting up steel platform
CN204174625U (en) The superimposed cantilever foundation pit supporting construction of a kind of piling wall
CN104164881A (en) Piling wall overlapping cantilever foundation pit support construction method and structure
CN104131566B (en) A kind of basement is without the construction method of horizontal support foundation ditch
CN108118690A (en) A kind of integral hoisting formula coercion underground continuous wall structure and its prefabricated and construction method
CN110805049B (en) Construction method of mountain slope ultra-thickness spray anchor permanent supporting structure
CN104895054A (en) Construction method of fiber rib concrete uplift pile
CN106759264A (en) One kind grouting pipe network and its construction method
CN205259216U (en) Adopt steel truss to add concrete structure of back cover under water of muscle
CN104775448A (en) Basement construction method in soft soil area
CN208184752U (en) The bottom stab ilization system in rich water soft stratum heavy haul railway tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant