CN208331437U - A kind of conduit jacking when the installation for Large Diameter Pipeline reinforced concrete pipiline - Google Patents

A kind of conduit jacking when the installation for Large Diameter Pipeline reinforced concrete pipiline Download PDF

Info

Publication number
CN208331437U
CN208331437U CN201820961756.6U CN201820961756U CN208331437U CN 208331437 U CN208331437 U CN 208331437U CN 201820961756 U CN201820961756 U CN 201820961756U CN 208331437 U CN208331437 U CN 208331437U
Authority
CN
China
Prior art keywords
slideway
slideways
reinforced concrete
conduit jacking
large diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820961756.6U
Other languages
Chinese (zh)
Inventor
王常松
李坤芬
于立杰
郝亚卫
李红卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Middle Friendship One 6th Engineering Co Ltd Of Public Office
Original Assignee
Middle Friendship One 6th Engineering Co Ltd Of Public Office
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Middle Friendship One 6th Engineering Co Ltd Of Public Office filed Critical Middle Friendship One 6th Engineering Co Ltd Of Public Office
Priority to CN201820961756.6U priority Critical patent/CN208331437U/en
Application granted granted Critical
Publication of CN208331437U publication Critical patent/CN208331437U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses conduit jackings when a kind of installation for Large Diameter Pipeline reinforced concrete pipiline comprising bull-dozer, the upper and lower side of the perching knife of bull-dozer are respectively fixed with a slideway;This two slideways are parallel to each other and axial direction is identical as the transverse direction of bulldozer perching knife;More support rods are vertically connected between two slideways and uniformly arrange along the extending direction of slideway;An at least waste tire by can along two slideways in axial sliding in a manner of be mounted on this two slideways.Conduit jacking provided by the utility model, when it cooperates crane lifting, it is contacted with Large Diameter Pipeline reinforced concrete pipiline by the waste tire on its perching knife slowly to push pipeline by bull-dozer, so that the Pipe installing leakiness being easy to appear in Large Diameter Pipeline reinforced concrete pipiline installation process, gap is excessive, and straight cis degree is poor, and cushion rubber rolls into the common faults such as uneven and is effectively improved, and construction efficiency is greatly improved, manpower is saved.

Description

A kind of conduit jacking when the installation for Large Diameter Pipeline reinforced concrete pipiline
Technical field
The utility model relates to pipeline construction devices, and in particular to one kind is installed for Large Diameter Pipeline reinforced concrete pipiline When conduit jacking.
Background technique
With the improvement of living standards, requirement of the people to urban duct mounting technique is higher and higher, arranged in municipal works The construction of waterpipe is always the most important thing, and the displacement that traditional minor diameter drainpipe has gradually been unable to satisfy city needs It asks.
In recent years, Large Diameter Pipeline reinforced concrete pipiline mounting technique is widely used.In municipal works, plumbing When Large Diameter Pipeline reinforced concrete pipiline is installed in engineering, that there are Pipe installings is not close for the method for existing hand fit's crane lifting Real, gap is excessive, and straight cis degree is poor, and cushion rubber rolls into unevenly, ineffective problem.
Utility model content
The purpose of this utility model is to provide one kind can improve Large Diameter Pipeline reinforced concrete pipiline (tongue and groove pipe, d >= 1200mm) the conduit jacking of installation quality, it is excessive to efficiently solve Pipe installing gap, and line style is not straight suitable, and cushion rubber rolls into unevenness Even problem keeps Pipe installing more efficient, more labor-saving.
To achieve the goals above, the utility model provides the following technical solutions:
A kind of conduit jacking when the installation for Large Diameter Pipeline reinforced concrete pipiline comprising:
Bull-dozer;
Two slideways, wherein the upper and lower side of the perching knife of bull-dozer is respectively fixed with the slideway;This two slideways are mutual It is parallel and axial identical as the transverse direction of bulldozer perching knife;
More support rods are vertically connected between two slideways and uniformly arrange along the extending direction of slideway;
An at least waste tire, by can along two slideways in axial sliding in a manner of be mounted on this two slideways.
Preferably, the slideway is the tubing that side is equipped with axially extending opening;The waste tire is pacified by bolt On the slideway and the bolt can be slided along the opening.
Preferably, the screw rod on bolt sequentially passes through the waste tire, the opening on the slideway, is placed in the cunning It is connect after gasket in road with the nut thread being placed in the slideway;The diameter of the width on head, the gasket in the bolt And the diameter of the nut is all larger than the width of the slideway upper opening.
Preferably, the length of two slideways is 2.46m, and the spacing between two slideways is 0.8m.
Preferably, the spacing between two adjacent support rods is 20cm.
Preferably, the support rod is channel steel.
Preferably, the waste tire be two, the two waste tires be diameter be 1m same model it is waste and old Tire.
Preferably, the centre distance of two waste tires is 1~1.4m.
The conduit jacking when installation provided by the utility model for Large Diameter Pipeline reinforced concrete pipiline, cooperates crane When lifting, contacted with Large Diameter Pipeline reinforced concrete pipiline by the waste tire on its perching knife slowly to push pipe by bull-dozer Road, so that the Pipe installing leakiness being easy to appear in Large Diameter Pipeline reinforced concrete pipiline installation process, gap is excessive, directly Compliance is poor, and cushion rubber rolls into the common faults such as uneven and is effectively improved, and greatly improves construction efficiency, saves people Power.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only to record in the utility model Some embodiments be also possible to obtain other drawings based on these drawings for those of ordinary skill in the art.
Conduit jacking when Fig. 1 is the installation provided by the embodiment of the utility model for Large Diameter Pipeline reinforced concrete pipiline Main view;
Conduit jacking work when Fig. 2 is the installation provided by the embodiment of the utility model for Large Diameter Pipeline reinforced concrete pipiline Side view when making;
Conduit jacking when Fig. 3 is the installation provided by the embodiment of the utility model for Large Diameter Pipeline reinforced concrete pipiline Top view;
Conduit jacking when Fig. 4 is the installation provided by the embodiment of the utility model for Large Diameter Pipeline reinforced concrete pipiline Partial sectional view.
Description of symbols:
1, slideway;2, support rod;3, waste tire;4, bolt;5, gasket;6, nut;7, bull-dozer.
Specific embodiment
In order to make those skilled in the art more fully understand the technical solution of the utility model, below in conjunction with attached drawing pair The utility model is further detailed.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or the terminal device that include a series of elements not only include those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or end The intrinsic element of end equipment.In the absence of more restrictions, being limited by sentence " including ... " or " including ... " Element, it is not excluded that there is also other elements in process, method, article or the terminal device for including the element.This Outside, herein, " being greater than ", " being less than ", " being more than " etc. are interpreted as not including this number;" more than ", " following ", " within " etc. understand Being includes this number.
As shown in Figure 1 to Figure 3, conduit jacking when a kind of installation for Large Diameter Pipeline reinforced concrete pipiline comprising two Root slideway 1, more support rods 2, at least a waste tire 3 and bull-dozer 7.Wherein, the upper and lower side of the perching knife of bull-dozer 7 is each solid Surely there is the slideway 1.This two slideway 1 is laterally extended along perching knife on bull-dozer 7, that is to say, that two slideways 1 Axial identical as the transverse direction of perching knife on bull-dozer 7, therefore, this two slideways 1 are parallel to each other.
As shown in Figure 1, more support rods 2 are vertically connected between two slideways 1 and uniformly arrange along the extending direction of slideway 1 Cloth.
An at least waste tire 3 by can along two slideways 1 in axial sliding in a manner of be mounted on this two slideways 1.This is useless Old tire 3 is directly contacted in push pipe with pipeline, is avoided perching knife from directly contacting with pipeline, is damaged to pipeline.
In the present embodiment, the width of perching knife is 2.46m on bull-dozer 7, is highly 0.95m.The length of two slideways 1 is equal Wide with the perching knife of bull-dozer 7 for 2.46m, the spacing between two slideways 1 is 0.8m.Preferably, two adjacent support rods Spacing between 2 is 20cm.Waste tire 3 is transmitted through the thrust come when these support rods 2 are used to bear push pipe, and plays slideway 1 and bull-dozer 7 on the effect that securely connects of perching knife.
The waste tire 3 be preferably two, the two waste tires 3 be diameter be 1m same model waste and old wheel Tire.After two waste tires 3 are fixed, centre distance is preferably 1~1.4m.
Preferably, the slideway 1 is that steel tubular goods preferably use square tube in the present embodiment.Axis is equipped in the side of tubing To extend be open, that is to say, be opening extending direction it is identical as the extending direction of tubing, the opening be preferably penetrate through.
Slideway 1 is welded backwards to the side of opening and the perching knife of bull-dozer 7, it is preferred to use two-sided welding.Support rod 2 is preferably used Channel steel, these channel steels are welded between two slideways 1 made of steel tubular goods.
Waste tire 3 is mounted on the slideway 1 by bolt 4 and the bolt 4 can be slided along the opening.
As shown in figure 4, the screw rod on bolt 4 sequentially passes through waste tire 3, the opening on slideway 1, is placed in slideway 1 It is threadedly coupled after gasket 5 with the nut 6 being placed in the slideway 1.In the bolt 4 diameter of the width, the gasket 5 on head with And the diameter of the nut 6 is all larger than the width of 1 upper opening of slideway.Unscrewing nut 6 then can make waste tire 3 along slideway 1 Sliding, to adjust the spacing of waste tire 3 in the installation of the reinforced concrete pipiline of different tube diameters.As previously mentioned, in this reality It applies in example, waste tire 3 is two, and after tightening nut 6 for the fixation of the two 3 positions of waste tire, the two centre distance is excellent It is selected as 1~1.4m.In addition, 4 bottom of bolt is a piece of steel plate, it can prevent bolt 4 from puncturing waste tire 3, bolt 4 when avoiding push pipe Reinforced concrete pipiline is damaged.
Crawler belt rubber slab is installed, when preventing bull-dozer 7 from walking on the basis of reinforced concrete pipiline on the crawler belt of bull-dozer 7 Basis is damaged.
Before using the conduit jacking in the present embodiment, it should verify whether reinforced concrete pipiline underlying strength can carry The self weight of pipeline and bull-dozer.
Conduit jacking when provided by the present embodiment for the installation of Large Diameter Pipeline reinforced concrete pipiline, there is efficient, province The characteristics of power, when cooperating crane lifting, by bull-dozer 7 by the waste tire 3 and Large Diameter Pipeline armored concrete on its perching knife Tube contacts slowly push pipeline, so that the pipeline peace being easy to appear in Large Diameter Pipeline reinforced concrete pipiline installation process Leakiness is filled, gap is excessive, and straight cis degree is poor, and cushion rubber rolls into the common faults such as uneven and is effectively improved, and greatly improves Construction efficiency, saves manpower.
Further more, bull-dozer 7 should be noted that push pipe speed will slowly when pushing up reinforced concrete pipiline, dynamics is uniform, never suddenly Top is removed suddenly, and special messenger should be arranged to command operation.
Waste tire 3 will be replaced in time after there is tattered, cracking phenomena using a period of time, prevent from pushing away when Pipe installing Perching knife is directly contacted with reinforced concrete pipiline on native machine 7, is damaged to pipeline.
It is above that certain exemplary embodiments of the utility model are only described by way of explanation, undoubtedly, for Those skilled in the art can be with a variety of different without departing from the spirit and scope of the utility model Mode is modified described embodiment.Therefore, above-mentioned attached drawing and description are regarded as illustrative in nature, and should not be construed as Limitation to the utility model claims protection scope.

Claims (8)

1. conduit jacking when a kind of installation for Large Diameter Pipeline reinforced concrete pipiline characterized by comprising
Bull-dozer;
Two slideways, wherein the upper and lower side of the perching knife of bull-dozer is respectively fixed with the slideway;This two slideways are parallel to each other And it is axial identical as the transverse direction of bulldozer perching knife;
More support rods are vertically connected between two slideways and uniformly arrange along the extending direction of slideway;
An at least waste tire, by can along two slideways in axial sliding in a manner of be mounted on this two slideways.
2. conduit jacking according to claim 1, which is characterized in that the slideway is that side is equipped with axially extending opening Tubing;The waste tire is mounted on the slideway by bolt and the bolt can be slided along the opening.
3. conduit jacking according to claim 2, which is characterized in that the screw rod on bolt sequentially passes through the waste and old wheel It is connect after tire, the opening on the slideway, the gasket that is placed in the slideway with the nut thread being placed in the slideway;The spiral shell The diameter of the width on head, the diameter of the gasket and the nut is all larger than the width of the slideway upper opening in bolt.
4. conduit jacking according to claim 1, which is characterized in that the length of two slideways is 2.46m, and two cunnings Spacing between road is 0.8m.
5. conduit jacking according to claim 4, which is characterized in that the spacing between two adjacent support rods is 20cm。
6. conduit jacking according to claim 1, which is characterized in that the support rod is channel steel.
7. conduit jacking according to claim 1, which is characterized in that the waste tire is two, the two waste and old wheels Tire be diameter be 1m same model waste tire.
8. conduit jacking according to claim 7, which is characterized in that the centre distance of two waste tires be 1~ 1.4m。
CN201820961756.6U 2018-06-21 2018-06-21 A kind of conduit jacking when the installation for Large Diameter Pipeline reinforced concrete pipiline Active CN208331437U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820961756.6U CN208331437U (en) 2018-06-21 2018-06-21 A kind of conduit jacking when the installation for Large Diameter Pipeline reinforced concrete pipiline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820961756.6U CN208331437U (en) 2018-06-21 2018-06-21 A kind of conduit jacking when the installation for Large Diameter Pipeline reinforced concrete pipiline

Publications (1)

Publication Number Publication Date
CN208331437U true CN208331437U (en) 2019-01-04

Family

ID=64768318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820961756.6U Active CN208331437U (en) 2018-06-21 2018-06-21 A kind of conduit jacking when the installation for Large Diameter Pipeline reinforced concrete pipiline

Country Status (1)

Country Link
CN (1) CN208331437U (en)

Similar Documents

Publication Publication Date Title
CN204922375U (en) Roof pressure formula pipeline inside lining repair system
CN105042272B (en) A kind of roof pressing type pipe lining repair system
CN206830946U (en) A kind of concrete sleeve jacking construction structure
CN104727425A (en) Traction-type non-excavation pipeline repairing method
CN208331437U (en) A kind of conduit jacking when the installation for Large Diameter Pipeline reinforced concrete pipiline
CN206015858U (en) Pipeline cleaning device
CN202219503U (en) Oil pipe line cutting strip
CN206664655U (en) A kind of civil construction pipeline rack
CN202901532U (en) Novel hydraulic internally-pulling device for prestressed concrete cylinder pipe (PCCP) installation
CN205833768U (en) deep well pipeline descaling tool
CN102877681A (en) Partially prestressed concrete electric pole
CN208518043U (en) A kind of EVA drainpipe
CN203514323U (en) Connection component
CN107152026B (en) A kind of the mud jacking pipe support and its distribution method of steel-pipe pile
CN203374989U (en) Groove type fixing device for pipeline
CN204538569U (en) A kind of cable passageway drill
CN203822170U (en) Mud brushing device for long bored pile machine
CN204357356U (en) Drilling rod thread washer
CN204780922U (en) Instrument of detachable clearance precast pile stake core soil
CN204048796U (en) A kind of work high above the ground stool being applicable to steel pipe pole
CN202228786U (en) MPP (Modified Polypropylene) traction pipe
CN205100565U (en) But steel pipe concrete jacking of superelevation layer is with retractable pump pipe
CN219491252U (en) Dredging tool for municipal drainage pipeline
CN202400545U (en) Quick conveying device for installation of large-scale pipeline on pipe gallery
CN201217107Y (en) Polyethylene pipe member scraping apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant