CN204780922U - Instrument of detachable clearance precast pile stake core soil - Google Patents

Instrument of detachable clearance precast pile stake core soil Download PDF

Info

Publication number
CN204780922U
CN204780922U CN201520519679.5U CN201520519679U CN204780922U CN 204780922 U CN204780922 U CN 204780922U CN 201520519679 U CN201520519679 U CN 201520519679U CN 204780922 U CN204780922 U CN 204780922U
Authority
CN
China
Prior art keywords
steel plate
stake core
instrument
pile stake
steel sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520519679.5U
Other languages
Chinese (zh)
Inventor
董福永
李军
祝宣
鲁延进
王正亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201520519679.5U priority Critical patent/CN204780922U/en
Application granted granted Critical
Publication of CN204780922U publication Critical patent/CN204780922U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides an instrument of detachable clearance precast pile stake core soil relates to building apparatus field, and its structure includes the handle, and welding two pole settings on hand and being in the same place rather than upper end fixed connection, the center distance of two pole settings is 100mm, be provided with a movable steel sheet in the lower part of pole setting, movable steel sheet is passed respectively and rather than sliding connection to two pole settings, the lower extreme of pole setting is provided with a location steel sheet, and the pole setting lower extreme links together through the location steel sheet, the lower extreme of location steel sheet is installed a cylinder and is connected rather than one end, set up in the cylinder one with the cylinder inner wall between sliding connection's piston board, piston board upper surface be provided with an axis and rather than the lower extreme welding together, the axis upper end is connected with movable steel sheet after passing the location steel sheet. At precast pile stake core soil clearance in -process, the degree of depth of the effectual control of ability clearance and the cleanliness of precast pile stake core. This instrument construction convenience, but cyclic utilization.

Description

A kind of instrument of detachable cleaning preformed pile stake core soil
Technical field
The utility model relates to building instrument field, specifically a kind of instrument of detachable cleaning preformed pile stake core soil.
Background technology
Along with the further expansion of the construction work preformed pile scope of application is promoted, the anchoring quality of prefabricated tubular pile and foundation platform requires more and more higher, in prefabricated tubular pile work progress, is inevitably clogged by the soil body in stake core.The cleaning of preformed pile stake in-core filling soil is commonly labour's manual operations, and do not have special instrument to clear up, effectively can not control the degree of depth and the preformed pile stake core cleannes of clearing up preformed pile stake core, be difficult to the anchoring quality ensureing prefabricated tubular pile and foundation platform.
Summary of the invention
In order to solve above technical problem, the utility model provides a kind of instrument of detachable cleaning preformed pile stake core soil, in order to control to clear up the degree of depth of preformed pile stake core and the construction quality of preformed pile stake core cleannes.
Technical solution adopted in the utility model is:
An instrument for detachable cleaning preformed pile stake core soil, comprises handle, and handle welds two vertical rods and is fixed together with its upper end, be arranged in parallel between vertical rod, the center distance of two vertical rods is 100mm; Be provided with one block of movable steel plate in the bottom of vertical rod, two vertical rods are each passed through movable steel plate and are slidably connected with it; The lower end of vertical rod is provided with one piece of fixing steel plate, and vertical rod lower end is linked together by fixing steel plate; The lower end of fixing steel plate is provided with a cylinder barrel and is connected with its one end, the piston plate be slidably connected between one piece and inner wall of cylinder is set in cylinder barrel, piston plate upper surface is provided with an axis and welds together with its lower end, axis upper end is connected with movable steel plate through after fixing steel plate, is slidably connected between axis and fixing steel plate.
The instrument of described detachable cleaning preformed pile stake core soil, vertical rod described in it is the vertical rod of adjustable length.
The instrument of described detachable cleaning preformed pile stake core soil, its every root vertical rod is made up of the galvanized pipe of more than a section, is fixed together, is threaded between galvanized pipe with tube connector between adjacent two galvanized pipes by tube connector.
The instrument of described detachable cleaning preformed pile stake core soil, its two vertical rods are connected with the dual-side of fixing steel plate respectively.
The instrument of described detachable cleaning preformed pile stake core soil, be arranged in parallel between its fixing steel plate, movable steel plate.
The beneficial effects of the utility model:
Preformed pile stake core soil can easily clear by steel cylinder, and detachable coating steel pipe vertical rod can control cleaning stake core length.In preformed pile stake core soil scale removal process, effectively can control the cleannes of the degree of depth and the preformed pile stake core cleared up.This instrument easy construction, reusable edible.
All coating steel pipe processing works complete, and top and the bottom structure is assembled into the device of cleaning preformed pile stake core soil by middle vertical rod.Because this device fixed form is movable, be convenient to dismounting, easy to carry, and by the use to this device, effectively can control to clear up the degree of depth of preformed pile stake core and the cleannes of preformed pile stake core, improve the anchoring quality of prefabricated tubular pile and foundation platform.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in detail below.
1, use 300mm long D32 × 2.5 coating steel pipe 1 as the handle of special tool, handle welds two 500mm long D20 × 2.5 coating steel pipes 2 as vertical rod, specific practice is as follows: at each welding in distance D32 × 2.5 coating steel pipe 1 both side ends 100mm place D20 × 2.5 coating steel pipe 2, two galvanized pipe 2 center distance are 100mm, and galvanized pipe 2 other end adopts die head threading machine mantle fiber.
2, one block of 120 × 50 × 3mm steel plate, 5, one block of 150 × 50 × 3mm steel plate, 4,100mm long ¢ 14 reinforcing bar, 6, one block of ¢ 45 × 3mm steel plate, 7, ¢ 50 × 2.5mm steel cylinder 8 and two 500mm long D20 × 2.5 coating steel pipes 2 are used, specific practice is as follows: 1. occupied by ¢ 50 × 2.5mm steel cylinder and be welded on one block of 120 × 50 × 3mm steel plate 5 in 8, and steel plate 5 bores ¢ 16 circular hole between two parties so that ¢ 14 reinforcing bar 6 is free to slide from hole; 2. be welded between two parties on one block of ¢ 45 × 3mm steel plate 7 by 100mm long ¢ 14 reinforcing bar 6, steel cylinder 8 put into by steel plate 7, and reinforcing bar 6 passes from the circular hole of 120 × 50 × 3mm steel plate 5; 3. two 500mm long D20 × 2.5 coating steel pipes 2 are welded on the two ends of 120 × 50 × 3mm steel plate 5, during welding, the center to center distance of two coating steel pipes 2 is 100mm; 4. respectively bore ¢ 22 circular hole at one piece of 150 × 50 × 3mm steel plate 4 two ends, the center to center distance of circular hole is 100mm; Steel plate 4 is passed from two D20 × 2.5 coating steel pipes 2, ¢ 14 reinforcing bar 6 other end is welded on this block plate 4 between two parties, forms a set of piston be free to slide.
3, according to the length of cleaning stake core, by coating steel pipe 2 two ends, long for 400mm D20 × 2.5 mantle fiber, use the direct joint 3 of DN20 coating steel pipe directly coating steel pipe 2 symmetry to be connected, the coating steel pipe 2 of middle part can random spreading according to the length of cleaning stake core.
During the cleaning preformed pile stake core soil body, instrument is firmly put and is inserted in stake core by operator, stake core soil enters in steel cylinder 8 by steel cylinder 8 after the jacking of ¢ 45 × 3mm steel plate 7, device is extracted by operator from stake core, tramp with one's feet and step on 150 × 50 × 3mm steel plate 4, soil in steel cylinder 8 is cleaned out steel cylinder 8, iterative cycles, reach the object of cleaning stake core soil.
Except the technical characteristic described in manual, be the known technology of those skilled in the art.

Claims (5)

1. an instrument for detachable cleaning preformed pile stake core soil, is characterized in that, comprise handle, and handle welds two vertical rods and is fixed together with its upper end, be arranged in parallel between vertical rod, the center distance of two vertical rods is 100mm; Be provided with one block of movable steel plate in the bottom of vertical rod, two vertical rods are each passed through movable steel plate and are slidably connected with it; The lower end of vertical rod is provided with one piece of fixing steel plate, and vertical rod lower end is linked together by fixing steel plate; The lower end of fixing steel plate is provided with a cylinder barrel and is connected with its one end, the piston plate be slidably connected between one piece and inner wall of cylinder is set in cylinder barrel, piston plate upper surface is provided with an axis and welds together with its lower end, axis upper end is connected with movable steel plate through after fixing steel plate, is slidably connected between axis and fixing steel plate.
2. the instrument of detachable cleaning preformed pile stake core soil according to claim 1, is characterized in that,
Described vertical rod is the vertical rod of adjustable length.
3. the instrument of detachable cleaning preformed pile stake core soil according to claim 2, is characterized in that,
Every root vertical rod is made up of the galvanized pipe of more than a section, is fixed together, is threaded between galvanized pipe with tube connector between adjacent two galvanized pipes by tube connector.
4. the instrument of detachable cleaning preformed pile stake core soil according to claim 1, is characterized in that,
Two vertical rods are connected with the dual-side of fixing steel plate respectively.
5. the instrument of detachable cleaning preformed pile stake core soil according to claim 1, is characterized in that,
Be arranged in parallel between fixing steel plate, movable steel plate.
CN201520519679.5U 2015-07-17 2015-07-17 Instrument of detachable clearance precast pile stake core soil Expired - Fee Related CN204780922U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520519679.5U CN204780922U (en) 2015-07-17 2015-07-17 Instrument of detachable clearance precast pile stake core soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520519679.5U CN204780922U (en) 2015-07-17 2015-07-17 Instrument of detachable clearance precast pile stake core soil

Publications (1)

Publication Number Publication Date
CN204780922U true CN204780922U (en) 2015-11-18

Family

ID=54521005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520519679.5U Expired - Fee Related CN204780922U (en) 2015-07-17 2015-07-17 Instrument of detachable clearance precast pile stake core soil

Country Status (1)

Country Link
CN (1) CN204780922U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105714826A (en) * 2016-04-20 2016-06-29 上海宝冶集团有限公司 Prestressed concrete pipe pile core hole cleaning device and operation method
CN109989718A (en) * 2019-03-26 2019-07-09 上海建工二建集团有限公司 Tool for rotary drilling of ceramic slag treatment and hole cleaning in karst area and manufacturing and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105714826A (en) * 2016-04-20 2016-06-29 上海宝冶集团有限公司 Prestressed concrete pipe pile core hole cleaning device and operation method
CN109989718A (en) * 2019-03-26 2019-07-09 上海建工二建集团有限公司 Tool for rotary drilling of ceramic slag treatment and hole cleaning in karst area and manufacturing and construction method thereof

Similar Documents

Publication Publication Date Title
CN103243745B (en) A kind of method of pile tube deviation rectification
CN209025468U (en) The device of accurate control multi-thickness wall mortar joint
CN204780922U (en) Instrument of detachable clearance precast pile stake core soil
CN101349154B (en) Structure construction method for forming subterranean tunnel
CN103556820A (en) Suspension mold for enlarging and reinforcing concrete beam and construction method of suspension mold
CN205171521U (en) A device that is used for tubular pile stake core to clear up
CN201221203Y (en) Circular ring-shaped narrow gap vibrator for concrete of floor drain of drainage pipe sleeve
CN206174466U (en) Marking device for construction
CN204139162U (en) Concrete tubular pile pile splicing structure
CN211171938U (en) Quick distance instrument of stake owner muscle
CN110005211B (en) Water spraying tool combining plastering wet wall and concrete surface maintenance
CN202509750U (en) Height-adjustable type scaffold
CN106996103B (en) Built-in pipe construction method in concrete cut based on detachable machine straightening device
CN216664075U (en) Tamping device for underground pipeline laying
CN203755666U (en) Finished grade beam binding mold
CN207739263U (en) The auxiliary pouring device of concrete tubular pile stake core
CN221297516U (en) Supporting and positioning device for pavement paving steel wire rope
CN210263950U (en) Thin-wall multi-opening pouring string barrel
CN211037874U (en) Wall mortar joint mould
CN209923732U (en) Water stable paving elevation control device
CN204311326U (en) The simple and easy template of a kind of pavement concrete
CN210208423U (en) Reserved steel bar straightening device
CN219862183U (en) Collapsible loess subgrade drainage device
CN217759867U (en) Novel concrete placement manual operation platform
CN218522247U (en) A support frame for slope concrete layer is pour

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151118