CN110005211B - Water spraying tool combining plastering wet wall and concrete surface maintenance - Google Patents

Water spraying tool combining plastering wet wall and concrete surface maintenance Download PDF

Info

Publication number
CN110005211B
CN110005211B CN201910293115.7A CN201910293115A CN110005211B CN 110005211 B CN110005211 B CN 110005211B CN 201910293115 A CN201910293115 A CN 201910293115A CN 110005211 B CN110005211 B CN 110005211B
Authority
CN
China
Prior art keywords
galvanized steel
steel pipe
pipe
water
spray head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910293115.7A
Other languages
Chinese (zh)
Other versions
CN110005211A (en
Inventor
崔恩泽
王荣祥
张阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201910293115.7A priority Critical patent/CN110005211B/en
Publication of CN110005211A publication Critical patent/CN110005211A/en
Application granted granted Critical
Publication of CN110005211B publication Critical patent/CN110005211B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/246Safety or protective measures preventing damage to building parts or finishing work during construction specially adapted for curing concrete in situ, e.g. by covering it with protective sheets

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a water spraying tool combining plastering wet walls and concrete surface maintenance, which comprises a supporting plate, wherein inclined supporting feet are welded at four corners of the lower end of the supporting plate, backing plates are welded at the lower ends of the inclined supporting feet, the lower ends of galvanized steel pipes penetrate through holes I and are connected with water inlet hoses, upper galvanized steel pipes are welded at the upper ends of the lower galvanized steel pipes, and spray heads are arranged at the upper ends of the upper galvanized steel pipes; the invention has reasonable structural design, can change the previous point into the surface when the fixed spray head which does not rotate is replaced and used, improves the efficiency, and has the advantages of uniform wetting, water saving and labor saving; the concrete surface is maintained, the rotary spray head can be replaced, the spray head automatically rotates, the concrete surface within a certain range is maintained in a wetting mode, workers do not need to care all the time, labor and water are saved, and the environment-friendly construction requirement is met.

Description

Water spraying tool combining plastering wet wall and concrete surface maintenance
Technical Field
The invention relates to the technical field of motors, in particular to a water spraying tool combining plastering wet walls and concrete surface maintenance.
Background
Before plastering a brick wall at a construction site, wetting the wall surface, and curing the concrete surface after pouring the concrete floor, wherein most of the concrete surface is manually performed at the construction site, and personnel always need to watch and operate the concrete surface in the process, so that the labor and time are wasted, the construction efficiency is low, and the phenomena of uneven wetting of the wall surface and water waste cannot be avoided.
Disclosure of Invention
The invention aims to provide a water spraying tool combining plastering wet walls and concrete surface maintenance, so as to solve the problems in the background technology.
In order to achieve the above purpose, the present invention provides the following technical solutions: the utility model provides a water spray tool that wet wall of plastering and concrete face maintenance combine together, includes the backup pad, the lower extreme four corners department of backup pad all welds the oblique supporting legs, the lower extreme of oblique supporting legs all welds the backing plate, and the backing plate all supports subaerial, through-hole I has been seted up at the middle part of backup pad, rectangular frame plate has been welded to the upper end of backup pad, through-hole II has all been seted up at the upper and lower diaphragm middle part of rectangular frame plate, passes down galvanized steel pipe between two through-holes II, the lower extreme of galvanized steel pipe passes through-hole I and is connected with the hose that intakes, the one end that the galvanized steel pipe was kept away from to the hose that intakes is connected with the water pump, the fixed cover in middle part of galvanized steel pipe is equipped with the fixed lantern ring down, one side welding of fixed lantern ring has the U template, the movable insertion has the circle card pole in the U type groove of U template, and the circle card is articulated through the articulated axle activity between the pole, a vertical slideway is vertically arranged on one side of the rectangular frame plate, a plurality of rectangular clamping grooves are formed in one side wall of the vertical slideway, a round clamping rod penetrates through the vertical slideway and is clamped in one rectangular clamping groove, one end of the round clamping rod, which is far away from the U-shaped plate, is connected with a wrenching rod, the upper end of the lower galvanized steel pipe is welded with an upper galvanized steel pipe, a corrugated pipe is arranged in the upper galvanized steel pipe, the lower end of the corrugated pipe is connected with a metal round pipe I, an inner ring is welded at the lower end of the interior of the upper galvanized steel pipe, the metal round pipe I is inserted and welded in the inner ring, an inner threaded connecting pipe is connected at the upper end of the corrugated pipe, a spray head is arranged at the upper end of the upper galvanized steel pipe, a metal round pipe II is welded at the lower end of the spray head, an outer threaded pipe is welded between the outer threaded pipe and the inner threaded connecting pipe through threaded fit connection, the four ends in the outer side of the metal round tube II are welded with vertical clamping blocks, four vertical clamping grooves are formed in the upper end of the inner wall of the upper galvanized steel tube, and the four vertical clamping blocks are respectively clamped in the four vertical clamping grooves.
Preferably, the outer diameter and the inner diameter of the lower galvanized steel pipe and the outer diameter of the upper galvanized steel pipe are equal, and the surfaces of the welding parts of the lower galvanized steel pipe and the upper galvanized steel pipe are polished to form smooth surfaces.
Preferably, the fixed lantern ring is formed by splicing two semicircular rings, connecting plates are welded at two ends of the two semicircular rings, and the two connecting plates which are mutually attached are fixedly connected through connecting bolts which penetrate through the fixed lantern ring.
Preferably, the rectangular clamping grooves are vertically arranged along the side wall of the vertical slideway, at least ten rectangular clamping grooves are arranged, the distances between two upper and lower adjacent rectangular clamping grooves are equal, and the depths of the rectangular clamping grooves are larger than the diameter of the circular clamping rod.
Preferably, one end of the water inlet hose far away from the water pump is connected with a threaded joint, the lower end of the inner wall of the lower galvanized steel pipe is provided with an internal thread, and the threaded joint is inserted into the lower end of the lower galvanized steel pipe and is connected through threaded fit.
Preferably, the spray heads are rotary spray heads and fixed spray heads.
Compared with the prior art, the invention has the beneficial effects that: the invention has reasonable structural design, the tool can be stably supported on the ground, and in the wall surface wetting before plastering and wall surface maintenance after plastering of the brick wall at a construction site, a fixed spray head which does not rotate can be replaced, so that workers can change the previous point into the surface during the work of wetting the wall surface, the efficiency is improved, and the tool has the advantages of uniform wetting, water saving and labor saving; after the concrete floor is poured, the concrete surface is maintained, the concrete surface can be replaced by a rotary spray head (greening spray), the spray head is placed in place, the spray head automatically rotates, the concrete surface within a certain range is wetted and maintained, compared with the traditional mode, workers do not need to care all the time, labor and water are saved, the environment-friendly construction requirement is met, the spray head can be freely adjusted according to the height of a wall surface and the ground area of a construction site, the wet wall and maintenance are more uniform, the spray head can be taken out from an upper galvanized steel pipe, the spray head can be extended through a corrugated pipe, the spray head can be manually held for operation, the functionality is strong, and the practicability is higher.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is an enlarged schematic view of the structure A in FIG. 1 according to the present invention;
FIG. 3 is a schematic view of a bellows of the present invention;
fig. 4 is an enlarged schematic view of the structure B in fig. 3 according to the present invention.
In the figure: the steel pipe type hot water bottle comprises a supporting plate 1, inclined supporting legs 2, a backing plate 3, a rectangular frame plate 4, a lower galvanized steel pipe 5, a water inlet hose 6, a threaded joint 7, a water pump 8, a vertical slide way 9, a pulling rod 10, an upper galvanized steel pipe 11, a spray head 12, a fixed sleeve ring 13, a connecting plate 14, a connecting bolt 15, a U-shaped plate 16, a hinge shaft 17, a rectangular clamping groove 18, a round clamping rod 19, an inner circular ring 20, a metal round pipe I21, a corrugated pipe 22, a metal round pipe II23, a vertical clamping block 24, a vertical clamping groove 25, an inner threaded connecting pipe 26 and an outer threaded pipe 27.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1-4, the present invention provides a technical solution: a water spraying tool combining plastering wet walls and concrete surface maintenance comprises a supporting plate 1, wherein inclined supporting legs 2 are welded at four corners of the lower end of the supporting plate 1, a backing plate 3 is welded at the lower end of each inclined supporting leg 2, the backing plate 3 is supported on the ground, through holes I are formed in the middle of the supporting plate 1, a rectangular frame plate 4 is welded at the upper end of the supporting plate 1, through holes II are formed in the middle of an upper transverse plate and a lower transverse plate of the rectangular frame plate 4, a lower galvanized steel pipe 5 passes through the two through holes II, the lower end of the galvanized steel pipe 5 passes through the through holes I and is connected with a water inlet hose 6, one end, far away from the galvanized steel pipe 5, of the water inlet hose 6 is connected with a water pump 8, a water tank can be prepared on a construction site, the water pump 8 is placed in the water tank, one end, far away from the water pump 8, of the water pump is connected with a threaded joint 7, the lower end of the lower galvanized steel pipe 5 is provided with internal threads, the threaded joint 7 is inserted into the lower end of the lower galvanized steel pipe 5 and is connected through threaded fit, and the threaded joint 7 is connected in a threaded connection mode, so that connection is stable and convenient to assemble and disassemble;
the middle part of the lower galvanized steel pipe 5 is fixedly sleeved with a fixed sleeve ring 13, the fixed sleeve ring 13 is formed by splicing two semicircular rings, two ends of the two semicircular rings are welded with connecting plates 14, two connecting plates 14 which are mutually attached are fixedly connected through connecting bolts 15 which are arranged in a penetrating way, one side of the fixed sleeve ring 13 is welded with a U-shaped plate 16, a round clamping rod 19 is movably inserted into the U-shaped groove of the U-shaped plate 16, the U-shaped plate 16 is movably hinged with the round clamping rod 19 through a hinge shaft 17, a vertical slideway 9 is vertically arranged on one side of the rectangular frame plate 4, a plurality of rectangular clamping grooves 18 are formed in one side wall of the vertical slideway 9, the round clamping rod 19 passes through the vertical slideway 9 and is clamped in one rectangular clamping groove 18, one end of the round clamping rod 19 which is far away from the U-shaped plate 16 is connected with a wrenching rod 10, the rectangular clamping grooves 18 are vertically arranged along the side wall of the vertical slideway 9, the number of the rectangular clamping grooves 18 is at least ten, the distances between the two adjacent rectangular clamping grooves 18 are equal, the depth of the rectangular clamping grooves 18 is larger than the diameter of the round clamping rod 19, the diameter of the round clamping rod 19 is adjusted by moving the vertical slideway 10 to the vertical slideway 10, and the height of the corresponding to the vertical slideway 10 can be adjusted when the vertical slideway is moved to the vertical slideway 9, and the height is adjusted to be the height of the vertical slideway 9, and the height is adjusted conveniently;
the upper end welding of lower galvanized steel pipe 5 has last galvanized steel pipe 11, the external diameter, the internal diameter of lower galvanized steel pipe 5 and last galvanized steel pipe 11 all equals, the welded part surface of lower galvanized steel pipe 5 and last galvanized steel pipe 11 all is through polishing treatment smooth surface, be provided with bellows 22 in the last galvanized steel pipe 11, the lower extreme of bellows 22 is connected with metal pipe I21, the inside lower extreme welding of last galvanized steel pipe 11 has interior ring 20, metal pipe I21 inserts and welds in interior ring 20, the upper end of bellows 22 is connected with internal thread take-over 26, the upper end of last galvanized steel pipe 11 is provided with shower nozzle 12, the shower nozzle 12 selects two kinds of rotatory shower nozzle and fixed shower nozzle, the lower extreme welding of shower nozzle 12 has metal pipe II23, the lower extreme welding of metal pipe II23 has external screw thread pipe 27, be connected through the screw-thread fit between external thread take-over 26, the outside of metal pipe II23 is four all welded with perpendicular fixture block 24, four perpendicular fixture blocks 25 have all been seted up to the inner wall upper end of last galvanized steel pipe 11, four perpendicular fixture block 24 are inserted and are established respectively in interior ring 20, can take out in order to directly taking out the function from last galvanized steel pipe 11 with the shower nozzle 12 with the manual work, can take out from the shower nozzle 12 with the high-pass through the manual work, the connection mode of the bellows 11 is convenient to take out the galvanized steel pipe 11, can take out the high-pass through the manual work, the shower nozzle is convenient and can take out.
The working principle of the invention is as follows:
the tool can be stably supported on the ground, and a fixed spray head which does not rotate can be replaced in the wall surface wetting before plastering and wall surface maintenance after plastering of a brick wall in a construction site, so that workers change the previous point into the surface during the work of wetting the wall surface, the efficiency is improved, and the tool has the advantages of uniform wetting, water saving and labor saving; after the concrete floor is poured, the concrete surface is maintained, a rotary spray head (greening spray) can be replaced, the spray head is placed in place, the spray head automatically rotates, the concrete surface within a certain range is wetted and maintained, compared with the traditional mode, workers do not need to care all the time, labor and water are saved, the environment-friendly construction requirement is met, the spray head can be freely adjusted according to the height of a wall surface and the ground area of a construction site, the wet wall and maintenance are more uniform, the spray head can be taken out from the upper galvanized steel pipe 11, the spray head extends through the corrugated pipe 22, the spray head can be manually held for operation, the functionality is strong, and the practicability is higher.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (3)

1. The utility model provides a water spray instrument that wet wall of plastering and concrete face maintenance combined together, includes backup pad (1), its characterized in that: the utility model discloses a vertical slide way, including support plate (1), fixed sleeve (13) are equipped with, fixed sleeve (13) one side welding of board (16) has U template (16), round trip (19) are equipped with in the U-shaped groove of U template (16) in the activity, and pass down galvanized steel pipe (5) between two through-holes II, the lower extreme of galvanized steel pipe (5) passes through-hole I and is connected with into water hose (6), the one end that lower galvanized steel pipe (5) was kept away from to water hose (6) is connected with water pump (8), fixed sleeve (13) are equipped with in the middle part of lower galvanized steel pipe (5), one side welding of fixed sleeve (13) has U template (16), and pass through articulated joint (17) between U (16) and the round trip (19) in the U-shaped groove of board (1), one side of perpendicular slide way (9) are equipped with in perpendicular slide way (9), the one end that U template (16) was kept away from to circle kelly (19) is connected with spanner (10), the upper end welding of lower galvanized steel pipe (5) has last galvanized steel pipe (11), be provided with bellows (22) in going up galvanized steel pipe (11), the lower extreme of bellows (22) is connected with metal pipe I (21), the inside lower extreme welding of going up galvanized steel pipe (11) has interior ring (20), metal pipe I (21) are inserted and are welded in interior ring (20), the upper end of bellows (22) is connected with internal thread take-over (26), the upper end of going up galvanized steel pipe (11) is provided with shower nozzle (12), the lower extreme welding of shower nozzle (12) has metal pipe II (23), the lower extreme welding of metal pipe II (23) has external thread pipe (27), be connected through screw-thread fit between external thread pipe (27) and the internal thread take-over (26), the outside of metal pipe II (23) has vertical fixture blocks (24), four vertical clamping grooves (25) have all been seted up in four vertical clamping grooves (25) respectively;
the rectangular clamping grooves (18) are vertically arranged along the side wall of the vertical slideway (9), at least ten rectangular clamping grooves (18) are arranged, the distances between two adjacent rectangular clamping grooves (18) are equal, and the depth of each rectangular clamping groove (18) is larger than the diameter of the circular clamping rod (19); the outer diameter and the inner diameter of the lower galvanized steel pipe (5) and the outer diameter of the upper galvanized steel pipe (11) are equal, and the surfaces of the welding parts of the lower galvanized steel pipe (5) and the upper galvanized steel pipe (11) are polished to form smooth surfaces; the fixed lantern ring (13) is formed by splicing two semicircular rings, connecting plates (14) are welded at two ends of the two semicircular rings, and the two connecting plates (14) which are mutually attached are fixedly connected through connecting bolts (15) which penetrate through the fixed lantern ring.
2. The water spraying tool for combining plastering wet walls and concrete surface curing according to claim 1, wherein: one end of the water inlet hose (6) far away from the water pump (8) is connected with a threaded joint (7), an inner thread is arranged at the lower end of the inner wall of the lower galvanized steel pipe (5), and the threaded joint (7) is inserted at the lower end of the lower galvanized steel pipe (5) and connected through threaded fit.
3. The water spraying tool for combining plastering wet walls and concrete surface curing according to claim 1, wherein: the spray head (12) is a rotary spray head and a fixed spray head.
CN201910293115.7A 2019-04-12 2019-04-12 Water spraying tool combining plastering wet wall and concrete surface maintenance Active CN110005211B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910293115.7A CN110005211B (en) 2019-04-12 2019-04-12 Water spraying tool combining plastering wet wall and concrete surface maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910293115.7A CN110005211B (en) 2019-04-12 2019-04-12 Water spraying tool combining plastering wet wall and concrete surface maintenance

Publications (2)

Publication Number Publication Date
CN110005211A CN110005211A (en) 2019-07-12
CN110005211B true CN110005211B (en) 2024-03-08

Family

ID=67171380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910293115.7A Active CN110005211B (en) 2019-04-12 2019-04-12 Water spraying tool combining plastering wet wall and concrete surface maintenance

Country Status (1)

Country Link
CN (1) CN110005211B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114438931A (en) * 2022-01-25 2022-05-06 增城市利安交通设施有限责任公司 Novel road anti-collision wall and construction method thereof

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08280837A (en) * 1995-04-10 1996-10-29 Bosai Kikaku:Kk Sprinkler unwinding piping
CN204592654U (en) * 2015-04-18 2015-08-26 长春市春燃物资设备有限公司 A kind of corrugated flexible hose and Coating Steel Pipe quick inserting joint
CN205438851U (en) * 2016-03-31 2016-08-10 黄河科技学院 Concrete wall curing means prevents that shower nozzle blocks up and easy governing system of working water jet capacity
CN106272928A (en) * 2016-08-31 2017-01-04 中国十七冶集团有限公司 A kind of automatic maintenance device to building concrete
CN206713681U (en) * 2017-05-10 2017-12-08 四川农业大学 A kind of ornamental plant curing means
CN207609837U (en) * 2017-11-14 2018-07-13 福建省宝成五金科技有限公司 A kind of height-adjustable new type water tap for kitchen use
CN108371061A (en) * 2017-11-14 2018-08-07 石城县松湖养殖专业合作社 A kind of orange gardens sprinkler
CN207920118U (en) * 2017-12-04 2018-09-28 中国建筑第二工程局有限公司 Detachable cast in situ concrete floor maintenance autogiration sprinkler
CN208152599U (en) * 2018-04-19 2018-11-27 温州海蓝工业设计有限公司 A kind of building concrete curing means
CN210002916U (en) * 2019-04-12 2020-01-31 中建八局第二建设有限公司 water spraying tool for combining plastering wet wall and concrete surface maintenance

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08280837A (en) * 1995-04-10 1996-10-29 Bosai Kikaku:Kk Sprinkler unwinding piping
CN204592654U (en) * 2015-04-18 2015-08-26 长春市春燃物资设备有限公司 A kind of corrugated flexible hose and Coating Steel Pipe quick inserting joint
CN205438851U (en) * 2016-03-31 2016-08-10 黄河科技学院 Concrete wall curing means prevents that shower nozzle blocks up and easy governing system of working water jet capacity
CN106272928A (en) * 2016-08-31 2017-01-04 中国十七冶集团有限公司 A kind of automatic maintenance device to building concrete
CN206713681U (en) * 2017-05-10 2017-12-08 四川农业大学 A kind of ornamental plant curing means
CN207609837U (en) * 2017-11-14 2018-07-13 福建省宝成五金科技有限公司 A kind of height-adjustable new type water tap for kitchen use
CN108371061A (en) * 2017-11-14 2018-08-07 石城县松湖养殖专业合作社 A kind of orange gardens sprinkler
CN207920118U (en) * 2017-12-04 2018-09-28 中国建筑第二工程局有限公司 Detachable cast in situ concrete floor maintenance autogiration sprinkler
CN208152599U (en) * 2018-04-19 2018-11-27 温州海蓝工业设计有限公司 A kind of building concrete curing means
CN210002916U (en) * 2019-04-12 2020-01-31 中建八局第二建设有限公司 water spraying tool for combining plastering wet wall and concrete surface maintenance

Also Published As

Publication number Publication date
CN110005211A (en) 2019-07-12

Similar Documents

Publication Publication Date Title
CN110469095B (en) Automatic watering device of construction concrete
CN206801065U (en) A kind of side wall concrete automatic maintenance device
CN110005211B (en) Water spraying tool combining plastering wet wall and concrete surface maintenance
CN210002916U (en) water spraying tool for combining plastering wet wall and concrete surface maintenance
CN213268757U (en) Building interior wall whitewashes device
CN117108200A (en) Mortar anchor rod drilling device for building construction
CN210421925U (en) Positioning and embedding device for water stop joint of building
CN206902768U (en) A kind of post-cast strip adjustable supporting
CN215036368U (en) Steel pipe inner wall rust cleaning device convenient to it is fixed
CN213729857U (en) Fixing device for welding architectural decoration steel pipe
CN203670121U (en) Simple water pressing machine
CN213597031U (en) Aluminum alloy template for urban underground pipe gallery
CN204780922U (en) Instrument of detachable clearance precast pile stake core soil
CN211948483U (en) Side slope construction is with preventing device that collapses
CN209937366U (en) Concrete hollow slab wet cutting device convenient to fix for construction
CN210278624U (en) Civil engineering environmental protection sprays dust device
CN209653076U (en) A kind of drainpipe prefabricated mould for the construction of house co-layer draining
CN212027140U (en) Steel column bottom grouting device
CN220994882U (en) Concrete maintenance device for building construction
CN215055339U (en) Detachable and adjustable pump pipe floor penetrating shaping formwork device
CN220362766U (en) Self-moving type continuous beam concrete curing device
CN220470941U (en) Water supply and drainage pipeline structure for building
CN213087479U (en) Cement wall spray set in building field
CN217699956U (en) Supporting tool for brushing cement lining on large-size cast iron pipe joint piece
CN213572988U (en) Expansion joint template for building construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Country or region after: China

Address after: 250014 17th floor, unit 1, phase II office building, Zhongjian cultural city, 16 Wenhua East Road, Lixia District, Jinan City, Shandong Province

Applicant after: THE SECOND CONSTRUCTION LIMITED COMPANY OF CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION

Address before: 250014 18th floor, Zhongjian building, No.16, Wenhua East Road, Lixia District, Jinan City, Shandong Province

Applicant before: THE SECOND CONSTRUCTION LIMITED COMPANY OF CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION

Country or region before: China

GR01 Patent grant
GR01 Patent grant