A kind of wet wall and the concrete surface of plastering conserves the water spraying tool combined
Technical field
It is specially a kind of to plaster wet wall and concrete surface conserves the nozzleman combined the present invention relates to technical field of motors
Tool.
Background technique
At the construction field (site) before masonry walls plastering, needs to moisten metope, after the completion of mattess pours, need pair
Concrete surface is conserved, these are most of at the construction field (site) to be carried out using artificial, needs personnel to keep an eye on always in the process
And operation, not only lost labor and time, construction efficiency is low, and not can avoid wet to metope uneven and waste water
The phenomenon that, for this purpose, it is proposed that a kind of wet wall and concrete surface of plastering conserves the water spraying tool combined.
Summary of the invention
The purpose of the present invention is to provide a kind of wet wall and concrete surfaces of plastering to conserve the water spraying tool combined, to solve
The problems mentioned above in the background art.
To achieve the above object, the invention provides the following technical scheme: a kind of wet wall of plastering is mutually tied with concrete surface maintenance
The water spraying tool of conjunction, including support plate, the lower end four corners of the support plate are welded with bearing diagonal foot, the bearing diagonal foot
Lower end is welded with backing plate, and backing plate is both supported upon on ground, and through-hole I, the support plate are offered in the middle part of the support plate
Upper end be welded with rectangle deckle board, offer through-hole II in the middle part of the upper lower cross plate of rectangle deckle board, passed through between two through-hole II
Lower coating steel pipe, the lower end of the coating steel pipe pass through through-hole I and are connected with water supply hose, and the water supply hose is far from galvanized steel
One end of pipe is connected with water pump, and the middle part fixing sleeve of the lower coating steel pipe is equipped with retaining collar, the side of the retaining collar
It is welded with U-shaped board, activity is inserted with round kelly in the U-type groove of the U-shaped board, and passes through articulated shaft between U-shaped board and circle kelly
It is movably hinged, the side of the rectangle deckle board offers perpendicular slideway vertically, offers several in the one side wall of the perpendicular slideway
Rectangle card slot, the round kelly passes through perpendicular slideway and is stuck in one of rectangle card slot, and the circle one end of kelly far from U-shaped board
It is connected with throw rod, the upper end of the lower coating steel pipe is welded with coating steel pipe, is provided with ripple in the upper coating steel pipe
Pipe, the lower end of bellows are connected with metal circular tube I, and the interior lower end of the upper coating steel pipe is welded with interior annular, the metal
Round tube I is plugged and is welded in interior annular, the upper end of the bellows be connected with internal screw thread adapter tube, the upper coating steel pipe it is upper
End is provided with spray head, and the lower end of the spray head is welded with metal circular tube II, and the lower end of the metal circular tube II is welded with external screw thread
Pipe, by being threadedly engaged connection between the male-pipe and internal screw thread adapter tube, four end of outside of the metal circular tube II is welded
It is connected to perpendicular fixture block, the inner wall upper end of the upper coating steel pipe is opened up there are four perpendicular card slot, and four perpendicular fixture blocks are clamped respectively
In four perpendicular card slots.
Preferably, outer diameter, the internal diameter of the lower coating steel pipe and upper coating steel pipe are equal, the lower coating steel pipe and upper
The weld surface of coating steel pipe passes through polishing treatment into shiny surface.
Preferably, the retaining collar is spliced by two semicircular rings, and the both ends of two semicircular rings are welded with connection
Plate, by being fixedly connected through the connection bolt of setting between two connecting plates being bonded to each other.
Preferably, the rectangle card slot is at least arranged along the side wall vertical array for erecting slideway, the quantity of the rectangle card slot
There are ten, and neighbouring the distance between two rectangle card slots are equal, the depth of the rectangle card slot is all larger than round card
The diameter of bar.
Preferably, the water supply hose is connected with nipple, the inner wall of the lower coating steel pipe far from one end of water pump
Lower end is provided with internal screw thread, and the nipple is plugged in the lower end of lower coating steel pipe and by being threadedly engaged connection.
Preferably, the sprinkler selection rotating sprinkler and two kinds of fixed sprinkler.
Compared with prior art, the beneficial effects of the present invention are: structure of the invention design is reasonable, which can stablize branch
Support is on the ground, replaceable to make in the metope maintenance processes after the metope before masonry walls plastering is moistened and plastered at the construction field (site)
With non-rotary fixed sprinkler, worker is allowed to become face, improved efficiency by point before in wetting metope work, and had wet
Profit is uniform, saves water, saves artificial advantage;After the completion of mattess pours, concrete surface is conserved, it can be more
It changes revolving spray head (greening spray) into, puts in place, spray head rotates automatically, and a certain range of concrete surface is wet feeding
Shield, compare traditional approach, and worker saves artificial, saving water, meet green construction requirement, Er Qieben without nursing always
Spray head in invention can be according to the height and floor area of construction site metope, and the free height for adjusting spray head is wet to guarantee
Wall and conserve it is more uniform, spray head can be taken out from upper coating steel pipe, be extended through bellows, can also manually hold spray head into
Row operation, functional have more practicability.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is structure enlargement diagram at A in Fig. 1 of the present invention;
Fig. 3 is bellows schematic diagram of the present invention;
Fig. 4 is structure enlargement diagram at B in Fig. 3 of the present invention.
In figure: support plate 1, bearing diagonal foot 2, backing plate 3, rectangle deckle board 4, lower coating steel pipe 5, water supply hose 6, nipple
7, water pump 8, perpendicular slideway 9, throw rod 10, upper coating steel pipe 11, spray head 12, retaining collar 13, connecting plate 14, connection bolt 15, U
Template 16, articulated shaft 17, rectangle card slot 18, circle kelly 19, interior annular 20, metal circular tube I21, bellows 22, metal circular tube
II23, perpendicular fixture block 24, perpendicular card slot 25, internal screw thread adapter tube 26, male-pipe 27.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1-Fig. 4, the present invention provides a kind of technical solution: a kind of wet wall of plastering and concrete surface maintenance combine
Water spraying tool, including support plate 1, the lower end four corners of support plate 1 are welded with bearing diagonal foot 2, and the lower end of bearing diagonal foot 2 is equal
It is welded with backing plate 3, and backing plate 3 is both supported upon on ground, the middle part of support plate 1 offers through-hole I, the upper end welding of support plate 1
There is rectangle deckle board 4, through-hole II is offered in the middle part of the upper lower cross plate of rectangle deckle board 4, passes through lower galvanized steel between two through-hole II
The lower end of pipe 5, coating steel pipe 5 passes through through-hole I and is connected with water supply hose 6, and water supply hose 6 connects far from one end of coating steel pipe 5
Be connected to water pump 8, water tank can be prepared at the construction field (site), water pump 8 is placed into water tank and is drawn water, water supply hose 6 far from water pump 8 one
End is connected with nipple 7, and the inner wall lower end of lower coating steel pipe 5 is provided with internal screw thread, and nipple 7 is plugged in lower coating steel pipe
5 lower end and by being threadedly engaged connection, using the connection type of screw thread so that connection is more stable, and convenient for assembling with
Disassembly;
The middle part fixing sleeve of lower coating steel pipe 5 is equipped with retaining collar 13, and retaining collar 13 is spliced by two semicircular rings,
The both ends of two semicircular rings are welded with connecting plate 14, pass through the company through setting between two be bonded to each other connecting plate 14
Connecting bolt 15 is fixedly connected, and the side of retaining collar 13 is welded with U-shaped board 16, and activity is inserted with round card in the U-type groove of U-shaped board 16
Bar 19, and be movably hinged between U-shaped board 16 and circle kelly 19 by articulated shaft 17, the side of rectangle deckle board 4 offers perpendicular vertically
Slideway 9, offers several rectangle card slots 18 in the one side wall of perpendicular slideway 9, and circle kelly 19 passes through perpendicular slideway 9 and is stuck in wherein one
In a rectangle card slot 18, and circle kelly 19 is connected with throw rod 10 far from one end of U-shaped board 16, and rectangle card slot 18 is along perpendicular slideway 9
Side wall vertical array, the quantity of rectangle card slot 18 is at least provided with ten, and between two neighbouring rectangle card slots 18
Distance be equal, the depth of rectangle card slot 18 is all larger than the diameter of round kelly 19, by pulling throw rod 10 to perpendicular slideway 9
In, throw rod 10 then is pulled up and down, throw rod 10 can move up and down in perpendicular slideway 9, can be according to the height of construction site metope
Degree and floor area, the free height for adjusting spray head 12, adjust to when needing height, pull throw rod 10 again, so that circle
Kelly 19 is stuck in corresponding rectangle card slot 18 and fixes, and it is convenient to operate;
The upper end of lower coating steel pipe 5 is welded with coating steel pipe 11, the outer diameter of lower coating steel pipe 5 and upper coating steel pipe 11,
Internal diameter is equal, and the weld surface of lower coating steel pipe 5 and upper coating steel pipe 11 passes through polishing treatment into shiny surface, upper zinc-plated
Bellows 22 is provided in steel pipe 11, the lower end of bellows 22 is connected with metal circular tube I21, the interior lower end of upper coating steel pipe 11
It is welded with interior annular 20, metal circular tube I21 is plugged and is welded in interior annular 20, and the upper end of bellows 22 is connected with internal screw thread and connects
Pipe 26, the upper end of upper coating steel pipe 11 are provided with spray head 12, and spray head 12 selects rotating sprinkler and two kinds of fixed sprinkler, spray head
12 lower end is welded with metal circular tube II23, and the lower end of metal circular tube II23 is welded with male-pipe 27, male-pipe 27 with it is interior
By being threadedly engaged connection between nipple joint 26, four end of outside of metal circular tube II23 is welded with perpendicular fixture block 24, upper zinc-plated
The inner wall upper end of steel pipe 11 is opened up there are four perpendicular card slot 25, and four perpendicular fixture blocks 24 are respectively engaged in four perpendicular card slots 25, adopt
It is stuck in the connection type of card slot with fixture block cooperation, allows the convenient taking-up and convenient solid on upper coating steel pipe 11 of spray head 12
It is fixed, spray head 12 can from upper coating steel pipe 11 directly on lift out, extended through bellows 22, can also manually hold spray head into
Row operation, functional, bellows 22 can be by folding storage into upper coating steel pipe 11 in the case where not using.
Working principle of the present invention is as follows:
The tool can stablize support on the ground, after the metope before masonry walls plastering is moistened and plastered at the construction field (site)
It is replaceable to use non-rotary fixed sprinkler in metope maintenance processes, allow worker in wetting metope work by point before
The advantage for becoming face, improved efficiency, and having wet uniform, saving water, saving artificial;Completion is poured in mattess
Afterwards, concrete surface is conserved, can be replaced into revolving spray head (greening spray), put in place, spray head rotates automatically, will
A certain range of concrete surface moist curing, compare traditional approach, and worker saves artificial, saving water without nursing always
Amount, meets green construction requirement, and the spray head in the present invention can be according to the height and floor area of construction site metope, freely
Adjusting spray head height, with guarantee wet wall and conserve it is more uniform, spray head can be taken out from upper coating steel pipe 11, pass through wave
Line pipe 22 extends, and can also manually hold spray head and be operated, functional, has more practicability.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.