CN206664655U - A kind of civil construction pipeline rack - Google Patents

A kind of civil construction pipeline rack Download PDF

Info

Publication number
CN206664655U
CN206664655U CN201720249068.2U CN201720249068U CN206664655U CN 206664655 U CN206664655 U CN 206664655U CN 201720249068 U CN201720249068 U CN 201720249068U CN 206664655 U CN206664655 U CN 206664655U
Authority
CN
China
Prior art keywords
pipeline
latch segment
support column
civil construction
counter weight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720249068.2U
Other languages
Chinese (zh)
Inventor
贺涛
刘耀鸿
卢滔
陈翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720249068.2U priority Critical patent/CN206664655U/en
Application granted granted Critical
Publication of CN206664655U publication Critical patent/CN206664655U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of civil construction pipeline rack, including support column, latch segment and pipeline standing groove, a support column is mounted at the top of described two counter weight bases, totally ten latch segments are symmetrically arranged with described two support columns, the side of the latch segment is provided with a pipeline and places cross bar, the bottom of each counter weight base is provided with two universal wheels, the side of the counter weight base is provided with a push rod, one handle is installed at the top of the push rod, the both sides of the latch segment are provided with a mounting blocks, the side insertion mounting blocks of the bolt simultaneously stretch out from the opposite side of mounting blocks, the nut is arranged on the side that bolt stretches out.The civil construction is provided with two symmetrical support columns with pipeline rack, and five convex structures are provided with support column, and latch segment is upper and lower convex umbilicate structure, it is fitted together to the bulge-structure on support column, installation is more firm, and installing/dismounting method is simpler, easy to use.

Description

A kind of civil construction pipeline rack
Technical field
Civil construction appliance technology is the utility model is related to, specially a kind of civil construction pipeline rack.
Background technology
Pipeline be with pipe, pipe connector and valve etc. be connected into be used for convey gas, liquid or with solid particle Fluid device.Pipeline because its own it is unique the characteristics of, extensive use and conglomerate are multi-field.Having many uses for pipeline is general, Be used primarily in feedwater, draining, heat supply, give gas, long distance delivery oil and natural gas, agricultural irrigation, hydraulic engineering and various In commercial plant.
At present, in building construction process, it is often necessary to use various types of pipelines, these pipe diameters and length are all It is different, it is placed in place during construction, does not only take up substantial amounts of area so, can also influence to construct, existing pipe Road generally by putting the lumps of wood or placed using the rack of entirety on the ground, but this mode is difficult effective By pipeline sorting placement.
Existing rack is most of using integral frame structure, although disclosure satisfy that its use demand, moves Dynamic inconvenience, support frame installation are unstable.
Utility model content
The purpose of this utility model is to provide a kind of civil construction pipeline rack, to solve in above-mentioned background technology The existing rack proposed is most of using integral frame structure, mobile although disclosure satisfy that its use demand Inconvenience, support frame install the problem of unstable.
To achieve the above object, the utility model provides following technical scheme:A kind of civil construction pipeline rack, bag Include support column, latch segment, pipeline standing groove, universal wheel, counter weight base, pipeline place cross bar, handle, push rod, bolt, nut and Mounting blocks, a support column is mounted at the top of described two counter weight bases, is symmetrically arranged with described two support columns Totally ten latch segments, the side of the latch segment are provided with a pipeline and place cross bar, and the pipeline is placed to be respectively provided with cross bar There are three pipeline standing grooves, the bottom of each counter weight base is provided with two universal wheels, and the side of the counter weight base is set A push rod is equipped with, a handle is installed at the top of the push rod, the both sides of the latch segment are provided with a mounting blocks, The side insertion mounting blocks of the bolt simultaneously stretch out from the opposite side of mounting blocks, and the nut is arranged on the side that bolt stretches out.
Preferably, five convex structures are provided with the support column.
Preferably, the latch segment is upper and lower convex umbilicate structure.
Preferably, the pipeline is placed and is enclosed with one layer of elastomeric material on cross bar.
Preferably, a non-slip rubber set is provided with the outside of the handle.
Compared with prior art, the beneficial effects of the utility model are:The civil construction is provided with two with pipeline rack Symmetrical support column, is provided with five convex structures on support column, and latch segment is upper and lower convex umbilicate structure, and support column On bulge-structure be fitted together to, installation is more firm, and installing/dismounting method is simpler, easy to use, and pipeline is placed on cross bar Be enclosed with one layer of elastomeric material, be easy to protective conduit, prevent pipeline because of collision and caused by unnecessary abrasion, bottom is provided with ten thousand It is more convenient to wheel, movement.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model latch segment main structure diagram;
Fig. 3 is the utility model latch segment overlooking the structure diagram;
Fig. 4 is the utility model main structure diagram.
In figure:Support column -1;Latch segment -2;Pipeline standing groove -3;Universal wheel -4;Counter weight base -5;Pipeline placement cross bar- 6;Handle -7;Push rod -8;Bolt -9;Nut -10;Mounting blocks -11.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-4 are referred to, the utility model provides a kind of technical scheme:A kind of civil construction pipeline rack, including Support column 1, latch segment 2, pipeline standing groove 3, universal wheel 4, counter weight base 5, pipeline place cross bar 6, handle 7, push rod 8, bolt 9th, nut 10 and mounting blocks 11, the tops of two counter weight bases 5 are mounted on a support column 1, symmetrical on two support columns 1 Totally ten latch segments 2 are provided with, the side of latch segment 2 is provided with a pipeline and places cross bar 6, and pipeline is placed to be all provided with cross bar 6 Three pipeline standing grooves 3 are equipped with, the bottom of each counter weight base 5 is provided with two universal wheels 4, and the side of counter weight base 5 is set There is a push rod 8, the top of push rod 8 is provided with a handle 7, and the both sides of latch segment 2 are provided with a mounting blocks 11, bolt 9 side insertion mounting blocks 11 simultaneously stretch out from the opposite side of mounting blocks 11, and nut 10 is arranged on the side that bolt 9 stretches out.
In above-described embodiment, specifically, being provided with five convex structures on support column 1, it is easy to latch segment 2 to be stuck in support On post 1, installation is more firm;
In above-described embodiment, specifically, latch segment 2 is upper and lower convex umbilicate structure, and the bulge-structure on support column 1 Chimeric, installation is firm;
In above-described embodiment, specifically, pipeline is placed is enclosed with one layer of elastomeric material on cross bar 6, it is easy to protective conduit, prevents Only pipeline because of collision and caused by unnecessary abrasion;
In above-described embodiment, specifically, the outside of handle 7 is provided with a non-slip rubber set, avoid promoting counter weight base 5 When slide.
Operation principle:Two latch segments 2 are first symmetrically disposed at the raised both sides of support column 1 during installation, then by bolt 9 Side insertion mounting blocks 11 and stretched out from the opposite sides of mounting blocks 11, nut 10 is then arranged on the side that bolt 9 stretches out, Both sides can install fixation after tightening, pipeline is placed and is enclosed with one layer of elastomeric material on cross bar 6, is easy to protective conduit, can prevent Pipeline because collision and caused by unnecessary abrasion movement when grasp handle 7 and promote, and then complete a series of operation Flow.
In summary, although the utility model is described in detail with reference to the foregoing embodiments, for this area For technical staff, it can still modify to the technical scheme described in foregoing embodiments, or to which part Technical characteristic carries out equivalent substitution, all within the spirit and principles of the utility model, any modification for being made, equivalent substitution, Improve etc., it should be included within the scope of protection of the utility model.

Claims (5)

1. a kind of civil construction pipeline rack, including support column (1), latch segment (2), pipeline standing groove (3), universal wheel (4), counter weight base (5), pipeline place cross bar (6), handle (7), push rod (8), bolt (9), nut (10)With mounting blocks (11), It is characterized in that:Two counter weight bases (5)Top be mounted on a support column (1), two support columns (1)On It is symmetrically arranged with totally ten latch segments (2), the latch segment (2)Side be provided with pipeline and place cross bar (6), it is described Pipeline places cross bar (6)On be provided with three pipeline standing grooves (3), each counter weight base (5)Bottom be provided with two Individual universal wheel (4), the counter weight base (5)Side be provided with a push rod (8), the push rod (8)Top be provided with one Individual handle (7), the latch segment (2)Both sides be provided with a mounting blocks (11), the bolt (9)Side insertion installation Block (11)And from mounting blocks (11)Opposite side stretch out, the nut (10)Installed in bolt (9)The side of stretching.
A kind of 2. civil construction pipeline rack according to claim 1, it is characterised in that:The support column (1)On It is provided with five convex structures.
A kind of 3. civil construction pipeline rack according to claim 1, it is characterised in that:The latch segment (2)For Upper and lower convex umbilicate structure.
A kind of 4. civil construction pipeline rack according to claim 1, it is characterised in that:The pipeline places cross bar (6)On be enclosed with one layer of elastomeric material.
A kind of 5. civil construction pipeline rack according to claim 1, it is characterised in that:The handle (7)It is outer Side is provided with a non-slip rubber set.
CN201720249068.2U 2017-03-15 2017-03-15 A kind of civil construction pipeline rack Expired - Fee Related CN206664655U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720249068.2U CN206664655U (en) 2017-03-15 2017-03-15 A kind of civil construction pipeline rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720249068.2U CN206664655U (en) 2017-03-15 2017-03-15 A kind of civil construction pipeline rack

Publications (1)

Publication Number Publication Date
CN206664655U true CN206664655U (en) 2017-11-24

Family

ID=60377402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720249068.2U Expired - Fee Related CN206664655U (en) 2017-03-15 2017-03-15 A kind of civil construction pipeline rack

Country Status (1)

Country Link
CN (1) CN206664655U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108791427A (en) * 2018-04-26 2018-11-13 黄河科技学院 A kind of civil engineering pipeline conveying device
CN109500755A (en) * 2018-12-24 2019-03-22 重庆新腾源环保科技有限公司 A kind of Carborundum wheel rack
CN109623682A (en) * 2018-12-24 2019-04-16 重庆新腾源环保科技有限公司 A kind of Carborundum wheel drying unit

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108791427A (en) * 2018-04-26 2018-11-13 黄河科技学院 A kind of civil engineering pipeline conveying device
CN109500755A (en) * 2018-12-24 2019-03-22 重庆新腾源环保科技有限公司 A kind of Carborundum wheel rack
CN109623682A (en) * 2018-12-24 2019-04-16 重庆新腾源环保科技有限公司 A kind of Carborundum wheel drying unit
CN109500755B (en) * 2018-12-24 2020-07-17 重庆新腾源环保科技有限公司 Diamond grinding wheel placing rack

Similar Documents

Publication Publication Date Title
CN205675087U (en) A kind of high-altitude pipe transporting mounting vehicle
CN206664655U (en) A kind of civil construction pipeline rack
CN206949121U (en) A kind of agricultural irrigation device easy to use
CN103691594B (en) The lifting portable rainfall simulator of the heterogeneous karst sloping field of a kind of suitable height
CN206559891U (en) A kind of sapling plantation servicing unit
CN204328224U (en) A kind of novel pipeline scaffold
CN207290059U (en) A kind of civil engineering pipe fitting rack
CN208185607U (en) A kind of hydraulic engineering tube support arrangement
CN204573340U (en) A kind of filling support setting up filling pipeline on complex-terrain
CN203692060U (en) Movable agricultural greenhouse framework device
CN207314483U (en) A kind of anti-deformation antiseep of big flow discharge culvert, which is moved, changes structure
CN203473395U (en) Special placing rack for construction site pipeline
CN203487548U (en) Connecting structure of transformer substation steel bracket and concrete foundation joint
CN207129394U (en) A kind of novel road bridge engineering pipe storage frame
CN206337582U (en) A kind of support meanss of steel pipe gallery
CN204062157U (en) A kind of glass fibre reinforced plastics fixing device for tube
CN204328225U (en) A kind of pipeline installation rack
CN207419526U (en) A kind of underpass falsework
CN207047638U (en) A kind of new town road discharge structure
CN220374573U (en) Large-scale pipeline transportation device
CN105380427A (en) Pipeline placement rack used in building
CN205577903U (en) Environment -friendly oil pipe discharging equipment
CN209671760U (en) Gas field waterline corner lays A-frame
CN206162324U (en) Adjustable computer base
CN221743374U (en) Pipeline installation auxiliary device for water treatment engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171124

Termination date: 20190315