CN208251022U - A kind of water conservancy project brick - Google Patents
A kind of water conservancy project brick Download PDFInfo
- Publication number
- CN208251022U CN208251022U CN201820780767.4U CN201820780767U CN208251022U CN 208251022 U CN208251022 U CN 208251022U CN 201820780767 U CN201820780767 U CN 201820780767U CN 208251022 U CN208251022 U CN 208251022U
- Authority
- CN
- China
- Prior art keywords
- brick body
- brick
- pieces
- clamping
- water conservancy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model relates to a kind of water conservancy project bricks, including rectangular brick body, it is characterized by: there are four water seepage holes for setting in brick body, extending outwardly respectively on brick body four is diagonal, there are four the clamping blocks of parallelogram for setting, four clamping blocks are symmetrically set along brick body central axes, the clamping groove being caught in simultaneously for two clamping blocks is formed between two neighbouring clamping blocks, section triangle water seepage hole triangular in shape is formed with by three pieces of water conservancy project brick clampings in the clamping groove, four pieces of fixed blocks in the shape of a right-angled ladder are provided with above and below brick body on the side wall of two sides and between two clamping blocks, side wall of the right-angle side of four pieces of fixed blocks respectively with four clamping blocks connects one to one, permeable slot is formed between adjacent two pieces of fixed blocks, the permeable slot of two neighboring brick body forms through-hole.The utility model provides that a kind of bonding strength is high, the more integral strengths of hole are high and stability water conservancy project brick with long service life by force.
Description
Technical field
The utility model relates to a kind of water conservancy equipments, and in particular to a kind of water conservancy project brick.
Background technique
Currently, the most of medium or smallsized river in China it is different degrees of the phenomenon that there are river process degenerations, it is the most prominent
Be river water self-cleaning function degenerate, pollution generate, in addition to blowdown flow rate is big, it is main that river revetment object structure, which does not meet ecological requirements,
The factor wanted, dike slope protection made of existing river revetment object one kind is barnacle or is cast-in-place, do not seep water ventilative function, completely
Separate water and soil exchange, cause river and shore protection not only without plant growth but also be unfavorable for the growth of water self-cleaning microorganism and aquatic organism,
Largely destroy the water zoology cycle system of the Nature.Meanwhile barnacle or it is cast-in-place made of dike slope protection due to smooth light
It is sliding, cause overboard people that can not climb, so that the tragedy of drowning happens occasionally, in addition, traditional rigid lining cutting (slope protection paving
Face) such as cast-in-place concrete, bituminous concrete, cemented rock, riprap, marl soils can also make LP blades mask, but it is total
Body is at high cost, and water and soil isolation is unfavorable for the growth of the self-cleaning water microorganism of plant and aquatic organism, and water quality not can guarantee easy pollution,
Durability is poor, to the bad adaptability that channel deforms on a small scale, encounters bad soil property, depression, swelled ground, dyke collapse, freeze
Local failure or structural instability are easy to happen when protuberance or dynamic water slug;Local failure once occurs for rigid lining, is easy hair
Raw greater area of destruction because broken block is also easy to produce displacement under flow action, the renewal expense valuableness of rigid lining cutting and
Construction is complicated.Existing water conservancy project brick bonding strength is not high, occur easily under the impact of water flow above and below emerging, be easy by from bottom
The phenomenon that either two sides are washed open, are subjected to displacement, influences to play the role of also being extremely limited while stability, service life
It is short.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of bonding strength height, hole are more
Integral strength is high and stability water conservancy project brick with long service life by force.
The technical solution of the utility model is achieved in that a kind of water conservancy project brick, and including rectangular brick body, feature exists
In: in brick body setting there are four water seepage hole, brick body four it is diagonal on extend outwardly that there are four in parallel for setting respectively
The clamping block of quadrangle, four clamping blocks are symmetrically set along brick body central axes, between two neighbouring clamping blocks
The clamping groove being caught in simultaneously for two clamping blocks is formed, is clamped in the clamping groove by three pieces of water conservancy project bricks and is formed with section in three
Angular triangle water seepage hole, brick body on two sides side walls and are located between two clamping blocks up and down and are provided with four pieces of at right angles ladders
The fixed block of shape, side wall of the right-angle side of four pieces of fixed blocks respectively with four clamping blocks connect one to one, and adjacent two pieces
Permeable slot is formed between fixed block, the permeable slot of two neighboring brick body forms through-hole.
By using above-mentioned technical proposal, four water seepage holes are set in one piece of brick body, the setting of multiple water seepage holes can drop
Low pore water pressure, to adapt to biggish bulk settling and a degree of differential settlement, unordered mortar construction is relied on
Setting is extended outwardly on brick body four is diagonal respectively there are four the clamping block of parallelogram, snaps onto neighbouring two
In clamping groove between clamping block, to stablize simultaneously to muti-piece brick body, stability strong security is high, passes through in clamping groove
Three pieces of water conservancy project brick clampings are formed with section triangle water seepage hole triangular in shape, and the setting of the triangle water seepage hole further improves brick
Stability of the body in splicing, increases seepage rate, reduces pressure between the upper and lower, on the side wall of two sides and be located above and below brick body
Four pieces of fixed blocks in the shape of a right-angled ladder are provided between two clamping blocks, the right-angle side of four pieces of fixed blocks blocks with four respectively
The side wall for connecing block connects one to one, and permeable slot is formed between adjacent two pieces of fixed blocks, two neighboring brick body it is permeable
Slot forms through-hole, and through-hole is hexagonal through-hole, and seepage rate is high, cooperates the structure of clamping block, strengthens the strong of brick body splicing
Degree is not easy to emerge phenomenon above and below occurring under the impact of water flow, and is not easy to be washed open from bottom either two sides, and position occurs
The phenomenon that shifting, long service life, the utility model provide that a kind of bonding strength is high, the more integral strengths of hole are high and stability is strong
Water conservancy project brick with long service life.
The utility model is further arranged to: the clamping block is several along brick body far from being provided on the side side wall of brick body
The lateral lines of thickness direction equally distributed first, the lateral lines of cooperation first is provided with several along brick on the clamping groove groove face
The lateral lines in body thickness direction equally distributed second.
It is preferred that are as follows: the fixed block several is uniformly distributed far from being provided on the side side wall of brick body along brick body thickness direction
Third transverse direction lines.
It is preferred that are as follows: the water seepage hole is square structure, is uniformly arranged in brick body.
By using above-mentioned technical proposal, after brick body is mutually spliced, neighbouring two are snapped by clamping block
The brick body spliced in clamping groove between clamping block is provided with several along brick on side side wall of the clamping block far from brick body
The lateral lines in body thickness direction equally distributed first, the lateral lines of cooperation first is provided with several along brick body on clamping groove groove face
The lateral lines of thickness direction equally distributed second, under the mutual cooperation effect of the first lateral lines and the second lateral lines,
When increasing brick body and floating up and down, the resistance between the upper and lower formed between the brick body mutually spliced improves what brick body floated up and down
Difficulty improves whole bonding strength so that reducing brick body is easy a possibility that being washed away avalanche;In order to further increase
The difficulty fluctuated up and down between brick body improves stability, and fixed block is several along brick far from being provided on the side side wall of brick body
The equally distributed third transverse direction lines in body thickness direction, the two pieces of brick bodies mutually spliced pass through between third transverse direction lines friction
Under fixation, the stationarity of brick body all around is made all to be improved, it is simple and reliable for structure;Water seepage hole is square structure, uniformly
It is arranged in brick body, oozes out water uniformly from the water seepage hole of brick body, keep hydraulic pressure relatively uniform, the pressure in unit area is equal
It is even to reducing a possibility that brick body is washed away.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is some embodiments of the utility model, for those of ordinary skill in the art, before not making the creative labor property
It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is specific embodiment of the present invention structural schematic diagram.
Fig. 2 is specific embodiment of the present invention splicing construction schematic diagram.
Fig. 3 is specific embodiment of the present invention left view structural representation.
Fig. 4 is specific embodiment of the present invention overlooking structure diagram.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without creative efforts
Every other embodiment obtained, fall within the protection scope of the utility model.
As Figure 1-Figure 4, the utility model discloses a kind of water conservancy project bricks, including rectangular brick body 1, in the utility model
In specific embodiment, in brick body 1 setting there are four water seepage hole 2, brick body 1 four it is diagonal on extend outwardly respectively setting
There are four the clamping blocks 3 of parallelogram, which is symmetrically set along 1 central axes of brick body, neighbouring
The clamping groove 4 being caught in simultaneously for two clamping blocks 3 is formed between two clamping blocks 3, passes through three pieces of water conservancy project bricks in the clamping groove 4
It is clamped and is formed with section triangle water seepage hole 5 triangular in shape, on about 1 two sides side wall of brick body and be located at two clamping blocks 3
Between be provided with four pieces of fixed blocks 6 in the shape of a right-angled ladder, the right-angle side of four pieces of fixed blocks 6 respectively with four clamping blocks 3
Side wall connects one to one, and permeable slot 7, the formation of permeable slot 7 of two neighboring brick body 1 are formed between adjacent two pieces of fixed blocks 6
Through-hole 8.
By using above-mentioned technical proposal, four water seepage holes 2, the setting energy of multiple water seepage holes 2 are set in one piece of brick body 1
Pore water pressure is reduced, so that biggish bulk settling and a degree of differential settlement are adapted to, unordered mortar construction, according to
By brick body 1 four it is diagonal on extend outwardly setting respectively there are four the clamping block 3 of parallelogram, snap onto neighbouring
In clamping groove 4 between two clamping blocks 3, to stablize simultaneously to muti-piece brick body 1, stability strong security is high, clamping
Section triangle water seepage hole 5 triangular in shape is formed with by the clamping of three pieces of water conservancy project bricks on slot 4, the setting of the triangle water seepage hole 5 into
One step improves stability of the brick body 1 in splicing, increases seepage rate, reduces pressure between the upper and lower, in brick body about 1 two
Four pieces of fixed blocks 6 in the shape of a right-angled ladder are provided on the side wall of side and between two clamping blocks 3, four pieces of fixed blocks 6
Side wall of the right-angle side respectively with four clamping blocks 3 connects one to one, and is formed with permeable slot between adjacent two pieces of fixed blocks 6
7, the permeable slot 7 of two neighboring brick body 1 forms through-hole 8, and through-hole 8 is hexagonal through-hole, and seepage rate is high, cooperates clamping block 3
Structure, strengthen brick body 1 splicing intensity, be not easy under the impact of water flow occur above and below emerge phenomenon, and be not easy by
The phenomenon that either two sides are washed open, are subjected to displacement from bottom, long service life, the utility model provides a kind of bonding strength
High, more integral strengths of hole are high and stability water conservancy project brick with long service life by force.
In the utility model specific embodiment, the clamping block 3 is far from being provided with several edges on the side side wall of brick body 1
The lateral lines 11 of 1 thickness direction of brick body equally distributed first, the lateral lines 11 of cooperation first is arranged on 4 groove face of clamping groove
Have several along the lateral lines 12 of 1 thickness direction of brick body equally distributed second.
In the utility model specific embodiment, the fixed block 6 is far from being provided with several edges on the side side wall of brick body 1
The equally distributed third transverse direction lines 13 of 1 thickness direction of brick body.
In the utility model specific embodiment, the water seepage hole 2 is square structure, is uniformly arranged in brick body 1.
Neighbouring two are snapped by clamping block 3 after brick body 1 mutually splicing by using above-mentioned technical proposal
The brick body 1 spliced in clamping groove 4 between a clamping block 3 is provided on side side wall of the clamping block 3 far from brick body 1
Several lateral lines 11 of cooperation first along the lateral lines 11 of 1 thickness direction of brick body equally distributed first, 4 groove face of clamping groove are set
Be equipped with it is several along the lateral lines 12 of 1 thickness direction of brick body equally distributed second, in the first lateral lines 11 and the second lateral line
Under the mutual cooperation effect on road 12, when increasing brick body 1 and floating up and down, the resistance between the upper and lower that is formed between the brick body 1 mutually spliced
Power improves the difficulty that brick body 1 floats up and down, so that reducing brick body 1 is easy a possibility that being washed away avalanche, improves entirety
Bonding strength;In order to further increase the difficulty fluctuated up and down between brick body 1, stability is improved, by fixed block 6 far from brick body
Several along the equally distributed third transverse direction lines 13 of 1 thickness direction of brick body, two pieces mutually spliced are provided on 1 side side wall
Brick body 1 pass through between third transverse direction lines 13 frictionally securing under, so that the stationarity of brick body 1 all around is all improved,
It is simple and reliable for structure;Water seepage hole 2 is square structure, is uniformly arranged in brick body 1, seeps water uniformly from the water seepage hole 2 of brick body 1
Out, keep hydraulic pressure relatively uniform, the pressure in unit area is uniformly to reduce a possibility that brick body 1 is washed away.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model
Protection scope within.
Claims (4)
1. a kind of water conservancy project brick, including rectangular brick body (1), it is characterised in that: there are four water seepage holes for setting in brick body (1)
(2), brick body (1) four it is diagonal on extend outwardly setting respectively there are four the clamping block (3) of parallelogram, this four
Clamping block (3) is symmetrically set along brick body (1) central axes, is formed between two neighbouring clamping blocks (3) for two cards
The clamping groove (4) for connecing block (3) while being caught in is formed with section in triangle by three pieces of water conservancy project bricks clampings on the clamping groove (4)
The triangle water seepage hole (5) of shape, brick body (1) are provided with four pieces on the side wall of two sides and between two clamping blocks (3) up and down
Fixed block (6) in the shape of a right-angled ladder, the right-angle side of four pieces of fixed blocks (6) respectively with the side wall of four clamping blocks (3) one by one
It is correspondingly connected with, is formed with permeable slot (7) between adjacent two pieces of fixed blocks (6), permeable slot (7) formation of two neighboring brick body (1)
Through-hole (8).
2. a kind of water conservancy project brick according to claim 1, it is characterised in that: side of the clamping block (3) far from brick body (1)
It is provided on side wall several along the lateral lines (11) of brick body (1) thickness direction equally distributed first, clamping groove (4) groove face
The lateral lines (11) of upper cooperation first is provided with several along the lateral lines (12) of brick body (1) thickness direction equally distributed second.
3. a kind of water conservancy project brick according to claim 2, it is characterised in that: side of the fixed block (6) far from brick body (1)
It is provided on side wall several along the equally distributed third transverse direction lines (13) of brick body (1) thickness direction.
4. a kind of water conservancy project brick according to claim 1, it is characterised in that: the water seepage hole (2) is square structure, is uniformly set
It sets on brick body (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820780767.4U CN208251022U (en) | 2018-05-19 | 2018-05-19 | A kind of water conservancy project brick |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820780767.4U CN208251022U (en) | 2018-05-19 | 2018-05-19 | A kind of water conservancy project brick |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208251022U true CN208251022U (en) | 2018-12-18 |
Family
ID=66481218
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820780767.4U Expired - Fee Related CN208251022U (en) | 2018-05-19 | 2018-05-19 | A kind of water conservancy project brick |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208251022U (en) |
-
2018
- 2018-05-19 CN CN201820780767.4U patent/CN208251022U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203222773U (en) | Vertical retaining wall with plantation groove | |
CN202644338U (en) | Ecological water holding paving brick | |
CN204570606U (en) | A kind of ecological slope protection block for sandy soil district channel | |
CN208251022U (en) | A kind of water conservancy project brick | |
CN207130672U (en) | A kind of Novel water conservancy dykes and dams | |
CN202509452U (en) | Ecological slope protection building block | |
CN205062751U (en) | Ecological drainage dam with stabilize water permeation | |
CN206467639U (en) | A kind of self-locking ecological revetment plate | |
CN214573720U (en) | Assembled large-aperture ecological sash structure and side slope protection structure | |
CN205348108U (en) | Firm interlocking formula water conservancy project brick | |
CN211312405U (en) | Sheet pile element and prefabricated ecological revetment structure | |
CN203213075U (en) | Reservoir area water-level-fluctuating zone ecological slope protecting system | |
CN211185069U (en) | Riverway water ecological aquatic plant planting device | |
CN112832196A (en) | Assembled large-aperture ecological sash structure and side slope protection structure | |
CN209669792U (en) | A kind of buttress type ecological revetment structure suitable for soft soil foundation | |
CN210621372U (en) | Novel water seepage pavement brick suitable for sponge city | |
CN207211076U (en) | A kind of slope protection block and ecological interlock type antiscour ecological revetment | |
CN205329634U (en) | Novel ecological reason pitched work | |
CN214401830U (en) | Novel ecological protection and building perforated brick | |
CN216041241U (en) | Novel ecological slope of garden design | |
CN210031690U (en) | Ecological bank protection of hydraulic engineering | |
CN204418111U (en) | Slope protection device | |
CN217078853U (en) | Retaining wall for hydraulic engineering | |
CN211690179U (en) | Composite embankment structure for urban river | |
CN106592530A (en) | Self-locking type ecological slope protection plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181218 Termination date: 20210519 |
|
CF01 | Termination of patent right due to non-payment of annual fee |