CN208220056U - Back-trough formula glassy brick - Google Patents
Back-trough formula glassy brick Download PDFInfo
- Publication number
- CN208220056U CN208220056U CN201820584902.8U CN201820584902U CN208220056U CN 208220056 U CN208220056 U CN 208220056U CN 201820584902 U CN201820584902 U CN 201820584902U CN 208220056 U CN208220056 U CN 208220056U
- Authority
- CN
- China
- Prior art keywords
- vitrified tile
- spacer bar
- splicing
- mounting
- positioning plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model discloses back-trough formula glassy brick, the inside of vitrified tile is embedded with reinforcing rib, and the two sides of vitrified tile, which outwardly protrude to be extended respectively, splicing column and splicing seat, and the splicing seat and splicing column of adjacent vitrified tile are mutually clamped;The mounting back side of vitrified tile, which is recessed inwardly, is provided with mounting slot, and the mounting back side of vitrified tile, which outwardly protrudes to be extended, has the spacer bar a and spacer bar b being parallel to each other, spacer bar a and spacer bar b are equal and mounting slot is perpendicular staggeredly to set up;The positioning mechanism includes positioning plate a and positioning plate b, horizontal between positioning plate a and positioning plate b to be provided with locating shaft.Positioning mechanism has stable support and positioning action, vitrified tile can be prevented to be subjected to displacement shift phenomenon;Adjacent vitrified tile is seamless spliced, accurate positioning, mounts the synergistic effect of slot and spacer bar, and firmness is high after installing vitrified tile, avoids the occurrence of hollowing and obscission, total quality, practicability and economy enhancing.
Description
Technical field
The utility model belongs to vitrified tile equipment technical field, and in particular to back-trough formula glassy brick.
Background technique
In the prior art, vitrified tile due to its water absorption rate it is too small, when doing wall brick, between existing vitrified tile and external wall
Binder bonding is generallyd use, when being bonded with binder, due to being influenced by environment and construction personnel's technology, after vitrified tile bonding
It is also easy to produce hollowing, vitrified tile is caused to fall off, brings security risk;Moreover, the curing time of binder is longer, lead to vitrified tile
Installation effectiveness is low.Cement interface agent will be mixed into grout, after broken vitreous brick and reinforcing bar firm pasting in the prior art
Even is covered in broken vitreous brick surface, makes surface in texturing state, pastes on the broken vitreous brick of texturing state after parching
One layer of composite Portland cement layer;Then one layer of wall plastering base is painted between shear wall body and composite Portland cement layer
Face is first brushed one times with interfacial agents painting before painting wall plastering basal plane.Although it reduces hollowing rate, prevent from being bonded because of vitrified tile
Layer hollowing generates ceramic tile and falls off, but mounting structure is complicated, and construction technology is cumbersome.In addition, the extension patch of existing vitrified tile is reliable
Property it is low, positioning accuracy is poor, construction not aspect, it is at high cost.Therefore, a kind of back-trough formula glassy brick how is researched and developed, is had
Important realistic meaning.
Utility model content
The technical issues of for installation polarization difference existing in the prior art and being easy to fall off, the purpose of this utility model
It is to provide back-trough formula glassy brick.
The technical solution that the utility model is taken are as follows:
Back-trough formula glassy brick, including vitrified tile and positioning mechanism, the inside of vitrified tile are embedded with reinforcing rib, vitrified tile
Two sides outwardly protrude to be extended respectively and have splicing column and splicing seat, the splicing seat and splicing column of adjacent vitrified tile mutually block
It closes;The mounting back side of vitrified tile, which is recessed inwardly, is provided with mounting slot, and the mounting back side of vitrified tile, which outwardly protrudes to be extended, phase
Mutually parallel spacer bar a and spacer bar b, spacer bar a and spacer bar b are and mounting slot is perpendicular staggeredly sets up;Institute
Stating positioning mechanism includes positioning plate a and positioning plate b, horizontal between positioning plate a and positioning plate b to be provided with locating shaft.
Further, the reinforcing rib is arranged in a crisscross manner " ten " word for being set as circulation along the upper and lower surface of vitrified tile
Shape structure.
Further, the splicing column is set as cylindrical structure along the longitudinal arrangement of vitrified tile, splices seat along vitrified tile
Longitudinal arrangement be set as rectangular parallelepiped structure, the upper surface for splicing seat, which is recessed inwardly, is provided with card slot, the splicing of adjacent vitrified tile
Seat is mutually clamped by card slot and splicing column.
Further, the card slot is set as hollow half cylinder groove structure, the radius of curvature and splicing column of card slot
Radius of curvature it is consistent.
Further, the mounting slot is set as rectangular recess, adjacent extension along the recess longitudinally inward of vitrified tile
Access slot is equidistantly arranged setting.
Further, the splicing column protrudes from the thickness at the mounting back side of vitrified tile, with spacer bar a, spacer bar b
The height at the mounting back side apart from vitrified tile is consistent.
Further, antiskid thread is provided on the outer wall of the locating shaft.
The utility model has the following beneficial effects:
Positioning mechanism in the utility model has stable support and positioning action, it is ensured that the level of vitrified tile installation
Consistency while the locating shaft with antiskid thread plays positioning action to vitrified tile, can prevent vitrified tile to be subjected to displacement offset
Phenomenon;The splicing column and splicing seat of adjacent vitrified tile are mutually clamped, accurate positioning, splicing stability enhancing, the mounting of vitrified tile
Slot can efficiently solve the vitrified tile problem too small due to its water absorption rate, and the synergistic effect of spacer bar, pacify vitrified tile
Firmness is high after dress, avoids the occurrence of hollowing and obscission, total quality, practicability and economy enhancing.
Detailed description of the invention
Fig. 1 is the overall structure diagram of vitrified tile in the utility model.
Fig. 2 is the structural schematic diagram of positioning mechanism in the utility model.
Wherein, 1, spacer bar a;2, spacer bar b;3, splicing column;4, vitrified tile;5, reinforcing rib;6, slot is mounted;7, it spells
Joint chair;8, card slot;9, positioning plate a;10, locating shaft;11, positioning plate b.
Specific embodiment
The utility model is further illustrated with reference to the accompanying drawing.
Embodiment 1
As depicted in figs. 1 and 2, back-trough formula glassy brick, including vitrified tile 4 and positioning mechanism, the inside of vitrified tile 4 are embedding
Equipped with reinforcing rib 5, the two sides of vitrified tile 4, which outwardly protrude to be extended respectively, splicing column 3 and splicing seat 7, adjacent vitrified tile 4
Splicing seat 7 and splicing column 3 are mutually clamped;The mounting back side of vitrified tile 4, which is recessed inwardly, is provided with mounting slot 6, the mounting of vitrified tile 4
The back side, which outwardly protrudes to be extended, the spacer bar a1 and spacer bar b2 being parallel to each other, spacer bar a1 and spacer bar b2
Equal and mounting slot 6 is perpendicular staggeredly to be set up;The positioning mechanism includes positioning plate a9 and positioning plate b11, positioning plate a9 and positioning
It is horizontal between plate b11 to be provided with locating shaft 10.
Reinforcing rib 5 is arranged in a crisscross manner " ten " character form structure for being set as circulation along the upper and lower surface of vitrified tile 4.Reinforce
Muscle 5 plays the role of reinforcing 4 internal structure of vitrified tile, and vitrified tile 4 is made to have shock resistance, compressive property.
Splicing column 3 is set as cylindrical structure, longitudinal arrangement of the splicing seat 7 along vitrified tile 4 along the longitudinal arrangement of vitrified tile 4
It is set as rectangular parallelepiped structure, the upper surface of splicing seat 7, which is recessed inwardly, is provided with card slot 8, and the splicing seat 7 of adjacent vitrified tile 4 passes through
Card slot 8 and splicing column 3 are mutually clamped.
Card slot 8 is set as hollow half cylinder groove structure, the radius of curvature of card slot 8 and the radius of curvature one of splicing column 3
It causes.The arc-shaped curved-surface structure of contact surface between splicing column 3 and splicing seat 7, contact area is larger, and fitting compactness is strong, realizes
The Fast Installation of adjacent vitrified tile 4 and the function of positioning.
Mounting slot 6 is set as rectangular recess along the recess longitudinally inward of vitrified tile 4, and adjacent mounting slot 6 is equidistant
Arrangement setting.Mounting slot 6 has certain depth, provides for mounting slurry and hangs space, ensure that the degree of packing of installation, prevents
Only obscission.
Splicing column 3 protrudes from the thickness at the mounting back side of vitrified tile 4, with spacer bar a1, spacer bar b2 apart from vitreous
The height at the mounting back side of brick 4 is consistent.Spacer bar a1 and spacer bar b2 is immersed in mounting slurry coating, is solidified in slurry
Afterwards, stable booster action can be played.
Antiskid thread is provided on the outer wall of locating shaft 10.Antiskid thread forms certain frictional resistance, rises to vitrified tile 4
While to positioning action, vitrified tile 4 can be prevented to be subjected to displacement shift phenomenon.
Specific installation process are as follows:
By the mounting back side of vitrified tile 4 one layer of mounting slurry of brush brushing, mount the coating thickness of slurry with and positioning
Reinforcing bar a1, spacer bar b2 upper surface flush and be advisable, one layer of extension of coating simultaneously in the card slot 8 of the splicing seat 7 of 4 side of vitrified tile
Slurry is connect, the back side tiling of the positioning plate a9 of positioning mechanism and positioning plate b11 is erected on the metope to be installed of vitrified tile 4,
Make locating shaft 10 in horizontal horizontal erection, the bottom wall for the vitrified tile 4 for mounting slurry is fastened on locating shaft 10, by vitrified tile 4
Tiling is fastened on metope;Then second piece of vitrified tile 4 adjacent thereto is taken again, and the splicing seat 7 of the vitrified tile 4 is fastened on
On the splicing column 3 of vitrified tile 4 after installing, adjacent vitrified tile 4 engages closely.
The above is not limitations of the present invention, it should be pointed out that: for the ordinary skill people of the art
For member, under the premise of not departing from the utility model in essence range, several variations, modifications, additions or substitutions can also be made,
These improvements and modifications also should be regarded as the protection scope of the utility model.
Claims (7)
1. back-trough formula glassy brick, which is characterized in that including vitrified tile and positioning mechanism, the inside of vitrified tile is embedded with reinforcement
Muscle, the two sides of vitrified tile, which outwardly protrude to be extended respectively, splicing column and splicing seat, the splicing seat of adjacent vitrified tile and splicing
Column is mutually clamped;The mounting back side of vitrified tile, which is recessed inwardly, is provided with mounting slot, and the mounting back side of vitrified tile outwardly protrudes extension
It is provided with the spacer bar a and spacer bar b being parallel to each other, spacer bar a and spacer bar b and mounting slot is perpendicular staggeredly
It sets up;The positioning mechanism includes positioning plate a and positioning plate b, horizontal between positioning plate a and positioning plate b to be provided with locating shaft.
2. back-trough formula glassy brick according to claim 1, which is characterized in that the reinforcing rib is along the upper and lower of vitrified tile
Surface is arranged in a crisscross manner " ten " character form structure for being set as circulation.
3. back-trough formula glassy brick according to claim 1, which is characterized in that the splicing column is arranged along the longitudinal direction of vitrified tile
Cloth is set as cylindrical structure, splices seat along the longitudinal arrangement of vitrified tile and is set as rectangular parallelepiped structure, splice the upper end of seat towards
Sunken inside is provided with card slot, and the splicing seat of adjacent vitrified tile is mutually clamped by card slot and splicing column.
4. back-trough formula glassy brick according to claim 3, which is characterized in that the card slot is set as hollow half cylinder
Groove structure, the radius of curvature of card slot and the radius of curvature of splicing column are consistent.
5. back-trough formula glassy brick according to claim 1, which is characterized in that the slot that mounts is along the longitudinal direction of vitrified tile
It is recessed inwardly and is set as rectangular recess, adjacent mounting slot is equidistantly arranged setting.
6. back-trough formula glassy brick according to claim 1, which is characterized in that the splicing column protrudes from the extension of vitrified tile
The thickness for connecing the back side, the mounting height at the back side with spacer bar a, spacer bar b apart from vitrified tile are consistent.
7. back-trough formula glassy brick according to claim 1, which is characterized in that be provided on the outer wall of the locating shaft anti-
Sliding screw thread.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820584902.8U CN208220056U (en) | 2018-04-23 | 2018-04-23 | Back-trough formula glassy brick |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820584902.8U CN208220056U (en) | 2018-04-23 | 2018-04-23 | Back-trough formula glassy brick |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208220056U true CN208220056U (en) | 2018-12-11 |
Family
ID=64512228
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820584902.8U Expired - Fee Related CN208220056U (en) | 2018-04-23 | 2018-04-23 | Back-trough formula glassy brick |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208220056U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110259008A (en) * | 2019-06-06 | 2019-09-20 | 东莞市唯美陶瓷工业园有限公司 | A kind of ceramic tile and its processing method |
-
2018
- 2018-04-23 CN CN201820584902.8U patent/CN208220056U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110259008A (en) * | 2019-06-06 | 2019-09-20 | 东莞市唯美陶瓷工业园有限公司 | A kind of ceramic tile and its processing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201801979U (en) | Aerated concrete building block heat insulating wall | |
CN201598846U (en) | Antique building external wall prestressing steel band reinforcement device | |
CN208220056U (en) | Back-trough formula glassy brick | |
CN102409767B (en) | Construction method of waterproof leaking stoppage structure of building seam | |
CN103899072B (en) | A kind of for wet extension stone material or the suspension member of ceramic tile and wet hanging method | |
CN201495651U (en) | Composite wall construction tie node of antique bricks and insulation blocks | |
CN205577120U (en) | Assembly component of light -duty pottery glass siding wall and floor | |
CN204960002U (en) | Novel assembled coincide floor bottom piece structure | |
CN110145090A (en) | A kind of assembled floor ceramic tile structure | |
CN205576959U (en) | Light -duty pottery glass siding wall and basic assembly component | |
CN202467027U (en) | Point-hanging stone for point-hanging construction | |
CN207620156U (en) | Hygienic partition wall structure | |
CN210857778U (en) | Assembled stair cladding structure | |
CN204626679U (en) | Prefabricated heat-insulation plate for external and the heat-preserving wall formed by its assembling | |
CN210369368U (en) | Pre-buried bearing structure of waterproof board for construction | |
CN212866384U (en) | Novel adhesive water stop | |
CN210117662U (en) | Double-layer stone blocking net | |
CN111827497A (en) | External wall heat insulation building block structure and construction method thereof | |
CN106567464A (en) | Thinly-plastered external wall thermal insulation system provided with composite sandwich vacuum insulation board | |
CN111910897A (en) | Cement mortar leveling fixing support structure and construction method | |
CN106968353A (en) | Composite heat insulation block | |
CN105002926A (en) | Parabasal plate alignment method for mounting large equipment | |
CN218668337U (en) | Floor splicing waterproof structure | |
CN109914812A (en) | A kind of floor leveling construction accessory part and its application method | |
CN105756317A (en) | Wet hanging method for wet-hung stones or tiles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181211 Termination date: 20210423 |
|
CF01 | Termination of patent right due to non-payment of annual fee |