CN208201903U - A kind of two pile framing steel reinforcement cage fast binding devices - Google Patents

A kind of two pile framing steel reinforcement cage fast binding devices Download PDF

Info

Publication number
CN208201903U
CN208201903U CN201820668496.3U CN201820668496U CN208201903U CN 208201903 U CN208201903 U CN 208201903U CN 201820668496 U CN201820668496 U CN 201820668496U CN 208201903 U CN208201903 U CN 208201903U
Authority
CN
China
Prior art keywords
bar
welded
brackets
reinforcement cage
steel reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820668496.3U
Other languages
Chinese (zh)
Inventor
苏群
姜延磊
张宁波
王强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China State Construction Bridge Corp Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China State Construction Bridge Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China State Construction Bridge Corp Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201820668496.3U priority Critical patent/CN208201903U/en
Application granted granted Critical
Publication of CN208201903U publication Critical patent/CN208201903U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Wire Processing (AREA)

Abstract

The utility model discloses a kind of two pile framing steel reinforcement cage fast binding devices, two brackets including the setting of left and right parallel interval, each bracket includes two gusseteds of time interval setting, each gusseted includes the T-shaped bottom bar being fixedly linked and connecting rod, it is welded with a upright bar along the vertical direction in the centre of bottom bar, it is weldingly connected between upright bar and connecting rod using a stabilization bracing diagonal from the horizontal by 60 degree of angles, four bottom bars of two brackets are respectively used to that four corner points of cushion cap planar dimension line are arranged in, a top reinforcing rod disposed in parallel with bottom bar is welded at the top of upright bar, " U " font top braces are welded on the reinforcing rod of top, a dismountable upper lateral being respectively inserted between two top braces of each bracket by rear and front end in top braces groove Bar is connected, and the upper cross bar of two brackets is used to support reinforcing bar to be bound.The present apparatus improves cushion cap reinforcing bar binding efficiency.

Description

A kind of two pile framing steel reinforcement cage fast binding devices
Technical field
The utility model relates to reinforcement foundation binding device more particularly to two pile framing steel reinforcement cage binding devices.
Background technique
Currently, commonly using cushion cap method for binding reinforcing steel bars in construction is to carry out the binding of cushion cap reinforcing bar in situ in cushion cap, due to cushion cap Size is limited, and each work post cross-operation working face is limited, and reinforcement construction is more difficult, and speed of application is slower.
Summary of the invention
The shortcomings that the purpose of the utility model is to overcome the prior arts, providing one kind can not be by cushion cap sitework face Limitation in advance, quickly carries out steel reinforcement cage binding, while guaranteeing both quality and quantity and more safely and effectively steel reinforcement cage fast binding device.
The technical scheme adopted by the utility model is
The two pile framing steel reinforcement cage fast binding device of one kind of the utility model, two including the setting of left and right parallel interval Bracket, the bracket described in each include two gusseteds of time interval setting, and the gusseted described in each includes The T-shaped bottom bar being fixedly linked and connecting rod are welded with a upright bar in the centre of the bottom bar along the vertical direction, described It is weldingly connected between upright bar and connecting rod using a stabilization bracing diagonal from the horizontal by 60 degree of angles, two brackets Four bottom bars are respectively used to that four corner points of cushion cap planar dimension line are arranged in, be welded at the top of the upright bar one with Bottom bar top reinforcing rod disposed in parallel is welded with " U " font top braces, each on the top reinforcing rod A dismountable upper lateral being respectively inserted between two top braces of bracket by rear and front end in top braces groove Bar is connected, and the upper cross bar of two brackets is used to support reinforcing bar to be bound.
The utility model has the beneficial effects that not only having overcome the problem of cushion cap position narrow field inconvenience construction, but also overcome Cross-operation security hidden trouble, while improving cushion cap reinforcing bar binding efficiency, and the features such as can reuse, to construct into Degree, quality and economic benefit improve a lot.
Detailed description of the invention
Fig. 1 is the three-dimensional structure schematic diagram of the two pile framing steel reinforcement cage fast binding device of one kind of the utility model.
Specific embodiment
The utility model is described in detail in the following with reference to the drawings and specific embodiments.
The two pile framing steel reinforcement cage fast binding device of one kind of the utility model as shown in Figure 1, including between left and right is parallel Every two brackets of setting, the bracket described in each includes two gusseteds of time interval setting, described in each Gusseted includes the T-shaped bottom bar 2 being fixedly linked and connecting rod 1, is welded with along the vertical direction in the centre of the bottom bar A piece upright bar 3 uses a stabilization bracing diagonal 4 from the horizontal by 60 degree of angles between the upright bar and connecting rod 1 It is weldingly connected, four bottom bars 2 of two brackets are respectively used to that four corner points of cushion cap planar dimension line 8 are arranged in, described Upright bar at the top of be welded with a top reinforcing rod 5 disposed in parallel with bottom bar, be welded on the top reinforcing rod 5 One " U " font top braces 6 is respectively inserted in top braces 6 by rear and front end between two top braces 6 of each bracket A dismountable upper cross bar 7 in groove is connected, and the upper cross bar 7 of two brackets is used to support reinforcing bar to be bound.
The installation and application of the present apparatus is as follows:
Cushion cap planar dimension line is released according to the size of Specific construction cushion cap, this steel reinforcement cage fast binding made is filled The four foundation bars 2 set are placed on four corner points of dimension of platform line, and the cushion cap top main reinforcement of required binding is then placed on top On cross bar 7, be then sequentially placed stirrup in the main reinforcement of top, stirrup and top main reinforcement it is fixed after lower part main reinforcement is placed on stirrup On, then reinforcing bar is bound, after being bound to cushion cap steel reinforcement cage, is hung steel reinforcement cage and upper cross bar together using crane To specified storage position, then removes upper cross bar and reuse.

Claims (1)

1. a kind of two pile framing steel reinforcement cage fast binding devices, two brackets including the setting of left and right parallel interval, feature exist In: the bracket described in each includes two gusseteds of time interval setting, and the gusseted described in each includes in T The bottom bar and connecting rod that shape is fixedly linked are welded with a upright bar in the centre of the bottom bar along the vertical direction, and described is vertical It is weldingly connected between bar and connecting rod using a stabilization bracing diagonal from the horizontal by 60 degree of angles, the four of two brackets A bottom bar is respectively used to that four corner points of cushion cap planar dimension line are arranged in, and one and bottom are welded at the top of the upright bar Bar top reinforcing rod disposed in parallel is welded with " U " font top braces, each bracket on the top reinforcing rod Two top braces between a dismountable upper cross bar phase being respectively inserted in by rear and front end in top braces groove Even, the upper cross bar of two brackets is used to support reinforcing bar to be bound.
CN201820668496.3U 2018-05-05 2018-05-05 A kind of two pile framing steel reinforcement cage fast binding devices Expired - Fee Related CN208201903U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820668496.3U CN208201903U (en) 2018-05-05 2018-05-05 A kind of two pile framing steel reinforcement cage fast binding devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820668496.3U CN208201903U (en) 2018-05-05 2018-05-05 A kind of two pile framing steel reinforcement cage fast binding devices

Publications (1)

Publication Number Publication Date
CN208201903U true CN208201903U (en) 2018-12-07

Family

ID=64519012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820668496.3U Expired - Fee Related CN208201903U (en) 2018-05-05 2018-05-05 A kind of two pile framing steel reinforcement cage fast binding devices

Country Status (1)

Country Link
CN (1) CN208201903U (en)

Similar Documents

Publication Publication Date Title
CN201649072U (en) Pile foundation reinforcement cage hoisting device
CN205934747U (en) A hang basket that is used for cantilever to pour bridge construction operation with pre -compaction structure
CN110306774A (en) A kind of installation method and device of spigot-and-socket builder's jack
CN205742998U (en) Straight cutting dish pin falsework side bar formwork system
CN208201903U (en) A kind of two pile framing steel reinforcement cage fast binding devices
CN201817814U (en) Adjustable fixed support of vertical surface sheet steel form
CN104233961B (en) A kind of supporting shelf bracket of No. 0 block of cantilever bridge
CN108487080A (en) Super-span T-type rigid structure beam side earnestly supports pinner reversed construction method
CN209816665U (en) Bent cap bracket suitable for round end shape pier stud
CN206969311U (en) One kind places reinforcing bar section or stirrup support
CN203222798U (en) Guiding frame applied to piling of steel piles in trestle construction on exposed bedrock
CN213419107U (en) Hydraulic lifting rack for excavation and supporting construction of small-section tunnel
CN204148776U (en) The assembled moulding bed of bent cap framework of steel reinforcement
CN203222734U (en) Bridge guardrail metal stand column base construction leveling device
CN207228652U (en) Stent spray system for beam spray maintenance
CN202788877U (en) Horizontal-vertical loading tunnel combined type full space supporting and propping frame
CN203569693U (en) Pre-buried iron part with steel ties arranged on concrete structure
CN218758816U (en) Concrete hopper support frame
CN207211086U (en) Gravity dam panel is poured with without support punching block mounting structure
CN206158145U (en) Elevartor shaft formwork construction trolley frame
CN220503885U (en) Supporting structure for preventing backfill from extruding pile body
CN216552710U (en) Reinforcing bar stirrup convenient to retrieve
CN211775663U (en) Simple scaffold supporting device
CN203889962U (en) Standard counterweight device of self-climbing tower crane
CN211472515U (en) Building foundation pit supporting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181207