CN207228652U - Stent spray system for beam spray maintenance - Google Patents

Stent spray system for beam spray maintenance Download PDF

Info

Publication number
CN207228652U
CN207228652U CN201721267938.5U CN201721267938U CN207228652U CN 207228652 U CN207228652 U CN 207228652U CN 201721267938 U CN201721267938 U CN 201721267938U CN 207228652 U CN207228652 U CN 207228652U
Authority
CN
China
Prior art keywords
spray
steel pipe
framework
stent
upper strata
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721267938.5U
Other languages
Chinese (zh)
Inventor
白铭宇
马小伟
高登峰
杨玉吉
李金星
张波
闫计强
王利平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Civil Engineering Co Ltd
Original Assignee
China Construction Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Civil Engineering Co Ltd filed Critical China Construction Civil Engineering Co Ltd
Priority to CN201721267938.5U priority Critical patent/CN207228652U/en
Application granted granted Critical
Publication of CN207228652U publication Critical patent/CN207228652U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Building maintenance technical field of auxiliary equipment is the utility model is related to, discloses a kind of stent spray system for beam spray maintenance.The utility model includes framework of steel reinforcement, supporting frame and spray system, the framework of steel reinforcement is horizontally disposed with, supporting frame is arranged on the surface of framework of steel reinforcement, framework of steel reinforcement is equipped with spray system, and spray system includes communicating pipe and spray tube, is erected at communicating pipe above supporting frame, communicating pipe, both ends were connected with spray tube respectively, spray tube is by the end to end rectangle endless tube formed of four straight tubes, is erected on framework of steel reinforcement, spray head is interval with spray tube.The utility model is simple in structure, simple operation, can fix water pipe, ensure uniform spraying, improves construction efficiency.

Description

Stent spray system for beam spray maintenance
Technical field
Building maintenance technical field of auxiliary equipment is the utility model is related to, maintenance is sprayed for beam more particularly to a kind of Stent spray system.
Background technology
Existing Beam-post Frame Structure, mostly using reinforced concrete structure, usually requires to conserve to pre- after the completion of pouring Determine could to carry out after intensity the construction of next step, and, it is necessary to periodically in concrete structure during concrete structure conserves Surface spraying water, to ensure that concrete surface moistens.At present, most of construction sites are all that spray header is directly placed at knot On the top surface of structure beam, when to water spray, water pipe often under the action of water column impact force it is crooked, displacement, cause spray less than It is position, uneven, the maintenance quality and maintenance efficiency of concrete structure are drastically influence, and need to be serviced per root architecture beam When, it is required for being laid with spray tube, it is necessary to be wound at the end of maintenance, adds manual operation amount, reduce construction efficiency.
Utility model content
The utility model provides a kind of simple in structure, simple operation, can fix water pipe, ensure uniform spraying, improves construction The stent spray system for being used for beam spray maintenance of efficiency.
Technical problems to be solved are:Spray tube is placed directly on structure top surface of the beam by existing structural beams in maintenance, Need manually to be laid with and wound, add manual operation amount, reduce construction efficiency, and during spray, easily make Into the displacement of spray tube and crooked, cause to spray not in place, uneven.
In order to solve the above technical problems, the utility model adopts the following technical solution:
The utility model is used for the stent spray system of beam spray maintenance, including framework of steel reinforcement, supporting frame and spray system System, the framework of steel reinforcement are horizontally disposed with, and supporting frame is arranged on the surface of framework of steel reinforcement, and framework of steel reinforcement is equipped with spray and is System, spray system includes communicating pipe and spray tube, is erected at supporting frame top communicating pipe, communicating pipe both ends respectively with spray tube Connection, spray tube are by the end to end rectangle endless tube formed of four straight tubes, are erected on framework of steel reinforcement, interval is set on spray tube There is spray head.
The utility model is used for the stent spray system of beam spray maintenance, and further, the framework of steel reinforcement includes rectangle The short side of outline border and the short keel being arranged in rectangular outer frame, the short keel and rectangular outer frame is arranged in parallel, and short keel are along square The length direction of shape outline border, uniform intervals arrangement.
The utility model is used for the stent spray system of beam spray maintenance, further, further includes bar, the bar erects It is straight to be arranged on above rectangular outer frame, the arrangement of bar uniform intervals.
The utility model is used for the stent spray system of beam spray maintenance, and further, support frame as described above body includes lower floor Steel pipe, upper strata steel pipe, supported rod erecting and brace;The quantity of lower floor's steel pipe is 2, length and the length phase one of framework of steel reinforcement Cause, arrange along the width of framework of steel reinforcement, uniform intervals, along the length direction of framework of steel reinforcement, elongated setting, with framework of steel reinforcement It is welded and fixed;The quantity of upper strata steel pipe is 2, is corresponded respectively positioned at the surface of lower floor's steel pipe and lower floor's steel pipe;It is described Supported rod erecting is provided between upper strata steel pipe and lower floor's steel pipe, brace is equipped between upper strata steel pipe and rectangular outer frame.
The utility model is used for the stent spray system of beam spray maintenance, and further, the length of the upper strata steel pipe is short In the length of lower floor's steel pipe, upper strata steel pipe and the length difference of lower floor's steel pipe are no more than 1800mm.
The utility model is used for the stent spray system of beam spray maintenance, and further, the supported rod erecting is along upper strata steel Length of tube direction, uniform intervals arrangement.
The utility model is used for the stent spray system of beam spray maintenance, further, between the adjacent supported rod erecting Reinforcing bar is additionally provided with, reinforcing bar both ends are fixed with upper strata steel pipe and lower floor's steel pipe respectively.
The utility model is used for the stent spray system of beam spray maintenance, further, is also set up between two upper strata steel pipes There is support rail, the support rail is vertically arranged with upper strata steel pipe, is set along upper strata length of steel pipe direction, uniform intervals.
The utility model is used for the stent spray system of beam spray maintenance, and further, the brace is along rectangular outer frame Periphery uniform intervals set, the angle of brace and horizontal direction is 20-50 °.
The utility model is used for the stent spray system of beam spray maintenance, and further, the communicating pipe is along framework of steel reinforcement Length direction, elongated setting, spray tube are located on the inside of bar, and spray head is located at below spray tube.
The stent spray system that the utility model is used for beam spray maintenance has the advantages that compared with prior art:
The stent spray system that the utility model is used for beam spray maintenance is simple in structure, and material is economical and easily available, can be used and applies The leftover pieces welded steel at work scene is made, and construction cost is low, easy to make;The pipeline of spray system can be smooth be fixed on On framework of steel reinforcement and supporting frame, avoid the displacement of pipeline and crooked, ensure the uniformity of spray, avoid because water pipe place it is uneven Or crooked, displacement and the spray situation not in place occurred, greatly reduce structural beams because conserve it is not in place there is quality and ask The probability of topic.
Directly lift, be placed on above structural beams to be conserved, by spray system and water-supply-pipe when the utility model is used Road connects, you can spray maintenance is carried out as needed, it is easy to use, and it is laid with without scene or carries out unnecessary constructing operation, greatly Construction efficiency is improved greatly, shortens construction period, reduces construction to artificial dependence.
The stent spray system for being used for beam spray maintenance of the utility model is described further below in conjunction with the accompanying drawings.
Brief description of the drawings
Fig. 1 is the top view for the stent spray system that the utility model is used for beam spray maintenance;
Fig. 2 is the left view for the stent spray system that the utility model is used for beam spray maintenance;
Fig. 3 is the front view for the stent spray system that the utility model is used for beam spray maintenance.
Reference numeral:
1- frameworks of steel reinforcement;11- rectangular outer frames;The short keel of 12-;2- supporting frames;21- lower floors steel pipe;22- upper stratas steel pipe; 23- supported rod erectings;24- support rails;25- braces;26- reinforcing bars;3- spray systems;31- communicating pipes;32- spray tubes;4- Spray head;5- bars.
Embodiment
As shown in Figure 1 to Figure 3, the utility model, which is used for the stent spray system that beam spray conserves, includes framework of steel reinforcement 1, branch Support body 2 and spray system 3.
Framework of steel reinforcement 1 is horizontally disposed, including rectangular outer frame 11 and the short keel 12 being arranged in rectangular outer frame 11, short keel 12 are arranged in parallel with the short side of rectangular outer frame 11, and short keel 12 are arranged along length direction, the uniform intervals of rectangular outer frame 11, adjacent Spacing between short keel 12 is no more than 500mm, and framework of steel reinforcement 1 is formed using the reinforcement welding of diameter 28mm;Rectangular outer frame 11 Top, be vertically arranged with bar 5, and 5 uniform intervals of bar are set, and is the reinforcing bar of diameter 14mm.
Supporting frame 2 is arranged on the surface of framework of steel reinforcement 1, supporting frame 2 include lower floor's steel pipe 21, upper strata steel pipe 22, Supported rod erecting 23, support rail 24 and brace 25;The quantity of lower floor's steel pipe 21 is 2, length and the length phase of framework of steel reinforcement 1 Unanimously, arrange along the width of framework of steel reinforcement 1, uniform intervals, along the length direction of framework of steel reinforcement 1, elongated setting, with reinforcing bar Skeleton 1 is welded and fixed;The quantity of upper strata steel pipe 22 is 2, respectively positioned at the surface of lower floor's steel pipe 21 and lower floor's steel pipe 21 1 One corresponds to, the length for being shorter in length than lower floor's steel pipe 21 of upper strata steel pipe 22, and the length difference of upper strata steel pipe 22 and lower floor's steel pipe 21 is not More than 1800mm, upper strata steel pipe 22 is not less than 2mm with the steel pipe that lower floor's steel pipe 21 is outside diameter 40mm, the wall thickness of steel pipe;On 2 Support rail 24 is provided between layer steel pipe 22, support rail 24 is vertically arranged with upper strata steel pipe 22, along 22 length of upper strata steel pipe Direction, uniform intervals are set;It is provided with supported rod erecting 23 between upper strata steel pipe 22 and lower floor's steel pipe 21, supported rod erecting 23 is along upper strata 22 length direction of steel pipe, uniform intervals arrangement, support rail 24 and the reinforcing bar that supported rod erecting 23 is diameter 14mm;Adjacent supports Reinforcing bar 26 is additionally provided between upright bar 23,26 both ends of reinforcing bar are welded and fixed with upper strata steel pipe 22 and lower floor's steel pipe 21, add respectively Gu bar 26 is the reinforcing bar of diameter 14mm;It is equipped with brace 25 between upper strata steel pipe 22 and rectangular outer frame 11, brace 25 is along rectangle The periphery uniform intervals of outline border 11 are set, and brace 25 and the angle of horizontal direction are 20-50 °, and brace 25 is diameter 14mm Reinforcing bar;
Framework of steel reinforcement 1 is equipped with spray system 3, and the water inlet of spray system 3 is connected with hydraulic pipeline, and spray system 3 is wrapped Include communicating pipe 31 and spray tube 32, be erected at communicating pipe 31 top of supporting frame 2, along 1 length direction of framework of steel reinforcement, elongated set Put, communicating pipe, 31 both ends were connected with spray tube 32 respectively, spray tube 32 be by the end to end rectangle endless tube formed of four straight tubes, Spray tube 32 is located at the inner side of bar 5, is erected on framework of steel reinforcement 1, spray head 4 is interval with spray tube 32, spray head 4 is located at The lower section of spray tube 32.
The application method that the utility model is used for the stent spray system of beam spray maintenance is as follows, by hanging device, hangs Finished to construction at the top of structural beams to be conserved, the spray direction and spray position of spray head 4 are adjusted, by hydraulic pipeline and spray The water inlet connection of leaching system 3, you can according to maintenance needs, periodically carry out spray maintenance.Structural beams are conserved to predetermined strength, Hanging to rise and remove stent spray system, the utility model is reusable at the construction field (site), and scene turnover utilization rate is high, without Assembly and disassembly, using convenient.
Embodiment described above is only that the preferred embodiment of the utility model is described, not to this practicality New scope is defined, and on the premise of the spirit of the design of the utility model is not departed from, those of ordinary skill in the art are to this The various modifications and improvement that the technical solution of utility model is made, should all fall into the protection that the utility model claims book determines In the range of.

Claims (10)

1. the stent spray system for beam spray maintenance, it is characterised in that:Including framework of steel reinforcement(1), supporting frame(2)And spray Leaching system(3), the framework of steel reinforcement(1)It is horizontally disposed, supporting frame(2)It is arranged on framework of steel reinforcement(1)Surface, reinforcing bar Frame(1)It is equipped with spray system(3), spray system(3)Including communicating pipe(31)And spray tube(32), communicating pipe(31)It is erected at Supporting frame(2)Top, communicating pipe(31)Both ends respectively with spray tube(32)Connection, spray tube(32)For by four straight tube head and the tail The rectangle endless tube to connect, is erected at framework of steel reinforcement(1)On, spray tube(32)On be interval with spray head(4).
2. the stent spray system according to claim 1 for beam spray maintenance, it is characterised in that:The framework of steel reinforcement (1)Including rectangular outer frame(11)Be arranged on rectangular outer frame(11)Interior short keel(12), the short keel(12)With outside rectangle Frame(11)Short side be arranged in parallel, short keel(12)Along rectangular outer frame(11)Length direction, uniform intervals arrangement.
3. the stent spray system according to claim 2 for beam spray maintenance, it is characterised in that:Further include bar (5), the bar(5)It is vertically arranged in rectangular outer frame(11)Top, bar(5)Uniform intervals are arranged.
4. the stent spray system according to claim 2 for beam spray maintenance, it is characterised in that:Support frame as described above body (2)Including lower floor's steel pipe(21), upper strata steel pipe(22), supported rod erecting(23)And brace(25);Lower floor's steel pipe(21)Quantity For 2, length and framework of steel reinforcement(1)Length it is consistent, along framework of steel reinforcement(1)Width, uniform intervals arrangement, along steel Tendons skeleton(1)Length direction, elongated setting, with framework of steel reinforcement(1)It is welded and fixed;Upper strata steel pipe(22)Quantity be 2, point Wei Yu not lower floor's steel pipe(21)Surface, with lower floor's steel pipe(21)Correspond;The upper strata steel pipe(22)With lower floor's steel pipe (21)Between be provided with supported rod erecting(23), upper strata steel pipe(22)With rectangular outer frame(11)Between be equipped with brace(25).
5. the stent spray system according to claim 4 for beam spray maintenance, it is characterised in that:The upper strata steel pipe (22)Be shorter in length than lower floor's steel pipe(21)Length, upper strata steel pipe(22)With lower floor's steel pipe(21)Length difference be no more than 1800mm。
6. the stent spray system according to claim 4 for beam spray maintenance, it is characterised in that:The supported rod erecting (23)Along upper strata steel pipe(22)Length direction, uniform intervals arrangement.
7. the stent spray system according to claim 6 for beam spray maintenance, it is characterised in that:The adjacent support Upright bar(23)Between be additionally provided with reinforcing bar(26), reinforcing bar(26)Both ends respectively with upper strata steel pipe(22)With lower floor's steel pipe(21)Gu It is fixed.
8. the stent spray system according to claim 4 for beam spray maintenance, it is characterised in that:Two upper strata steel pipes (22)Between be additionally provided with support rail(24), the support rail(24)With upper strata steel pipe(22)It is vertically arranged, along upper strata steel Pipe(22)Length direction, uniform intervals are set.
9. the stent spray system according to claim 4 for beam spray maintenance, it is characterised in that:The brace (25)Along rectangular outer frame(11)Periphery uniform intervals set, brace(25)Angle with horizontal direction is 20-50 °.
10. the stent spray system according to claim 3 for beam spray maintenance, it is characterised in that:The communicating pipe (31)Along framework of steel reinforcement(1)Length direction, elongated setting, spray tube(32)Positioned at bar(5)Inner side, spray head(4)Positioned at spray Shower pipe(32)Lower section.
CN201721267938.5U 2017-09-29 2017-09-29 Stent spray system for beam spray maintenance Active CN207228652U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721267938.5U CN207228652U (en) 2017-09-29 2017-09-29 Stent spray system for beam spray maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721267938.5U CN207228652U (en) 2017-09-29 2017-09-29 Stent spray system for beam spray maintenance

Publications (1)

Publication Number Publication Date
CN207228652U true CN207228652U (en) 2018-04-13

Family

ID=61850029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721267938.5U Active CN207228652U (en) 2017-09-29 2017-09-29 Stent spray system for beam spray maintenance

Country Status (1)

Country Link
CN (1) CN207228652U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110303584A (en) * 2019-07-16 2019-10-08 中交路桥北方工程有限公司 A kind of prefabricated box culvert spraying health promotion auxiliary device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110303584A (en) * 2019-07-16 2019-10-08 中交路桥北方工程有限公司 A kind of prefabricated box culvert spraying health promotion auxiliary device

Similar Documents

Publication Publication Date Title
CN104806011B (en) Raft board post poured band formwork for placing
CN101818570B (en) Method for constructing girder structure conversion layer of high-rise building
CN102493341A (en) Construction method for hollow thin-walled high pier non-bracket formwork turnover of railway
CN108360380A (en) A kind of bridge pier column construction operation platform and its construction method
CN105544873A (en) Wavy hollow roof and construction method thereof
CN107905124A (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN107905111A (en) A kind of rigid frame-continuous girder end bay construction technology
CN210659228U (en) Movable single-side formwork system for subway construction
CN206438529U (en) Beam and slab type raft foundation formwork support structure
CN103603494B (en) A kind of ultra-thin steel truss sloping core construction method and formwork structure
CN205242788U (en) Wave roofing structure of continuous gradation
CN207228652U (en) Stent spray system for beam spray maintenance
CN206625260U (en) A kind of detachable late poured band support post
CN205591122U (en) Simple bridge roof beam bearing structure based on beiLei beam support
CN103866692A (en) Novel assembling method for bent cap bearing frame
CN202766974U (en) Bent cap bearing frame without full framing
CN215799204U (en) Tunnel secondary lining maintenance trolley
CN201943350U (en) Supporting steel frame for die holder of high-altitude large span overhanging structure
CN209892227U (en) A mould spouts template for tunnel shotcrete
CN113186830A (en) Construction process of cast-in-place bent cap
CN207598256U (en) A kind of piping lane low-cost die vehicle
CN109519009A (en) The top-down construction method of the above structure in the ground of large-scale pump house
CN212957893U (en) Super high concrete water tank structure connected with upper floor
CN217679240U (en) Tower crane foundation for underwater bridge construction
CN209837663U (en) Template system for high-rise building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant