CN208168195U - Connection stair inside and outside building - Google Patents

Connection stair inside and outside building Download PDF

Info

Publication number
CN208168195U
CN208168195U CN201820394131.6U CN201820394131U CN208168195U CN 208168195 U CN208168195 U CN 208168195U CN 201820394131 U CN201820394131 U CN 201820394131U CN 208168195 U CN208168195 U CN 208168195U
Authority
CN
China
Prior art keywords
building
stair
stiffening plate
connection
horizontal pedal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820394131.6U
Other languages
Chinese (zh)
Inventor
李洲至
田志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201820394131.6U priority Critical patent/CN208168195U/en
Application granted granted Critical
Publication of CN208168195U publication Critical patent/CN208168195U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model provides connection stair inside and outside building, it is arranged between the building Lou Neiyu external scaffolding, including stair tread, platform board, support frame, the first stiffening plate and the second stiffening plate, stair tread includes horizontal pedal and the vertical plate that is arranged alternately with horizontal pedal;Support frame includes column and crossbeam, and column has two and column bottom is arranged in building on ground, by the way that the crossbeam connection at the top of it is arranged between two root posts;Crossbeam top surface is bonded the lower end surface that horizontal pedal is arranged in;Platform board side is connect with stair tread, is extended outside another lateral building of platform board and is constituted extended segment and ride upon on building external scaffolding;First stiffening plate and the second stiffening plate are bonded respectively to be arranged on the top and bottom of extended segment.Staircase design is reasonable, safe and convenient to use, can effectively connect the building Lou Neihe external scaffolding, make pedestrian's freedom of movement, provides convenience for passage of the construction personnel between the building Lou Neihe external scaffolding, reduces the passage difficulty during construction operation.

Description

Connection stair inside and outside building
Technical field
The utility model relates to construction ancillary equipment fields, and in particular to connection stair inside and outside building.
Background technique
Currently, worker generally by the way of manually climbing from the building Lou Neidao external scaffolding, with the hair of construction technology Exhibition precast stair starts generally to enter construction site, and when casting concrete no longer needs to pour stair, wait pour several layers of buildings Afterwards, then by stair it is lifted, stair do not have stair connection between each floor before installing, when construction can only climb out of building It to building external scaffolding, passes through on the stair of building external scaffolding, because there are railings(Face the safeguard procedures at side hole)Come Climbing and its inconvenience are returned, and building external scaffolding is hanging with existing between main body, there are security risks during climbing.
Worker does not have proper security channel from the building Lou Neidao external scaffolding, there are the problem of have:First, construction personnel is past Toward needing carrying operation tool to walk back and forth between the building Lou Neihe external scaffolding, it is extremely inconvenient that when no tool, has walked, and carries Walk that process is more difficult, this increases task difficulty to construction personnel after tool;Second, construction personnel arrives foot outside building indoors Need to cross railing during hand cradle across building external scaffolding with gap hanging between exterior wall, current process there are security risk, It is more dangerous in sleet strong wind weather;Third, construction personnel takes during climbing, crossing pays attention to inherently safe at quarter, And it is big to cross difficulty, other people is needed to help when carry-on articles are excessive, crosses that process is time-consuming, laborious increase activity duration.
Utility model content
In view of the deficienciess of the prior art, passing through building the purpose of this utility model is to provide connection stair inside and outside building Ladder builds the walking passageway that a safety can have been formed between the building Lou Neidao external scaffolding, provides one to construction personnel Preferable construction operation environment, the inconvenience when personnel of solving walk reduce current difficulty, reduce when walking personnel or The probability that object falls, improves construction efficiency.
The utility model adopts the following technical solution:Connection stair inside and outside building are arranged between the building Lou Neiyu external scaffolding, Including stair tread, platform board, support frame, the first stiffening plate and the second stiffening plate, the stair tread include horizontal pedal with And the vertical plate being arranged alternately with horizontal pedal;Support frame as described above includes column and crossbeam, and column has two and column bottom It is arranged in building on ground, by the way that the crossbeam connection at the top of it is arranged between two root posts;The fitting of crossbeam top surface is arranged in water The lower end surface of flat pedal;
Platform board side is connect with stair tread, is extended outside another lateral building of platform board and is constituted extended segment and ride upon building On external scaffolding;First stiffening plate and the second stiffening plate are bonded respectively to be arranged on the top and bottom of extended segment.
Further, the first reinforcement plate surface is provided with tread plate.
Further, horizontal pedal surface is provided with tread plate.
Further, the second stiffening plate lower part is additionally provided with reinforcement supporting member.
Further, reinforcement supporting member is balcony side plate.
Further, vertical plate height is 150mm;Horizontal pedal width is 250mm, and horizontal pedal length is 500mm- 1500mm。
Further, the crossbeam length Yu horizontal pedal equal length of support frame;Support frame quantity and horizontal pedal quantity phase Deng.
Further, the first stiffening plate and the second reinforcement plate thickness are at least 15mm.
Further, stair are timber or steel.
The utility model has the characteristics that and beneficial effect compared with prior art:
(1)Connection stair inside and outside building provided by the utility model, rationally, structure is simple for design, safe and convenient to use, can have The effect connection building Lou Neihe external scaffolding, stair have preferable load-bearing capacity.Stair channel can make pedestrian's freedom of movement, to apply Current offer convenience between the building worker Yuan Lou Neihe external scaffolding, reduces the passage difficulty during construction operation.
(2)Connection stair inside and outside building provided by the utility model, after building, climbing position can be transformed into temporarily by stair Channel, worker is without seeking connections with excessively high railing, without, with the hanging distance between building external scaffolding, avoiding and turning over repeatedly across exterior wall More railing is time-consuming and laborious and crosses over building external scaffolding with the risk of exterior wall overhead positions, improves the building Lou Neitong external scaffolding Percent of pass saves the construction time, improves operating efficiency, reduces security risk.
Other features and advantages of the utility model will illustrate in the following description, and partly from specification It becomes apparent, or is understood and implementing the utility model.The main purpose and further advantage of the utility model can lead to Specifically noted scheme in specification, claims is crossed to be achieved and obtained.
Detailed description of the invention
Fig. 1 is the utility model side view;
Fig. 2 is support frame structure diagram;
Fig. 3 is horizontal pedal schematic surface;
Fig. 4 is staircase structure schematic diagram.
Appended drawing reference:1- stair tread, 11- horizontal pedal, 12- vertical plate,
2- platform board, 3- support frame, 31- column, 32- crossbeam,
The first stiffening plate of 4-, the second stiffening plate of 5-, 6- tread plate, 7- reinforcement supporting member.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only to explain this Utility model is not used to limit the utility model.
When construction, worker is current inconvenient by the building Lou Neidao external scaffolding, and directly manually there is biggish safety is hidden for climbing Suffer from, in order to improve the safety coefficient of construction and provide preferable construction operation environment to construction personnel, changes original backwardness and apply Work mode, the utility model provide connection stair inside and outside building, and as shown in Figure 1 and Figure 4, stair can use timber or steel Material is arranged between the building Lou Neiyu external scaffolding, including stair tread 1, platform board 2, support frame 3, the first stiffening plate 4 and second Stiffening plate 5, the stair tread 1 include horizontal pedal 11 and the vertical plate 12 being arranged alternately with horizontal pedal 11.Vertical plate 12 height can be 150mm;11 width of horizontal pedal can be 250mm, and 11 length of horizontal pedal can be 500mm-1500mm.
As shown in Fig. 2, support frame 3 includes column 31 and crossbeam 32, column 31 has two and the setting of 31 bottom of column exists In building on ground, connected between two root posts 31 by the way that the crossbeam 32 at the top of it is arranged in;The fitting of 32 top surface of crossbeam is arranged in water The lower end surface of flat pedal 11;2 side of platform board is connect with stair tread 1, is extended outside another lateral building of platform board 2 and is constituted extension Section simultaneously rides upon on building external scaffolding;First stiffening plate 4 and the second stiffening plate 5 are bonded the top that extended segment is arranged in respectively On face and bottom surface.First stiffening plate 4 and 5 thickness of the second stiffening plate are at least 15mm.32 length of crossbeam of support frame 3 should be with water Flat 11 equal length of pedal;3 quantity of support frame should be equal with 11 quantity of horizontal pedal.
As shown in figure 3, there is showing for walking skidding in stairwell surface precipitation when sleet strong wind weather is more constructed in order to prevent As tread plate 6 can be provided on 4 surface of the first stiffening plate and 11 surface of horizontal pedal.When the extended segment of platform board 2 is too long When, reinforcement supporting member 7 can be added extending pars infrasegmentalis, reinforcement supporting member 7 can be the balcony side plate for completion of having constructed.
Specific making and use method, following steps:
Step 1:Using wood materials such as discarded flitches as stair main material, stair tread 1 can be according to the practical feelings in scene 12 quantity of condition production technique pedal 11 and vertical plate;After determining the height crossed over needed for scene, scene materials carry out cutting spelling Wooden stair pedal 1 is formed after dress;Vertical step height uses 15cm, and lateral board width uses 25cm, vertical pedal and transverse direction The length of plate takes 1m.Certainly, tread length can be increased and decreased according to on-site actual situations;
Step 2:3 quantity of flitch support frame according to 11 quantity performed of horizontal pedal subject to, support frame 3 support stair, improve The stability of stair, safety;
Step 3:The extended segment of platform board 2, the first stiffening plate 4 and is arranged in first stiffening plate 4 and the second stiffening plate 5 Two stiffening plates 5 are the stability that useless template mainly reinforces junction chamber inner and outer plates;Reinforce the stairs frame completed, 3 He of support frame Stair tread 1, which is formed, stablizes the unified whole of safety, walk about inside and outside building for construction personnel;
Step 4:Acceptance(check) is come into operation.
Connection stair inside and outside building provided by the utility model, rationally, structure is simple for design, safe and convenient to use, can be effective The building Lou Neihe external scaffolding is connected, stair have preferable load-bearing capacity.Stair channel can make pedestrian's freedom of movement, for construction Current offer convenience of the personnel between the building Lou Neihe external scaffolding, reduces the passage difficulty during construction operation.
The foregoing is merely the preferable specific embodiment of the utility model, but the protection scope of the utility model not office Be limited to this, variation that anyone skilled in the art is expected within the technical scope disclosed by the utility model or Replacement, should be covered within the scope of the utility model.

Claims (9)

1. connection stair inside and outside building are arranged between the building Lou Neiyu external scaffolding, which is characterized in that including stair tread(1), it is flat Platen(2), support frame(3), the first stiffening plate(4)With the second stiffening plate(5), the stair tread(1)Including horizontal pedal (11)And and horizontal pedal(11)The vertical plate being arranged alternately(12);Support frame as described above(3)Including column(31)And crossbeam (32), column(31)There are two and column(31)Bottom is arranged in building on ground, two root posts(31)Between pass through setting Crossbeam at the top of it(32)Connection;Crossbeam(32)Top surface fitting is arranged in horizontal pedal(11)Lower end surface;
Platform board(2)Side and stair tread(1)Connection, platform board(2)Extend outside another lateral building and constitutes extended segment and set up On building external scaffolding;First stiffening plate(4)With the second stiffening plate(5)The top surface and bottom of extended segment is arranged in fitting respectively On face.
2. connection stair inside and outside building as described in claim 1, which is characterized in that the first stiffening plate(4)Surface is provided with anti-skidding Item(6).
3. connection stair inside and outside building as described in claim 1, which is characterized in that horizontal pedal(11)Surface is provided with tread plate (6).
4. connection stair inside and outside building as described in claim 1, which is characterized in that the second stiffening plate(5)Lower part, which is additionally provided with, to be added Strong supporting element(7).
5. connection stair inside and outside building as claimed in claim 4, which is characterized in that reinforcement supporting member(7)For balcony side plate.
6. connection stair inside and outside building as described in claim 1, which is characterized in that vertical plate(12)Height is 150 mm;It is horizontal Pedal(11)Width is 250mm, horizontal pedal(11)Length is 500mm-1500mm.
7. connection stair inside and outside building as described in claim 1, which is characterized in that support frame(3)Crossbeam(32)Length and water Flat pedal(11)Equal length;Support frame(3)Quantity and horizontal pedal(11)Quantity is equal.
8. connection stair inside and outside building as described in claim 1, which is characterized in that the first stiffening plate(4)With the second stiffening plate(5) Thickness is at least 15mm.
9. connection stair inside and outside building as described in claim 1, which is characterized in that stair are timber or steel.
CN201820394131.6U 2018-03-22 2018-03-22 Connection stair inside and outside building Expired - Fee Related CN208168195U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820394131.6U CN208168195U (en) 2018-03-22 2018-03-22 Connection stair inside and outside building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820394131.6U CN208168195U (en) 2018-03-22 2018-03-22 Connection stair inside and outside building

Publications (1)

Publication Number Publication Date
CN208168195U true CN208168195U (en) 2018-11-30

Family

ID=64373909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820394131.6U Expired - Fee Related CN208168195U (en) 2018-03-22 2018-03-22 Connection stair inside and outside building

Country Status (1)

Country Link
CN (1) CN208168195U (en)

Similar Documents

Publication Publication Date Title
CN102322135A (en) Elevator shaft construction scaffolding device capable of being elevated along with construction layer of building main body structure and method for setting same
CN206053274U (en) The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose
CN106400951B (en) A kind of level and vertical structure method for synchronously constructing of super high-rise building
CN206487087U (en) A kind of scissor stairs of sectional
CN205894681U (en) Closed staircase template
CN110886488A (en) Intelligent integrated high-rise building machine
CN208168195U (en) Connection stair inside and outside building
CN205654127U (en) Portable operation protective platform of assembly type structure stairwell
CN209568688U (en) A kind of elevating construction platform
CN215670884U (en) Assembly type building staircase operation platform
CN211776076U (en) Steel construction retractable cat ladder of going to people for elevator well
CN206128636U (en) Detachable stair formwork of flier
CN208577945U (en) A kind of tapered pier template multifunctional operating platform
CN214615432U (en) Formwork for closed stair construction
CN220036073U (en) Assembled stairwell construction is with operation steel platform
CN219411924U (en) Precast concrete stair finished product protection device
CN105178602A (en) Building construction system
CN215054703U (en) Simple stair for assembled stair
CN218563002U (en) Intelligent climbing frame walkway plate
CN218029176U (en) Reinforced structure of interior decoration stair of municipal building
CN215055076U (en) Two operation platform that run are used in construction of prefabricated building stairwell
CN206128635U (en) Transition stair can be dismantled to stair mold and flier
CN211143845U (en) Turnover type stair and operation platform
CN212507124U (en) Steel assembled stair
CN211900422U (en) Folding staircase for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181130

Termination date: 20190322