CN208168195U - Connection stair inside and outside building - Google Patents
Connection stair inside and outside building Download PDFInfo
- Publication number
- CN208168195U CN208168195U CN201820394131.6U CN201820394131U CN208168195U CN 208168195 U CN208168195 U CN 208168195U CN 201820394131 U CN201820394131 U CN 201820394131U CN 208168195 U CN208168195 U CN 208168195U
- Authority
- CN
- China
- Prior art keywords
- building
- stair
- stiffening plate
- connection
- horizontal pedal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
The utility model provides connection stair inside and outside building, it is arranged between the building Lou Neiyu external scaffolding, including stair tread, platform board, support frame, the first stiffening plate and the second stiffening plate, stair tread includes horizontal pedal and the vertical plate that is arranged alternately with horizontal pedal;Support frame includes column and crossbeam, and column has two and column bottom is arranged in building on ground, by the way that the crossbeam connection at the top of it is arranged between two root posts;Crossbeam top surface is bonded the lower end surface that horizontal pedal is arranged in;Platform board side is connect with stair tread, is extended outside another lateral building of platform board and is constituted extended segment and ride upon on building external scaffolding;First stiffening plate and the second stiffening plate are bonded respectively to be arranged on the top and bottom of extended segment.Staircase design is reasonable, safe and convenient to use, can effectively connect the building Lou Neihe external scaffolding, make pedestrian's freedom of movement, provides convenience for passage of the construction personnel between the building Lou Neihe external scaffolding, reduces the passage difficulty during construction operation.
Description
Technical field
The utility model relates to construction ancillary equipment fields, and in particular to connection stair inside and outside building.
Background technique
Currently, worker generally by the way of manually climbing from the building Lou Neidao external scaffolding, with the hair of construction technology
Exhibition precast stair starts generally to enter construction site, and when casting concrete no longer needs to pour stair, wait pour several layers of buildings
Afterwards, then by stair it is lifted, stair do not have stair connection between each floor before installing, when construction can only climb out of building
It to building external scaffolding, passes through on the stair of building external scaffolding, because there are railings(Face the safeguard procedures at side hole)Come
Climbing and its inconvenience are returned, and building external scaffolding is hanging with existing between main body, there are security risks during climbing.
Worker does not have proper security channel from the building Lou Neidao external scaffolding, there are the problem of have:First, construction personnel is past
Toward needing carrying operation tool to walk back and forth between the building Lou Neihe external scaffolding, it is extremely inconvenient that when no tool, has walked, and carries
Walk that process is more difficult, this increases task difficulty to construction personnel after tool;Second, construction personnel arrives foot outside building indoors
Need to cross railing during hand cradle across building external scaffolding with gap hanging between exterior wall, current process there are security risk,
It is more dangerous in sleet strong wind weather;Third, construction personnel takes during climbing, crossing pays attention to inherently safe at quarter,
And it is big to cross difficulty, other people is needed to help when carry-on articles are excessive, crosses that process is time-consuming, laborious increase activity duration.
Utility model content
In view of the deficienciess of the prior art, passing through building the purpose of this utility model is to provide connection stair inside and outside building
Ladder builds the walking passageway that a safety can have been formed between the building Lou Neidao external scaffolding, provides one to construction personnel
Preferable construction operation environment, the inconvenience when personnel of solving walk reduce current difficulty, reduce when walking personnel or
The probability that object falls, improves construction efficiency.
The utility model adopts the following technical solution:Connection stair inside and outside building are arranged between the building Lou Neiyu external scaffolding,
Including stair tread, platform board, support frame, the first stiffening plate and the second stiffening plate, the stair tread include horizontal pedal with
And the vertical plate being arranged alternately with horizontal pedal;Support frame as described above includes column and crossbeam, and column has two and column bottom
It is arranged in building on ground, by the way that the crossbeam connection at the top of it is arranged between two root posts;The fitting of crossbeam top surface is arranged in water
The lower end surface of flat pedal;
Platform board side is connect with stair tread, is extended outside another lateral building of platform board and is constituted extended segment and ride upon building
On external scaffolding;First stiffening plate and the second stiffening plate are bonded respectively to be arranged on the top and bottom of extended segment.
Further, the first reinforcement plate surface is provided with tread plate.
Further, horizontal pedal surface is provided with tread plate.
Further, the second stiffening plate lower part is additionally provided with reinforcement supporting member.
Further, reinforcement supporting member is balcony side plate.
Further, vertical plate height is 150mm;Horizontal pedal width is 250mm, and horizontal pedal length is 500mm-
1500mm。
Further, the crossbeam length Yu horizontal pedal equal length of support frame;Support frame quantity and horizontal pedal quantity phase
Deng.
Further, the first stiffening plate and the second reinforcement plate thickness are at least 15mm.
Further, stair are timber or steel.
The utility model has the characteristics that and beneficial effect compared with prior art:
(1)Connection stair inside and outside building provided by the utility model, rationally, structure is simple for design, safe and convenient to use, can have
The effect connection building Lou Neihe external scaffolding, stair have preferable load-bearing capacity.Stair channel can make pedestrian's freedom of movement, to apply
Current offer convenience between the building worker Yuan Lou Neihe external scaffolding, reduces the passage difficulty during construction operation.
(2)Connection stair inside and outside building provided by the utility model, after building, climbing position can be transformed into temporarily by stair
Channel, worker is without seeking connections with excessively high railing, without, with the hanging distance between building external scaffolding, avoiding and turning over repeatedly across exterior wall
More railing is time-consuming and laborious and crosses over building external scaffolding with the risk of exterior wall overhead positions, improves the building Lou Neitong external scaffolding
Percent of pass saves the construction time, improves operating efficiency, reduces security risk.
Other features and advantages of the utility model will illustrate in the following description, and partly from specification
It becomes apparent, or is understood and implementing the utility model.The main purpose and further advantage of the utility model can lead to
Specifically noted scheme in specification, claims is crossed to be achieved and obtained.
Detailed description of the invention
Fig. 1 is the utility model side view;
Fig. 2 is support frame structure diagram;
Fig. 3 is horizontal pedal schematic surface;
Fig. 4 is staircase structure schematic diagram.
Appended drawing reference:1- stair tread, 11- horizontal pedal, 12- vertical plate,
2- platform board, 3- support frame, 31- column, 32- crossbeam,
The first stiffening plate of 4-, the second stiffening plate of 5-, 6- tread plate, 7- reinforcement supporting member.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation
Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only to explain this
Utility model is not used to limit the utility model.
When construction, worker is current inconvenient by the building Lou Neidao external scaffolding, and directly manually there is biggish safety is hidden for climbing
Suffer from, in order to improve the safety coefficient of construction and provide preferable construction operation environment to construction personnel, changes original backwardness and apply
Work mode, the utility model provide connection stair inside and outside building, and as shown in Figure 1 and Figure 4, stair can use timber or steel
Material is arranged between the building Lou Neiyu external scaffolding, including stair tread 1, platform board 2, support frame 3, the first stiffening plate 4 and second
Stiffening plate 5, the stair tread 1 include horizontal pedal 11 and the vertical plate 12 being arranged alternately with horizontal pedal 11.Vertical plate
12 height can be 150mm;11 width of horizontal pedal can be 250mm, and 11 length of horizontal pedal can be 500mm-1500mm.
As shown in Fig. 2, support frame 3 includes column 31 and crossbeam 32, column 31 has two and the setting of 31 bottom of column exists
In building on ground, connected between two root posts 31 by the way that the crossbeam 32 at the top of it is arranged in;The fitting of 32 top surface of crossbeam is arranged in water
The lower end surface of flat pedal 11;2 side of platform board is connect with stair tread 1, is extended outside another lateral building of platform board 2 and is constituted extension
Section simultaneously rides upon on building external scaffolding;First stiffening plate 4 and the second stiffening plate 5 are bonded the top that extended segment is arranged in respectively
On face and bottom surface.First stiffening plate 4 and 5 thickness of the second stiffening plate are at least 15mm.32 length of crossbeam of support frame 3 should be with water
Flat 11 equal length of pedal;3 quantity of support frame should be equal with 11 quantity of horizontal pedal.
As shown in figure 3, there is showing for walking skidding in stairwell surface precipitation when sleet strong wind weather is more constructed in order to prevent
As tread plate 6 can be provided on 4 surface of the first stiffening plate and 11 surface of horizontal pedal.When the extended segment of platform board 2 is too long
When, reinforcement supporting member 7 can be added extending pars infrasegmentalis, reinforcement supporting member 7 can be the balcony side plate for completion of having constructed.
Specific making and use method, following steps:
Step 1:Using wood materials such as discarded flitches as stair main material, stair tread 1 can be according to the practical feelings in scene
12 quantity of condition production technique pedal 11 and vertical plate;After determining the height crossed over needed for scene, scene materials carry out cutting spelling
Wooden stair pedal 1 is formed after dress;Vertical step height uses 15cm, and lateral board width uses 25cm, vertical pedal and transverse direction
The length of plate takes 1m.Certainly, tread length can be increased and decreased according to on-site actual situations;
Step 2:3 quantity of flitch support frame according to 11 quantity performed of horizontal pedal subject to, support frame 3 support stair, improve
The stability of stair, safety;
Step 3:The extended segment of platform board 2, the first stiffening plate 4 and is arranged in first stiffening plate 4 and the second stiffening plate 5
Two stiffening plates 5 are the stability that useless template mainly reinforces junction chamber inner and outer plates;Reinforce the stairs frame completed, 3 He of support frame
Stair tread 1, which is formed, stablizes the unified whole of safety, walk about inside and outside building for construction personnel;
Step 4:Acceptance(check) is come into operation.
Connection stair inside and outside building provided by the utility model, rationally, structure is simple for design, safe and convenient to use, can be effective
The building Lou Neihe external scaffolding is connected, stair have preferable load-bearing capacity.Stair channel can make pedestrian's freedom of movement, for construction
Current offer convenience of the personnel between the building Lou Neihe external scaffolding, reduces the passage difficulty during construction operation.
The foregoing is merely the preferable specific embodiment of the utility model, but the protection scope of the utility model not office
Be limited to this, variation that anyone skilled in the art is expected within the technical scope disclosed by the utility model or
Replacement, should be covered within the scope of the utility model.
Claims (9)
1. connection stair inside and outside building are arranged between the building Lou Neiyu external scaffolding, which is characterized in that including stair tread(1), it is flat
Platen(2), support frame(3), the first stiffening plate(4)With the second stiffening plate(5), the stair tread(1)Including horizontal pedal
(11)And and horizontal pedal(11)The vertical plate being arranged alternately(12);Support frame as described above(3)Including column(31)And crossbeam
(32), column(31)There are two and column(31)Bottom is arranged in building on ground, two root posts(31)Between pass through setting
Crossbeam at the top of it(32)Connection;Crossbeam(32)Top surface fitting is arranged in horizontal pedal(11)Lower end surface;
Platform board(2)Side and stair tread(1)Connection, platform board(2)Extend outside another lateral building and constitutes extended segment and set up
On building external scaffolding;First stiffening plate(4)With the second stiffening plate(5)The top surface and bottom of extended segment is arranged in fitting respectively
On face.
2. connection stair inside and outside building as described in claim 1, which is characterized in that the first stiffening plate(4)Surface is provided with anti-skidding
Item(6).
3. connection stair inside and outside building as described in claim 1, which is characterized in that horizontal pedal(11)Surface is provided with tread plate
(6).
4. connection stair inside and outside building as described in claim 1, which is characterized in that the second stiffening plate(5)Lower part, which is additionally provided with, to be added
Strong supporting element(7).
5. connection stair inside and outside building as claimed in claim 4, which is characterized in that reinforcement supporting member(7)For balcony side plate.
6. connection stair inside and outside building as described in claim 1, which is characterized in that vertical plate(12)Height is 150 mm;It is horizontal
Pedal(11)Width is 250mm, horizontal pedal(11)Length is 500mm-1500mm.
7. connection stair inside and outside building as described in claim 1, which is characterized in that support frame(3)Crossbeam(32)Length and water
Flat pedal(11)Equal length;Support frame(3)Quantity and horizontal pedal(11)Quantity is equal.
8. connection stair inside and outside building as described in claim 1, which is characterized in that the first stiffening plate(4)With the second stiffening plate(5)
Thickness is at least 15mm.
9. connection stair inside and outside building as described in claim 1, which is characterized in that stair are timber or steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820394131.6U CN208168195U (en) | 2018-03-22 | 2018-03-22 | Connection stair inside and outside building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820394131.6U CN208168195U (en) | 2018-03-22 | 2018-03-22 | Connection stair inside and outside building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208168195U true CN208168195U (en) | 2018-11-30 |
Family
ID=64373909
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820394131.6U Expired - Fee Related CN208168195U (en) | 2018-03-22 | 2018-03-22 | Connection stair inside and outside building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208168195U (en) |
-
2018
- 2018-03-22 CN CN201820394131.6U patent/CN208168195U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102322135A (en) | Elevator shaft construction scaffolding device capable of being elevated along with construction layer of building main body structure and method for setting same | |
CN206053274U (en) | The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose | |
CN106400951B (en) | A kind of level and vertical structure method for synchronously constructing of super high-rise building | |
CN206487087U (en) | A kind of scissor stairs of sectional | |
CN205894681U (en) | Closed staircase template | |
CN110886488A (en) | Intelligent integrated high-rise building machine | |
CN208168195U (en) | Connection stair inside and outside building | |
CN205654127U (en) | Portable operation protective platform of assembly type structure stairwell | |
CN209568688U (en) | A kind of elevating construction platform | |
CN215670884U (en) | Assembly type building staircase operation platform | |
CN211776076U (en) | Steel construction retractable cat ladder of going to people for elevator well | |
CN206128636U (en) | Detachable stair formwork of flier | |
CN208577945U (en) | A kind of tapered pier template multifunctional operating platform | |
CN214615432U (en) | Formwork for closed stair construction | |
CN220036073U (en) | Assembled stairwell construction is with operation steel platform | |
CN219411924U (en) | Precast concrete stair finished product protection device | |
CN105178602A (en) | Building construction system | |
CN215054703U (en) | Simple stair for assembled stair | |
CN218563002U (en) | Intelligent climbing frame walkway plate | |
CN218029176U (en) | Reinforced structure of interior decoration stair of municipal building | |
CN215055076U (en) | Two operation platform that run are used in construction of prefabricated building stairwell | |
CN206128635U (en) | Transition stair can be dismantled to stair mold and flier | |
CN211143845U (en) | Turnover type stair and operation platform | |
CN212507124U (en) | Steel assembled stair | |
CN211900422U (en) | Folding staircase for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181130 Termination date: 20190322 |