CN208136995U - A kind of desilting fluid-adjusting device for yellow river regulation - Google Patents

A kind of desilting fluid-adjusting device for yellow river regulation Download PDF

Info

Publication number
CN208136995U
CN208136995U CN201820601293.2U CN201820601293U CN208136995U CN 208136995 U CN208136995 U CN 208136995U CN 201820601293 U CN201820601293 U CN 201820601293U CN 208136995 U CN208136995 U CN 208136995U
Authority
CN
China
Prior art keywords
water pipe
desilting
fluid
filter box
mud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820601293.2U
Other languages
Chinese (zh)
Inventor
刘鹏
张振军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820601293.2U priority Critical patent/CN208136995U/en
Application granted granted Critical
Publication of CN208136995U publication Critical patent/CN208136995U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model discloses a kind of desilting fluid-adjusting devices for yellow river regulation, ship body tail section is hinged with desilting fluid-adjusting plate, silt collecting box is equipped in ship ontology, filter box is equipped with right above silt collecting box, filter box one side wall is connected with hydraulic fill pipeline, hydraulic fill pipeline lower end is close to desilting fluid-adjusting plate lower end and at the downstream in desilting fluid-adjusting plate lower end when desilting fluid-adjusting, the first water pipe is equipped in filter box, first water pipe upper end is equipped with the first active connection part, first water pipe lower end coats mud filter screen, first water pipe is connected with the second water pipe by the first active connection part, second water pipe lower end is integrally connected with third water pipe and the 4th water pipe respectively, 4th water pipe lower end is connected with water tank, water tank is connected by the 5th water pipe that rotary-atomizing spray head is arranged in end with filter box, rotary-atomizing spray head is in immediately below the first water pipe.Mud is not in clogging in the utility model, can conveniently and efficiently be cleared up mud filter screen, and desilting fluid-adjusting is high-efficient.

Description

A kind of desilting fluid-adjusting device for yellow river regulation
Technical field
The utility model belongs to hydraulic engineering technical field, and in particular to a kind of desilting fluid-adjusting dress for yellow river regulation It sets.
Background technique
During river regulation, it is often necessary to be purged to the mud in river, at present for the removing of riverway sludge Process is:It drains firstly the need of by the water in river, is then again dug out the mud in river by digging machine, finally again by water weight It is newly put back into river, however above-mentioned dredging process is troublesome in poeration, and desilting efficiency data is low.
Although river Accrete clearing device in the prior art does not have to drain in the water in river to remove mud, due to returning mud Branch pipe is vertically arranged, returns mud general pipeline and is horizontally disposed with, and the junction for returning mud branch pipe and time mud general pipeline is at right angles arranged, and passes through in this way The filtered mud of sieve plate is easy to block back mud branch pipe and returns mud general pipeline, and is not provided with water pump and takes out filtered water Out, therefore desilting efficiency data is lower, and screen pack must remove screen pack after a period of use to clear up it, because This is cumbersome.
Another kind desilting fluid-adjusting device in the prior art is that the mud agitation in river is come, not by river In mud clean up, the mud held is stirred after a period of time still can deposit in riverway sludge layer.
Utility model content
The utility model provides a kind of desilting fluid-adjusting device for yellow river regulation, and mud is not in clogging, energy Conveniently and efficiently mud filter screen is cleared up, and desilting fluid-adjusting is high-efficient.
In order to solve the above-mentioned technical problem, the utility model adopts the following technical solution:
The outer end face middle part of a kind of desilting fluid-adjusting device for yellow river regulation, including ship ontology, ship body tail section passes through Shaft is hinged with desilting fluid-adjusting plate, and shaft is parallel to the Yellow River surface and perpendicular with line direction before ship ontology, on desilting fluid-adjusting plate The intersection and line direction before ship ontology that surface and the Yellow River surface are formed are perpendicular, and ship body tail section upper surface is fixed with vertical and pushes up The bracket of end setting fixed pulley, ship body upper surface are additionally provided with hoist engine, wirerope, steel wire rope end are tied on the reel of hoist engine Portion is around fixed pulley and is fixed on desilting fluid-adjusting plate upper surface lower part corresponding position;It is fixed with silt collecting box in ship ontology, Cylindrical filter box is fixed with right above silt collecting box, filter box is received by the mud discharge bucket and mud of its positive lower end Header top is connected, and mud discharge bucket is equipped with mud valve, and filter box one side wall is connected with is arranged mud valve and mud thereon The hydraulic fill pipeline of stock pump, hydraulic fill pipeline lower end is close to desilting fluid-adjusting plate lower end and in desilting fluid-adjusting plate lower end when desilting fluid-adjusting Top is fixed at downstream, in filter box to stretch out filter box top and the first of the first water pump is arranged vertically and thereon Water pipe, the first water pipe lower end height be lower than hydraulic fill pipeline upper end level, the first water pipe upper end be equipped with the first active connection part, first Water pipe lower end coats mud filter screen, and the first water pipe is connected with the second water pipe, the second water pipe lower end point by the first active connection part It is not connected with the third water pipe of lower end face the Yellow River integrally and the 4th water pipe of first switch is set thereon, the 4th water pipe lower end and solid Water tank due to ship body upper surface corresponding position is connected, and water tank is by protruding into the 5th water pipe of filter box side wall and filtering Cabinet is connected, and the 5th water pipe end is equipped with rotary-atomizing spray head, and rotary-atomizing spray head is in immediately below the first water pipe, is in The 5th external water pipe of filter box is equipped with second switch and the second water pump.
Further, hydraulic fill pipeline includes the first hydraulic fill pipeline and the second hydraulic fill pipeline, and the first hydraulic fill pipeline is located at filtering In cabinet one side wall, the first hydraulic fill pipeline is equipped with mud valve and slush pump, and the first hydraulic fill pipeline end is equipped with the second activity Interconnecting piece, the first hydraulic fill pipeline are connected with the second hydraulic fill pipeline by the second active connection part, the second hydraulic fill pipeline when desilting fluid-adjusting Lower end is close to desilting fluid-adjusting plate lower end and at the downstream in desilting fluid-adjusting plate lower end.
Further, the first hydraulic fill pipeline is set on the right side wall of filter box, and the first hydraulic fill pipeline is to upper left side It is obliquely installed, filter box left side wall top is integrally formed with tilt component, and lower section is obliquely installed to the left on tilt component right surface, inclines Oblique member upper surface is horizontally disposed, and tilt component left surface is wholely set with filter box left side wall, from first when desilting fluid-adjusting The slurry content that hydraulic fill pipeline comes out is ejected on the right surface of tilt component.
Further, filter box top is equipped with top cover, and the first water pipe is wholely set through top cover and with top cover.
Further, the vertical centerline of the first water pipe and the vertical centerline of filter box coincide.
Further, desilting fluid-adjusting plate upper center is integrally formed with articulated slab, and articulated slab, which is equipped with, runs through hinged plate surface First level through-hole, and first level through hole center line and line direction before ship ontology are perpendicular, in ship body tail section outer end face Side is symmetrically integrally formed with the first connecting plate and the second connecting plate before and after portion, and the first connecting plate is equipped with through the first connection plate surface The second horizontal through hole, the second connecting plate be equipped with through second connection plate surface third horizontal through hole, the second horizontal through hole Perpendicular with the center line of third horizontal through hole and line direction before ship ontology, articulated slab is in the first connecting plate and the second connecting plate Between, articulated slab, the first connecting plate and the second connecting plate are equipped with across first level through-hole, the second horizontal through hole and third The first connecting plate is stretched out in the shaft of horizontal through hole, shaft front end, and the second connecting plate is stretched out in shaft rear end, and the rear and front end of shaft is attacked There is external screw thread, and shaft is connected with first level through-hole by first bearing, shaft and the second horizontal through hole pass through second bearing It is connected, shaft is connected with third horizontal through hole by 3rd bearing, and the first nut is screwed at shaft front end, is revolved at shaft rear end It is connected to the second nut.
Further, inclined curved surface, filter box inner bottom wall and silt are formed between filter box inner sidewall and inner bottom wall Inclined curved surface is formed between mud discharge bucket inner sidewall.
The working process of the utility model is as follows:Hoist engine pulls desilting fluid-adjusting plate by wirerope and makes under desilting fluid-adjusting plate In Yellow river silt layer, ship ontology moves forward and desilting fluid-adjusting plate is driven to stir the mud in the Yellow River, makes Huang at end The mud of korneforos is mixed into water and is formed mud, is then pumped to the mud of formation in filter box by slush pump, and lead to It crosses the first water pump the intracorporal mud of Rose Box is made to flow through mud filter screen and be filtered, the water in mud flows through mud filter screen simultaneously It flows in the first water pipe, then the water in the first water pipe passes through the second water pipe and flows to third water pipe and the 4th water pipe, third water pipe In water flow directly in the Yellow River, the water in the 4th water pipe flows in water tank, when in water tank water it is full after close first switch, mud In mud reach mud discharge bucket, when the mud in mud discharge bucket it is accumulative to a certain extent when open mud valve for mud It is discharged into silt collecting box, when the water in water tank is passed through rotary-atomizing by the second water pump after a period of use by mud filter screen Spray head is ejected on mud filter screen to clean to mud filter screen.
Compared with the existing technology, the beneficial effects of the utility model are:
Desilting fluid-adjusting plate, filter box one are hinged with by shaft in the middle part of the outer end face of ship body tail section in the utility model Side wall is fixed with the first hydraulic fill pipeline that mud valve and slush pump are arranged thereon, and it is living that the first hydraulic fill pipeline end is equipped with second Rotation connection, the first hydraulic fill pipeline are connected with the second hydraulic fill pipeline by the second active connection part, the second mud tube when desilting fluid-adjusting Road lower end is close to desilting fluid-adjusting plate lower end and at the downstream in desilting fluid-adjusting plate lower end, and desilting fluid-adjusting plate is to Huang when desilting fluid-adjusting The mud of korneforos is stirred, and is mixed into the mud in the Yellow River in water and is formed mud, then passes through slush pump for the mud of formation Slurry, which pumps in filter box, to be filtered, therefore desilting fluid-adjusting is high-efficient;The first water pipe upper end is equipped with the in the utility model One active connection part, the first water pipe are connected with the second water pipe by the first active connection part, by second after mud filter screen is damaged Water pipe is unloaded from the first active connection part of the first water pipe, the first water pipe is then taken out out of filter box and to mud thereon Filter screen is replaced;In the utility model the second water pipe lower end be integrally connected with respectively lower end face the Yellow River third water pipe and its 4th water pipe of upper setting first switch, the 4th water pipe lower end and the water tank phase for being fixed on ship body upper surface corresponding position Even, water tank is connected by protruding into the 5th water pipe of filter box side wall with filter box, and the 5th water pipe end is equipped with rotary-atomizing Spray head, and rotary-atomizing spray head is in immediately below the first water pipe, the 5th water pipe outside filter box is equipped with second switch With the second water pump, when mud filter screen is after a period of use sprayed the water in water tank by rotary-atomizing spray head by the second water pump It is mapped to be cleaned to mud filter screen on mud filter screen, therefore conveniently and efficiently mud filter screen can be cleared up; The first water pipe lower end is in filter box in the utility model, and the first water pipe lower end is enclosed with mud filter screen, the first water pipe Lower end height is lower than the first hydraulic fill pipeline upper end level, enters the intracorporal mud of Rose Box by the first hydraulic fill pipeline and passes through mud mistake Strainer is filtered, by filtered mud it is direct under fall at mud discharge bucket, therefore mud is not in clogging; The first hydraulic fill pipeline is set on the right side wall of filter box in the utility model, and inclined upward is set the first hydraulic fill pipeline to the left It sets, filter box left side wall top is integrally formed with tilt component, and lower section is obliquely installed to the left on tilt component right surface, tilt component Upper surface is horizontally disposed, and tilt component left surface is wholely set with filter box left side wall, the first mud when such desilting fluid-adjusting Mud in pipeline is tilted into filter box along the direction for favouring filter box right side wall, is come out from the first hydraulic fill pipeline Slurry content be ejected on the right surface of tilt component, be conducive to the mud in mud in this way and rapidly fall under filter box down Portion;Filter box top is equipped with top cover in the utility model, and the first water pipe is wholely set through top cover and with top cover, when mud mistake Second water pipe is unloaded from the first active connection part of the first water pipe after strainer is damaged, then by top cover together with the first water pipe from mistake It is removed on filter box body, and mud filter screen is replaced;Shape between filter box inner sidewall and inner bottom wall in the utility model At inclined curved surface, inclined curved surface is formed between filter box inner bottom wall and mud discharge bucket inner sidewall, is more advantageous in this way The blanking of mud, and mud is not in clogging.
Detailed description of the invention
Fig. 1 is the schematic view of the front view of the utility model;
Fig. 2 is ship ontology, desilting fluid-adjusting plate, articulated slab, the first connecting plate, the second connecting plate, shaft, the first spiral shell in Fig. 1 The overlooking structure diagram of cap and the second nut.
Detailed description of the invention:1, ship ontology, 2, shaft, 3, desilting fluid-adjusting plate, 4, fixed pulley, 5, bracket, 6, hoist engine, 7, volume Cylinder, 8, wirerope, 9, silt collecting box, 10, filter box, 11, mud discharge bucket, 12, mud valve, 13, mud valve, 14, slush pump, the 15, first hydraulic fill pipeline, the 16, first active connection part, the 17, second hydraulic fill pipeline, the 18, first water pump, 19, One water pipe, the 20, second active connection part, 21, mud filter screen, the 22, second water pipe, 23, third water pipe, 24, first switch, 25, the 4th water pipe, 26, water tank, the 27, the 5th water pipe, 28, rotary-atomizing spray head, 29, second switch, the 30, second water pump, 31, incline Inclined portion part, 32, top cover, 33, articulated slab, the 34, first connecting plate, the 35, second connecting plate, the 36, first nut, the 37, second nut.
Specific embodiment
As illustrated in fig. 1 and 2, the utility model includes ship ontology 1, is cut with scissors in the middle part of the outer end face of 1 tail portion of ship ontology by shaft 2 It is connected to desilting fluid-adjusting plate 3, shaft 2 is parallel to the Yellow River surface and, desilting fluid-adjusting plate 3 on table perpendicular with line direction before ship ontology 1 The intersection and line direction before ship ontology 1 that face and the Yellow River surface are formed are perpendicular, and 1 tail portion upper surface of ship ontology is fixed with vertical and pushes up The bracket 5 of end setting fixed pulley 4,1 upper surface of ship ontology are additionally provided with hoist engine 6, are tied with wirerope 8 on the reel 7 of hoist engine 6, 8 end of wirerope is around fixed pulley 4 and is fixed on 3 upper surface lower part corresponding position of desilting fluid-adjusting plate;It is fixed in ship ontology 1 Silt collecting box 9, cylindrical filter box 10 is fixed with right above silt collecting box 9, and filter box 10 passes through its positive lower end Mud discharge bucket 11 is connected with 9 top of silt collecting box, and mud discharge bucket 11 is equipped with mud valve 12,10 side of filter box Wall is fixed with the first hydraulic fill pipeline 15 that mud valve 13 and slush pump 14 are arranged thereon, and 15 end of the first hydraulic fill pipeline is equipped with Second active connection part 20, the first hydraulic fill pipeline 15 are connected with the second hydraulic fill pipeline 17, dredging tune by the second active connection part 20 17 lower end of the second hydraulic fill pipeline is close to 3 lower end of desilting fluid-adjusting plate and at the downstream in 3 lower end of desilting fluid-adjusting plate when stream, Rose Box Top is fixed in body 10 to stretch out 10 top of filter box and the first water pipe 19 of the first water pump 18 is arranged vertically and thereon, The vertical centerline of first water pipe 19 and the vertical centerline of filter box 10 coincide, and 19 lower end height of the first water pipe is lower than the One hydraulic fill pipeline, 15 upper end level, 19 upper end of the first water pipe are equipped with the first active connection part 16, and 19 lower end of the first water pipe is enclosed with Mud filter screen 21, the first water pipe 19 are connected with the second water pipe 22,22 lower end of the second water pipe difference by the first active connection part 16 It is integrally connected with the third water pipe 23 of lower end face the Yellow River and the 4th water pipe 25 of first switch 24 is set thereon, under the 4th water pipe 25 It holds and is connected with the water tank 26 for being fixed on 1 upper surface corresponding position of ship ontology, water tank 26 is by protruding into 10 side wall of filter box 5th water pipe 27 is connected with filter box 10, and 27 end of the 5th water pipe is equipped with rotary-atomizing spray head 28, and rotary-atomizing spray head 28 Immediately below the first water pipe 19, the 5th water pipe 27 outside filter box 10 is equipped with second switch 29 and the second water pump 30。
Wherein, the first hydraulic fill pipeline 15 is set on the right side wall of filter box 10, and the first hydraulic fill pipeline 15 is to upper left Side is obliquely installed, and 10 left side wall top of filter box is integrally formed with tilt component 31, and the right surface of tilt component 31 to the left incline by lower section Tiltedly setting, 31 upper surface of tilt component is horizontally disposed, and 31 left surface of tilt component is wholely set with 10 left side wall of filter box, clearly It becomes silted up and is ejected on the right surface of tilt component 31 when adjusting stream from the slurry content that the first hydraulic fill pipeline 15 comes out.
Wherein, 10 top of filter box is equipped with top cover 32, and the first water pipe 19 is wholely set through top cover 32 and with top cover 32.
Wherein, 3 upper center of desilting fluid-adjusting plate is integrally formed with articulated slab 33, and articulated slab 33, which is equipped with, runs through 33 table of articulated slab The first level through-hole in face, and first level through hole center line and line direction before ship ontology 1 are perpendicular, 1 tail portion outer end of ship ontology Side is symmetrically integrally formed with the first connecting plate 34 and the second connecting plate 35 before and after Middle face, and the first connecting plate 34, which is equipped with, runs through first Second horizontal through hole on 34 surface of connecting plate, the third level that the second connecting plate 35 is equipped with through 35 surface of the second connecting plate are logical The center line of hole, the second horizontal through hole and third horizontal through hole and line direction before ship ontology 1 are perpendicular, and articulated slab 33 is in first Between connecting plate 34 and the second connecting plate 35, articulated slab 33, the first connecting plate 34 and the second connecting plate 35 are equipped with across first The first connecting plate 34, shaft 2 are stretched out in the shaft 2 of horizontal through hole, the second horizontal through hole and third horizontal through hole, 2 front end of shaft The second connecting plate 35 is stretched out in rear end, and the rear and front end of shaft 2 is externally threaded, and shaft 2 and first level through-hole pass through first Bearing is connected, and shaft 2 is connected with the second horizontal through hole by second bearing, and shaft 2 and third horizontal through hole pass through 3rd bearing It is connected, the first nut 36 is screwed at 2 front end of shaft, the second nut 37 is screwed at 2 rear end of shaft.
Wherein, inclined curved surface, 10 inner bottom wall of filter box and silt are formed between 10 inner sidewall of filter box and inner bottom wall Inclined curved surface is formed between 11 inner sidewall of mud discharge bucket.
The working process of the utility model is as follows:Hoist engine 6 pulls desilting fluid-adjusting plate 3 by wirerope 8 and makes desilting fluid-adjusting 3 lower end of plate is in Yellow river silt layer, and ship ontology 1 moves forward and desilting fluid-adjusting plate 3 is driven to stir the mud in the Yellow River It is dynamic, it is mixed into the mud in the Yellow River in water and forms mud, the mud of formation is then pumped to by Rose Box by slush pump 14 In body 10, and so that the mud in filter box 10 is flowed through mud filter screen 21 by the first water pump 18 and be filtered, in mud Water flows through mud filter screen 21 and flows in the first water pipe 19, then the water in the first water pipe 19 passes through the second water pipe 22 and flows to Three water pipes 23 and the 4th water pipe 25, the water in third water pipe 23 flow directly in the Yellow River, and the water in the 4th water pipe 25 flows to water tank In 26, first switch 24 is closed after water is full in water tank 26, the mud in mud reaches mud discharge bucket 11, when mud discharge bucket Mud in 11 opens mud valve 12 when adding up to a certain extent and mud is discharged into silt collecting box 9, when mud filter screen Water in water tank 26 is ejected into mud filter screen by rotary-atomizing spray head 28 by the second water pump 30 after a period of use by 21 To be cleaned to mud filter screen 21 on 21.

Claims (7)

1. a kind of desilting fluid-adjusting device for yellow river regulation, including ship ontology, it is characterised in that:The outer end face of ship body tail section Middle part is hinged with desilting fluid-adjusting plate by shaft, and shaft is parallel to the Yellow River surface and, dredging perpendicular with line direction before ship ontology The intersection and line direction before ship ontology that adjusting-flow board upper surface and the Yellow River surface are formed are perpendicular, and ship body tail section upper surface is fixed with The bracket of vertical and top setting fixed pulley, ship body upper surface are additionally provided with hoist engine, are tied with wirerope on the reel of hoist engine, Steel cord ends are around fixed pulley and are fixed on desilting fluid-adjusting plate upper surface lower part corresponding position;Mud is fixed in ship ontology Collecting box, silt collecting box surface are fixed with cylindrical filter box, and filter box passes through the mud discharge bucket of its positive lower end It is connected with silt collecting box top, mud discharge bucket is equipped with mud valve, and filter box one side wall is connected with is arranged mud thereon The hydraulic fill pipeline of valve and slush pump, hydraulic fill pipeline lower end close to desilting fluid-adjusting plate lower end and is in desilting fluid-adjusting when desilting fluid-adjusting Top is fixed at the downstream of plate lower end, in filter box to stretch out filter box top and the first water pump is arranged vertically and thereon The first water pipe, the first water pipe lower end height be lower than hydraulic fill pipeline upper end level, the first water pipe upper end be equipped with first be flexibly connected Portion, the first water pipe lower end coat mud filter screen, and the first water pipe is connected with the second water pipe, the second water pipe by the first active connection part Lower end is integrally connected with the third water pipe of lower end face the Yellow River respectively and the 4th water pipe of first switch is arranged thereon, under the 4th water pipe It holds and is connected with the water tank for being fixed on ship body upper surface corresponding position, water tank is by protruding into the 5th water pipe of filter box side wall It is connected with filter box, the 5th water pipe end is equipped with rotary-atomizing spray head, and rotary-atomizing spray head is in immediately below the first water pipe, The 5th water pipe outside filter box is equipped with second switch and the second water pump.
2. the desilting fluid-adjusting device according to claim 1 for yellow river regulation, it is characterised in that:Hydraulic fill pipeline includes the One hydraulic fill pipeline and the second hydraulic fill pipeline, the first hydraulic fill pipeline are located in filter box one side wall, and the first hydraulic fill pipeline is equipped with Mud valve and slush pump, the first hydraulic fill pipeline end are equipped with the second active connection part, and the first hydraulic fill pipeline passes through the second activity Interconnecting piece is connected with the second hydraulic fill pipeline, and the second hydraulic fill pipeline lower end close to desilting fluid-adjusting plate lower end and is in dredging when desilting fluid-adjusting At the downstream of adjusting-flow board lower end.
3. the desilting fluid-adjusting device according to claim 2 for yellow river regulation, it is characterised in that:First hydraulic fill pipeline is set It is placed on the right side wall of filter box, and inclined upward is arranged the first hydraulic fill pipeline to the left, filter box left side wall top one Equipped with tilt component, lower section is obliquely installed to the left on tilt component right surface, and tilt component upper surface is horizontally disposed, and tilt component is left Surface is wholely set with filter box left side wall, is ejected into inclination from the slurry content that the first hydraulic fill pipeline comes out when desilting fluid-adjusting On the right surface of component.
4. the desilting fluid-adjusting device according to claim 1 for yellow river regulation, it is characterised in that:Filter box top is set There is top cover, the first water pipe is wholely set through top cover and with top cover.
5. the desilting fluid-adjusting device according to claim 1 for yellow river regulation, it is characterised in that:First water pipe it is vertical The vertical centerline of center line and filter box coincides.
6. the desilting fluid-adjusting device according to claim 1 for yellow river regulation, it is characterised in that:Desilting fluid-adjusting plate upper end Integral middle is equipped with articulated slab, and articulated slab is equipped with the first level through-hole through hinged plate surface, and in first level through-hole Heart line and line direction before ship ontology are perpendicular, in the middle part of ship body tail section outer end face front and back side be symmetrically integrally formed with the first connecting plate with Second connecting plate, the first connecting plate are equipped with the second horizontal through hole through the first connection plate surface, and the second connecting plate is equipped with Through the third horizontal through hole of the second connection plate surface, before the center line and ship ontology of the second horizontal through hole and third horizontal through hole Line direction is perpendicular, and articulated slab is between the first connecting plate and the second connecting plate, and articulated slab, the first connecting plate are connect with second Plate is equipped with the shaft across first level through-hole, the second horizontal through hole and third horizontal through hole, and shaft front end stretches out first The second connecting plate is stretched out in connecting plate, shaft rear end, and the rear and front end of shaft is externally threaded, and shaft and first level through-hole are logical It crosses first bearing to be connected, shaft is connected with the second horizontal through hole by second bearing, and shaft and third horizontal through hole pass through third Bearing is connected, and the first nut is screwed at shaft front end, the second nut is screwed at shaft rear end.
7. the desilting fluid-adjusting device according to claim 1 for yellow river regulation, it is characterised in that:Filter box inner sidewall Inclined curved surface is formed between inner bottom wall, forms inclined song between filter box inner bottom wall and mud discharge bucket inner sidewall Face.
CN201820601293.2U 2018-04-25 2018-04-25 A kind of desilting fluid-adjusting device for yellow river regulation Expired - Fee Related CN208136995U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820601293.2U CN208136995U (en) 2018-04-25 2018-04-25 A kind of desilting fluid-adjusting device for yellow river regulation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820601293.2U CN208136995U (en) 2018-04-25 2018-04-25 A kind of desilting fluid-adjusting device for yellow river regulation

Publications (1)

Publication Number Publication Date
CN208136995U true CN208136995U (en) 2018-11-23

Family

ID=64311096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820601293.2U Expired - Fee Related CN208136995U (en) 2018-04-25 2018-04-25 A kind of desilting fluid-adjusting device for yellow river regulation

Country Status (1)

Country Link
CN (1) CN208136995U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110042731A (en) * 2019-03-02 2019-07-23 陈丽玉 A kind of diluted concrete paver of waterproof accumulation
CN110374159A (en) * 2019-08-16 2019-10-25 河北工业大学 Self-cleaning auger silt dredging device suitable for underwater desilting machine people

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110042731A (en) * 2019-03-02 2019-07-23 陈丽玉 A kind of diluted concrete paver of waterproof accumulation
CN110042731B (en) * 2019-03-02 2021-03-30 陈丽玉 Waterproof concrete paver that piles up dilution
CN110374159A (en) * 2019-08-16 2019-10-25 河北工业大学 Self-cleaning auger silt dredging device suitable for underwater desilting machine people

Similar Documents

Publication Publication Date Title
CN206052818U (en) A kind of improved high-efficiency silt-cleaning vessel for river way
CN107083766B (en) One seeds algae water tackling method and separating and filtering equipment
CN108360596A (en) A kind of hydraulic engineering channel cleanout device
CN208472812U (en) A kind of hydraulic engineering channel cleanout device
CN109723398A (en) Rotary digging bored concrete pile drilling cleaning plant
CN208136995U (en) A kind of desilting fluid-adjusting device for yellow river regulation
CN208934032U (en) A kind of environment-friendly type water conservancy channel cleanout device
CN112517364A (en) Construction device for bridge construction
CN105216988A (en) A kind of ballast tank silt eduction gear
CN208288110U (en) A kind of harbor dredging device
CN208121841U (en) A kind of quick Accrete clearing device of hydraulic engineering
CN107558571B (en) Municipal drainage pipeline
CN206621845U (en) Pond sludge cleaning plant
CN209490531U (en) A kind of environment-friendly type rainwater-collecting lavatory recoil tank-washer
CN209330798U (en) A kind of gardens Catchwork irrigation device
CN208136994U (en) A kind of harnessing silted Yellow River Accrete clearing device
CN208056149U (en) A kind of dredging device for water conservancy projects
CN213756088U (en) Agricultural irrigation sand discharging device
CN113062391B (en) Desilting device and processing system for hydraulic and hydroelectric engineering dam
CN202822986U (en) Solid-liquid separation and settlement device
CN210529810U (en) Hydraulic engineering desilting device
CN207033377U (en) A kind of well drilling detritus collection device
CN207102096U (en) A kind of small ship type sedimentation tank device for treating sewage
CN215518604U (en) Water conservancy construction slope protection structure
CN205239858U (en) Ballast tank silt eduction gear

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181123

Termination date: 20210425

CF01 Termination of patent right due to non-payment of annual fee