CN208122342U - A kind of assembled lightweight wall panel installation equipment - Google Patents

A kind of assembled lightweight wall panel installation equipment Download PDF

Info

Publication number
CN208122342U
CN208122342U CN201820512228.2U CN201820512228U CN208122342U CN 208122342 U CN208122342 U CN 208122342U CN 201820512228 U CN201820512228 U CN 201820512228U CN 208122342 U CN208122342 U CN 208122342U
Authority
CN
China
Prior art keywords
lightweight wall
wallboard
trolley
arm
ground rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820512228.2U
Other languages
Chinese (zh)
Inventor
盛于洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongxiang Zhong Zhuo Metal Component Co Ltd
Original Assignee
Tongxiang Zhong Zhuo Metal Component Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongxiang Zhong Zhuo Metal Component Co Ltd filed Critical Tongxiang Zhong Zhuo Metal Component Co Ltd
Priority to CN201820512228.2U priority Critical patent/CN208122342U/en
Application granted granted Critical
Publication of CN208122342U publication Critical patent/CN208122342U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of assembled lightweight wall panels to install equipment.Including ground rail, trolley, card wheel, vertical arm, horizontal arm, wallboard card slot frame and fixing bolt;Ground rail is equipped on ground, parallel laid is moved towards in ground rail and wallboard installation, and trolley bottom is equipped with card wheel, and card wheel is connected on ground rail;Vertical arm fixed vertically is installed, horizontal arm one end is hingedly connected to the top of vertical arm, and the horizontal arm other end is fixed with wallboard card slot frame, and the fixing bolt fixed for lightweight wall plate installation is equipped on wallboard card slot frame on trolley.The utility model simple structure, process be few, convenient and quick construction, can be widely applied in the installation technology of steel house lightweight wall plate.

Description

A kind of assembled lightweight wall panel installation equipment
Technical field
The utility model relates to a kind of assembled lightweight wall panels to install equipment, can be widely applied to steel house light weight wall In the installation technology of plate.
Background technique
The characteristics of steel house is high-strength light, and anti-seismic performance is good.Wall in steel house also mostly uses lightweight Material.Common light wall material has air-entrained concrete building block, lightweight composite strip plate, air entrained concrete batten, haydite coagulation Native batten, compound big plate etc..
The width of currently used light lath is generally 600mm, and the length of some light laths is full-length 2440mm, some are customized length.Since the density of material of light lath is small, the weight of monolithic wallboard be can be convenient manually Carrying and installation.Lightweight wall plate is a kind of industrialized product, is fabricated to finished product in factory, and the quality stabilization of bulk article can It leans on.The overall installation speed of lightweight wall plate at the scene is faster than the speed of blockwork, saves manually, is a kind of preferable assembled wall Body.
In national standard《Assembled architecture evaluation criterion》In, wall is distinctly claimed using non-masonry, it is desirable that the ratio of masonry For example no more than certain ratio, this is also the requirement from specification level to assembled light wall.
The installation of wallboard at present needs to smear slurry, wall by wallboard cutting, wall board conveying, edge joint position based on manually installed The processes such as plate is in place, shake shove, wallboard adjustment is carried out according to flatness, fixed wallboard, filleting processing, each link have compared with High technical requirements, the construction technology for needing installer to have comparison consummate are horizontal.
The final installation quality of lightweight wall plate, with the technological level of installer, construction process management, construction quality management Etc. related.Different installer's speed of applications is different, and construction quality is also irregular, if process management in batch construction It is not in place, it may appear that some quality problems.
The construction of assembled in situization required by assembled architecture needs assembly of more constructing, benefit from the point of view of long term growth It is manually installed to replace with mechanical and equipment, it can both save manually, and can also be improved construction efficiency, and guarantee the matter of installation Amount accelerates the speed of construction, improves productivity.Currently, the installation equipment of lightweight wall plate occurs not yet.
Utility model content
In order to cooperate the construction and installation of the fast and high quality of lightweight wall in steel house, the utility model discloses one Kind assembled lightweight wall panel installs equipment, and the simple in equipment is easy to operate, and simple process, process are few, site operation is fast Victory, reliable in quality can be widely applied in the installation technology of steel house lightweight wall plate.
The technical solution adopted in the utility model is:
The utility model includes ground rail, trolley, card wheel, vertical arm, horizontal arm, wallboard card slot frame and fixing bolt; Ground rail is equipped on ground, parallel laid is moved towards in ground rail and wallboard installation, and trolley bottom is equipped with card wheel, card wheel connection In on ground rail;Vertical arm fixed vertically is installed, horizontal arm one end is hingedly connected to the top of vertical arm, water on trolley The flat arm other end is fixed with wallboard card slot frame, and the fixing bolt fixed for lightweight wall plate installation is equipped on wallboard card slot frame.
The horizontal arm is rotated around vertical arm top in horizontal plane, and then drives the end fixed wallboard card slot of horizontal arm Frame is in horizontal plane roto-translation movement.
The lightweight wall plate is placed in wallboard card slot frame and tightens fix tightly by fixing bolt.
It is walked by card wheel supporting trolley along ground rail.
Two ground rails are equipped on ground, trolley two sides of the bottom are equipped with card wheel, and the card wheel of two sides is connected to Two ground rails.
The utility model has the beneficial effects that:
1, equipment is simple.Live unwrapping wire determines track, and track is fixed and trolley installation is all very easy, the processes such as wallboard installation Operation it is more flexible.
2, working procedure is simple.The only processes such as loading board, rotation, jam-packed fixation, it is simple that plurality of plates repeats process.
3, reliable in quality.It is straight due to track, thus the position of every block of plate be all it is pinpoint along unwrapping wire, plate hangs down Straight degree and flatness are controlled by equipment, accurately more reliable than manually installed quality.
4, speed of application is fast.Most of loading board, positioning, the work of jam-packed are done by equipment, save the physical strength of worker, can be with The speed of construction is improved, with artificial loading board ratio, production efficiency is greatly improved.
Detailed description of the invention
Fig. 1 is assembled lightweight wall panel installation equipment elevation;
Fig. 2 is horizontal arm and wallboard rotation preceding equipment plan view in place;
Fig. 3 is the equipment plan view after horizontal arm and wallboard rotation in place.
In figure:1, ground rail;2, trolley;3, card wheel;4, vertical arm;5, horizontal arm;6, wallboard card slot frame;7, fixed spiral shell Bolt;8, lightweight wall plate.
Specific embodiment
With reference to the accompanying drawing and specific embodiment is described in further detail the utility model.
As shown in Figure 1, present invention specific implementation includes ground rail 1, trolley 2, card wheel 3, vertical arm 4, horizontal arm 5, wall Board slot frame 6 and fixing bolt 7;Two ground rails 1 are equipped on ground, 2 two sides of the bottom of trolley are equipped with card wheel 3, two sides Card wheel 3 be connected to two ground rails 1, parallel laid is moved towards in ground rail 1 and wallboard installation, and 2 bottom of trolley is equipped with Card wheel 3, card wheel 3 are connected on ground rail 1;It is walked by 3 supporting trolley 2 of card wheel along ground rail 1.
Vertical arm 4 fixed vertically is installed, vertical arm is fixed, 5 one end of horizontal arm articulated connection on trolley On the top of vertical arm 4,5 other end of horizontal arm is fixed with wallboard card slot frame 6, is equipped on wallboard card slot frame 6 for light weight wall Plate 8 installs fixed fixing bolt 7.Horizontal arm 5 is rotated around vertical 4 top of arm in horizontal plane, and then drives 5 end of horizontal arm solid Fixed wallboard card slot frame 6 is in horizontal plane roto-translation movement.Lightweight wall plate 8 is placed in wallboard card slot frame 6 and by fixed spiral shell Bolt 7 tightens fix tightly.
The work progress of wallboard installation equipment of the present invention is as follows:
Firstly, ground rail 1 is laid by design route, as shown in Fig. 2, the walking of trolley 2 is on ground rail 1;
Then, horizontal arm 5 is rotated to parallel with ground rail 1, lightweight wall plate 8 is installed in wallboard card slot frame 6, and It is fixed with fixing bolt 7;
Then, after lightweight wall plate 8 is constructed required material and technological preparation, the walking of trolley 2 is moved to target position It sets, the wallboard installation place that lightweight wall plate 8 is moved to target position by rotation horizontal arm 5 is in place, will be one piece on 8 jam-packed of lightweight wall plate Lightweight wall plate installation, as shown in figure 3, just completing the installation of one piece of lightweight wall plate 8.
Repeat by above step, installation direction of the trolley in orbit along lightweight wall plate 8 goes ahead, so that it may pacify Install full wafer wall.
Content described in this specification embodiment is only an enumeration of the implementation forms of the utility model concept, this is practical new The protection scope of type should not be construed as being limited to the specific forms stated in the embodiments, the protection scope of the utility model also and In those skilled in the art according to the utility model design it is conceivable that equivalent technologies mean.

Claims (5)

1. a kind of assembled lightweight wall panel installs equipment, it is characterised in that:Including ground rail (1), trolley (2), card wheel (3), Vertical arm (4), horizontal arm (5), wallboard card slot frame (6) and fixing bolt (7);Ground rail (1), ground rail are equipped on ground Parallel laid is moved towards in road (1) and wallboard installation, and trolley (2) bottom is equipped with card wheel (3), and card wheel (3) is connected to ground rail (1) On;Vertical arm (4) fixed vertically is installed, horizontal arm (5) one end is hingedly connected to the top of vertical arm (4), water on trolley Flat arm (5) other end is fixed with wallboard card slot frame (6), is equipped with to install for lightweight wall plate (8) on wallboard card slot frame (6) and fix Fixing bolt (7).
2. a kind of assembled lightweight wall panel according to claim 1 installs equipment, it is characterised in that:
The horizontal arm (5) is rotated around vertical arm (4) top in horizontal plane, and then drives horizontal arm (5) end fixed wall Board slot frame (6) is in horizontal plane roto-translation movement.
3. a kind of assembled lightweight wall panel according to claim 1 installs equipment, it is characterised in that:
The lightweight wall plate (8) is placed in wallboard card slot frame (6) and tightens fix tightly by fixing bolt (7).
4. a kind of assembled lightweight wall panel according to claim 1 installs equipment, it is characterised in that:
It is walked by card wheel (3) supporting trolley (2) along ground rail (1).
5. a kind of assembled lightweight wall panel according to claim 1 installs equipment, it is characterised in that:
Two ground rails (1) are equipped on ground, trolley (2) two sides of the bottom are equipped with card wheel (3), the card wheel (3) point of two sides It is not connected to two ground rails (1).
CN201820512228.2U 2018-04-11 2018-04-11 A kind of assembled lightweight wall panel installation equipment Active CN208122342U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820512228.2U CN208122342U (en) 2018-04-11 2018-04-11 A kind of assembled lightweight wall panel installation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820512228.2U CN208122342U (en) 2018-04-11 2018-04-11 A kind of assembled lightweight wall panel installation equipment

Publications (1)

Publication Number Publication Date
CN208122342U true CN208122342U (en) 2018-11-20

Family

ID=64190166

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820512228.2U Active CN208122342U (en) 2018-04-11 2018-04-11 A kind of assembled lightweight wall panel installation equipment

Country Status (1)

Country Link
CN (1) CN208122342U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914823A (en) * 2019-04-15 2019-06-21 谷尚坤 A kind of assembled architecture prefabricated panel installation method
CN115929051A (en) * 2022-10-10 2023-04-07 中国十七冶集团有限公司 Simple transportation and installation auxiliary tool for light partition wall batten for building and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914823A (en) * 2019-04-15 2019-06-21 谷尚坤 A kind of assembled architecture prefabricated panel installation method
CN115929051A (en) * 2022-10-10 2023-04-07 中国十七冶集团有限公司 Simple transportation and installation auxiliary tool for light partition wall batten for building and construction method

Similar Documents

Publication Publication Date Title
CN208122342U (en) A kind of assembled lightweight wall panel installation equipment
CN104929297B (en) A kind of decoration panel installation of ceiling technique
CN107327111A (en) A kind of dried hanging hang structure and finishing systems
CN104153495A (en) Multifunctional lightweight concrete curtain wall connecting structure
CN108952178B (en) Bidirectional angular displacement accumulation lifting method for irregular free-form surface steel roof
CN108952075A (en) Assembled floor leveling structure and installation method
CN110792233A (en) Construction method of large aluminum-magnesium-manganese decorative roof panel
CN204001309U (en) A kind of syndeton of Multi-function light concrete curtain wall
CN203213372U (en) F-shaped hanging piece and suspended ceiling system employing same
CN218758864U (en) No anchor platform of unloading of encorbelmenting
CN206571022U (en) A kind of grafting leveling structure and suspended ceiling device
CN105421656A (en) External wall board installation structure of embedded type steel structure assembled house
CN109441025A (en) A kind of fabricated roofing cornice support rod component, support unit and installation method
CN208718184U (en) Tilt the back of the body bolt system of metope installation curtain wall panel
CN211114323U (en) Suspended ceiling basic unit
CN108240089A (en) Metope component and metope installation method
CN209413151U (en) A kind of fabricated roofing cornice support rod component and support unit
CN208918181U (en) Outer liners wall body structure
CN208502000U (en) A kind of fixation device of stone curtain wall
CN203846721U (en) Novel flexible dry-hanging and supporting system
CN207919819U (en) A kind of steel framework concrete partition
CN208899791U (en) A kind of decoration cladding panel structure
CN208455911U (en) A kind of digital module plaster tablet suspended ceiling that quickly can be produced and install
CN112040344A (en) Remote area communication base station
CN219840255U (en) High stability furred ceiling structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 314500 No. 307, gaoxinxi 1st Road, Tongxiang Development Zone, Tongxiang City, Jiaxing City, Zhejiang Province

Patentee after: Temuxinke (Zhejiang) Metal Structure Co.,Ltd.

Address before: 314515 Zhejiang Jiaxing Tongxiang Gaoqiao Town Xiang Zhuang village Cao Jia Bang (formerly riding Tang brick and tile factory)

Patentee before: TONGXIANG ZHONGZHUO METAL COMPONENTS Co.,Ltd.

CP03 Change of name, title or address