CN208120627U - A kind of side slope protection materials transportation system - Google Patents
A kind of side slope protection materials transportation system Download PDFInfo
- Publication number
- CN208120627U CN208120627U CN201820628000.XU CN201820628000U CN208120627U CN 208120627 U CN208120627 U CN 208120627U CN 201820628000 U CN201820628000 U CN 201820628000U CN 208120627 U CN208120627 U CN 208120627U
- Authority
- CN
- China
- Prior art keywords
- side slope
- conveying track
- track
- transportation system
- support frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
A kind of side slope protection materials transportation system provided by the present application, is related to civil engineering construction technical field.Transportation system includes:Support frame, conveying track, track transverse direction lateral, electrical hoist, guy wire, pulley blocks, travelling bogie.Conveying track is arranged in parallel by support frame and side slope, and support frame supports conveying track, and track transverse direction lateral is arranged between conveying track, to improve the rigidity of transportation system.The top of conveying track is arranged in pulley blocks, and travelling bogie is connect by guy wire with pulley blocks, and electrical hoist acts on travelling bogie by operation guy wire and slides along conveying track, conveys protective materials, returns to homeposition after completing conveying.Side slope protection materials transportation system structure provided by the present application is simple, and easy to operate, form of construction work is simple, highly-safe, strong applicability, the investment that can be saved human and material resources, and reduces job costs, improves transport of materials speed, effectively raises working efficiency.
Description
Technical field
This application involves civil engineering construction technical field more particularly to a kind of side slope materials transportation systems.
Background technique
With the fast development of civil engineering construction, mountain area engineering construction is more and more, slope protection project mountain area engineering
Important component extend mountain area to mountain area slope project is improved and run the period, guaranteeing that mountain area facility is firm has important work
With.In slope protection project construction, after the completion of slope excavating, need that protective materials is delivered to construction using certain tool
Place is constructed with side slope protection works.
When side slope series is less, the mechanical equipments such as loading machine is selected to carry out the transport of protective materials, passes through the dynamic of loading machine
The collective effects such as Force system, hydraulic system, transmission system are loaded into the protective materials in material pocket, are delivered to construction location, material
After unloading, job location is exited, continues protective materials conveying next time;When side slope series is more, the conveying of loading machine
It is height-limited, when transporting using modes such as tower cranes, construction cost is increased, thus protective materials can only be delivered to nearest horse
On road, after continue to convey by the negative modes such as carry of the anti-the back of the hand of worker.
Using in the manner described above, need the cost of used device larger, the heavy workload of worker, working efficiency is low, simultaneously
There is certain damage to the body of worker.The topographic features in some areas are special, loading machine construction not easy to use, such as massif slope
The wet and slippery situation in ground caused by larger or rain and snow weather is spent, there are certain risks for loading machine construction.Thus need to develop one kind
Side slope materials transportation system reduces construction cost to improve working efficiency, increases applicability.
Utility model content
This application provides a kind of side slope protection materials transportation systems, to solve working efficiency existing for Traditional Transportation equipment
Low, the problems such as construction cost is high, applicability is limited.
A kind of side slope protection materials transportation system, including:Support frame, conveying track, track transverse direction lateral, guy wire, cunning
Wheel group, travelling bogie, and the electrical hoist of the conveying track lower position is set;
Wherein, the conveying track is arranged in parallel by support frame as described above and side slope;The track transverse direction lateral setting exists
Between two conveying tracks being parallel to each other;The top of the conveying track is equipped with the pulley blocks;The guy wire is flat
The middle position of two conveying tracks is arranged in row;The guy wire is across the pulley blocks by the travelling bogie and institute
Electrical hoist is stated to link together;The bottom of the travelling bogie is slidably connected with the conveying track.
Optionally, support frame as described above is vertically set in the side slope, and the spacing of two neighboring support frame as described above is 0.5~
5m。
Optionally, one end of the guy wire and the travelling bogie pass through hook connection, the other end and the electric rolling
Raise the reel connection on machine, the pulley blocks of the guy wire across the conveying track top.
Optionally, the spacing between the track transverse direction lateral is 0.3~1m.
Optionally, the height of the side slope is 2~5 grades.
The technical scheme provided by the application includes following advantageous effects:
Compared with prior art, a kind of side slope protection materials transportation system provided by the present application, including:Support frame, transport
Track, track transverse direction lateral, electrical hoist, guy wire, pulley blocks, travelling bogie.Conveying track passes through support frame and side slope
It is arranged in parallel, support frame is arranged perpendicular to side slope, and travelling bogie and conveying track are slidably connected under the action of guy wire, along fortune
It is slided on defeated track, protective materials is delivered to job location, after completing conveying, continued on conveying track and be back to and set out
Ground.The lower part of conveying track is arranged in electrical hoist, connect with pulley blocks, and the rotation of driving pulley group is to drive guy wire
The movement of travelling bogie is realized in folding and unfolding, is arranged in lower position, can be facilitated the operation of worker.It is equipped between two conveying tracks
Track transverse direction lateral can reinforce the intensity of transportation system, guarantee the safety that transportation system uses.Side slope provided by the present application
Protective materials transportation system structure is simple, easy to operate, and form of construction work is simple, highly-safe, strong applicability, can save manpower
The investment of material resources reduces job costs, improves transport of materials speed, effectively raises working efficiency.
Detailed description of the invention
In order to illustrate more clearly of the technical solution of the application, letter will be made to attached drawing needed in the embodiment below
Singly introduce, it should be apparent that, for those of ordinary skills, without any creative labor,
It is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of overall schematic of side slope protection materials transportation system provided by the embodiments of the present application.
Fig. 2 is the connection type of travelling bogie provided by the embodiments of the present application and guy wire.
Description of symbols:1, support frame;2, conveying track;3, track transverse direction lateral;4, electrical hoist;5, wirerope
Line;6, pulley blocks;7, travelling bogie.
Specific embodiment
Attached drawing 1 is please referred to, changes plan and shows the overall schematic of side slope protection materials transportation system provided by the present application.
A kind of side slope protection materials transportation system, including:Support frame 1, conveying track 2, track transverse direction lateral 3, guy wire
5, pulley blocks 6, travelling bogie 7, and the electrical hoist 4 of 2 lower position of conveying track is set.
Wherein, conveying track 2 is arranged in parallel by support frame 1 with side slope;The setting of track transverse direction lateral 3 is mutually flat at two
Between capable conveying track 2;The top of conveying track 2 is equipped with pulley blocks 6;Guy wire 5 is arranged in parallel in two conveying tracks 2
Middle position;Guy wire 5 links together travelling bogie 7 and electrical hoist 4 across pulley blocks 6;The bottom of travelling bogie 7
It is slidably connected with conveying track 2.
Two conveying tracks 2 are parallel to side slope setting, and support frame 1 is arranged between conveying track 2 and side slope, is used to support
Conveying track 2.Support frame 1 includes that longitudinal rod and transverse bar form, and when construction, support frame 1 is fabricated to the knot such as H-shaped, C-shaped in advance
Existing scaffolding steel pipe production common on the market can be selected in structure.It is made by buckle-type or the directly modes such as welding,
Wherein buckle-type is convenient for disassembly and assembly, for the side slope of different characteristics, can adjust at any time to meet operating condition;Direct welded type, it is not readily removable
It unloads, can be considered standard component, meet the side slope without particular/special requirement.One group of support frame 1 is set at interval of certain distance, according to practical work
Journey situation sets support frame 1 at a distance from side slope, such as 0.5~1m is set by distance between the two, by one end of support frame 1
Squeeze into side slope, the exposed other end supports conveying track 2, the spacing of two conveying tracks 2, support frame 1 width need to be with
Travelling bogie 7 matches.
Conveying track 2 generallys use section steel manufacture and forms, such as I-steel, channel steel.
The intensity that transportation system is improved between two conveying tracks 2, each adjacent two rail is arranged in track transverse direction lateral 3
There are a fixed spacing, the setting of the spacing needs to be arranged within limits, no according to construction condition road transverse direction lateral 3
Preferably excessively intensive and evacuation.
Track transverse direction lateral 3 generally selects section steel material to be cut into certain length, and welding manner and conveying track 2 can be selected
Connection.
Electrical hoist 4 plays driving effect in this transportation system, and electrical hoist 4 includes reel, is wound on reel
Guy wire 5, the forward and backward by controlling reel realize that the folding and unfolding of guy wire 5 reaches to realize moving up and down for travelling bogie 7
To the effect of conveying protective materials.
Slope protection project is constructed from bottom to up, and the characteristics of according to mountain area, electrical hoist 4 is suitably arranged at the foot of the hill,
Be exactly the lower part of conveying track 2, fixed on the ground by modes such as earth anchors, can preferably be suitable for mountain area slope height by
Limit, eminence such as can not construct at the engineerings.
After conveying track 2, support frame 1, track transverse direction lateral 3, guy wire 5, pulley blocks 6 etc. are installed in place, selection is suitable
Electrical hoist 4 is fixed in position, is connect by guy wire 5 with travelling bogie, and the protective materials for being located at lower is transported to eminence.
The middle position of two conveying tracks 2 and the middle position of travelling bogie 7, guy wire 5 is arranged in guy wire 5
Folding and unfolding, drive travelling bogie 7 moved up and down along conveying track 2.
The top of conveying track 2 is arranged in pulley blocks 6, is equipped with guy wire 5, pulley blocks 6 between two idler wheels of pulley blocks 6
Setting labour-saving effect is played in transportation system.
The bottom of travelling bogie 7 is slidably connected with conveying track 2, and in 7 bottom of travelling bogie, setting two or four is small-sized
Castor, setting has the card slot of one fixed width on the conveying track 2 contacted with castor, prevents travelling bogie 7 from turning on one's side, and transports
Defeated trolley 7 is moved up and down along conveying track 2 always.
For the side slope of different height, production first has effigurate support frame 1, support frame 1 is fixed on side slope
On, one group is arranged at spacing intervals, the fashioned iron of several certain lengths is welded together, forms conveying track 2, guarantees transport
Height meets construction operating condition, the track transverse direction lateral 3 for being cut into certain length is welded between two conveying tracks 2, then
It is moved to the trapezoidal finished product on support frame 1, is fixed by modes such as buckles.Pulley blocks 6 and electrical hoist 4 are installed,
Travelling bogie 7 is placed on conveying track 2, is connect with guy wire 5.Before formal construction, trial operation is carried out to transportation system,
It is formal to enable after guaranteeing that various aspects are able to satisfy construction requirement.
The ready protective materials of lower is placed into travelling bogie 7, starts electrical hoist 4, reel is according to certain
Direction is with certain rotational speed, and guy wire 5 is tightened, and pulls travelling bogie 7 along the slow upward sliding of conveying track 2, and speed is not
It is preferably too fast, after reaching designated position, electrical hoist 4 out of service.After the completion of material unloading, electrical hoist 4 is restarted,
For the rotation direction of reel on the contrary, guy wire 5 loosens, travelling bogie 7 is slow along conveying track 2 under self gravitation effect at this time
It moves down, until after returning to homeposition, electrical hoist 4 out of service.One time transportational process is completed.
Antirust, anticorrosion layer can be set to the surface of the components such as conveying track 2, track transverse direction lateral 3, travelling bogie 7, with
Improve the service life of transportation system.
A kind of side slope protection materials transportation system provided by the present application, including:Support frame 1, conveying track 2, track are lateral
Lateral 3, electrical hoist 4, guy wire 5, pulley blocks 6, travelling bogie 7.Conveying track 2 is set by the way that support frame 1 is parallel with side slope
It sets, and is supported by support frame 1.Guy wire 5 under the action of electrical hoist 4, drive travelling bogie 7 conveying track 2 to
Protective materials is delivered to eminence by upper sliding, and travelling bogie 7 returns to the lower part of conveying track 2 after completing protective materials conveying,
Complete a transmission process.Track transverse direction lateral 3 is arranged between two conveying tracks 2, strengthens the intensity of transportation system, and
The whole stiff skeleton for forming transportation system, guarantees the safety that transportation system uses.The transportation system structure is simple, operation side
Just, form of construction work is simple, highly-safe, strong applicability, and excessive manual labor is put into without worker, is not necessarily to big equipment investment,
Job costs are reduced, the investment of manpower and material resources is saved, effectively increases working efficiency.
Optionally, support frame 1 is vertically set in side slope, and the spacing of two neighboring support frame 1 is 0.5~5m.
Support frame 1 is vertically arranged with side slope, it is ensured that 2 uniform force of conveying track, support are steady.Two neighboring support frame
1 spacing controls within 0.5~5m, and according to site operation situation, reasonable Arrangement guarantees that primary side slope is not simultaneously maximum by destroying
The rigidity that conveying track 2 is improved in degree, reduces flexibility, guarantees going on smoothly for protective materials conveying.
Optionally, one end of guy wire 5 and travelling bogie 7 pass through hook connection, the other end and the volume on electrical hoist 4
Cylinder connection, pulley blocks 6 of the guy wire 5 across 2 top of conveying track.
One end of guy wire 5 is connect by hook with travelling bogie 7, as shown in Fig. 2, on the other end and electrical hoist 4
Reel connection, the pulley blocks 6 on 2 top of conveying track work as a buffer in transportation system.When electrical hoist 4 drives reel
When rotating forward, guy wire 5 is gradually tightened, and protective materials is transported to eminence by the upward sliding therewith of travelling bogie 7;Work as electricity
When dynamic hoist engine 4 drives reel to rotate backward, guy wire 5 is gradually released, and travelling bogie 7 moves down under the effect of gravity,
Travelling bogie 7 finally revert to homeposition.One time transmission process is completed.
Optionally, the spacing between track transverse direction lateral 3 is 0.3~1m.
Track transverse direction lateral 3 is primarily to increase the intensity of conveying track 2, and form the whole stiffness bone of transportation system
Frame is arranged one group of track transverse direction lateral 3 at interval of 0.3~1m, improves the intensity of conveying track 2, protect according to site operation situation
Card transport is gone on smoothly.
Track transverse direction lateral 3 generallys use all kinds of fashioned iron by cutting production.
Optionally, the height of side slope is 2~5 grades.
The height of single-stage slope is generally 8~9m, and platform at one is equipped with per adjacent two-stage side slope, and the embodiment of the present application provides
Transportation system can preferably be applied to slope height range be 2~5 grades, in the range, protective materials passes through transportation system
It can fast, easily convey, improve working efficiency.
It should be noted that the terms "include", "comprise" or its any other variant are intended to the packet of nonexcludability
Contain, so that article or equipment including a series of elements not only include those elements, but also including not arranging clearly
Other element out, or further include for elements inherent to such a process, method, article, or device.Not more
In the case where limitation, the element that is limited by sentence "including a ...", it is not excluded that including process, the side of the element
There is also other identical elements in method, article or equipment.
The above is only the specific embodiment of the application, is made skilled artisans appreciate that or realizing this Shen
Please.Various modifications to these embodiments will be apparent to one skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the application.Therefore, the application
It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one
The widest scope of cause.
It should be understood that the application is not limited to the content being described above, and its model can not departed from
It encloses and carry out various modifications and change.Scope of the present application is only limited by the accompanying claims.
Claims (5)
1. a kind of side slope protection materials transportation system, which is characterized in that including:Support frame (1), conveying track (2), track are lateral
Lateral (3), guy wire (5), pulley blocks (6), travelling bogie (7), and setting is in the electricity of the conveying track (2) lower position
Dynamic hoist engine (4);
Wherein, the conveying track (2) is arranged in parallel by support frame as described above (1) with side slope;The track transverse direction lateral (3) sets
It sets between the conveying track (2) being parallel to each other at two;The top of the conveying track (2) is equipped with the pulley blocks (6);
The guy wire (5) is arranged in parallel in the middle position of two conveying tracks (2);The guy wire (5) is across the cunning
Wheel group (6) links together the travelling bogie (7) and the electrical hoist (4);The bottom of the travelling bogie (7) with
The conveying track (2) is slidably connected.
2. a kind of side slope protection materials transportation system according to claim 1, which is characterized in that support frame as described above (1) hangs down
Straight to be arranged in the side slope, the spacing of two neighboring support frame as described above (1) is 0.5~5m.
3. a kind of side slope protection materials transportation system according to claim 1, which is characterized in that the guy wire (5)
By hook connection, the other end is connect with the reel on the electrical hoist (4), described for one end and the travelling bogie (7)
The pulley blocks (6) of the guy wire (5) across the conveying track (2) top.
4. a kind of side slope protection materials transportation system according to claim 1, which is characterized in that the track transverse direction lateral
(3) spacing between is 0.3~1m.
5. a kind of side slope protection materials transportation system according to claim 1, which is characterized in that the height of the side slope is
2~5 grades.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820628000.XU CN208120627U (en) | 2018-04-28 | 2018-04-28 | A kind of side slope protection materials transportation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820628000.XU CN208120627U (en) | 2018-04-28 | 2018-04-28 | A kind of side slope protection materials transportation system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208120627U true CN208120627U (en) | 2018-11-20 |
Family
ID=64186897
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820628000.XU Active CN208120627U (en) | 2018-04-28 | 2018-04-28 | A kind of side slope protection materials transportation system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208120627U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110406926A (en) * | 2019-07-16 | 2019-11-05 | 中冶天工集团有限公司 | A kind of narrow space mentions native formula building foundation pit and drops native device and its application method |
CN112352595A (en) * | 2020-11-10 | 2021-02-12 | 华南农业大学 | Rail transport system of supplementary planting wax gourd |
-
2018
- 2018-04-28 CN CN201820628000.XU patent/CN208120627U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110406926A (en) * | 2019-07-16 | 2019-11-05 | 中冶天工集团有限公司 | A kind of narrow space mentions native formula building foundation pit and drops native device and its application method |
CN112352595A (en) * | 2020-11-10 | 2021-02-12 | 华南农业大学 | Rail transport system of supplementary planting wax gourd |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203269274U (en) | Slope section rail type conveying device | |
CN105083867B (en) | Free-discharging rotary displacement conveyor for tailing discharge and use method thereof | |
CN102501853B (en) | Steel wire rope pull type mountain orchard freight machine | |
CN101475003B (en) | Railway bed laying emergency stone self-discharging train | |
CN208120627U (en) | A kind of side slope protection materials transportation system | |
CN108468554A (en) | The mechanical laying method of tunnel trolley and earth water-proof plate and two lining longitudinal reinforcements | |
US20130206031A1 (en) | Railway track construction method | |
CN102349369A (en) | Paddy field general walking device | |
CN109930435A (en) | Straddle-type monorail PC track beam construction method in a kind of circular cross section tunnel | |
CN107161891A (en) | A kind of handling machinery manually adjusts steering mechanism | |
CN102602398B (en) | Quick-transporting method and quick-transport device for foldable temporary cableways | |
JP6636955B2 (en) | Portal scraper with carrier structure based on truss structure | |
CN111636914A (en) | Construction method for integrating transportation and erection of straddle type monorail PC track beam in circular-section tunnel | |
CN106050265A (en) | Full-automatic hydraulic self-propelled caterpillar trestle | |
CN203581022U (en) | GIS (geographic information system) equipment conveying device | |
CN203270582U (en) | Electric-climbing material conveying device | |
CN201941770U (en) | Curve transport cableway system | |
CN207957486U (en) | A kind of mine lift Transportation Engineering mechanical equipment | |
CN101289941A (en) | Multi-pit car type second conveyor | |
CN203877784U (en) | Semi-rubber-tired gantry crane with electric hoist | |
CN205526362U (en) | Prefab travelling bogie | |
CN209875170U (en) | Rail-mounted slurry spraying mine car for primary support of large-slope inclined shaft | |
CN209396449U (en) | A kind of rail type mobile system traversing for arc steel lagging jack | |
CN202130917U (en) | Cable moving device for mine shaft | |
CN205526358U (en) | Prefab production conveyor system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |