CN208105248U - A kind of road and bridge firmly base - Google Patents
A kind of road and bridge firmly base Download PDFInfo
- Publication number
- CN208105248U CN208105248U CN201721787500.XU CN201721787500U CN208105248U CN 208105248 U CN208105248 U CN 208105248U CN 201721787500 U CN201721787500 U CN 201721787500U CN 208105248 U CN208105248 U CN 208105248U
- Authority
- CN
- China
- Prior art keywords
- fixed
- jack
- fixed plate
- bridge
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000002002 slurry Substances 0.000 claims abstract description 21
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 17
- 239000010959 steel Substances 0.000 claims abstract description 17
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 9
- 238000003780 insertion Methods 0.000 claims abstract description 4
- 230000037431 insertion Effects 0.000 claims abstract description 4
- 239000007787 solid Substances 0.000 claims description 4
- 239000004568 cement Substances 0.000 abstract description 13
- 239000002689 soil Substances 0.000 abstract description 8
- 230000000694 effects Effects 0.000 abstract description 4
- 238000010276 construction Methods 0.000 abstract description 3
- 230000010410 reperfusion Effects 0.000 abstract description 3
- 238000007711 solidification Methods 0.000 abstract description 2
- 230000008023 solidification Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000009738 saturating Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of road and bridge firmly bases, including ground basic body, the middle position of ground body bottom portion is fixed with jack fixed plate, and jack fixed plate is in " cuboid " shape, the both ends of the fixed plate top surface of jack are fixed with bored concrete pile fixed plate, and bored concrete pile fixed plate and jack fixed plate are laterally vertical, the rear and front end of bored concrete pile fixed plate bottom surface is fixed with bored concrete pile.The ground basic body is additionally provided with bored concrete pile, bored concrete pile is equipped with fixed steel bars, when being fixed on inside ground, fixed steel bars will be inserted into the soil outside ground, then concrete cement is poured into pile pipe from perfusing hole, the outside of pile pipe is equipped with slurry outlet, slurry outlet appears cement, cement appears in ground, it carries out merging solidification with the cement in ground, the problem of playing good fixed effect, solving previous Bridge Foundation bottom and be the construction method using reinforcing bar insertion Reperfu- sion cement, lead to the offset of bridge.
Description
Technical field
The utility model relates to foundation technical field, specially a kind of road and bridge firmly base.
Background technique
Ground refers to the soil body or rock mass of supporting base below building.Soil layer as building lot is divided into rock, broken
Stone soil, sand, silt, cohesive soil and artificial earth fill.Ground has two class of subsoil and artificial foundation's (composite foundation).Natively
Base is the natural soil layer for being not required to very important person's reinforcing.Artificial foundation needs people's consolidation process, common to have aggregate chips bed course, sand bedding course, mixing
Grey earthen backfill is tamped again.
But the fixed stress of existing Bridge Foundation is not uniform enough, and the bottom of bridge can be not in place because of an angle fixation when fixed
And collapse, do not have the performance of good dispersion force, and existing Bridge Foundation bottom is to be inserted into Reperfu- sion using reinforcing bar
The construction method of cement, reinforcing bar is not secured enough, used long afterwards can torsional deformation, lead to the offset of bridge.
Utility model content
The purpose of this utility model is to provide a kind of road and bridge firmly bases, are proposed with solving above-mentioned background technique
The fixed stress of Bridge Foundation it is not uniform enough, used long afterwards can torsional deformation, the problem of will lead to the offset of bridge.
To achieve the above object, the utility model provides the following technical solutions:A kind of road and bridge firmly base, including
Ground basic body, the middle position of the ground body bottom portion is fixed with jack fixed plate, and jack fixed plate is in " rectangular
The both ends of body " shape, the fixed plate top surface of the jack are fixed with bored concrete pile fixed plate, and bored concrete pile fixed plate and jack
Fixed plate is laterally vertical, and the rear and front end of bored concrete pile fixed plate bottom surface is fixed with bored concrete pile, and the jack is fixed
The middle position in board bottom face is fixed with connecting column and jack, and jack and jack fixed plate connect by the way that connecting column is fixed
It connecing, the outer surface of the bored concrete pile is equipped with pile pipe, and pile pipe is in " cylindrical body " shape, and the top of the pile pipe is equipped with perfusing hole,
And perfusing hole perforation is set in pile pipe, the top surface of described ground basic body quadrangle is equipped with stressed plate, and stressed plate is by intensity height
Reinforcing bar be made, the top surface of the stressed plate is fixed with bridge column fixed bit, and the top surface of the bridge column fixed bit is equipped with solid
Determine mouth, and fixing port insertion is set in bridge column fixed bit, the bottom surface of described ground basic body is equipped with middle part stress fixed bit, and
Middle part stress fixed bit is in " circle " shape.
Preferably, the outside of the pile pipe is equipped with slurry outlet, and slurry outlet is in " circle " shape.
Preferably, fixed steel bars are equipped between the adjacent slurry outlet, and fixed steel bars are in " strip " shape.
Preferably, the bottom of the jack is equipped with fixed column, and fixed column is in " cylindrical body " shape.
Preferably, the bottom surface of the fixed column is fixed with single pile.
Compared with prior art the utility model has the beneficial effects that:This kind of road and bridge firmly base, is provided with thousand
Jin top, jack fixed plate and bored concrete pile fixed plate, select the bored concrete pile fixed plate of same ability to bear, jack fixed plate and
Single pile is squeezed into ground end, fixed column is embedded in single pile by jack, and single pile can prevent the offset of fixed column, then solid
Jack is fixed in fixed column top surface, and jack can uniformly bear the weight of bridge, and the progress of the weight of bridge is evenly dispersed, can
Collapsing for bridge is prevented, then connects jack and jack fixed plate with connecting column, then bored concrete pile fixed plate level is fixed
It is equipped with stressed plate at the both ends of the fixed plate top surface of jack, the fixed plate top surface of bored concrete pile, the strength of bridge can be dispersed in stressed plate,
The top surface of stressed plate is fixed with circular bridge column fixed bit, and bridge column fixed bit is in a recess shape, and bridge is fixed to
On bridge column fixed bit, by fixed workpiece connecting bridge beam and fixing port, fixation can be completed, the ground basic body is perpendicular horizontal solid
Fixed, jack can be good at support entirely basic body, and realizing prevents bridge from deviating, and have the effect of uniform force, solve
Previous Bridge Foundation of having determined is unstable, and discontinuity leads to the problem of collapsing, which is additionally provided with bored concrete pile, bored concrete pile
Outside be made of pile pipe, the outside of pile pipe is equipped with slurry outlet, and slurry outlet is in " circle " shape, adjacent slurry outlet it
Between be equipped with fixed steel bars, and fixed steel bars are in " strip " shape, and bored concrete pile is arranged in the Corner Strapped of ground, when being fixed on ground
When inside base, fixed steel bars will be inserted into the soil outside ground, is then poured into concrete cement in pile pipe from perfusing hole, stake
The outside of pipe is equipped with slurry outlet, and slurry outlet appears cement, and cement appears in ground, merge with the cement in ground solidifying
Gu catching ground, good fixed effect is played, solving previous Bridge Foundation bottom is to be inserted into Reperfu- sion water using reinforcing bar
The construction method of mud, reinforcing bar is not secured enough, used long afterwards can torsional deformation, the problem of will lead to the offset of bridge.
Detailed description of the invention
Fig. 1 is the utility model overall structure diagram;
Fig. 2 for the utility model basic body top view;
Fig. 3 is the utility model filling pile structure schematic diagram.
In figure:1, jack fixed plate, 2, bored concrete pile fixed plate, 3, bored concrete pile, 4, connecting column, 5, jack, 6, fixation
Column, 7, single pile, 8, fixed steel bars, 9, slurry outlet, 10, pile pipe, 11, perfusing hole, 12, bridge column fixed bit, 13, fixing port,
14, stressed plate, 15, basic body, 16, middle part stress fixed bit.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment, based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1 to 3 is please referred to, the utility model provides a kind of technical solution:A kind of road and bridge firmly base, including thousand
Jin top fixed plate 1, bored concrete pile fixed plate 2, bored concrete pile 3, connecting column 4, jack 5, fixed column 6, single pile 7, fixed steel bars 8, mud
Slurry outlet 9, pile pipe 10, perfusing hole 11, bridge column fixed bit 12, fixing port 13, stressed plate 14, basic body 15 and middle part stress
Fixed bit 16, the middle position of 15 bottom of ground basic body is fixed with jack fixed plate 1, and jack fixed plate 1 is in " rectangular
Body " shape, the both ends of 1 top surface of jack fixed plate are fixed with bored concrete pile fixed plate 2, and bored concrete pile fixed plate 2 and jack
Fixed plate 1 is laterally vertical, and the rear and front end of 2 bottom surface of bored concrete pile fixed plate is fixed with bored concrete pile 3,1 bottom of jack fixed plate
The middle position in face is fixed with connecting column 4 and jack 5, and jack 5 and jack fixed plate 1 are fixed by connecting column 4
Connection, the outer surface of bored concrete pile 3 is equipped with pile pipe 10, and pile pipe 10 is in " cylindrical body " shape, and the top of pile pipe 10 is equipped with perfusing hole
11, and the perforation of perfusing hole 11 is set in pile pipe 10, the top surface that 15 4 jiaos of ground basic body is equipped with stressed plate 14, and stressed plate 14
It is made of the high reinforcing bar of intensity, the top surface of stressed plate 14 is fixed with bridge column fixed bit 12, the top surface of bridge column fixed bit 12
Equipped with fixing port 13, and the insertion of fixing port 13 is set in bridge column fixed bit 12, the bottom surface of ground basic body 15 be equipped with middle part by
Power fixed bit 16, and middle part stress fixed bit 16 is in " circle " shape, the outside of pile pipe 10 is equipped with slurry outlet 9, and mud goes out
Mouthfuls 9 be in " circle " shape, and slurry outlet 9 can appear concrete mud, mud flows out parch after by entire bored concrete pile 3 and ground
It is merged, has the function that fixed, be equipped with fixed steel bars 8 between adjacent slurry outlet 9, and fixed steel bars 8 are in " strip "
Shape, fixed steel bars 8 are inserted into ground, and ground, which is fixed, prevents bored concrete pile 3 from shifting, and the bottom of jack 5 is equipped with
Fixed column 6, and fixed column 6 is in " cylindrical body " shape, fixed column 6 can be good at support jack 5, disperse the power of entire ground
Amount plays the role of evenly dispersed power, and the bottom surface of fixed column 6 is fixed with single pile 7, and single pile 7 is inserted into ground bottom surface, with ground end
Face is preferably merged, and efficient fixed function is played.
Working principle:Firstly, choosing the region for needing to construct, the size of ground is measured, then according to the weight of bridge
Amount, selects the bored concrete pile fixed plate 2, jack fixed plate 1 and jack 5 of same ability to bear, single pile 7 is squeezed into ground end, will
Fixed column 6 is embedded in single pile 7, and single pile 7 can prevent the offset of fixed column 6, then fixes jack 5 in 6 top surface of fixed column,
Jack 5 can uniformly bear the weight of bridge, and the progress of the weight of bridge is evenly dispersed, can prevent collapsing for bridge, connect
Connect jack 5 and jack fixed plate 1 with connecting column 4, then bored concrete pile 3 is set in the Corner Strapped of ground, on bored concrete pile 3
Equipped with fixed steel bars 8, when being fixed on inside ground, fixed steel bars 8 will be inserted into the soil outside ground, then by concrete water
Mud is poured into pile pipe 10 from perfusing hole 11, and the outside of pile pipe 10 is equipped with slurry outlet 9, and slurry outlet 9 appears cement, and cement is saturating
It out in ground, carries out merging solidification with the cement in ground, catches ground, play good fixed effect, then bored concrete pile is consolidated
Fixed board 2 is horizontally fixed on 1 top surface of jack fixed plate, and the both ends of 2 top surface of bored concrete pile fixed plate are equipped with stressed plate 14, stressed plate
The strength of 14 dispersible bridges, the top surface of stressed plate 14 are fixed with circular bridge column fixed bit 12, and bridge column fixed bit 12 is in
One recess shape, bridge is fixed on bridge column fixed bit 12, can be complete by fixed workpiece connecting bridge beam and fixing port 13
At fixation.
Although the utility model is described in detail with reference to the foregoing embodiments, come for those skilled in the art
Say, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic into
Row equivalent replacement, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should all
It is included within the scope of protection of this utility model.
Claims (5)
1. a kind of road and bridge firmly base, including jack fixed plate (1), bored concrete pile fixed plate (2), bored concrete pile (3), company
Connect column (4), jack (5), fixed column (6), single pile (7), fixed steel bars (8), slurry outlet (9), pile pipe (10), perfusing hole
(11), bridge column fixed bit (12), fixing port (13), stressed plate (14), basic body (15) and middle part stress fixed bit (16),
It is characterized in that:The middle position of described ground basic body (15) bottom is fixed with jack fixed plate (1), and jack is fixed
Plate (1) is in " cuboid " shape, and the both ends of jack fixed plate (1) top surface are fixed with bored concrete pile fixed plate (2), and is filled
Note stake fixed plate (2) is laterally vertical with jack fixed plate (1), and the rear and front end of bored concrete pile fixed plate (2) bottom surface is solid
Surely bored concrete pile (3) are equipped with, the middle position of jack fixed plate (1) bottom surface is fixed with connecting column (4) and jack
(5), and jack (5) is fixedly connected with jack fixed plate (1) by connecting column (4), and the outer surface of the bored concrete pile (3) is set
Have pile pipe (10), and pile pipe (10) is in " cylindrical body " shape, the top of the pile pipe (10) is equipped with perfusing hole (11), and perfusing hole
(11) perforation is set in pile pipe (10), and the top surface of described ground basic body (15) quadrangle is equipped with stressed plate (14), and stressed plate
(14) it is made of the high reinforcing bar of intensity, the top surface of the stressed plate (14) is fixed with bridge column fixed bit (12), the bridge
The top surface of column fixed bit (12) is equipped with fixing port (13), and fixing port (13) insertion is set in bridge column fixed bit (12), institute
The bottom surface for stating ground basic body (15) is equipped with middle part stress fixed bit (16), and middle part stress fixed bit (16) is in " circle " shape.
2. a kind of road and bridge according to claim 1 firmly base, it is characterised in that:The outside of the pile pipe (10)
Equipped with slurry outlet (9), and slurry outlet (9) is in " circle " shape.
3. a kind of road and bridge according to claim 2 firmly base, it is characterised in that:The adjacent slurry outlet
(9) it is equipped between fixed steel bars (8), and fixed steel bars (8) are in " strip " shape.
4. a kind of road and bridge according to claim 1 firmly base, it is characterised in that:The bottom of the jack (5)
Portion is equipped with fixed column (6), and fixed column (6) is in " cylindrical body " shape.
5. a kind of road and bridge according to claim 4 firmly base, it is characterised in that:The bottom of the fixed column (6)
Face is fixed with single pile (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721787500.XU CN208105248U (en) | 2017-12-20 | 2017-12-20 | A kind of road and bridge firmly base |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721787500.XU CN208105248U (en) | 2017-12-20 | 2017-12-20 | A kind of road and bridge firmly base |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208105248U true CN208105248U (en) | 2018-11-16 |
Family
ID=64130971
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721787500.XU Expired - Fee Related CN208105248U (en) | 2017-12-20 | 2017-12-20 | A kind of road and bridge firmly base |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208105248U (en) |
-
2017
- 2017-12-20 CN CN201721787500.XU patent/CN208105248U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103485363B (en) | Three-dimensional continuous frame formula reinforced concrete structure retaining wall | |
CN102352632B (en) | Anchor rod sheet pile combined structure and method for reinforcing high filling body on one side of slope | |
CN203174619U (en) | Reverse raft concrete terrace | |
CN110374134A (en) | A kind of combined member increased suitable for retaining wall and construction method | |
CN110685286A (en) | Deep foundation pit supporting construction process for adjacent road under complex geological condition | |
CN109252542B (en) | Tree root pile light retaining wall for road widening and construction method thereof | |
CN201770942U (en) | Support for soft soil foundation cast-in-place concrete continuous beam bridge | |
CN218813730U (en) | Pebble base course capable of reducing loss rate of pile foundation poured concrete | |
CN102864796B (en) | Construction spreading foundation adaptive to filled ground settlement and construction method | |
CN105804101B (en) | Reduce off-loading supporting and retaining system system and construction method and the application of retaining structure stress | |
CN108978698A (en) | A kind of building pile foundation construction method | |
CN112696049A (en) | Ancient city wall reinforcing counter-force device and using method thereof | |
CN208105248U (en) | A kind of road and bridge firmly base | |
CN207878441U (en) | A kind of ruggedized construction of soft soil foundation | |
CN207714357U (en) | A kind of mountainous region reinforcement type iron tower foundation | |
CN208981337U (en) | Tunnel immediately adjacent to bridge section deep foundation pit supporting structure | |
CN208039294U (en) | A kind of compound raft foundation of resistance to deformation suitable for goaf building | |
CN203007761U (en) | Grouting reinforcement structure for steel floral tube of existing railway roadbed under operation condition | |
CN203498863U (en) | Three-dimensional continuous-frame-type reinforced concrete structural retaining wall | |
CN206844135U (en) | A kind of cofferdam | |
CN109555166A (en) | A kind of Rubber Concrete is coupled inclination Vibration Isolation by Piles in Rows barrier and production method | |
CN213772759U (en) | Building engineering foundation | |
CN209538212U (en) | A kind of anti-horizontal displacement radical combination soil-baffling structure | |
CN207973953U (en) | A kind of thick collapsible loess subgrade groundwork structure | |
CN210507517U (en) | Combined member suitable for retaining wall heightening |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190409 Address after: 411200 Building 3, 16A, Famous Capital, North of Tianyi Road, Yiyihe Town, Xiangtan County, Hunan Province Patentee after: Hunan Xiangrui Traffic Engineering Co., Ltd. Address before: 510000 12 Whampoa 202, Wenyuan village, Wenchong street, Whampoa District, Guangzhou, China Patentee before: Zheng Zefeng |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181116 Termination date: 20201220 |