CN208082767U - Coating equipment for Large bridge tunnel steel immersed tube outer surface - Google Patents

Coating equipment for Large bridge tunnel steel immersed tube outer surface Download PDF

Info

Publication number
CN208082767U
CN208082767U CN201820069586.0U CN201820069586U CN208082767U CN 208082767 U CN208082767 U CN 208082767U CN 201820069586 U CN201820069586 U CN 201820069586U CN 208082767 U CN208082767 U CN 208082767U
Authority
CN
China
Prior art keywords
spraying
top surface
ball blast
immersed tube
steel immersed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820069586.0U
Other languages
Chinese (zh)
Inventor
倪雅
李紫跃
左新龙
刘国彬
周春侠
赵青青
王金明
周忠振
孟凡浩
高昊
邵宁
闵亮
徐迪
张安永
陈天健
刘贞
冷阳光
许丽丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU CUMT DAZHENG SURFACE ENGINEERING TECHNOLOGY CO LTD
Original Assignee
JIANGSU CUMT DAZHENG SURFACE ENGINEERING TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU CUMT DAZHENG SURFACE ENGINEERING TECHNOLOGY CO LTD filed Critical JIANGSU CUMT DAZHENG SURFACE ENGINEERING TECHNOLOGY CO LTD
Priority to CN201820069586.0U priority Critical patent/CN208082767U/en
Application granted granted Critical
Publication of CN208082767U publication Critical patent/CN208082767U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of coating equipment for Large bridge tunnel steel immersed tube outer surface, belongs between bridge tunnel technical field of construction, including sequentially connected impeller blasting pre-treatment, between compartment and spraying;Peener is equipped in the impeller blasting pre-treatment, the side for steel immersed tube and top surface impeller blasting;Spray equipment is equipped in the spraying, for the side of steel immersed tube and top surface spraying;Between the impeller blasting pre-treatment, it is built-up by bearing diagonal at the top of Steel Structure column, Steel Structure horizontal support and Steel Structure between compartment and spraying, the Steel Structure column is equipped with mobile beam orbit.The coating equipment of the utility model uses the Production Line Configured of three compartment of a workshop two-step, it can ensure that small segment steel immersed tube derusting, spraying two procedures are completed in closed workshop, and by being transported in compartment between two procedures, avoiding transition from open-pit fortune from waiting influences the steel structure surface after derusting.

Description

Coating equipment for Large bridge tunnel steel immersed tube outer surface
Technical field
The utility model is related to a kind of coating equipments for Large bridge tunnel steel immersed tube outer surface, belong to bridge tunnel construction technology Field.
Background technology
Bridge tunnel construction is the important engineering of complicated network of communication lines strategical planning, concerning the national matter of fundamental importance.Structural steelwork, which has, to be applied The features such as work speed is fast, load-bearing capacity is strong, use is relatively broad.And the disadvantage of large-scale steel structure corrosion resistance difference, after causing Phase safeguards that more difficulty, durability guarantee are the important consideration factor of bridge bulk life time design, protective coating form of construction work There is very important influence to painting quality and working efficiency etc..
By taking Large bridge tunnel Painting Construction of Steel Structures as an example, there are many defects.Taking human as main application mode, in bridge tunnel steel It is more universal in structure application workshop.Wherein, material be sufficiently mixed, accurately proportioning etc. preliminary preparations, Personnel Dependence compared with By force;Secondly, though more common small air, airless spraying equipment mobility are strong, in coating formula, i.e. spray, spraying swath are mixed Control and long-time stability operation etc. performance are insufficient, and coating quality is by the uncontrollability shadow of personnel's skill level It rings greatly, it is difficult to ensure bridge tunnel steel construction large area coating quality.
Large-scale application, category world the first, standard tube coupling are 46 meters wide for the first time to steel immersed tube for the seabed tunnel in channel in depth Width, 10.6 meters of height also lean on world forefront, the protective coating construction for the steel immersed tube upstream face being placed in the adverse circumstances of seabed just to seem It is increasingly important.
Invention content
In view of the above-mentioned problems of the prior art, the utility model, which provides one kind, being used for Large bridge tunnel steel immersed tube outer surface Coating equipment, effective guarantee coating quality, improve construction efficiency.
To achieve the goals above, a kind of painting for Large bridge tunnel steel immersed tube outer surface that the utility model uses is installed It is standby, including between sequentially connected impeller blasting pre-treatment, between compartment and spraying;
Peener is equipped in the impeller blasting pre-treatment, the side for steel immersed tube and top surface impeller blasting;Institute It states and is equipped with spray equipment in spraying, for the side of steel immersed tube and top surface spraying;
Between the impeller blasting pre-treatment, between compartment and spraying by Steel Structure column, Steel Structure horizontal support and steel structure Top of the trellis bearing diagonal is built-up, and the Steel Structure column is equipped with mobile beam orbit.
As an improvement, being equipped with the top surface ball blast moving beam being erected on mobile beam orbit in the impeller blasting pre-treatment With side ball blast moving beam, the top surface, side ball blast moving beam can be vertically moved along beam orbit is moved;
The peener include be mounted on the top surface ball blast moving beam on top surface peener and be mounted on side Side peener on ball blast moving beam.
As an improvement, the top surface peener includes top surface ball blast head, top surface ball blast mechanical arm;
The top surface ball blast moving beam is equipped with ball blast transverse moving mechanism, and the top surface ball blast mechanical arm is horizontal with ball blast It is connected to mobile mechanism, realizes all standing of small segment steel immersed tube top surface ball blast job area.
As an improvement, the side peener includes the side ball blast manipulator bolted on side ball blast telescopic arm one Arm and side ball blast head;
Ball blast transverse moving mechanism, the side ball blast telescopic arm one and erection also are provided on the side ball blast moving beam Ball blast transverse moving mechanism bolt on the ball blast moving beam of side, realizes the complete of small segment steel immersed tube side ball blast job area Covering.
As an improvement, being equipped with dust removal machine on the side ball blast telescopic arm one, the dust removal machine is logical with side ball blast head Cross hose connection.
As an improvement, including that the top surface spraying moving beam being erected on mobile beam orbit and side spraying move between the spraying Dynamic beam, the top surface, side spraying moving beam can be vertically moved along beam orbit is moved;
The spray equipment includes the top surface spray equipment being mounted on top surface spraying moving beam and is mounted on side Spray the side spray equipment on moving beam.
As an improvement, the top surface spray equipment includes top surface painting machine arm;
The top surface spraying moving beam is equipped with spraying transverse moving mechanism, and the top surface painting machine arm is horizontal with spraying It is connected to mobile mechanism, realizes all standing of small segment steel immersed tube top surface spraying operation range.
As an improvement, the side spray equipment includes the side spray coating mechanical hand bolted on side spraying telescopic arm Arm and the material proportion device and material pot being respectively erected on side spraying telescopic arm;
The side spraying moving beam is equipped with spraying transverse moving mechanism, and the side sprays telescopic arm and is erected at side Face sprays the spraying transverse moving mechanism bolt on moving beam, realizes that the complete of small segment steel immersed tube side spraying operation range covers Lid.
As an improvement, the side of the compartment is equipped with rolling screen door.
As an improvement, be equipped on ground between the impeller blasting pre-treatment, between compartment and spraying embedding ground formula track, And several steel immersed tube buttresses, small segment steel immersed tube can be operated to impeller blasting by track carrier loader along embedding ground formula track respectively Between processing, between spraying.
Compared with prior art, the utility model has the beneficial effects that:
1) coating equipment of the utility model uses the Production Line Configured of three compartment of a workshop two-step, can ensure small segment The derusting of steel immersed tube, spraying two procedures are completed in closed workshop, and are kept away between two procedures by being transported in compartment Exempt from transition from open-pit fortune to wait on the steel structure surface influence after derusting.
2) top surface and side application of the coating equipment of the utility model to small segment steel immersed tube upstream face, can pass through shifting It moves beam and moves along the cooperation of beam transverse moving mechanism and realize all standing operation simultaneously;Impeller blasting and spraying two procedures are equal It takes mechanical arm to execute, can conveniently lift the pouring hole for avoiding steel immersed tube top surface protrusion, realize automatic obstacle avoiding operation, effectively protect Hinder coating quality, improves construction efficiency.
3) coating equipment of the utility model is before carrying out small segment steel immersed tube impeller blasting when handling, by ball blast head, small Type pulse dust removal machine and mechanical arm concentrate on movable mechanism, while realizing autonomous fitting, avoidance, recycle impeller blasting The a large amount of dust that process generates, substantially dustless operating environment between guarantee impeller blasting pre-treatment.
Description of the drawings
Fig. 1 is the dimensional structure diagram of the utility model;
Fig. 2 is the structure top view of the utility model;
Fig. 3 is the structural front view of the utility model;
Fig. 4 is the structure top view of steel immersed tube side ball blast in the utility model;
Fig. 5 is the structural front view of Fig. 4;
Fig. 6 is the structural front view of steel immersed tube top surface ball blast in the utility model;
Fig. 7 is the structural front view that steel immersed tube side sprays in the utility model;
Fig. 8 is the structural front view that steel immersed tube top surface sprays in the utility model;
In figure:A, between impeller blasting pre-treatment, B, compartment, between C, spraying, 1, rolling screen door, 2, Steel Structure column, 3, steel Immersed tube buttress, 4, Steel Structure horizontal support, 5, small segment steel immersed tube, 6, embedding ground formula track, 7, bearing diagonal at the top of Steel Structure, 8, top surface Ball blast moving beam, 9, mobile beam orbit, 10, side ball blast moving beam, 11, top surface spray moving beam, 12, side spraying movement Beam, 13, track carrier loader, 14, side ball blast telescopic arm one, 15, side ball blast head, 16, ball blast transverse moving mechanism, 17, remove Dirt machine, 18, top surface painting machine arm, 19, side ball blast mechanical arm, 20, side ball blast extension job area, 21, top surface Ball blast mechanical arm, 22, top surface ball blast head, 23, top surface ball blast initial position, 24, material pot, 25, spraying transverse moving mechanism, 26, moving beam longitudinal moving mechanism, 27, material proportion device, 28, side spray telescopic arm, 29, side spray coating mechanical arm, 30, Side spray extension job area, 31, top surface spray initial position.
Specific implementation mode
To make the objectives, technical solutions and advantages of the present invention clearer, below by accompanying drawings and embodiments, The present invention will be further described in detail.However, it should be understood that specific embodiment described herein is only used to solve The utility model is released, the range being not intended to limit the utility model.
Unless otherwise defined, all technical terms and scientific terms used herein and the skill for belonging to the utility model The normally understood meaning of technical staff in art field is identical, and terminology used in the description of the utility model herein is only It is to describe the purpose of specific embodiment, it is not intended that in limitation the utility model.
As shown in Figure 1, Figure 2 and Figure 3, a kind of coating equipment for Large bridge tunnel steel immersed tube outer surface, including connect successively C between A, compartment B and spraying between the impeller blasting pre-treatment connect;
Peener is equipped between the impeller blasting pre-treatment in A, the side for steel immersed tube and top surface impeller blasting;Institute C is interior equipped with spray equipment between stating spraying, for the side of steel immersed tube and top surface spraying;
Between the impeller blasting pre-treatment A, compartment B and spraying between C by Steel Structure column 2, Steel Structure horizontal support 4 and Bearing diagonal 7 is built-up at the top of Steel Structure, and the Steel Structure column 2 is equipped with mobile beam orbit 9.
As the improvement of embodiment, it is equipped in A as shown in Fig. 1,7, between the impeller blasting pre-treatment and is erected at moving beam Top surface ball blast moving beam 8 on track 9 and side ball blast moving beam 10, the top surface, side ball blast moving beam can pass through shifting Dynamic beam longitudinal moving mechanism 26 is vertically moved along beam orbit 9 is moved, it is preferred that the longitudinal moving mechanism of use can be and movement The rail wheel or other similar common mobile mechanisms that beam orbit 9 coordinates;
The peener include be mounted on the top surface ball blast moving beam 8 on top surface peener and be mounted on side Side peener on face ball blast moving beam 10.
As an improvement, as shown in fig. 6, the top surface peener includes top surface ball blast head 22, top surface ball blast mechanical arm 21;
The top surface ball blast moving beam 8 be equipped with ball blast transverse moving mechanism 16, the top surface ball blast mechanical arm 21 with Ball blast transverse moving mechanism 16 connects, and realizes all standing of 5 top surface ball blast job area of small segment steel immersed tube.Preferably, it uses Transverse moving mechanism can be rail wheel or other similar common mobile mechanisms.In addition, fitting steel immersed tube top surface operation Top surface ball blast head 22 connect with top surface ball blast mechanical arm 21, can conveniently lift and avoid small 5 top surface of segment steel immersed tube protrusion Pouring hole realizes automatic obstacle avoiding operation.
As the improvement of embodiment, as shown in Figure 4,5, the side peener includes bolt in side ball blast telescopic arm Side ball blast mechanical arm 19 on one 14 and side ball blast head 15;
Ball blast transverse moving mechanism 16, the side ball blast telescopic arm 1 also are provided on the side ball blast moving beam 10 It is bolted with the ball blast transverse moving mechanism 16 being erected on side ball blast moving beam 10, realizes small 5 side ball blast of segment steel immersed tube The all standing of job area.
As being further improved for embodiment, as shown in Figure 5,6, dedusting is installed on the side ball blast telescopic arm 1 Machine 17, the dust removal machine 17 are connect with side ball blast head 15 by hose.Small-sized pulse dust removal machine is preferably used, can be returned in time The dust that ball blast process generates is received, ensures dust-free operation environment.
As the improvement of embodiment, as shown in Fig. 2, C includes the top surface spray being erected on mobile beam orbit 9 between the spraying It applies moving beam 11 and side sprays moving beam 12, the top surface, side spraying moving beam can vertically move machine by moving beam Structure 26 is vertically moved along beam orbit 9 is moved;
The spray equipment includes the top surface spray equipment being mounted on top surface spraying moving beam 11 and is mounted on side Face sprays the side spray equipment on moving beam 12.
As the improvement of embodiment, as shown in figure 8, the top surface spray equipment includes top surface painting machine arm 18;
Top surface spraying moving beam 11 is equipped with spraying transverse moving mechanism 25, the top surface painting machine arm 18 with It sprays transverse moving mechanism 25 to connect, realizes all standing of 5 top surface spraying operation range of small segment steel immersed tube.It is sprayed using top surface Mechanical arm 18 can facilitate the pouring hole hole outer arm for spraying small 5 top surface protrusion of segment steel immersed tube, and also liftable to avoid pouring hole convex Platform easily realizes automatic obstacle avoiding operation.
As a further improvement, the side spray equipment includes that the side bolted on side spraying telescopic arm 28 is sprayed The material proportion device 27 and material pot 24 for applying mechanical arm 29 and being respectively erected on side spraying telescopic arm 28, it is preferred that object Expect that proportioner 27 uses high-precision material proportion device;
The side spraying moving beam 12 is equipped with spraying transverse moving mechanism 25, the side spraying telescopic arm 28 and frame The spraying transverse moving mechanism 25 being located on side spraying moving beam 12 bolts, and realizes small 5 side spraying operation of segment steel immersed tube The all standing of range.
As the improvement of embodiment, as shown in Figure 1,3, the side of the compartment B is equipped with rolling screen door 1.Compartment B can rise Separate between dividing and safeguard, dust blocks;Also outdoor transporting work pieces are avoided, influence of the external environment to Workpiece coating quality is prevented.
As the improvement of embodiment, it is equipped on the ground of C between A, compartment B and spraying between the impeller blasting pre-treatment Embedding ground formula track 6 and several steel immersed tube buttresses 3, small segment steel immersed tube 5 can be divided by track carrier loader 13 along embedding ground formula track 6 It does not operate to C, effective guarantee coating quality improve construction efficiency between A, spraying between impeller blasting pre-treatment.
Using the steel immersed tube upstream face coating process of the utility model:
Steel immersed tube segmented making in channel in depth, face mirror image of the small segment steel immersed tube 5 along c-type hole side splice, and as one The bridge tunnel steel immersed tube of the round-trip two-way lane of segment.Small segment steel immersed tube 5 can be distinguished by track carrier loader 13 along embedding ground formula track 6 It operates to A between impeller blasting pre-treatment, C between spraying.Compartment B separates between can playing point to be safeguarded, dust blocks;Also it avoids outdoor Transporting work pieces prevent influence of the external environment to Workpiece coating quality.
After operating to A between impeller blasting pre-treatment, small segment steel immersed tube 5 is placed on steel immersed tube buttress by track carrier loader 13 On 3.As shown in figure 5, side peener may spread to II working positions (i.e. side ball blast extension operation model in Fig. 5 by I working positions It encloses 20), small 5 side of segment steel immersed tube of all standing carries out impeller blasting operation;As shown in fig. 6, top surface peener is by I working positions (i.e. top surface ball blast initial position 23 in Fig. 6) is movable to II working positions, and small 5 top surface of segment steel immersed tube of all standing carries out ball blast and removes Rust operation.
C to be shipped between going to spraying.As shown in fig. 7, side spray equipment may spread to II working positions (i.e. Fig. 7 by I working positions Middle side spraying extension job area 30), small 5 side of segment steel immersed tube of all standing carries out spraying operation;As shown in figure 8, top surface Spray equipment is movable to II working positions by I working positions (i.e. top surface sprays initial position 31 in Fig. 8), and the small segment steel of all standing is heavy 5 top surface of pipe carries out spraying operation.
The above is only the preferred embodiment of the utility model, the application scheme of bridge tunnel box beam, also can be according to this side Case carries out suitable for change.It should be understood that:For those skilled in the art, the utility model original is not being departed from Under the premise of reason, several improvements and modifications can also be made, these improvements and modifications also should be regarded as the protection model of the utility model It encloses.

Claims (10)

1. a kind of coating equipment for Large bridge tunnel steel immersed tube outer surface, which is characterized in that removed including sequentially connected ball blast Between rust pre-treatment between (A), compartment (B) and spraying (C);
Peener is equipped between the impeller blasting pre-treatment in (A), the side for steel immersed tube and top surface impeller blasting;It is described Spray equipment is equipped between spraying in (C), for the side of steel immersed tube and top surface spraying;
(C) is by Steel Structure column (2), the horizontal branch of Steel Structure between (A) between the impeller blasting pre-treatment, compartment (B) and spraying It is built-up to support bearing diagonal (7) at the top of (4) and Steel Structure, the Steel Structure column (2) is equipped with mobile beam orbit (9).
2. a kind of coating equipment for Large bridge tunnel steel immersed tube outer surface according to claim 1, which is characterized in that institute (A) is interior equipped with the top surface ball blast moving beam (8) and the side ball blast that are erected on mobile beam orbit (9) between stating impeller blasting pre-treatment Moving beam (10), the top surface, side (8,10) ball blast moving beam can be vertically moved along beam orbit (9) is moved;
The peener include be mounted on the top surface ball blast moving beam (8) on top surface peener and be mounted on side Side peener on ball blast moving beam (10).
3. a kind of coating equipment for Large bridge tunnel steel immersed tube outer surface according to claim 2, which is characterized in that institute It includes top surface ball blast head (22), top surface ball blast mechanical arm (21) to state top surface peener;
The top surface ball blast moving beam (8) is equipped with ball blast transverse moving mechanism (16), the top surface ball blast mechanical arm (21) It is connect with ball blast transverse moving mechanism (16), realizes all standing of small segment steel immersed tube (5) top surface ball blast job area.
4. a kind of coating equipment for Large bridge tunnel steel immersed tube outer surface according to claim 2, which is characterized in that institute It includes that side ball blast mechanical arm (19) and side of the bolt on side ball blast telescopic arm one (14) are thrown to state side peener Ball head (15);
Ball blast transverse moving mechanism (16), the side ball blast telescopic arm one also are provided on the side ball blast moving beam (10) (14) it is bolted with the ball blast transverse moving mechanism (16) being erected on side ball blast moving beam (10), realizes small segment steel immersed tube (5) all standing of side ball blast job area.
5. a kind of coating equipment for Large bridge tunnel steel immersed tube outer surface according to claim 4, which is characterized in that institute It states and dust removal machine (17) is installed on side ball blast telescopic arm one (14), the dust removal machine (17) is with side ball blast head (15) by soft Pipe connects.
6. a kind of coating equipment for Large bridge tunnel steel immersed tube outer surface according to claim 1, which is characterized in that institute (C) includes that the top surface spraying moving beam (11) being erected on mobile beam orbit (9) and side spray moving beam (12) between stating spraying, The top surface, side spraying moving beam (11,12) can be vertically moved along beam orbit (9) is moved;
The spray equipment includes being mounted on the top surface to spray the top surface spray equipment on moving beam (11) and be mounted on side Spray the side spray equipment on moving beam (12).
7. a kind of coating equipment for Large bridge tunnel steel immersed tube outer surface according to claim 6, which is characterized in that institute It includes top surface painting machine arm (18) to state top surface spray equipment;
The top surface spraying moving beam (11) is equipped with spraying transverse moving mechanism (25), the top surface painting machine arm (18) It is connect with spraying transverse moving mechanism (25), realizes all standing of small segment steel immersed tube (5) top surface spraying operation range.
8. a kind of coating equipment for Large bridge tunnel steel immersed tube outer surface according to claim 6, which is characterized in that institute It includes that bolt sprays the side spray coating mechanical arm (29) on telescopic arm (28) in side and sets up respectively to state side spray equipment Material proportion device (27) on side spraying telescopic arm (28) and material pot (24);
Side spraying moving beam (12) is equipped with spraying transverse moving mechanism (25), the side spraying telescopic arm (28) with Spraying transverse moving mechanism (25) bolt being erected on side spraying moving beam (12), realizes small segment steel immersed tube (5) side The all standing of spraying operation range.
9. a kind of coating equipment for Large bridge tunnel steel immersed tube outer surface according to claim 1, which is characterized in that institute The side for stating compartment (B) is equipped with rolling screen door (1).
10. a kind of coating equipment for Large bridge tunnel steel immersed tube outer surface according to claim 1, which is characterized in that Be equipped with embedding ground formula track (6) on the ground of (C) between (A) between the impeller blasting pre-treatment, compartment (B) and spraying and if Dry steel immersed tube buttress (3), small segment steel immersed tube (5) by track carrier loader (13) along embedding ground formula track (6) can operate respectively to Between impeller blasting pre-treatment between (A), spraying (C).
CN201820069586.0U 2018-01-16 2018-01-16 Coating equipment for Large bridge tunnel steel immersed tube outer surface Active CN208082767U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820069586.0U CN208082767U (en) 2018-01-16 2018-01-16 Coating equipment for Large bridge tunnel steel immersed tube outer surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820069586.0U CN208082767U (en) 2018-01-16 2018-01-16 Coating equipment for Large bridge tunnel steel immersed tube outer surface

Publications (1)

Publication Number Publication Date
CN208082767U true CN208082767U (en) 2018-11-13

Family

ID=64065845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820069586.0U Active CN208082767U (en) 2018-01-16 2018-01-16 Coating equipment for Large bridge tunnel steel immersed tube outer surface

Country Status (1)

Country Link
CN (1) CN208082767U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107952616A (en) * 2018-01-16 2018-04-24 江苏中矿大正表面工程技术有限公司 A kind of coating equipment for Large bridge tunnel steel immersed tube outer surface

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107952616A (en) * 2018-01-16 2018-04-24 江苏中矿大正表面工程技术有限公司 A kind of coating equipment for Large bridge tunnel steel immersed tube outer surface

Similar Documents

Publication Publication Date Title
CN108970866B (en) Automatic coating system for large ship in sections
JPH10500377A (en) Equipment for external surface work under the hull
CN110700527B (en) Automatic spraying equipment for high-rise outer wall
CN104440915A (en) Spray painting robot for rust removal of large pipe
CN204933814U (en) A kind of twin shaft gantry device of automatic coating
CN107571158A (en) A kind of sand blasting room with crown-block type sand blasting machine people
CN208082767U (en) Coating equipment for Large bridge tunnel steel immersed tube outer surface
CN114082568B (en) Off-line digital-analog planning system and method for large ship body segmented spraying operation
CN214234657U (en) Movable paint spraying robot for spraying at side position
CN105065852B (en) Construction method for laying pressure penstock inside water tunnel of hydropower station
CN102897698B (en) Beam upset transport all-in-one
CN111633565A (en) Robot for constructing outer surface of ship body
CN108160380A (en) A kind of inner surface coating tool for bridge tunnel steel immersed tube
CN107952616A (en) A kind of coating equipment for Large bridge tunnel steel immersed tube outer surface
CN113751231B (en) Super-large space spraying equipment and spraying method for ship segmental non-structural surface
CN107790315A (en) Large-scale pipeline rust removal sprayer device people
CN206474316U (en) Can automated cleaning hanger the synchronous double mode flush coater of 4 axles
CN102275820A (en) Automatic following watering dust suppression device for coal operation of portal crane
CN103433183B (en) Coating method capable of avoiding paint mist ripples of ship shell plate
CN207331449U (en) A kind of bridge surface waterproof layer construction spraying moving cart
Kangari et al. Prototype robotics in construction industry
CN107127081A (en) Ship spray robot
CN107476261A (en) Power station etch planes gate Quick overhaul method
CN202803503U (en) Automatic paint sprayer for container bottom frame
CN111890237A (en) Sand blasting workshop for immersed tunnel steel shell and ship segmentation