CN208072809U - A kind of whole perception type stair of raising - Google Patents

A kind of whole perception type stair of raising Download PDF

Info

Publication number
CN208072809U
CN208072809U CN201820213670.5U CN201820213670U CN208072809U CN 208072809 U CN208072809 U CN 208072809U CN 201820213670 U CN201820213670 U CN 201820213670U CN 208072809 U CN208072809 U CN 208072809U
Authority
CN
China
Prior art keywords
time
marked time
marked
bolt
terraced beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820213670.5U
Other languages
Chinese (zh)
Inventor
刘继鹏
孙兵
萧树忠
邵广超
张晓东
张玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ji'nan Changxin Construction Group Industrial Technology Co Ltd
Original Assignee
Ji'nan Changxin Construction Group Industrial Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ji'nan Changxin Construction Group Industrial Technology Co Ltd filed Critical Ji'nan Changxin Construction Group Industrial Technology Co Ltd
Priority to CN201820213670.5U priority Critical patent/CN208072809U/en
Application granted granted Critical
Publication of CN208072809U publication Critical patent/CN208072809U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model discloses a kind of whole perception type stair of raising, belong to building field, its structure includes precast stair, precast stair is made of multiple mark time, it marks time including upper end, lower end is marked time marks time with centre, mark time the height drop >=15mm to mark time with lower end for upper end, the facade that upper end is marked time is to bench end contracting >=15mm, the plane and facade that upper end is marked time, the plane that lower end is marked time separately designs as male and fomale(M&F), the upper end of precast stair marks time to mark time with lower end to be connected with half space and terraced beam respectively, upper end, which is marked time, to be connected between the terraced beam on top by upper attachment, lower end, which is marked time, to be connected between the terraced beam of lower part by lower attachment, upper end is marked time and lower end marks time and is connected respectively by building coats between half space.The utility model solves the problems, such as the concrete aberration of current precast stair and cast-in-place part later stage way so that precast stair and the joint part color and luster of half space later stage way are unified, and perception is strong.

Description

A kind of whole perception type stair of raising
Technical field
The utility model is related to a kind of building field, especially a kind of whole perception type stair of raising.
Background technology
Precast concrete stair is carried out wider in the field of assembled industrialization at present, and precast stair is usually global formation Concrete bench, the riser height equalization that stair are each marked time are divided equally, step surface one-pass molding, at later stage way Reason.With relatively broad in current assembled architecture engineering.
Most precast stair is all the as-cast finish of decoration of no later stage in industrialization engineering at present, due to prefabricated Stair are that industrialization producer shifts to an earlier date prefabricated profiled prefabricated components, and the requirements such as design strength, coagulation have been had reached when to be used Ashen pool finalizes the design almost.When later stage is installed in engineering, done with cast-in-place terraced beam and the joint part of half space part, later stage building The concrete color and luster of method has apparent aberration with molded prefabricated bench, influences perception.
Utility model content
The technical assignment of the utility model be for the above-mentioned prior art in deficiency a kind of raisings entirety perception type is provided Stair, this is a kind of, which to improve whole perception type stair, has the concrete for solving current precast stair and cast-in-place part later stage way Aberration problem promotes the overall effect of staircase so that and precast stair and the joint part color and luster of half space later stage way are unified, The strong feature of perception.
Technical solution adopted by the utility model to solve its technical problems is:It includes precast stair, and described is prefabricated Stair are made of multiple mark time, including upper end is marked time, lower end is marked time and centre is marked time, and centre is marked time including multiple, and centre is marked time It marks time positioned at upper end and between lower end marks time, marks time the height drop >=15mm to mark time with lower end for the upper end, what upper end was marked time To bench end contracting >=15mm, the plane that plane and facade that upper end is marked time, lower end are marked time separately designs as male and fomale(M&F), institute facade The upper end for the precast stair stated marks time to mark time with lower end to be connected with half space and terraced beam respectively, the terraced beam that upper end is marked time with top Between by upper attachment be connected, lower end, which is marked time, to be connected between the terraced beam of lower part by lower attachment, the upper end It marks time and lower end marks time and is connected respectively by building coats between half space.
It is respectively arranged with anti-slip tank in the plane that each centre is marked time.
The side that centre is marked time is respectively arranged with railing mounting hole.
The building coats is ceramic tile or cement layer.
The bottom that the centre is marked time is provided with drip.
The side that the centre is marked time is provided with demoulding lifting bolt.
The upper attachment includes that top injecting glue layer, top PE sticks, top polyphenyl filled layer, top cement mortar are looked for Flat bed, top anchor head, upper bolt, top pulp layer and top mortar plugged zone, between front that upper end is marked time and terraced beam from Top to bottm is disposed with top injecting glue layer, top PE sticks and top polyphenyl filled layer, between the lower part that upper end is marked time and terraced beam Be provided with top cement mortar screed-coat, the upper end mark time on be provided with upper end mounting hole, in the mounting hole of upper end on to Under be disposed with top mortar plugged zone and upper bolt, be provided with top slurry in the upper end mounting hole of upper bolt periphery Layer, the lower end of the upper bolt are stretched into across top cement mortar screed-coat in terraced beam, and the lower part of upper bolt is provided with Top anchor head.
The lower attachment includes that lower part injecting glue layer, lower part PE sticks, lower part polyphenyl filled layer, lower part cement mortar are looked for Flat bed, lower part anchor head, lower bolt, fixing nut, gasket and lower part mortar plugged zone, between the rear portion that lower end is marked time and terraced beam Be disposed with lower part injecting glue layer, lower part PE sticks and lower part polyphenyl filled layer from top to bottom, the lower part that lower end is marked time and terraced beam it Between be provided with lower part cement mortar screeding layer, the lower end mark time on be provided with lower end mounting hole, from upper in the mounting hole of lower end Lower part mortar plugged zone and lower bolt are disposed under, the top of lower bolt is provided with gasket and fixing nut, institute The lower end for the lower bolt stated is stretched into across lower part cement mortar screeding layer in terraced beam, and the lower part of lower bolt is provided with lower part anchor Head.
Compared to the prior art a kind of raising entirety perception type stair of the utility model, have beneficial effect following prominent Fruit:The concrete aberration for solving the problems, such as current precast stair and cast-in-place part later stage way, promotes the overall effect of staircase, So that the features such as precast stair and the joint part color and luster of half space later stage way are unified, and perception is strong.
Description of the drawings
Attached drawing 1 is the main structure diagram of precast stair;
Attached drawing 2 is vertical view shown in FIG. 1;
Attached drawing 3 is upward view shown in FIG. 1;
Attached drawing 4 is A-A sectional views shown in Fig. 3;
Attached drawing 5 is precast stair and half space, terraced beam connection diagram;
Attached drawing 6 is that the upper end of precast stair marks time and connect enlarged diagram with half space, terraced beam;
Attached drawing 7 is that the lower end of precast stair marks time and connect enlarged diagram with half space, terraced beam;
Reference sign:1, precast stair, 11, upper end mark time, 111, upper end mounting hole, 12, lower end mark time, 121, under Hold mounting hole, 13, centre mark time, 2, half space, 3, terraced beam, 4, upper attachment, 41, top injecting glue layer, 42, top PE Stick, 43, top polyphenyl filled layer, 44, top cement mortar screed-coat, 45, top anchor head, 46, upper bolt, 47, top slurry The bed of material, 48, top mortar plugged zone, 5, lower attachment, 51, lower part injecting glue layer, 52, lower part PE sticks, 53, the filling of lower part polyphenyl Layer, 54, lower part cement mortar screeding layer, 55, lower part anchor head, 56, lower bolt, 57, fixing nut, 58, gasket, 59, lower part Mortar plugged zone, 6, building coats, 7, anti-slip tank, 8, railing mounting hole, 9, drip, 10, lifting bolt.
Specific implementation mode
A kind of raising entirety perception type stair of the utility model are made in detailed below with reference to Figure of description 1 to attached drawing 7 Ground explanation.
A kind of raising entirety perception type stair of the utility model, structure include precast stair 1, the precast stair 1 is made of multiple mark time, including upper end mark time 11, lower end mark time 12 and centre mark time 13, centre mark time 13 include it is multiple, it is intermediate Mark time 13 positioned at upper end mark time 11 and lower end mark time between 12, the upper end mark time 11 and lower end mark time 12 height drop >= 15mm, can according to Practical Project require adjust, upper end mark time 11 facade to bench end contracting >=15mm, can be according to Practical Project It is required that adjust, 11 plane is marked time in upper end and facade, lower end are marked time, and 12 plane separately designs as male and fomale(M&F), the prefabricated building The upper end of ladder 1, which is marked time, 11 marks time with lower end and 12 3 is connected with half space 2 and ladder beam respectively, and upper end is marked time the terraced beam 3 on 11 and top Between by upper attachment 4 be connected, lower end, which is marked time, to be connected between 12 and the terraced beam 3 of lower part by lower attachment 5, described Upper end mark time 11 and lower end mark time and be connected respectively by building coats 6 between 12 and half space 2.
The centre mark time 13 plane on be respectively arranged with anti-slip tank 7.
The side that centre is marked time is respectively arranged with railing mounting hole 8.
The building coats 6 is ceramic tile or cement layer.
Mark time 13 bottom of the centre is provided with drip 9.
The centre mark time 13 side be provided with demoulding lifting bolt 10.
The upper attachment 4 includes top injecting glue layer 41, top PE sticks 42, top polyphenyl filled layer 43, upper water Cement mortar screed-coat 44, top anchor head 45, upper bolt 46, top pulp layer 47 and top mortar plugged zone 48, upper end is marked time It is disposed with top injecting glue layer 41, top PE sticks 42 and top polyphenyl filled layer from top to bottom between 11 front and terraced beam 3 43, upper end mark time 11 lower part and terraced beam 3 between be provided with top cement mortar screed-coat 44, the upper end is marked time and is set on 11 It is equipped with upper end mounting hole 111, is disposed with top mortar plugged zone 48 and upper bolt in upper end mounting hole 111 from top to bottom 46, top pulp layer 47 is provided in the upper end mounting hole 111 of the periphery of upper bolt 46, and the lower end of the upper bolt 46 is worn It crosses top cement mortar screed-coat 44 to stretch into terraced beam 3, the lower part of upper bolt 46 is provided with top anchor head 45.
The lower attachment 5 includes lower part injecting glue layer 51, lower part PE sticks 52, lower part polyphenyl filled layer 53, lower part water Cement mortar screed-coat 54, lower part anchor head 55, lower bolt 56, fixing nut 57, gasket 58 and lower part mortar plugged zone 59, lower end Mark time 12 rear portion and terraced beam 3 between be disposed with lower part injecting glue layer 51, lower part PE sticks 52 and lower part polyphenyl from top to bottom and fill out Fill layer 53, lower end mark time 12 lower part and terraced beam 3 between be provided with lower part cement mortar screeding layer 54, the lower end marks time 12 On be provided with lower end mounting hole 121, lower part mortar plugged zone 59 and lower part are disposed in lower end mounting hole 121 from top to bottom The top of bolt 56, lower bolt 56 is provided with gasket 58 and fixing nut 57, and the lower end of the lower bolt 56 passes through down Portion's cement mortar screeding layer 54 stretches into terraced beam 3, and the lower part of lower bolt 56 is provided with lower part anchor head 55.
After precast stair 1 is installed in engineering, when the building coats 6 of later stage half space 2 is constructed, just by precast stair 1 Upper end mark time 11 and the mark time 12 reserved way of male and fomale(M&F) of lower end construct together completion.When later stage completion of works, half space 2 With the joint part of precast stair 1, the almost the same no color differnece of color and luster of concrete, globality perception is promoted.
Illustrative embodiments listed above are not to described in the utility model only for understanding that the utility model is used The restriction of technical solution, the those of ordinary skill in relation to field described in claim on the basis of technical solution, can also make Go out a variety of variations or deformation, all equivalent variations or deformation should all cover the utility model claims it It is interior.Place is not described in detail for the utility model, is the known technology of those skilled in the art of the present technique.

Claims (8)

1. a kind of whole perception type stair of raising, including precast stair, the precast stair are made of multiple mark time, including upper End is marked time, lower end is marked time and centre is marked time, and centre is marked time including multiple, and centre marks time to mark time positioned at upper end marks time it with lower end Between, it is characterized in that:Mark time the height drop >=15mm to mark time with lower end for the upper end, and the facade that upper end is marked time contracts to bench end >=15mm, the plane that plane and facade that upper end is marked time, lower end are marked time separately design as male and fomale(M&F), the precast stair it is upper End marks time to mark time with lower end to be connected with half space and terraced beam respectively, and upper end is marked time and connect by top between the terraced beam on top Part be connected, lower end, which is marked time, to be connected between the terraced beam of lower part by lower attachment, the upper end mark time with lower end mark time and It is connected respectively by building coats between half space.
2. the whole perception type stair of a kind of raising according to claim 1, it is characterized in that:What each centre was marked time Anti-slip tank is respectively arranged in plane.
3. the whole perception type stair of a kind of raising according to claim 1, it is characterized in that:The side that centre is marked time is set respectively It is equipped with railing mounting hole.
4. the whole perception type stair of a kind of raising according to claim 1, it is characterized in that:The building coats is ceramic tile Or cement layer.
5. the whole perception type stair of a kind of raising according to claim 1, it is characterized in that:The bottom that the centre is marked time It is provided with drip.
6. the whole perception type stair of a kind of raising according to claim 1, it is characterized in that:The side that the centre is marked time It is provided with demoulding lifting bolt.
7. the whole perception type stair of a kind of raising according to claim 1, it is characterized in that:The upper attachment includes Top injecting glue layer, top PE sticks, top polyphenyl filled layer, top cement mortar screed-coat, top anchor head, upper bolt, top Pulp layer and top mortar plugged zone, be disposed with from top to bottom between front that upper end is marked time and terraced beam top injecting glue layer, Top PE sticks and top polyphenyl filled layer are provided with top cement mortar screed-coat, institute between the lower part that upper end is marked time and terraced beam The upper end stated is provided with upper end mounting hole on marking time, be disposed with from top to bottom in the mounting hole of upper end top mortar plugged zone and Upper bolt is provided with top pulp layer in the upper end mounting hole of upper bolt periphery, and the lower end of the upper bolt passes through Top cement mortar screed-coat stretches into terraced beam, and the lower part of upper bolt is provided with top anchor head.
8. the whole perception type stair of a kind of raising according to claim 1, it is characterized in that:The lower attachment includes Lower part injecting glue layer, lower part PE sticks, lower part polyphenyl filled layer, lower part cement mortar screeding layer, lower part anchor head, lower bolt, fixation Nut, gasket and lower part mortar plugged zone are disposed with lower part injecting glue from top to bottom between the rear portion that lower end is marked time and terraced beam Layer, lower part PE sticks and lower part polyphenyl filled layer are provided with lower part cement mortar screeding layer between the lower part that lower end is marked time and terraced beam, The lower end is provided with lower end mounting hole on marking time, and is disposed with lower part mortar plugged zone in the mounting hole of lower end from top to bottom And lower bolt, the top of lower bolt are provided with gasket and fixing nut, the lower end of the lower bolt passes through lower part water Cement mortar screed-coat stretches into terraced beam, and the lower part of lower bolt is provided with lower part anchor head.
CN201820213670.5U 2018-02-07 2018-02-07 A kind of whole perception type stair of raising Active CN208072809U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820213670.5U CN208072809U (en) 2018-02-07 2018-02-07 A kind of whole perception type stair of raising

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820213670.5U CN208072809U (en) 2018-02-07 2018-02-07 A kind of whole perception type stair of raising

Publications (1)

Publication Number Publication Date
CN208072809U true CN208072809U (en) 2018-11-09

Family

ID=64037416

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820213670.5U Active CN208072809U (en) 2018-02-07 2018-02-07 A kind of whole perception type stair of raising

Country Status (1)

Country Link
CN (1) CN208072809U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930759A (en) * 2019-03-28 2019-06-25 中建四局第一建筑工程有限公司 A kind of structure using prefabricated components assembling stair
CN110748102A (en) * 2019-11-07 2020-02-04 扬州大学 Prefabricated staircase support stop device that slides
CN111927015A (en) * 2020-08-13 2020-11-13 上海宝冶建筑工程有限公司 Prefabricated staircase structure
CN113266117A (en) * 2021-05-06 2021-08-17 浙江省建工集团有限责任公司 Assembled concrete beam type stair and installation method thereof
CN115217278A (en) * 2022-05-25 2022-10-21 中交一公局集团有限公司 Assembled prefabricated staircase and installation method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930759A (en) * 2019-03-28 2019-06-25 中建四局第一建筑工程有限公司 A kind of structure using prefabricated components assembling stair
CN110748102A (en) * 2019-11-07 2020-02-04 扬州大学 Prefabricated staircase support stop device that slides
CN111927015A (en) * 2020-08-13 2020-11-13 上海宝冶建筑工程有限公司 Prefabricated staircase structure
CN113266117A (en) * 2021-05-06 2021-08-17 浙江省建工集团有限责任公司 Assembled concrete beam type stair and installation method thereof
CN115217278A (en) * 2022-05-25 2022-10-21 中交一公局集团有限公司 Assembled prefabricated staircase and installation method thereof

Similar Documents

Publication Publication Date Title
CN208072809U (en) A kind of whole perception type stair of raising
CN207260132U (en) Spiling for ecoscape combination shore protection
CN106150001B (en) A kind of fabricated assembly overall stair construction method
CN103009477A (en) Construction method for prefabricated components for prefabricated component factory
CN207960424U (en) A kind of prefabricated bay window
CN206800166U (en) Integral reinforcing transforms the stone arch bridge of main arch
CN101634133A (en) Sidewalk ground tile paving die
CN105133492B (en) Concrete bridge deck with channels at bottom
CN109184103A (en) Building masonry wall exempts from plastering construction technique
CN206529712U (en) Assembled steel reinforced concrete aliform type culvert opening
CN208533894U (en) A kind of lightweight precast concrete stair
CN205894273U (en) Concrete module pin -connected panel frame building structure
CN205677235U (en) A kind of prefabricated anti-bank constructing structure applied in toilet
CN107489258A (en) The prefabricated pit of elevator hoistways, elevator hoistways pit method of construction and installation elevator
CN107476603A (en) A kind of gardens wayside pavilion construction method
CN208039666U (en) Assembled stairs module
CN108104166A (en) A kind of ground well body structure and construction method
CN114277964A (en) Method for building colored glaze shadow wall
CN111335562B (en) Stair construction method applying precast concrete stair platform plate and support system
CN211597170U (en) Wall structure is decorated to artistic fretwork cellular type of imitative historical architecture red brick effect
CN102972222A (en) Prefabricated flower groove
CN209243751U (en) A kind of low-rise building
CN202635197U (en) Prefabricated planter
CN207268110U (en) One kind tree pond Fence structure
CN207714376U (en) A kind of ground well body structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant