CN208009879U - A kind of Super High grid operations platform - Google Patents
A kind of Super High grid operations platform Download PDFInfo
- Publication number
- CN208009879U CN208009879U CN201820267901.0U CN201820267901U CN208009879U CN 208009879 U CN208009879 U CN 208009879U CN 201820267901 U CN201820267901 U CN 201820267901U CN 208009879 U CN208009879 U CN 208009879U
- Authority
- CN
- China
- Prior art keywords
- platform
- steel
- platform floor
- super high
- steel plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 68
- 239000010959 steel Substances 0.000 claims abstract description 68
- 238000010276 construction Methods 0.000 abstract description 20
- 238000009434 installation Methods 0.000 abstract description 5
- 238000004064 recycling Methods 0.000 abstract description 2
- 238000003466 welding Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000033001 locomotion Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011022 operating instruction Methods 0.000 description 1
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a kind of Super High grid operations platform, including:Platform floor, it is circumferentially enclosed equipped with baffle on platform floor, baffle forms the box body structure of upper end opening with platform floor, wherein dodge gate is offered on a baffle, platform floor center offers through-hole, it is also fixed with more steel link chains on platform floor, hook is installed on steel link chain, expansion plate is additionally provided on platform floor.Safety higher during use, can lifting operation directly be carried out to operating platform, working efficiency greatly improves, it avoids artificial repeatedly high-altitude from taking the dangerous operation for dismounting and mounting assembling platform, the size of through-hole is adjusted, to be applicable in various sizes of cylinder to be onstructed, substantially reduce cost, structure novel, safety and firmness, installation and removal are all very convenient quick, shorten the construction period, improve construction efficiency, highly practical, high recycling rate, it is worth of widely use, at the construction field (site), operating platform structure is unified, neat appearance.
Description
Technical field:
The utility model is related to construction engineering technical fields, and in particular to a kind of Super High grid operations platform.
Background technology:
With the development of construction industry, the requirement of urban development, Super High, the building of unique style are more and more common, structure
Form is mostly concrete Core Walls Structure+outline border steel structural form, and profile variation is various, and it is difficult to bring higher construction to installation
Degree is difficult point, the key point of management and control in the construction of high-altitude.
Currently, during construction of super highrise building, Normal practice is to enclose to set foot hand by steel pipe in construction cylinder surrounding
Frame is laid with springboard in scaffold top, is bound springboard to being fixed on scaffold by iron wire, this structure use is very square
Just, safety when erecting and come very simply, but using is very poor, is often easy to happen safety accident.It is done as above-mentioned routine
The improvement of method derives another structure, is to replace springboard with steel plate, and by welding, extremely by Interal fixation
On scaffold, safety is improved to a certain extent, but the work of the erecting and welding of steel plate and dismounting work when dismounting
Make, be required for consuming a large amount of manpower and time, not only increase the work load of construction personnel, while also making claim for eot,
Construction efficiency reduces, and is not well positioned to meet the use demand of people.
It is, therefore, desirable to provide a kind of more applicable Super High grid operations platform, to solve the above problems.
Utility model content:
The purpose of this utility model is to provide a kind of safety that can be improved in the operation of construction personnel's construction operation, installation
It is quick with convenient disassembly, shorten the construction period, improves the Super High grid operations platform of construction efficiency.
To achieve the above object, the utility model uses following technical scheme:
A kind of Super High grid operations platform provided by the utility model, including:Platform floor, the platform floor upper edge
It circumferentially encloses equipped with baffle, the baffle forms the box body structure of upper end opening with the platform floor, wherein on a baffle
Dodge gate is offered, the platform floor center offers through-hole, more steel link chains is also fixed on the platform floor,
It is installed with hook on the steel link chain, expansion plate is additionally provided on the platform floor, the expansion plate adjusts the through-hole
Size.
The baffle includes along more circumferentially disposed steel columns of the platform floor, and the steel column is vertically arranged, institute
It states steel column surface and is equipped with one layer of steel gauze.
The baffle is steel plate.
The steel link chain is circumferentially distributed along the through-hole.
The radial dimension of the through-hole is more than the radial dimension of cylinder to be onstructed.
The platform floor includes the first steel plate and the second steel plate, the concave structure of the first steel plate, cylinder to be onstructed
It is passed through from the indent of the concave structure, second steel plate is installed on the open end of the concave structure, the expansion plate
It is installed on first steel plate.
The open end of the concave structure includes first end and the second end, and the both ends of the second steel plate are overlapped in described
On one end and the second end, and it is bolted.
The open end of the concave structure includes first end and the second end, and one end of the second steel plate is articulated with described
One end, the other end is overlapped on the second end, and is bolted.
A kind of advantageous effect of Super High grid operations platform of the utility model:It changes tradition and sets up platform with steel pipe
Way, it is baffled by being enclosed on platform floor, box space is formed, makes its safety higher during use, simultaneously
The through-hole being arranged on platform floor directly can carry out lifting operation, work convenient for being caught in for cylinder to be onstructed to operating platform
Efficiency greatly improves, and avoids artificial repeatedly high-altitude from taking the dangerous operation for dismounting and mounting assembling platform, is stretched by what is be arranged on platform floor
The size of through-hole is adjusted in contracting plate, to be applicable in various sizes of cylinder to be onstructed, substantially reduces cost, only same dimensions
Landing stage of scaffold cost 50%, structure novel, safety and firmness, installation and removal are all very convenient quick, can shorten and apply
The work duration improves construction efficiency, and highly practical, high recycling rate is worth of widely use, at the construction field (site), operating platform knot
Structure is unified, neat appearance.
Description of the drawings:
Fig. 1 is the structural schematic diagram of the utility model Super High grid operations platform,
Fig. 2 is the vertical view of the utility model Super High grid operations platform;
In figure:1- platform floors, 2- baffles, 3- through-holes, 4- steel columns, 5- steel gauzes, the first steel plates of 6-, the second steel plates of 7-,
8- cylinders to be onstructed, 9- dodge gates.
Specific implementation mode:
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describing, it is clear that described embodiment is only a part of the embodiment of the utility model, rather than all
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise
Lower obtained every other embodiment, shall fall within the protection scope of the present invention.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute in the utility model embodiment
It is only used for explaining relative position relation, the motion conditions etc. under a certain particular pose (as shown in the picture) between each component, such as
When the fruit particular pose changes, then directionality instruction also correspondingly changes correspondingly.
In addition, the description for being related to " first ", " second " etc. in the present invention is used for description purposes only, and cannot understand
To indicate or implying its relative importance or implicitly indicate the quantity of indicated technical characteristic.Define as a result, " first ",
The feature of " second " can explicitly or implicitly include at least one of the features.In addition, the technical side between each embodiment
Case can be combined with each other, but must can be implemented as basis with those of ordinary skill in the art, when the combination of technical solution
Conflicting or cannot achieve when occur will be understood that the combination of this technical solution is not present, also not in the requires of the utility model
Protection domain within.
According to Fig. 1~Fig. 2, a kind of Super High grid operations platform provided by the utility model, including:Platform floor
1, it circumferentially encloses on the platform floor 1 equipped with baffle 2, the baffle 2 forms the box body of upper end opening with the platform floor 1
Structure, offers dodge gate 9 wherein on a baffle 2,1 center of the platform floor offers through-hole 3, the platform
Also it is fixed with more steel link chains on bottom plate 1, when Specific construction, the steel link chain is circumferentially distributed along the through-hole 3 so that whole knot
Structure is more uniformly stressed, and then the stability of holding structure, and hook is installed on the steel link chain, in the peace for carrying out operating platform
When dress, hook is hooked to the buckle of 8 upper mounting plate of cylinder to be onstructed, keeps the firm of operating platform, the platform floor 1
On be additionally provided with expansion plate, the expansion plate adjusts the size of the through-hole 3, and the radial dimension of the through-hole 3 is more than to be onstructed
The radial dimension of cylinder 8, in order to being caught in for cylinder 8 to be onstructed.
The baffle 2 includes along more circumferentially disposed steel columns 4 of the platform floor 1, and the steel column 4 is vertically arranged,
The steel column 4 can be straight steel column, or oblique steel column, 4 surface of the steel column is equipped with one layer of steel gauze 5, or may be used also
To set the baffle 2 to steel plate, to increase the windproof function of operating platform eminence.
The platform floor 1 includes the first steel plate 6 and the second steel plate 7, and first steel plate, 6 concave structure is described recessed
The spill mouth of shape structure is the through-hole 3, and cylinder 8 to be onstructed is passed through from the indent of the concave structure, second steel
Plate 7 is installed on the open end of the concave structure, and the expansion plate is installed on first steel plate 6, and second steel plate 7 can
Separate installment, can be directly by the second steel plate 7 when carrying out the installation or transfer of operating platform on first steel plate 6
It is unloaded from the first steel plate 6 or turns down the second steel plate 7 so that the side of platform floor 1 is open end, can facilitate platform bottom
It plate 1 and the clamping of cylinder 8 to be onstructed and detaches, is convenient for the lifting and movement of whole operation platform, in the present invention, specifically
Two kinds of connection types of the first steel plate 6 and the second steel plate 7 are listed, only as the removable of the first steel plate 6 of explanation and the second steel plate 7
Formula movable connection method is unloaded, it, can also be there are many connection type in Specific construction.
The open end of the concave structure includes first end and the second end, and one of connection type is second
The both ends of steel plate 7 are overlapped on the first end and the second end, and are bolted, a connection type in addition
For one end of the second steel plate 7 is articulated with the first end, and the other end is overlapped on the second end, and passes through bolt
It is fixed.
When operating platform comes into operation, national high-rise working relevant regulations need to be strictly carried out, in operating platform system
After the completion of work, close inspection assembling, welding quality, it is ensured that safe to use, operating platform is before use, operating personnel has to pass through peace
Full technical education, full-time security official perform safety and tell somebody what one's real intentions are and record daily, tell somebody what one's real intentions are targetedly and validity, operating personnel are stringent
It operates, must not operate against regulations by operating instruction, cruelty construction, and carry out security provisions measure.
Finally it should be noted that:Above example is only to illustrate the technical solution of the utility model rather than limits it
System, although the utility model is described in detail with reference to above-described embodiment, those of ordinary skill in the art should manage
Solution:Specific embodiment of the present utility model can be still modified or replaced equivalently, and without departing from the utility model
Any modification of spirit and scope or equivalent replacement should all cover in present claims range.
Claims (8)
1. a kind of Super High grid operations platform, it is characterised in that:Including:Platform floor circumferentially encloses on the platform floor
Equipped with baffle, the baffle forms the box body structure of upper end opening with the platform floor, is offered on a baffle wherein
Dodge gate, the platform floor center offer through-hole, more steel link chains, the steel are also fixed on the platform floor
It is installed with hook on chain, expansion plate is additionally provided on the platform floor, the expansion plate adjusts the size of the through-hole.
2. a kind of Super High grid operations platform according to claim 1, it is characterised in that:The baffle includes along described
More circumferentially disposed steel columns of platform floor, the steel column are vertically arranged, and the steel column surface is equipped with one layer of steel gauze.
3. a kind of Super High grid operations platform according to claim 1, it is characterised in that:The baffle is steel plate.
4. a kind of Super High grid operations platform according to claim 1, it is characterised in that:The steel link chain is along described logical
Hole is circumferentially distributed.
5. a kind of Super High grid operations platform according to claim 1, it is characterised in that:The radial dimension of the through-hole
More than the radial dimension of cylinder to be onstructed.
6. a kind of Super High grid operations platform according to claim 1, it is characterised in that:The platform floor includes the
One steel plate and the second steel plate, the concave structure of the first steel plate, cylinder to be onstructed are passed through from the indent of the concave structure,
Second steel plate is installed on the open end of the concave structure, and the expansion plate is installed on first steel plate.
7. a kind of Super High grid operations platform according to claim 6, it is characterised in that:The opening of the concave structure
End includes first end and the second end, and the both ends of the second steel plate are overlapped on the first end and the second end, and are passed through
Bolt is fixed.
8. a kind of Super High grid operations platform according to claim 6, it is characterised in that:The opening of the concave structure
End includes first end and the second end, and one end of the second steel plate is articulated with the first end, and the other end is overlapped in described
On the second end, and it is bolted.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820267901.0U CN208009879U (en) | 2018-02-24 | 2018-02-24 | A kind of Super High grid operations platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820267901.0U CN208009879U (en) | 2018-02-24 | 2018-02-24 | A kind of Super High grid operations platform |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN208009879U true CN208009879U (en) | 2018-10-26 |
Family
ID=63887794
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820267901.0U Expired - Fee Related CN208009879U (en) | 2018-02-24 | 2018-02-24 | A kind of Super High grid operations platform |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN208009879U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108118884A (en) * | 2018-02-24 | 2018-06-05 | 上海宝钢工程咨询有限公司 | A kind of Super High grid operations platform and preparation method thereof |
-
2018
- 2018-02-24 CN CN201820267901.0U patent/CN208009879U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108118884A (en) * | 2018-02-24 | 2018-06-05 | 上海宝钢工程咨询有限公司 | A kind of Super High grid operations platform and preparation method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3237888U (en) | A stylized unloading platform suitable for core tube steel frame structures | |
| CN207267961U (en) | An operating platform for pouring bridge piers | |
| CN101105024A (en) | Method for setting up box-type bridge body maintain engineering box outer hanging falsework | |
| CN111719878A (en) | A metal safety net and scaffolding fixing device and its installation method | |
| CN208009878U (en) | A kind of Super High grid operations platform of the lattice section point on cylinder of constructing | |
| CN202944998U (en) | Attached installation and maintenance platform of calibrated tower crane | |
| CN110552495A (en) | assembled building combined tool type outer protective frame system and construction method thereof | |
| CN208009877U (en) | A kind of Super High grid operations platform of the K-type node on cylinder of constructing | |
| CN105888269A (en) | Suspended cable type safety protection device for building construction overhead operation, and construction method of suspended cable type safety protection device | |
| CN207110662U (en) | Hang assembled and face limit guard rail | |
| CN108118884A (en) | A kind of Super High grid operations platform and preparation method thereof | |
| CN208815690U (en) | A kind of tower crane sealing hole structure | |
| CN208858134U (en) | The security platform of high-altitude installation exercise | |
| CN221799271U (en) | Safety rope component | |
| CN210316518U (en) | Detachable aluminum alloy template K plate | |
| CN205713178U (en) | A kind of construction work high above the ground suspension safety device | |
| CN105781133A (en) | Simple edge protecting system and construction method thereof | |
| CN223548983U (en) | Anti-falling net structure for arch box girder construction | |
| CN222190074U (en) | A multi-type safety education and diversified training simulation device | |
| CN205558330U (en) | Plain type faces limit protective system | |
| CN223963836U (en) | Anti-falling device for rectangular pier column template | |
| CN211256689U (en) | Fixed net type limb protection system | |
| CN218291560U (en) | Precast concrete box girder structure | |
| CN205953375U (en) | Can dismantle and tower crane attachment jacking platform of independent assortment | |
| CN217998874U (en) | Mounting platform that tower machine was used |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181026 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |