CN208009878U - A kind of Super High grid operations platform of the lattice section point on cylinder of constructing - Google Patents
A kind of Super High grid operations platform of the lattice section point on cylinder of constructing Download PDFInfo
- Publication number
- CN208009878U CN208009878U CN201820267738.8U CN201820267738U CN208009878U CN 208009878 U CN208009878 U CN 208009878U CN 201820267738 U CN201820267738 U CN 201820267738U CN 208009878 U CN208009878 U CN 208009878U
- Authority
- CN
- China
- Prior art keywords
- steel
- platform
- cylinder
- steel plate
- section point
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 90
- 239000010959 steel Substances 0.000 claims abstract description 90
- 239000004744 fabric Substances 0.000 claims abstract description 8
- 239000000725 suspension Substances 0.000 claims abstract description 6
- 238000003466 welding Methods 0.000 claims description 7
- 238000010276 construction Methods 0.000 abstract description 24
- 238000009434 installation Methods 0.000 abstract description 6
- 238000004064 recycling Methods 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000033001 locomotion Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011022 operating instruction Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a kind of Super High grid operations platform of the lattice section point on cylinder of constructing, including:Platform floor, circumferentially vertically arranged more steel columns on platform floor, color steel and steel fabric sheet are equipped on steel column, platform floor includes the first steel plate and the second steel plate, the concave structure of first steel plate, second steel plate is located at is hinged with more angle steel on the side of dodge gate, platform floor, and suspension hook is installed on angle steel.Safety higher during use, can lifting operation directly be carried out to operating platform, working efficiency greatly improves, it avoids artificial repeatedly high-altitude from taking the dangerous operation for dismounting and mounting assembling platform, the size of through-hole is adjusted, to be applicable in various sizes of cylinder to be onstructed, substantially reduce cost, structure novel, safety and firmness, installation and removal are all very convenient quick, shorten the construction period, improve construction efficiency, highly practical, high recycling rate, it is worth of widely use, at the construction field (site), operating platform structure is unified, neat appearance.
Description
Technical field:
The utility model is related to construction engineering technical fields, and in particular to a kind of lattice section point on cylinder of constructing surpasses
High-rise grid operations platform.
Background technology:
With the development of construction industry, the requirement of urban development, Super High, the building of unique style are more and more common, structure
Form is mostly concrete Core Walls Structure+outline border steel structural form, and profile variation is various, and it is difficult to bring higher construction to installation
Degree is difficult point, the key point of management and control in the construction of high-altitude.
Currently, during construction of super highrise building, Normal practice is to enclose to set foot hand by steel pipe in construction cylinder surrounding
Frame is laid with springboard in scaffold top, is bound springboard to being fixed on scaffold by iron wire, this structure use is very square
Just, safety when erecting and come very simply, but using is very poor, is often easy to happen safety accident.It is done as above-mentioned routine
The improvement of method derives another structure, is to replace springboard with steel plate, and by welding, extremely by Interal fixation
On scaffold, safety is improved to a certain extent, but the work of the erecting and welding of steel plate and dismounting work when dismounting
Make, be required for consuming a large amount of manpower and time, not only increase the work load of construction personnel, while also making claim for eot,
Construction efficiency reduces, and is not well positioned to meet the use demand of people.
It is, therefore, desirable to provide a kind of more applicable Super High grid operations platform, to solve the above problems.
Utility model content:
The purpose of this utility model is to provide a kind of safety that can be improved in the operation of construction personnel's construction operation, installation
It is quick with convenient disassembly, shorten the construction period, improves construction efficiency, the Super High grid behaviour of lattice section point on cylinder of constructing
Make platform.
To achieve the above object, the utility model uses following technical scheme:
A kind of Super High grid operations platform of lattice section point on cylinder of constructing provided by the utility model, including:It is flat
Platform bottom plate, circumferentially arranged more steel columns on the platform floor, the steel column are vertically arranged, and are spread on the steel column top
Equipped with color steel, its underpart is equipped with steel fabric sheet, and the steel column, color steel and steel fabric sheet are in the platform floor surrounding shape
At baffle arrangement, dodge gate is offered on a baffle arrangement wherein, the platform floor includes the first steel plate and the second steel
Plate, the concave structure of the first steel plate, cylinder to be onstructed are passed through from the indent of the concave structure, second steel plate position
In the side of the close dodge gate, and its is detachable on the open end of the concave structure, the platform floor
More angle steel are hinged with, suspension hook is installed on the angle steel.
Expansion plate is additionally provided on the platform floor, the expansion plate adjusts the big of the indent of the concave structure
It is small.
The platform floor includes rectangular frame, and the rectangular frame is enclosed by four angle steel welding to be set, in the square
It is equipped with checkered steel plate on shape frame, fire blanket is equipped on the checkered steel plate.
The angle steel is circumferentially distributed along the first steel plate indent.
The edge of spill mouth is apart from 10~20cm of cylinder to be onstructed on the platform floor.
The open end of the concave structure includes first end and the second end, and the both ends of the second steel plate are overlapped in described
On one end and the second end, and it is bolted.
The open end of the concave structure includes first end and the second end, and one end of the second steel plate is articulated with described
One end, the other end is overlapped on the second end, and is bolted.
A kind of advantageous effect of the Super High grid operations platform of the lattice section point on cylinder of constructing of this practicality:It changes
Tradition sets up the way of platform with steel pipe, baffled by being enclosed on platform floor, forms box space, makes it in the mistake used
Safety higher in journey, while the indent being arranged on platform floor can be directly to operations convenient for being caught in for cylinder to be onstructed
Platform carries out lifting operation, and working efficiency greatly improves, and avoids artificial repeatedly high-altitude from taking the dangerous operation for dismounting and mounting assembling platform, passes through
The size of indent is adjusted in the expansion plate being arranged on platform floor, to be applicable in various sizes of cylinder to be onstructed, drops significantly
Low cost, only 50% with the landing stage of scaffold cost of dimensions, structure novel, safety and firmness, installation and removal are all non-
It is often convenient and efficient, the construction period can be shortened, improve construction efficiency, highly practical, high recycling rate is worth of widely use,
At the construction field (site), operating platform structure is unified, neat appearance.
Description of the drawings:
Fig. 1 is that a kind of structure of the Super High grid operations platform of the lattice section point on cylinder of constructing of the utility model is shown
It is intended to,
Fig. 2 is the vertical view of Fig. 1;
In figure:1- platform floors, 2- baffle arrangements, 3- steel columns, 4- color steels, 5- steel fabric sheets, the first steel plates of 6-, 7-
Two steel plates, 8- cylinders to be onstructed, 9- dodge gates, 10- indents.
Specific implementation mode:
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describing, it is clear that described embodiment is only a part of the embodiment of the utility model, rather than all
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise
Lower obtained every other embodiment, shall fall within the protection scope of the present invention.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute in the utility model embodiment
It is only used for explaining relative position relation, the motion conditions etc. under a certain particular pose (as shown in the picture) between each component, such as
When the fruit particular pose changes, then directionality instruction also correspondingly changes correspondingly.
In addition, the description for being related to " first ", " second " etc. in the present invention is used for description purposes only, and cannot understand
To indicate or implying its relative importance or implicitly indicate the quantity of indicated technical characteristic.Define as a result, " first ",
The feature of " second " can explicitly or implicitly include at least one of the features.In addition, the technical side between each embodiment
Case can be combined with each other, but must can be implemented as basis with those of ordinary skill in the art, when the combination of technical solution
Conflicting or cannot achieve when occur will be understood that the combination of this technical solution is not present, also not in the requires of the utility model
Protection domain within.
According to Fig. 1~Fig. 2, a kind of Super High net of the lattice section point on cylinder of constructing provided by the utility model
Lattice operating platform, including:Platform floor 1, circumferentially arranged more steel columns 3 on the platform floor 1, the steel column 3 is along perpendicular
To setting, color steel 4 is equipped on 3 top of the steel column, its underpart is equipped with steel fabric sheet 5, the steel column 3, color steel 4 and
Steel fabric sheet 5 forms baffle arrangement 2 in 1 surrounding of the platform floor, to increase the windproof function of operating platform eminence, the gear
Harden structure 2 forms the box body structure of upper end opening with the platform floor 1, offers activity on a baffle arrangement 2 wherein
Door 9, the platform floor 1 include the first steel plate 6 and the second steel plate 7, first steel plate, 6 concave structure, cylinder 8 to be onstructed
It is passed through from the indent 10 of the concave structure, second steel plate 7 is located at close to the side of the dodge gate 9, and it can divide
From the open end that formula is mounted on the concave structure, it is hinged with more angle steel on the platform floor 1, it is described when Specific construction
Angle steel is circumferentially distributed along first steel plate, 6 indent 10 so that and overall structure is more uniformly stressed, and then holding structure
Stability is installed with suspension hook on the angle steel, and when carrying out the installation of operating platform, suspension hook is hooked to cylinder 8 to be onstructed
On the buckle of mounting plate, the firm of operating platform is kept, expansion plate, the expansion plate tune are additionally provided on the platform floor 1
The size for saving the indent 10 of the concave structure, to be applicable in various sizes of cylinder to be onstructed.
Further, the platform floor 1 includes rectangular frame, the rectangular frame enclosed by the welding of four angle steel set and
At, checkered steel plate is equipped on the rectangular frame, fire blanket is equipped on the checkered steel plate, prevent in welding process fly
It splashes and falls.
Further, the edge of spill mouth is apart from 10~20cm of cylinder to be onstructed on the platform floor 1, in order to wait applying
Work cylinder 8 is caught in.
It further, can be directly by the second steel plate 7 from the first steel plate 6 when carrying out the installation or transfer of operating platform
On unload or turn down the second steel plate 7 so that the side of platform floor 1 is open end, can facilitate platform floor 1 with it is to be onstructed
The clamping and separation of cylinder 8 specifically list first in the present invention convenient for the lifting and movement of whole operation platform
Two kinds of connection types of steel plate 6 and the second steel plate 7, the only detachable activity as the first steel plate 6 of explanation and the second steel plate 7 connect
Mode is connect, can also be there are many connection type in Specific construction, the open end of the concave structure includes first end and the
Two ends, one of connection type are that the both ends of the second steel plate 7 are overlapped on the first end and the second end, and
It is bolted, a connection type in addition is that one end of the second steel plate 7 is articulated with the first end, the other end
It is overlapped on the second end, and is bolted.
When operating platform is to lattice section point operation on construction cylinder, can operating platform be directly placed on column to be onstructed
On the crossbeam of body, when operating platform is to lattice section point top operation on construction cylinder, it can be placed on the crossbeam of cylinder to be onstructed
Multiple split heads, operating platform are placed on split heads, are more stablized when use, when operating platform is under lattice section point on construction cylinder
When portion's operation, then more vertical pulling ropes or suspension cable are symmetrical arranged between operating platform and cylinder to be onstructed, to keep operating
Platform it is steady.
When operating platform comes into operation, national high-rise working relevant regulations need to be strictly carried out, in operating platform system
After the completion of work, close inspection assembling, welding quality, it is ensured that safe to use, operating platform is before use, operating personnel has to pass through peace
Full technical education, full-time security official perform safety and tell somebody what one's real intentions are and record daily, tell somebody what one's real intentions are targetedly and validity, operating personnel are stringent
It operates, must not operate against regulations by operating instruction, cruelty construction, and carry out security provisions measure.
Finally it should be noted that:Above example is only to illustrate the technical solution of the utility model rather than limits it
System, although the utility model is described in detail with reference to above-described embodiment, those of ordinary skill in the art should manage
Solution:Specific embodiment of the present utility model can be still modified or replaced equivalently, and without departing from the utility model
Any modification of spirit and scope or equivalent replacement should all cover in present claims range.
Claims (7)
1. a kind of Super High grid operations platform of the lattice section point on cylinder of constructing, it is characterised in that:Including:Platform floor,
Circumferentially arranged more steel columns, the steel column are vertically arranged on the platform floor, and coloured silk is equipped on the steel column top
Steel plate, its underpart are equipped with steel fabric sheet, and the steel column, color steel and steel fabric sheet form baffle in the platform floor surrounding
Structure offers dodge gate wherein on a baffle arrangement, the platform floor includes the first steel plate and the second steel plate, described
The concave structure of first steel plate, cylinder to be onstructed are passed through from the indent of the concave structure, and second steel plate is located at close
The side of the dodge gate, and its detachable is hinged on the open end of the concave structure, the platform floor
More angle steel are installed with suspension hook on the angle steel.
2. a kind of Super High grid operations platform of lattice section point on cylinder of constructing according to claim 1, feature
It is:Expansion plate is additionally provided on the platform floor, the expansion plate adjusts the size of the indent of the concave structure.
3. a kind of Super High grid operations platform of lattice section point on cylinder of constructing according to claim 1, feature
It is:The platform floor includes rectangular frame, and the rectangular frame is enclosed by four angle steel welding to be set, in the rectangle frame
It is equipped with checkered steel plate on frame, fire blanket is equipped on the checkered steel plate.
4. a kind of Super High grid operations platform of lattice section point on cylinder of constructing according to claim 1, feature
It is:The angle steel is circumferentially distributed along the first steel plate indent.
5. a kind of Super High grid operations platform of lattice section point on cylinder of constructing according to claim 1, feature
It is:The edge of spill mouth is apart from 10~20cm of cylinder to be onstructed on the platform floor.
6. a kind of Super High grid operations platform of lattice section point on cylinder of constructing according to claim 1, feature
It is:The open end of the concave structure includes first end and the second end, and the both ends of the second steel plate are overlapped in described first
On end and the second end, and it is bolted.
7. a kind of Super High grid operations platform of lattice section point on cylinder of constructing according to claim 1, feature
It is:The open end of the concave structure includes first end and the second end, and one end of the second steel plate is articulated with described first
End, the other end is overlapped on the second end, and is bolted.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820267738.8U CN208009878U (en) | 2018-02-24 | 2018-02-24 | A kind of Super High grid operations platform of the lattice section point on cylinder of constructing |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820267738.8U CN208009878U (en) | 2018-02-24 | 2018-02-24 | A kind of Super High grid operations platform of the lattice section point on cylinder of constructing |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN208009878U true CN208009878U (en) | 2018-10-26 |
Family
ID=63886810
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820267738.8U Expired - Fee Related CN208009878U (en) | 2018-02-24 | 2018-02-24 | A kind of Super High grid operations platform of the lattice section point on cylinder of constructing |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN208009878U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112942798A (en) * | 2021-02-25 | 2021-06-11 | 中建三局第二建设工程有限责任公司 | Adjustable construction operation device and installation method for super high-rise huge section steel column |
| CN116921941A (en) * | 2023-09-14 | 2023-10-24 | 中广核(兴安盟)新能源有限公司 | Welding platform for wind power tower cylinder door frame |
-
2018
- 2018-02-24 CN CN201820267738.8U patent/CN208009878U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112942798A (en) * | 2021-02-25 | 2021-06-11 | 中建三局第二建设工程有限责任公司 | Adjustable construction operation device and installation method for super high-rise huge section steel column |
| CN116921941A (en) * | 2023-09-14 | 2023-10-24 | 中广核(兴安盟)新能源有限公司 | Welding platform for wind power tower cylinder door frame |
| CN116921941B (en) * | 2023-09-14 | 2023-12-15 | 中广核(兴安盟)新能源有限公司 | Welding platform for wind power tower cylinder door frame |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109707090A (en) | A kind of superimposed sheet reinforces pre-buried anti-faulting of slab ends structure and construction method under band plate | |
| JP3237888U (en) | A stylized unloading platform suitable for core tube steel frame structures | |
| CN106948598A (en) | A kind of aluminum alloy formwork system and its construction method for variable cross-section rectangular column | |
| CN101105024A (en) | Method for setting up box-type bridge body maintain engineering box outer hanging falsework | |
| CN208009877U (en) | A kind of Super High grid operations platform of the K-type node on cylinder of constructing | |
| CN107587711A (en) | A kind of regularization assembled overhanging protection canopy and its assembly method | |
| CN208009879U (en) | A kind of Super High grid operations platform | |
| CN205296799U (en) | Construction of elevator well and protection platform | |
| CN110552495A (en) | assembled building combined tool type outer protective frame system and construction method thereof | |
| CN208472972U (en) | A kind of steel bar girder plate end connecting joint structure | |
| CN105888269A (en) | Suspended cable type safety protection device for building construction overhead operation, and construction method of suspended cable type safety protection device | |
| CN213011677U (en) | Tower crane channel attached to climbing frame | |
| CN208455941U (en) | A kind of building precast beam | |
| CN209976016U (en) | Combined steel formwork keel support with steel bar protection layer support | |
| CN208815690U (en) | A kind of tower crane sealing hole structure | |
| CN207553565U (en) | A kind of crosshead of truss | |
| CN216429119U (en) | Super high-rise quick assembly disassembly safety protection canopy of encorbelmenting | |
| CN206016211U (en) | A new type of operating platform for assembling quadrangular pyramid grids | |
| CN206232306U (en) | A kind of glomeration building concrete hollow block wall piece banding system colligation beam | |
| CN205713178U (en) | A kind of construction work high above the ground suspension safety device | |
| CN108118884A (en) | A kind of Super High grid operations platform and preparation method thereof | |
| CN210316518U (en) | Detachable aluminum alloy template K plate | |
| CN222121051U (en) | A steel bar truss floor deck hanging hole device | |
| CN218291560U (en) | Precast concrete box girder structure | |
| CN217998874U (en) | Mounting platform that tower machine was used |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181026 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |