CN208009877U - A kind of Super High grid operations platform of the K-type node on cylinder of constructing - Google Patents

A kind of Super High grid operations platform of the K-type node on cylinder of constructing Download PDF

Info

Publication number
CN208009877U
CN208009877U CN201820267689.8U CN201820267689U CN208009877U CN 208009877 U CN208009877 U CN 208009877U CN 201820267689 U CN201820267689 U CN 201820267689U CN 208009877 U CN208009877 U CN 208009877U
Authority
CN
China
Prior art keywords
platform
hole
cylinder
floor
platform floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820267689.8U
Other languages
Chinese (zh)
Inventor
董才文
王秀云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI BAOSTEEL ENGINEERING CONSULTING Co Ltd
Original Assignee
SHANGHAI BAOSTEEL ENGINEERING CONSULTING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI BAOSTEEL ENGINEERING CONSULTING Co Ltd filed Critical SHANGHAI BAOSTEEL ENGINEERING CONSULTING Co Ltd
Priority to CN201820267689.8U priority Critical patent/CN208009877U/en
Application granted granted Critical
Publication of CN208009877U publication Critical patent/CN208009877U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of Super High grid operations platform of the K-type node on cylinder of constructing, including:First operating platform and the second operating platform, first operating platform and the second operating platform are spliced to form the box body structure of upper end opening, first operating platform includes the first platform floor, second operating platform includes the second platform floor, more steel columns are provided on first platform floor and the second platform floor, it is equipped with color steel and steel fabric sheet on steel column, offers first through hole and the second through-hole on the first platform floor and the second platform floor respectively, first through hole is connected to the second through-hole.Safety higher during use, can lifting operation directly be carried out to operating platform, working efficiency greatly improves, and artificial repeatedly high-altitude is avoided to take the dangerous operation for dismounting and mounting assembling platform, structure novel, safety and firmness, installation and removal are all very convenient quick, shorten the construction period, improve construction efficiency, highly practical, high recycling rate is worth of widely use.

Description

A kind of Super High grid operations platform of the K-type node on cylinder of constructing
Technical field:
The utility model is related to construction engineering technical fields, and in particular to a kind of K-type node on cylinder of constructing surpasses High-rise grid operations platform.
Background technology:
With the development of construction industry, the requirement of urban development, Super High, the building of unique style are more and more common, structure Form is mostly concrete Core Walls Structure+outline border steel structural form, and profile variation is various, and it is difficult to bring higher construction to installation Degree is difficult point, the key point of management and control in the construction of high-altitude.
Currently, during construction of super highrise building, Normal practice is to enclose to set foot hand by steel pipe in construction cylinder surrounding Frame is laid with springboard in scaffold top, is bound springboard to being fixed on scaffold by iron wire, this structure use is very square Just, safety when erecting and come very simply, but using is very poor, is often easy to happen safety accident.It is done as above-mentioned routine The improvement of method derives another structure, is to replace springboard with steel plate, and by welding, extremely by Interal fixation On scaffold, safety is improved to a certain extent, but the work of the erecting and welding of steel plate and dismounting work when dismounting Make, be required for consuming a large amount of manpower and time, not only increase the work load of construction personnel, while also making claim for eot, Construction efficiency reduces, and is not well positioned to meet the use demand of people.
It is, therefore, desirable to provide a kind of more applicable Super High grid operations platform of K-type node on cylinder of constructing, To solve the above problems.
Utility model content:
The purpose of this utility model is to provide a kind of safety that can be improved in the operation of construction personnel's construction operation, installation It is quick with convenient disassembly, shorten the construction period, improves construction efficiency, the Super High grid behaviour of K-type node on cylinder of constructing Make platform.
To achieve the above object, the utility model uses following technical scheme:
A kind of Super High grid operations platform of K-type node on cylinder of constructing provided by the utility model, including:The One operating platform and the second operating platform, first operating platform and the second operating platform mutually splice, and form upper end opening Box body structure, first operating platform include the first platform floor, and second operating platform includes the second platform floor, institute It states the first platform floor and the second platform floor fixes as one, close to institute on first platform floor and the second platform floor It states the side outside box body structure and is vertically provided with more steel columns, color steel, its underpart are equipped on the steel column top It is equipped with steel fabric sheet, the steel column, color steel and steel fabric sheet are in first platform floor and the second platform floor top Baffle arrangement is formed, first through hole is offered on first platform floor, it is logical that second is offered on second platform floor Hole, the first through hole are connected to the second through-hole, and cylinder to be onstructed is passed through from the first through hole and the second through-hole, and described first It is hinged with more angle steel on platform floor and the second platform floor, suspension hook is installed on the angle steel.
The edge of the first through hole and the second through-hole is apart from 10~20cm of cylinder to be onstructed.
Expansion plate is both provided on first platform floor and the second platform floor, the expansion plate adjusts described first The size of through-hole and the second through-hole.
The angle steel is circumferentially distributed along the first through hole and the second through-hole.
First platform floor and second platform floor are L-shaped structure, two L-shaped structure head and the tail phases Even, fastening forms hollow structure, and cylinder to be onstructed is passed through from the hollow structure.
First platform floor and the second platform floor are bolted to connection and are integrated.
Dodge gate is offered on the baffle arrangement of first operating platform or the second operating platform.
It is equipped with fire blanket on first platform floor and the second platform floor.
A kind of advantageous effect of the Super High grid operations platform of the K-type node on cylinder of constructing of this practicality:It changes Tradition sets up the way of platform with steel pipe, baffled by being enclosed on platform floor, forms box space, makes it in the mistake used Safety higher in journey, while the indent being arranged on platform floor can be directly to operations convenient for being caught in for cylinder to be onstructed Platform carries out lifting operation, and working efficiency greatly improves, and avoids artificial repeatedly high-altitude from taking the dangerous operation for dismounting and mounting assembling platform, passes through The size of indent is adjusted in the expansion plate being arranged on platform floor, to be applicable in various sizes of cylinder to be onstructed, drops significantly Low cost, only 50% with the landing stage of scaffold cost of dimensions, structure novel, safety and firmness, installation and removal are all non- It is often convenient and efficient, the construction period can be shortened, improve construction efficiency, highly practical, high recycling rate is worth of widely use, At the construction field (site), operating platform structure is unified, neat appearance.
Description of the drawings:
Fig. 1 is that a kind of structure of the Super High grid operations platform of the K-type node on cylinder of constructing of the utility model is shown It is intended to,
Fig. 2 is the vertical view of Fig. 1;
In figure:The first operating platforms of 1-, the second operating platforms of 2-, the first platform floors of 3-, the second platform floors of 4-, 5- steel Column, 6- color steels, 7- steel fabric sheets, 8- first through hole, the second through-holes of 9-, 10- cylinders to be onstructed.
Specific implementation mode:
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describing, it is clear that described embodiment is only a part of the embodiment of the utility model, rather than all Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Lower obtained every other embodiment, shall fall within the protection scope of the present invention.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute in the utility model embodiment It is only used for explaining relative position relation, the motion conditions etc. under a certain particular pose (as shown in the picture) between each component, such as When the fruit particular pose changes, then directionality instruction also correspondingly changes correspondingly.
In addition, the description for being related to " first ", " second " etc. in the present invention is used for description purposes only, and cannot understand To indicate or implying its relative importance or implicitly indicate the quantity of indicated technical characteristic.Define as a result, " first ", The feature of " second " can explicitly or implicitly include at least one of the features.In addition, the technical side between each embodiment Case can be combined with each other, but must can be implemented as basis with those of ordinary skill in the art, when the combination of technical solution Conflicting or cannot achieve when occur will be understood that the combination of this technical solution is not present, also not in the requires of the utility model Protection domain within.
According to Fig. 1~Fig. 2, a kind of Super High net of the K-type node on cylinder of constructing provided by the utility model Lattice operating platform, including:First operating platform 1 and the second operating platform 2, first operating platform, 1 and second operating platform 2 Mutually splice, form the box body structure of upper end opening, first operating platform 1 includes the first platform floor 3, second operation Platform 2 includes the second platform floor 4, and first platform floor, 3 and second platform floor 4 fixes as one, and described first is flat Side on platform bottom plate 3 and the second platform floor 4 outside the box body structure is vertically provided with more steel columns 5, makes It is open end to obtain the side of the first operating platform 1 and the second operating platform 2 toward each other, is equipped on 5 top of the steel column Color steel 6, its underpart are equipped with steel fabric sheet 7, and the steel column 5, color steel 6 and steel fabric sheet 7 are in first platform floor 3 Baffle arrangement is formed with 4 top of the second platform floor, to increase the windproof function of operating platform eminence, first platform floor First through hole 8 is offered on 3, and the second through-hole 9, the first through hole 8 and the second through-hole are offered on second platform floor 4 9 connections, cylinder 10 to be onstructed are passed through from the first through hole 8 and the second through-hole 9, first platform floor, 3 and second platform It is hinged with more angle steel on bottom plate 4, the angle steel is circumferentially distributed along the first through hole 8 and the second through-hole 9 so that whole Structure stress is more uniform, and then the stability of holding structure, and suspension hook is installed on the angle steel, in the peace for carrying out operating platform When dress, suspension hook is hooked to the buckle of cylinder upper mounting plate to be onstructed, keeps the firm of operating platform, first operation flat Dodge gate is offered on the baffle arrangement of platform 1 or the second operating platform 2, facilitates the disengaging of personnel, at first platform bottom It is equipped with fire blanket on plate 3 and the second platform floor 4, prevents from splashing in welding process and fall.
Further, the edge of the first through hole 8 and the second through-hole 9 is apart from 10~20cm of cylinder to be onstructed, in order to Cylinder 10 to be onstructed is caught in.
Further, expansion plate, the expansion plate are both provided on first platform floor, 3 and second platform floor 4 The size for adjusting the first through hole 8 and the second through-hole 9, to be applicable in various sizes of cylinder to be onstructed.
Further, first platform floor 3 and second platform floor 4 are L-shaped structure, L-shaped structure it is recessed As above-mentioned through-hole structure, two L-shaped structures join end to end, are bolted to connection and are integrated at mouthful, fasten shape At hollow structure, the hollow space of the hollow is that the first through hole 8 being connected and the second through-hole 9 are formed, to be onstructed Cylinder is passed through from the hollow space of the hollow structure.
Further, when carrying out the installation or transfer of operating platform, the first operating platform 1 and second is operated respectively Platform 2 is lifted to region to be onstructed, and then the first operating platform 1 and the second operating platform 2 are welded as a whole, and the first operation is flat The side of platform 1 and the second operating platform 2 is disposed as open end, can facilitate the first platform floor 3 and the second platform floor 4 and wait for The clamping and separation of construction cylinder 10, and then facilitate the lifting and movement of whole operation platform and cylinder 10 to be onstructed.
When operating platform is to K-type node operation on construction cylinder, can operating platform be directly placed on column to be onstructed On the crossbeam of body, when operating platform is to K-type node top operation on construction cylinder, it can be placed on the crossbeam of cylinder to be onstructed Multiple split heads, operating platform are placed on split heads, are more stablized when use, when operating platform is under K-type node on construction cylinder When portion's operation, then more vertical pulling ropes or suspension cable are symmetrical arranged between operating platform and cylinder to be onstructed, to keep operating Platform it is steady.
When operating platform comes into operation, national high-rise working relevant regulations need to be strictly carried out, in operating platform system After the completion of work, close inspection assembling, welding quality, it is ensured that safe to use, operating platform is before use, operating personnel has to pass through peace Full technical education, full-time security official perform safety and tell somebody what one's real intentions are and record daily, tell somebody what one's real intentions are targetedly and validity, operating personnel are stringent It operates, must not operate against regulations by operating instruction, cruelty construction, and carry out security provisions measure.
Finally it should be noted that:Above example is only to illustrate the technical solution of the utility model rather than limits it System, although the utility model is described in detail with reference to above-described embodiment, those of ordinary skill in the art should manage Solution:Specific embodiment of the present utility model can be still modified or replaced equivalently, and without departing from the utility model Any modification of spirit and scope or equivalent replacement should all cover in present claims range.

Claims (8)

1. a kind of Super High grid operations platform of the K-type node on cylinder of constructing, it is characterised in that:Including:First operation Platform and the second operating platform, first operating platform and the second operating platform mutually splice, and form the box body knot of upper end opening Structure, first operating platform include the first platform floor, second operating platform include the second platform floor, described first Platform floor and the second platform floor fix as one, close to the box body on first platform floor and the second platform floor The side of structural outer is vertically provided with more steel columns, is equipped with color steel on the steel column top, its underpart is equipped with Steel fabric sheet, the steel column, color steel and steel fabric sheet form gear in first platform floor and the second platform floor top Harden structure offers first through hole on first platform floor, the second through-hole is offered on second platform floor, described First through hole is connected to the second through-hole, and cylinder to be onstructed is passed through from the first through hole and the second through-hole, first platform bottom It is hinged with more angle steel on plate and the second platform floor, suspension hook is installed on the angle steel.
2. a kind of Super High grid operations platform of K-type node on cylinder of constructing according to claim 1, feature It is:The edge of the first through hole and the second through-hole is apart from 10~20cm of cylinder to be onstructed.
3. a kind of Super High grid operations platform of K-type node on cylinder of constructing according to claim 1, feature It is:Expansion plate is both provided on first platform floor and the second platform floor, it is logical that the expansion plate adjusts described first The size in hole and the second through-hole.
4. a kind of Super High grid operations platform of K-type node on cylinder of constructing according to claim 1, feature It is:The angle steel is circumferentially distributed along the first through hole and the second through-hole.
5. a kind of Super High grid operations platform of K-type node on cylinder of constructing according to claim 1, feature It is:First platform floor and second platform floor are L-shaped structure, and two L-shaped structures join end to end, button Conjunction forms hollow structure, and cylinder to be onstructed is passed through from the hollow structure.
6. a kind of Super High grid operations platform of the K-type node on cylinder of constructing according to claim 1 or 5, It is characterized in that:First platform floor and the second platform floor are bolted to connection and are integrated.
7. a kind of Super High grid operations platform of K-type node on cylinder of constructing according to claim 1, feature It is:Dodge gate is offered on the baffle arrangement of first operating platform or the second operating platform.
8. a kind of Super High grid operations platform of K-type node on cylinder of constructing according to claim 1, feature It is:It is equipped with fire blanket on first platform floor and the second platform floor.
CN201820267689.8U 2018-02-24 2018-02-24 A kind of Super High grid operations platform of the K-type node on cylinder of constructing Expired - Fee Related CN208009877U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820267689.8U CN208009877U (en) 2018-02-24 2018-02-24 A kind of Super High grid operations platform of the K-type node on cylinder of constructing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820267689.8U CN208009877U (en) 2018-02-24 2018-02-24 A kind of Super High grid operations platform of the K-type node on cylinder of constructing

Publications (1)

Publication Number Publication Date
CN208009877U true CN208009877U (en) 2018-10-26

Family

ID=63886795

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820267689.8U Expired - Fee Related CN208009877U (en) 2018-02-24 2018-02-24 A kind of Super High grid operations platform of the K-type node on cylinder of constructing

Country Status (1)

Country Link
CN (1) CN208009877U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113653307A (en) * 2021-08-24 2021-11-16 中建八局新型建造工程有限公司 Positioning device of operating platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113653307A (en) * 2021-08-24 2021-11-16 中建八局新型建造工程有限公司 Positioning device of operating platform

Similar Documents

Publication Publication Date Title
CN109707090A (en) A kind of superimposed sheet reinforces pre-buried anti-faulting of slab ends structure and construction method under band plate
CN109488008A (en) A kind of coupling type hanger job platform
CN101105024A (en) Method for setting up box-type bridge body maintain engineering box outer hanging falsework
CN108625489A (en) A kind of steel bar girder edges of boards portion and connection joints of steel structure structure
CN208009878U (en) A kind of Super High grid operations platform of the lattice section point on cylinder of constructing
CN208650505U (en) Integrated formwork connection device for jacking platform
CN208472972U (en) A kind of steel bar girder plate end connecting joint structure
CN208472971U (en) A kind of steel bar girder edges of boards portion and connection joints of steel structure structure
CN206827973U (en) One kind plus drag-line tower crane climbing frame apparatus
CN208455941U (en) A kind of building precast beam
CN208009879U (en) A kind of Super High grid operations platform
CN219386680U (en) High-speed railway station room quick column-beam connection node structure based on BIM
CN2238872Y (en) Extension electrical lift well die carrier
CN206232306U (en) A kind of glomeration building concrete hollow block wall piece banding system colligation beam
CN214899827U (en) High-altitude outdoor cable terminal work platform
CN208168342U (en) Floor support plate span centre supporting arrangement
CN210313146U (en) A simple plate hoisting and reinforcing hook
CN110118014A (en) A kind of outer wall template system and its construction method for exempting from external scaffolding
CN222121051U (en) A steel bar truss floor deck hanging hole device
CN211736289U (en) Operation platform
CN208267374U (en) A kind of reserved mold of detachable through-flooring pipeline
CN208168318U (en) High-altitude overhanging platform
CN108590149B (en) Construction protection operation frame
CN220080871U (en) Hoisting hole cover plate used as protective guard rod
CN215671063U (en) A roof high-altitude cantilever structure formwork support platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181026