CN208966124U - A kind of novel clamp - Google Patents

A kind of novel clamp Download PDF

Info

Publication number
CN208966124U
CN208966124U CN201821657251.7U CN201821657251U CN208966124U CN 208966124 U CN208966124 U CN 208966124U CN 201821657251 U CN201821657251 U CN 201821657251U CN 208966124 U CN208966124 U CN 208966124U
Authority
CN
China
Prior art keywords
shape
plate
side plate
interior angle
angle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821657251.7U
Other languages
Chinese (zh)
Inventor
刘海祥
曾志
李瑞山
栗高俊
何清怡
刘金旺
唐学忠
刘宝华
陈柱荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Guangdong Power Grid Energy Development Co Ltd
Original Assignee
GUANGDONG POWER TRANSMISSION AND TRANSFORMATION ENGINEERING Co Ltd
Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG POWER TRANSMISSION AND TRANSFORMATION ENGINEERING Co Ltd, Guangdong Power Grid Co Ltd filed Critical GUANGDONG POWER TRANSMISSION AND TRANSFORMATION ENGINEERING Co Ltd
Priority to CN201821657251.7U priority Critical patent/CN208966124U/en
Application granted granted Critical
Publication of CN208966124U publication Critical patent/CN208966124U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Application is related to power transmission line vertical tower, Poling Construction technical field more particularly to a kind of novel clamp.Novel clamp provided by the present application includes: L shape exterior angle yoke plate, the first side plate of L shape, the second side plate of L shape and L shape interior angle yoke plate, L shape exterior angle yoke plate is fixedly connected with the first side plate of L shape and the second side plate of L shape by screw hole and bolt respectively, and L shape interior angle yoke plate is fixedly connected with the first side plate of L shape and the second side plate of L shape by screw hole and bolt respectively.The novel clamp of the application passes through: L shape exterior angle yoke plate, the first side plate of L shape, the second side plate of L shape are fixedly connected with L shape interior angle yoke plate, it can effectively solve to design in power transmission line vertical tower, Poling Construction at present and do not consider that fulcrum force or fulcrum force do not meet construction reality, the zinc coat that will cause iron tower main material in such a way that steel wire loop does fulcrum force hurts fracture of wire or stranded technological deficiency by iron tower main material by steel rope abrasion and wirerope.

Description

A kind of novel clamp
Technical field
This application involves power transmission line vertical tower, Poling Construction technical field more particularly to a kind of novel clamps.
Background technique
It is stood in the construction such as tower, stringing in work transmission line, needs to use the tower leg of transmission facility to turn as lifting block To the fulcrum forces such as, bracing wire is fixed, previous tower leg fulcrum force is typically employed in tower leg main material metal binding wire rope sling or design is pre- Stay the modes such as construction hole.Metal binding wire rope sling is easy to cause tower because the protection of tower material is not in place as fulcrum force on tower leg There are the safe masses hidden danger such as firmly curved, damage is stranded in the abrasion of material zinc coat, steel wire loop.It is set in order to not influence steel tower overall structure Meter and appearance, reserved tower leg constructs Kong Jun all on the boots plate of cross line and suitable line direction when steel tower designs, but this Method is unable to satisfy the force status requirement of basic diagonal and different height.
The prior art is used in tower leg main material metal binding wire rope sling or the reserved construction hole mode of design to provide tower leg stress Fulcrum have following defect, first: tower leg main material metal binding wire rope sling be used as fulcrum force, need to tower material pad round log, wrap up The protection of cushion object.This method is cumbersome, easy to fall off.It is easy to cause tower material because the protection of tower material is not in place in use There are the safe masses hidden danger such as firmly curved, damage is stranded in zinc coat abrasion, steel wire loop;Second: reserved tower leg when steel tower designs Kong Jun construct all on the boots plate of cross line and suitable line direction, this method is unable to satisfy basic diagonal force status Requirement;Third:, need to be in tower if the steel tower of transmission facility is in the construction hole hanging plate of the reserved basic diagonal line unwinding direction of tower leg Additional permanent component on leg influences steel tower beauty and iron tower structure performance, and because position is fixed, is unable to satisfy live difference The working condition requirement of highly stressed fulcrum.
How to avoid power transmission line vertical tower and Poling Construction to the zinc coat of tower material by steel rope abrasion and wirerope by iron Tower main material hurts fracture of wire or stranded defect, and then ensures site operation safety, is that those skilled in the art need to solve at present The technical issues of.
Utility model content
The purpose of the application is to provide a kind of novel clamp, can effectively solve at present in power transmission line vertical tower, Poling Construction Middle design does not consider that fulcrum force or fulcrum force do not meet construction reality, can make in such a way that steel wire loop does fulcrum force Fracture of wire or stranded technological deficiency are hurt by iron tower main material by steel rope abrasion and wirerope at the zinc coat of iron tower main material.
In order to solve the above technical problems, this application provides a kind of novel clamp, including L shape exterior angle yoke plate, L shape interior angle connection Plate, the first side plate of L shape, the second side plate of L shape and hanging plate;
First face of the opening interior angle of L shape exterior angle yoke plate is fixed with the first stiffening plate, L shape exterior angle yoke plate Second face of opening interior angle is fixed with the second stiffening plate;
First face of the opening interior angle of first side plate of L shape is fixed with third stiffening plate;
First face of the opening interior angle of second side plate of L shape is fixed with the 5th stiffening plate;
L shape exterior angle yoke plate, the L shape interior angle yoke plate, first side plate of L shape and second side plate of L shape are all provided with There is screw hole, L shape exterior angle yoke plate passes through the screw hole and spiral shell with first side plate of L shape and second side plate of L shape respectively Bolt is fixedly connected, and the L shape interior angle yoke plate passes through the screw hole with first side plate of L shape and second side plate of L shape respectively It is fixedly connected with bolt;
First face of the opening interior angle of the L shape interior angle yoke plate is equipped with the 7th stiffening plate, and the L shape interior angle yoke plate is opened Second face of mouth interior angle is equipped with the 8th stiffening plate, and the 7th stiffening plate and the 8th stiffening plate are parallel to each other;
The hanging plate is fixed with along the angular bisector of the opening interior angle of the L shape interior angle yoke plate in the 7th stiffening plate Between the 8th stiffening plate.
Preferably, the 7th stiffening plate is equipped with multiple construction technology holes.
Preferably, the shape of the 7th stiffening plate is specially isosceles trapezoid.
Preferably, the 8th stiffening plate is equipped with construction technology hole.
Preferably, the shape of the 8th stiffening plate is specially isosceles trapezoid.
Preferably, the hanging plate is equipped with connection mounting hole.
Preferably, the screw hole is specially oval bolt hole or/and multiple rows of bolt hole, it is suitable for different size angle steel The installation of tower main material.
Preferably, the L shape interior angle yoke plate specifically includes the first internal angle plate and the second internal angle plate;
First internal angle plate and second internal angle plate are mutually in 90 ° to be welded and fixed.
Preferably, first side plate of L shape is additionally provided with the 4th stiffening plate, the 4th stiffening plate fixation is located at the L Second face of the opening interior angle of the first side plate of shape.
Preferably, second side plate of L shape is additionally provided with the 6th stiffening plate, the 6th stiffening plate fixation is located at the L Second face of the opening interior angle of the second side plate of shape.
Relatively above-mentioned background technique, a kind of novel clamp provided herein, including L shape exterior angle yoke plate, L shape interior angle connection Plate, the first side plate of L shape, the second side plate of L shape and hanging plate;First face of the opening interior angle of L shape exterior angle yoke plate is fixed with first and adds Second face of strong plate, the opening interior angle of L shape exterior angle yoke plate is fixed with the second stiffening plate;The opening interior angle of the first side plate of L shape First face is fixed with third stiffening plate;First face of the opening interior angle of the second side plate of L shape is fixed with the 5th stiffening plate;L shape Exterior angle yoke plate, L shape interior angle yoke plate, the first side plate of L shape and the second side plate of L shape are equipped with screw hole, L shape exterior angle yoke plate respectively with L shape First side plate is fixedly connected by screw hole with bolt with the second side plate of L shape, L shape interior angle yoke plate respectively with the first side plate of L shape and L The second side plate of shape is fixedly connected by screw hole with bolt;First face of the opening interior angle of L shape interior angle yoke plate is equipped with the 7th stiffening plate, Second face of the opening interior angle of L shape interior angle yoke plate is equipped with the 8th stiffening plate;Hanging plate is flat along the angle of the opening interior angle of L shape interior angle yoke plate Separated time is fixed between the 7th stiffening plate and the 8th stiffening plate.
Therefore, novel clamp provided herein has split type structure, and it is common to be suitable for current power transmission line project Double angle main material steel tower, L shape exterior angle yoke plate abutting is fixedly mounted on main material angle steel backwards to Center stake side, L shape interior angle connection Plate, which is adjacent to, to be fixedly mounted on main material angle steel and snugly fits to lead respectively towards Center stake side, the first side plate of L shape and the second side plate of L shape The side on material angle steel both sides passes through the spiral shell on L shape exterior angle yoke plate, L shape interior angle yoke plate, the second side plate of the first side plate of L shape and L shape L shape exterior angle yoke plate and L shape interior angle yoke plate are fixed on the steel tower of double angle main material (referring to Fig. 1, outside L shape by hole and bolt The screw hole B screw hole of screw hole A and L the first side plate of shape of angle yoke plate is bolted to connection, the screw hole A and L of L shape exterior angle yoke plate The screw hole C screw hole of the second side plate of shape is bolted to connection, the screw hole D of L shape interior angle yoke plate and the screw hole B of the first side plate of L shape It is bolted to connection, the screw hole D of L shape interior angle yoke plate and the screw hole C of the second side plate of L shape are bolted to connection), this The hanging plate of the novel clamp of application can provide the fulcrum force of power transmission engineering construction equipment, and the novel clamp of the application uses When, shackle can be first installed on Slate hanging construction hole, shackle is connect with stress tool again.
Since the fulcrum force of construction equipment is not provided by the way of metal binding wire rope sling, solves double angle main material Steel tower generallys use metal binding wire rope sling as tower leg fulcrum force and is easily damaged the safe masses problem such as tower material, wirerope;This The novel clamp of application can be adjusted according to the needs the mounting height of novel clamp, meet various height operating condition requirements;This Outside, hanging plate along the angular bisector of the opening interior angle of L shape interior angle yoke plate be fixed with the 7th stiffening plate and the 8th stiffening plate it Between, the novel clamp of the application is increased without the steel tower accessory structure of transmission facility, just meets double angle main material steel tower tower leg and exists Basic diagonal force request.
Detailed description of the invention
Fig. 1 is a kind of top view of novel clamp provided by the embodiment of the present application;
Overlooking structure figure when Fig. 2 is the use of the novel clamp of Fig. 1;
Fig. 3 is the overlooking structure figure of the L shape interior angle yoke plate of the novel clamp of Fig. 1;
Fig. 4 is the side block diagram of the L shape interior angle yoke plate of the novel clamp of Fig. 1;
Fig. 5 is the overlooking structure figure of L shape exterior angle yoke plate in Fig. 1;
Fig. 6 is the side block diagram of L shape exterior angle yoke plate in Fig. 1;
Fig. 7 is the overlooking structure figure of the first side plate of L shape in Fig. 1;
Fig. 8 is the side block diagram of the first side plate of L shape in Fig. 1;
Fig. 9 is the structure chart of the 7th stiffening plate in Fig. 1;
Figure 10 is the structure chart of hanging plate in Fig. 1;
Figure 11 is the structure chart of third stiffening plate in Fig. 1;
Figure 12 is the structure chart of the first stiffening plate in Fig. 1;
Wherein, appended drawing reference, L shape exterior angle yoke plate 1, the first stiffening plate 2, the first side plate of L shape 3, third stiffening plate 4, L Shape the second side plate 5, the 5th stiffening plate 6, L shape interior angle yoke plate 7, L shape exterior angle yoke plate screw hole A, L the first side plate of shape spiral shell The screw hole D of screw hole C, L shape interior angle yoke plate of hole the second side plate of B, L shape, the construction technology hole E of the 7th stiffening plate 8, connection Mounting hole F, the 7th stiffening plate 8, hanging plate 9, Center stake O.
Specific embodiment
In order to make those skilled in the art more fully understand application scheme, with reference to the accompanying drawing and it is embodied Mode is described in further detail the application.
Fig. 1 to Figure 12 is please referred to, Fig. 1 is a kind of top view of novel clamp provided by the embodiment of the present application;Fig. 2 is figure The overlooking structure figure when use of 1 novel clamp;Fig. 3 is the overlooking structure figure of the L shape interior angle yoke plate of the novel clamp of Fig. 1; Fig. 4 is the side block diagram of the L shape interior angle yoke plate of the novel clamp of Fig. 1;Fig. 5 is the plan structure of L shape exterior angle yoke plate in Fig. 1 Figure;Fig. 6 is the side block diagram of L shape exterior angle yoke plate in Fig. 1;Fig. 7 is the overlooking structure figure of the first side plate of L shape in Fig. 1;Fig. 8 is The side block diagram of the first side plate of L shape in Fig. 1;Fig. 9 is the structure chart of the 7th stiffening plate in Fig. 1;Figure 10 is the knot of hanging plate in Fig. 1 Composition;Figure 11 is the structure chart of third stiffening plate in Fig. 1;Figure 12 is the structure chart of the first stiffening plate in Fig. 1.
Please refer to Fig. 1 to Figure 12, a kind of novel clamp provided by the embodiment of the present application, including L shape exterior angle yoke plate 1, L Shape interior angle yoke plate 7, the first side plate of L shape 3, the second side plate of L shape 5 and hanging plate 9;
First face of the opening interior angle of L shape exterior angle yoke plate 1 is fixed with the first stiffening plate 2, the opening of L shape exterior angle yoke plate 1 Second face of interior angle is fixed with the second stiffening plate;First face of the opening interior angle of the first side plate of L shape 3 is fixed with third reinforcement Plate 4;First face of the opening interior angle of the second side plate of L shape 5 is fixed with the 5th stiffening plate 6;L shape exterior angle yoke plate 1, L shape interior angle connection Plate 7, the first side plate of L shape 3 and the second side plate of L shape 5 are equipped with screw hole, are screw hole A, L the first side plate of shape of L shape exterior angle yoke plate respectively Screw hole B, L the second side plate of shape screw hole C, L shape interior angle yoke plate screw hole D, L shape exterior angle yoke plate 1 respectively with the first side plate of L shape 3 Be fixedly connected by screw hole with bolt with the second side plate of L shape 5, L shape interior angle yoke plate 7 respectively with the first side plate of L shape 3 and L shape second Side plate 5 is fixedly connected by screw hole with bolt;First face of the opening interior angle of L shape interior angle yoke plate 7 is equipped with the 7th stiffening plate 8, L shape Second face of the opening interior angle of interior angle yoke plate 7 is equipped with the 8th stiffening plate;Hanging plate 9 is flat along the angle of the opening interior angle of L shape interior angle yoke plate 7 Separated time is fixed between the 7th stiffening plate 8 and the 8th stiffening plate.
Specifically, the screw hole B screw hole of screw hole A and L the first side plate of shape of L shape exterior angle yoke plate is bolted to connection, L shape The screw hole C screw hole of screw hole A and L the second side plate of shape of exterior angle yoke plate is bolted to connection, the screw hole D and L of L shape interior angle yoke plate The screw hole B of the first side plate of shape is bolted to connection, and the screw hole D of L shape interior angle yoke plate and the screw hole C of the second side plate of L shape are logical Bolt is crossed to be fixedly connected.
In order to provide more fulcrum forces, the 7th stiffening plate 8 of the fixture of the application is equipped with multiple construction technologies The quantity of hole E, mounting hole E are 1,2,3 or 4, and the 8th stiffening plate is equipped with multiple construction technology holes, the installation of the 8th stiffening plate The quantity in hole is 1,2,3 or 4, and hanging plate 9 is equipped with connection mounting hole F, and the quantity of connection mounting hole F is 1,2,3 or 4, Wherein, wherein the construction technology hole E of the 7th stiffening plate 8 and the construction technology hole of the 8th stiffening plate are for placing shackle or suspension Bolt etc. is installed;Connection mounting hole F is for being connected and fixed stress tool.In addition, in order to enable the fixture of the application is more firm, The shape of 7th stiffening plate 8 is specially isosceles trapezoid, and the shape of the 8th stiffening plate is specially isosceles trapezoid, and isosceles trapezoid can be with So that the structure of L shape interior angle yoke plate is more firm, it is not easy to generate malformation after stress.
In order to adapt to double angle main material tower leg, L shape interior angle yoke plate 7 specifically includes the first internal angle plate and the second internal angle plate;The One internal angle plate and the second internal angle plate are welded to each other fixation, and the angle that the first internal angle plate and the second internal angle plate are formed is 90 °;In L shape Angle yoke plate 7 or integrated molding.
L shape exterior angle yoke plate 1 can be welded to each other fixation for two pieces of external angle plates and form, and the angle that two pieces of external angle plates are formed is 90°;L shape exterior angle yoke plate 1 or integrated molding.
The first side plate of L shape 3 and the second side plate of L shape 5 can be welded to each other fixation for two blocks of side plates and form, and two blocks of side plates are formed Angle be 90 °;The first side plate of L shape 3 and the second side plate of L shape 5 or integrated molding obtain.
Further, L shape exterior angle yoke plate 1, L shape interior angle yoke plate 7, the first side plate of L shape 3, the second side plate of L shape 5 are equipped with spiral shell Hole, L shape exterior angle yoke plate 1, L shape interior angle yoke plate 7, the first side plate of L shape 3, the second side plate of L shape 5 screw hole be specially oval bolt Hole or/and multiple rows of bolt hole;The reserved oval bolt hole in the both ends of L shape interior angle yoke plate 1, the both ends of L shape exterior angle yoke plate 7 are pre- Three row's bolts hole are stayed, are installed with being suitable for different size angle steel tower main material.
The fixture installation and application of the application are as follows: the abutting of L shape exterior angle yoke plate 1 is fixedly mounted on main material angle steel backwards to center The side stake O, L shape interior angle yoke plate 7, which is adjacent to, is fixedly mounted on main material angle steel towards the side Center stake O, the first side plate of L shape 3 and L shape second side Plate 5 snugly fits to the side on main material angle steel both sides respectively, passes through L shape exterior angle yoke plate 1, L shape interior angle yoke plate 7, the first side plate of L shape L shape exterior angle yoke plate 1 and L shape interior angle yoke plate 7 are fixed on double angle main material by screw hole and bolt on the second side plate of 3 and L shape 5 Steel tower on (the screw hole B screw hole of screw hole A and L the first side plate of shape of L shape exterior angle yoke plate is bolted to connection, L shape exterior angle The screw hole C screw hole of screw hole A and L the second side plate of shape of yoke plate is bolted to connection, the screw hole D and L shape of L shape interior angle yoke plate The screw hole B of first side plate is bolted to connection, and the screw hole D of L shape interior angle yoke plate and the screw hole C of the second side plate of L shape pass through spiral shell Bolt is fixedly connected), the hanging plate 9 of the novel clamp of the application can provide the fulcrum force of power transmission engineering construction equipment, this Shen Novel clamp please is in use, shackle can first be installed on the connection mounting hole F of hanging plate 9, shackle is connect with stress tool again.
Fixture provided herein is had the advantage that above
First: the assembly and disassembly of the novel clamp of the application are simple, only need to be by L shape exterior angle yoke plate 1, L shape interior angle yoke plate 7, L shape First side plate 3, the second side plate of L shape 5 are fixed by screw hole and bolt, securely and reliably, are solved the use of double angle main material steel tower and are tied up Steel wire loop is pricked as tower leg fulcrum force and is easily damaged the safe masses problem such as tower material, wirerope;
Second: the hanging plate of the novel clamp of the application, which solves, is increased without steel tower accessory structure, just meets double angle master Material steel tower tower leg is in basic diagonal force request;
Third: the novel clamp of the application is due to using L shape exterior angle yoke plate 1, L shape interior angle yoke plate 7, the first side plate of L shape 3, the disassembly form of the second side plate of L shape 5 is able to satisfy current power transmission line project double angle main material steel tower commonly various models The installation requirement of angle steel main material;
4th: the 7th stiffening plate 8 of the novel clamp of the application is equipped with multiple construction technology E, sets in the 8th stiffening plate There are mounting hole, hanging plate 9 to be equipped with connection mounting hole F, mounting height can be adjusted as needed, meet various height operating condition uses and want It asks;
5th: using L shape exterior angle yoke plate 1, L shape interior angle yoke plate 7, the first side plate of L shape 3, the second side plate of L shape 5 equipped with more Bolt hole or/and elliptic bolt hole Combination Design are arranged, guarantees that fixing bolt can be vertical in different size main material angle steel It is close to main material angle steel side by L shape exterior angle yoke plate 1 and L shape interior angle yoke plate 7 and carries out fastening installation, the first side plate of L shape 3, L shape second The side that side plate 5 is close to main material angle steel side carries out fastening installation, effectively avoids fixture use process middle clamp plate moment of flexure, fixation Bolt shearing force problems of too.
Specific examples are used herein to illustrate the principle and implementation manner of the present application, and above embodiments are said It is bright to be merely used to help understand the present processes and its core concept.It should be pointed out that for the ordinary skill of the art For personnel, under the premise of not departing from the application principle, can also to the application, some improvement and modification can also be carried out, these improvement It is also fallen into the protection scope of the claim of this application with modification.

Claims (10)

1. a kind of novel clamp, which is characterized in that including L shape exterior angle yoke plate, L shape interior angle yoke plate, the first side plate of L shape, L shape second Side plate and hanging plate;
First face of the opening interior angle of L shape exterior angle yoke plate is fixed with the first stiffening plate, the opening of L shape exterior angle yoke plate Second face of interior angle is fixed with the second stiffening plate;
First face of the opening interior angle of first side plate of L shape is fixed with third stiffening plate;
First face of the opening interior angle of second side plate of L shape is fixed with the 5th stiffening plate;
L shape exterior angle yoke plate, the L shape interior angle yoke plate, first side plate of L shape and second side plate of L shape are equipped with spiral shell Hole, L shape exterior angle yoke plate are solid by the screw hole and bolt with first side plate of L shape and second side plate of L shape respectively Fixed connection, the L shape interior angle yoke plate pass through the screw hole and spiral shell with first side plate of L shape and second side plate of L shape respectively Bolt is fixedly connected;
First face of the opening interior angle of the L shape interior angle yoke plate is equipped with the 7th stiffening plate, the opening interior angle of the L shape interior angle yoke plate The second face be equipped with the 8th stiffening plate;
The hanging plate is fixed with along the angular bisector of the opening interior angle of the L shape interior angle yoke plate in the 7th stiffening plate and institute It states between the 8th stiffening plate.
2. novel clamp according to claim 1, which is characterized in that the 7th stiffening plate is equipped with multiple construction technologies Hole.
3. novel clamp according to claim 2, which is characterized in that the shape of the 7th stiffening plate is specially isosceles ladder Shape.
4. novel clamp according to claim 1, which is characterized in that the 8th stiffening plate is equipped with construction technology hole.
5. novel clamp according to claim 4, which is characterized in that the shape of the 8th stiffening plate is specially isosceles ladder Shape.
6. novel clamp according to claim 1, which is characterized in that the hanging plate is equipped with connection mounting hole.
7. novel clamp according to any one of claims 1 to 6, which is characterized in that the screw hole is specially oval spiral shell Keyhole or/and multiple rows of bolt hole.
8. novel clamp according to any one of claims 1 to 6, which is characterized in that the L shape interior angle yoke plate specifically includes First internal angle plate and the second internal angle plate;
First internal angle plate and second internal angle plate are mutually in 90 ° to be welded and fixed.
9. novel clamp according to any one of claims 1 to 6, which is characterized in that first side plate of L shape is additionally provided with Four stiffening plates, the second face of the fixed opening interior angle for being located at first side plate of L shape of the 4th stiffening plate.
10. novel clamp according to any one of claims 1 to 6, which is characterized in that second side plate of L shape is additionally provided with 6th stiffening plate, the second face of the fixed opening interior angle for being located at second side plate of L shape of the 6th stiffening plate.
CN201821657251.7U 2018-10-12 2018-10-12 A kind of novel clamp Active CN208966124U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821657251.7U CN208966124U (en) 2018-10-12 2018-10-12 A kind of novel clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821657251.7U CN208966124U (en) 2018-10-12 2018-10-12 A kind of novel clamp

Publications (1)

Publication Number Publication Date
CN208966124U true CN208966124U (en) 2019-06-11

Family

ID=66758537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821657251.7U Active CN208966124U (en) 2018-10-12 2018-10-12 A kind of novel clamp

Country Status (1)

Country Link
CN (1) CN208966124U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648639A (en) * 2020-06-12 2020-09-11 赵青山 Strenghthened type electric power corner cross arm
CN112177372A (en) * 2020-09-30 2021-01-05 南方电网科学研究院有限责任公司 Power transmission angle steel tower and reinforcing method for main material of power transmission angle steel tower

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648639A (en) * 2020-06-12 2020-09-11 赵青山 Strenghthened type electric power corner cross arm
CN112177372A (en) * 2020-09-30 2021-01-05 南方电网科学研究院有限责任公司 Power transmission angle steel tower and reinforcing method for main material of power transmission angle steel tower

Similar Documents

Publication Publication Date Title
CN208966124U (en) A kind of novel clamp
CN203319514U (en) Box girder lifting device
CN109095343A (en) Assembled hanger
CN209291784U (en) It is a kind of can adjust automatically hoisting point position composite beam/plate hanging apparatus
CN201785144U (en) Gin pole crane
CN201746220U (en) Strip-type element hanging device
CN202944998U (en) Attached installation and maintenance platform of calibrated tower crane
CN207404705U (en) A kind of lifting assembled architecture prefabricated components suspension hook
CN208039053U (en) A kind of sling of suspension bridge installation auxiliary clamp
CN208966126U (en) A kind of fixture
CN206110810U (en) Fixed armful of pole structure of staple bolt that slides
CN213037254U (en) Steel reinforcement cage hoist
CN204096924U (en) Concrete pumping pipe connector anchor fitting
CN103388418A (en) Method for connecting pulling wires through transmission line non-self-supporting pole/tower pulling wire repair and backup protection type connector
CN208814490U (en) A kind of novel drainage ditch cover plate hanging apparatus
CN208948679U (en) Assembled hanger
CN203429559U (en) Suspension bridge anchor system steel anchor rod hoisting tool
CN202730652U (en) Combined type cable clip for two main cables of suspension bridge
CN207361602U (en) A kind of steel structure hoisting instrument
CN209635710U (en) The suspender vertically converted with horizontal direction
CN204826599U (en) Builder's jack drawknot device
CN201169512Y (en) Clamp sling special for mounting electric hoist
CN219990899U (en) Prestressing force broken line roof truss hoist device
CN205034948U (en) Rack formula hanging beam device
CN204079236U (en) A kind of large-scale storage tank primary wind girder lifting appliance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 510600 No. 757 Dongfeng East Road, Guangzhou, Guangdong, Yuexiu District

Patentee after: GUANGDONG POWER GRID Co.,Ltd.

Patentee after: Guangdong Power Grid Energy Development Co.,Ltd.

Address before: 510600 No. 757 Dongfeng East Road, Guangzhou, Guangdong, Yuexiu District

Patentee before: GUANGDONG POWER GRID Co.,Ltd.

Patentee before: GUANGDONG POWER TRANSMISSION AND TRANSFORMATION ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder