CN207959894U - A kind of architectural engineering operation platform - Google Patents
A kind of architectural engineering operation platform Download PDFInfo
- Publication number
- CN207959894U CN207959894U CN201820278239.9U CN201820278239U CN207959894U CN 207959894 U CN207959894 U CN 207959894U CN 201820278239 U CN201820278239 U CN 201820278239U CN 207959894 U CN207959894 U CN 207959894U
- Authority
- CN
- China
- Prior art keywords
- crane
- cable
- pulley
- rope
- insurance steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model is related to construction engineering technical fields, disclose a kind of architectural engineering operation platform, including fixed two be oppositely arranged the supporting rack being located in building roof plate face, two support frames as described above are respectively arranged below with crane, are connected by lifting mechanism between the crane and supporting rack;It is provided with insurance steel cable one between two support frames as described above;It is provided with insurance steel cable two, hauling rope, track cable between two cranes;The insurance steel cable two is two, is arranged in parallel in the upper position of crane;The track cable is two, is arranged in parallel in the lower position of crane;The hauling rope is one, is arranged in the center of crane;And insurance steel cable two, hauling rope, track cable are fixed on by steel wire rope geometrical clamp on crane;Workbench is connected by rope clamp on the track cable.The utility model can freely control the position of workbench, and operation is flexibly and suitable for the construction of various buildings.
Description
Technical field
The utility model is related to construction engineering technical field more particularly to a kind of architectural engineering operation platforms.
Background technology
For large-scale and skyscraper beauty, curtain wall is often laid on external wall, and during curtain wall construction
The following construction method of generally use:1) it is constructed using landing full hall scaffold erection construction platform;2) working at height is used
Platform is constructed.Although two methods can adapt to mostly build, some shortcomings are also all individually present.
Curtain wall outside the smaller building of ground bearing pressure peace cannot be applicable in using landing full hall scaffold erection construction platform
Dress;And the brachium of general high-altitude operation vehicle is about 20m, so can not be suitable for it is higher building and rental charge it is higher;And mesh
Preceding operation platform, which exists simultaneously, to be run dumb, can not adapt to the larger vestibule curtain wall construction of span.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of architectural engineering operation platforms, to solve the above-mentioned back of the body
The scope of application existing for the existing operation platform proposed in scape technology is small and runs inflexible problem.
In order to solve the above technical problems, technical solution adopted in the utility model is:
A kind of architectural engineering operation platform, including fixed two be oppositely arranged the support being located in building roof plate face
Frame, two support frames as described above are respectively arranged below with crane, are connected by lifting mechanism between the crane and supporting rack;Two
Insurance steel cable one is provided between a support frame as described above;It is provided with insurance steel cable two between two cranes, hauling rope, holds
Weight rope;The insurance steel cable two is two, is arranged in parallel in the upper position of crane;The track cable is two, parallel
Lower position in crane is set;The hauling rope is one, is arranged in the center of crane;And insurance steel cable
Two, hauling rope, track cable are fixed on by steel wire rope geometrical clamp on crane;Work is connected by rope clamp on the track cable
Two groups of leading blocks are respectively set in platform, workbench top both sides, and the leading block can be slided along track cable;It is described
Insurance steel cable two is equipped with several interim hanging points, and the interim hanging point includes that fixation is suspended on two insurance steel cables two
Girder steel, two wire tensioners are respectively set in the girder steel both sides, and the wire tensioner is detachably connected with track cable.
Further technical solution is:The lifting mechanism includes the upper hanger and crane being fixedly connected with supporting rack
Lower hanger, upper hanger pulley, equalizer pulley and the movable pulley being fixedly connected, the upper hanger pulley and equalizer pulley respectively with it is upper
Hanger connects, and forms fixed pulley group;The movable pulley is connect with lower hanger, forms running block, and in the lower hanger
Suspension hook is arranged in lower part, the running block in fixed pulley group and lower hanger on upper hanger by the hoisting rope on hoisting winding around
Set connection.
Further technical solution is:The underhung clump weight of the suspension hook, and the clump weight is placed in crane.
Further technical solution is:Multiple construction safety bands are set on the insurance steel cable one.
Further technical solution is:The workbench is formed by rectangular tube and square tubes soldering, and bottom is paved with plank simultaneously
Banding fixed.
It is using advantageous effect caused by above-mentioned technical proposal:The position of workbench, upper bottom left can freely be controlled
The right side can arbitrarily move, and operation is flexibly and suitable for the construction of various buildings.
Description of the drawings
Utility model will be further described in detail below with reference to the attached drawings and specific embodiments.
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of lifting mechanism;
Wherein:1- supporting racks, 2- lifting mechanisms, 3- cranes, 4- clump weights, 5- leading blocks, 6- workbenches, 7- are led
Straw line, 9- wire tensioners, 10- girder steels, 11- insurance steel cables two, 12- insurance steel cables one, is hung on 2.1- 8- track cables
Frame, 2.2- equalizer pulleys, 2.3- upper hangers pulley, 2.4- movable pulleys, 2.5- suspension hooks, 2.6- hoisting ropes.
Specific implementation mode
With reference to the attached drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out clear
Chu is fully described by, it is clear that and described embodiment is only a part of the embodiment of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
The every other embodiment obtained, shall fall within the protection scope of the present invention.
Many details are elaborated in the following description in order to fully understand the utility model, but this practicality is new
Type can also be implemented using other different from other manner described here, and those skilled in the art can be without prejudice to this reality
With doing similar popularization in the case of novel intension, therefore the utility model is not limited by following public specific embodiment.
As shown in Figs. 1-2, a kind of architectural engineering operation platform, including fixed be located at build setting relatively in roof plate face
Two supporting racks 1 set, two support frames as described above 1 are respectively arranged below with crane 3, lead between the crane 3 and supporting rack 1
Cross the connection of lifting mechanism 2;It is provided with insurance steel cable 1 between two support frames as described above 1, is set on insurance steel cable 1 more
A construction safety band;Insurance steel cable 2 11, hauling rope 7, track cable 8 are provided between two cranes 3;The safety lanyard
Restrict 2 11 be two, be arranged in parallel in the upper position of crane 3;The track cable 8 is two, is arranged in parallel in crane 3
Lower position;The hauling rope 7 is one, is arranged in the center of crane 3;And insurance steel cable 2 11, hauling rope
7, track cable 8 is fixed on by steel wire rope geometrical clamp on crane 3;Workbench is connected by rope clamp on the track cable 8
6, the workbench 6 is formed by rectangular tube and square tubes soldering, and bottom is paved with plank and banding fixed, 6 top two of workbench
Two groups of leading blocks 5 are respectively set in side, and the leading block 5 can be slided along track cable 8;The insurance steel cable 2 11 is equipped with
Several interim hanging points, the interim hanging point include the fixed girder steel 10 being suspended on two insurance steel cables 2 11, the steel
Two wire tensioners 9 are respectively set in 10 both sides of beam, and the wire tensioner 9 is detachably connected with track cable 8.
Wherein, the lifting mechanism 2 includes the upper hanger 2.1 being fixedly connected with supporting rack 1, is fixedly connected with crane 3
Lower hanger, upper hanger pulley 2.3, equalizer pulley 2.2 and movable pulley 2.4, the upper hanger pulley 2.3 and equalizer pulley 2.2
It is connect respectively with upper hanger 2.1, forms fixed pulley group;The movable pulley 2.4 is connect with lower hanger, forms running block, and
Suspension hook 2.5, the underhung clump weight 4 of the suspension hook 2.5 are set in the lower part of the lower hanger, and the clump weight 4 is placed in
In crane 3;The running block in fixed pulley group and lower hanger on upper hanger 2.1 passes through the hoisting rope on hoisting winding
2.6 connect around the home.
When the utility model is used, supporting rack 1 is anchored in building roof plate face, by assembled good 6 row of workbench
It is placed on ground, operation hoisting winding makes crane 3 decline, and track cable 8 is then passed through leading block 5 and is consolidated with crane 3
It is fixed, then track cable 8 and workbench 6 are connected using rope clamp, by the rope on an interim hanging point nearest from workbench 6
Tool screw-button 9 is connect with track cable 8, and staff enters workbench 6, fastens construction safety band, and operation hoisting winding makes
Crane 3 is promoted to desired height;When needing 6 position of mobile working platform, wire tensioner 9 and rope clamp are unclamped, work people
Member holds hauling rope 7, and force driving workbench 6 moves, after being moved to suitable position, with rope clamp by workbench 6 and load-bearing
Rope 8 links together, and workbench 6 is made to be fixed on track cable 8, then by the wire tensioner of the nearest interim hanging point of distance
9 are buckled on track cable 8, complete the movement of workbench 6.
Claims (5)
1. a kind of architectural engineering operation platform, it is characterised in that:It is located at being oppositely arranged in building roof plate face including fixed
Two supporting racks (1), two support frames as described above (1) are respectively arranged below with crane (3), the crane (3) and supporting rack
(1) it is connected by lifting mechanism (2) between;It is provided with insurance steel cable one (12) between two support frames as described above (1);Two rise
It is provided with insurance steel cable two (11), hauling rope (7), track cable (8) between drop frame (3);The insurance steel cable two (11) is
Two, it is arranged in parallel in the upper position of crane (3);The track cable (8) is two, is arranged in parallel in crane (3)
Lower position;The hauling rope (7) is one, is arranged in the center of crane (3);And it insurance steel cable two (11), leads
Straw line (7), track cable (8) are fixed on by steel wire rope geometrical clamp on crane (3);Pass through rope clamp on the track cable (8)
Workbench (6) is connected, two groups of leading blocks (5), the leading block is respectively set in workbench (6) the top both sides
(5) it can be slided along track cable (8);The insurance steel cable two (11) is equipped with several interim hanging points, the interim hanging point packet
The fixed girder steel (10) being suspended on two insurance steel cables two (11) is included, two riggings are respectively set in girder steel (10) both sides
Screw-button (9), the wire tensioner (9) are detachably connected with track cable (8).
2. architectural engineering operation platform according to claim 1, it is characterised in that the lifting mechanism (2) includes and branch
Upper hanger (2.1) that support (1) is fixedly connected, the lower hanger being fixedly connected with crane (3), upper hanger pulley (2.3), balance
Pulley (2.2) and movable pulley (2.4), the upper hanger pulley (2.3) and equalizer pulley (2.2) connect with upper hanger (2.1) respectively
It connects, forms fixed pulley group;The movable pulley (2.4) connect with lower hanger, forms running block, and under the lower hanger
Suspension hook (2.5) is arranged in portion, and the running block in fixed pulley group and lower hanger on upper hanger (2.1) passes through on hoisting winding
Hoisting rope (2.6) connects around the home.
3. architectural engineering operation platform according to claim 2, it is characterised in that the underhung of the suspension hook (2.5)
Clump weight (4), and the clump weight (4) is placed in crane (3).
4. architectural engineering operation platform according to claim 3, it is characterised in that on the insurance steel cable one (12)
If multiple construction safety bands.
5. architectural engineering operation platform according to claim 4, it is characterised in that the workbench (6) is by rectangular tube
It is formed with square tubes soldering, bottom is paved with plank and banding fixed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820278239.9U CN207959894U (en) | 2018-02-28 | 2018-02-28 | A kind of architectural engineering operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820278239.9U CN207959894U (en) | 2018-02-28 | 2018-02-28 | A kind of architectural engineering operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207959894U true CN207959894U (en) | 2018-10-12 |
Family
ID=63740283
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820278239.9U Expired - Fee Related CN207959894U (en) | 2018-02-28 | 2018-02-28 | A kind of architectural engineering operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207959894U (en) |
-
2018
- 2018-02-28 CN CN201820278239.9U patent/CN207959894U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202090286U (en) | Traction system suitable for self-anchored type double cable plane suspension bridge | |
CN207974504U (en) | Climbing type hanging basket system for tilting decoration of exterior wall construction | |
CN103523683A (en) | Construction method for dismantling tower crane by use of small hoisting equipment | |
CN206722429U (en) | A kind of roofing color corrugated sheet steel transportation system | |
CN105113803B (en) | High-altitude sliding hoisting device of corridor truss of mountain and implementing method of high-altitude sliding hoisting device | |
CN104499723A (en) | Movable safety net and installation method thereof | |
CN109372243A (en) | A kind of hanging basket system for the installation of steel construction metal Roof bottom plate | |
CN103863938A (en) | Safe lifting device for conveying wind tunnel test car | |
CN110386559B (en) | Bidirectional traction self-adaptive horse race system of cable hoisting system | |
CN108505623A (en) | A kind of overhead cable construction method suitable for flexible double rope net system | |
CN203128099U (en) | Slipping type pipeline lifting device | |
CN207959894U (en) | A kind of architectural engineering operation platform | |
CN205802757U (en) | A kind of hanging tubular mother's integral hoisting device for rapid | |
CN210713752U (en) | High-altitude operation construction hanging basket capable of moving in three-dimensional space | |
CN214269987U (en) | Hoisting device applied to high-rise building roof elevator shaft | |
CN205802758U (en) | A kind of hanging tubular mother's Integral hoisting equipment | |
CN204138213U (en) | Track gun carriage is used in a kind of cell cube curtain wall lifting | |
CN211006334U (en) | Maintenance equipment for inner side surface of inverted Y-shaped tower column of three-way movable cable-stayed bridge | |
CN211173022U (en) | Corridor bridge construction operation platform device | |
CN210856930U (en) | Maintenance system of cable-stay bridge inverted Y-shaped tower column | |
CN104912339B (en) | Long-distance multi-span welding H-section steel roof beam installation method | |
CN210117917U (en) | Construction hanging basket device with overhanging structure inclined column body | |
CN208265605U (en) | A kind of more cabin piping lane finished product suspenders of self-balancing type | |
CN210002233U (en) | Hoisting system suitable for suspension bridge steel structure bridge deck system | |
CN203461691U (en) | Hydraulic swing arm type deviation-rectifying lifting tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181012 Termination date: 20190228 |
|
CF01 | Termination of patent right due to non-payment of annual fee |