CN207905811U - The freezing system of shield drive end unit - Google Patents

The freezing system of shield drive end unit Download PDF

Info

Publication number
CN207905811U
CN207905811U CN201820248377.2U CN201820248377U CN207905811U CN 207905811 U CN207905811 U CN 207905811U CN 201820248377 U CN201820248377 U CN 201820248377U CN 207905811 U CN207905811 U CN 207905811U
Authority
CN
China
Prior art keywords
shield
freezing
liquid nitrogen
pipe
drive end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820248377.2U
Other languages
Chinese (zh)
Inventor
杨平
潘荣凯
何文龙
张婷
王帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadong Construction Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
Nanjing Forestry University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Forestry University filed Critical Nanjing Forestry University
Priority to CN201820248377.2U priority Critical patent/CN207905811U/en
Application granted granted Critical
Publication of CN207905811U publication Critical patent/CN207905811U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses the freezing systems of shield drive end unit, and the system comprises liquid nitrogen pipeline and freezing pipe, liquid nitrogen pipeline is divided into for nitrogen main pipe and circuit main pipe, respectively with the liquid nitrogen import of freezing pipe and liquid nitrogen outlet;Liquid nitrogen pipeline is set in shield shell, and freezing pipe is set to shield case inside or outside, and shield tail brush is equipped on the downside of shield shell.The freezing system of shield drive end unit described in the utility model can fast and efficiently realize freezing for shield drive end unit soil layer, without in addition being punched on section of jurisdiction, blocking drilling, extend the durability of section of jurisdiction;Exchanging shield ventral brush method simple operation described in the utility model, short time limit have no adverse effect to shield tunnel stability.

Description

The freezing system of shield drive end unit
Technical field
The utility model belongs to shield tunnel reinforcement technique field, is related to exchanging shield ventral brush technology, specially shield tail The freezing system and exchanging shield ventral brush method in portion.
Background technology
Shield tunnel is just locating the rapid development stage in China, and extensive shield tunnel construction faces many problems, wherein shield Structure machine is being passed through over long distances rich in water sandy soil or when pebble layer, and shield tail brush is easy to wear, or even is destroyed and caused to leak, therefore Need to change the shield tail brush for losing sealing function.
One of the technical issues of exchanging shield ventral brush most critical is carried out in soil layer is exactly the waterstop sealing processing to shield tail soil layer, When construct stratum complicated condition when, this engineering difficulty bigger.Currently used method has chemical consolidation, brine manual pipe jacking It reinforces and liquid nitrogen manual pipe jacking is reinforced, the wherein liquid nitrogen freezing duration is shorter, and freezing efficiency is reliable, and the liquid nitrogen circulatory system is also opposite Simply.When using sealing is freezed, it can be divided into prefabricated section of jurisdiction of freezing by the difference of freezing pipe arrangement mode and freeze sealing and section of jurisdiction Sealing is freezed in upper directly punching, the former the problem of be that the special section of jurisdiction with freezing pipe needs in addition to make, in face of burst Replacement shield tail brush situation when, ventral brush cannot be carried out immediately and more changed jobs, need the prediction scheme for carrying out exchanging shield ventral brush in advance, for It speedily carries out rescue work and the higher engineering of construction period does not have practicability.And directly punching freezes sealing and can cope with sudden accident on section of jurisdiction, It is various to punch flexible form, can be adjusted according to on-site actual situations, main problem, which is freezing hole, to cause forever section of jurisdiction Long property damage, and the continuity of freezing curtain and uniformity cannot be effectively ensured.
Utility model content
The technical issues of solution:In order to overcome the deficiencies of existing technologies, shield tail can quickly and efficiently be replaced by obtaining one kind Brush without other punching, blocks drilling, and does not influence section of jurisdiction durability, has no adverse effect to shield tunnel construction stability, this Utility model provides the freezing system of shield drive end unit.
Technical solution:The freezing system of shield drive end unit, the system comprises liquid nitrogen pipeline and freezing pipe, liquid nitrogen pipelines point For for nitrogen main pipe and circuit main pipe, respectively with the liquid nitrogen import of freezing pipe and liquid nitrogen outlet;Liquid nitrogen pipeline is set to shield shell In vivo, freezing pipe is set to shield case inside or outside, and shield tail brush is equipped on the downside of shield shell.
Inbuilt liquid nitrogen pipeline uses arc hollow heat-insulated pipe in the shield shell.
Preferably, freezing pipe is set to shield case inside or outside, including congelation face and adiabatic face, with shield shell Between by adiabatic face be connected.
Preferably, the section of the freezing pipe is arc, circle or rectangle.It is 50mm to freeze tube section bottom side length degree, high Degree is 30mm.
Preferably, the section of the freezing pipe be arc, freezing pipe by looped sections be distributed, length be segmented spacing according to Shield machine diameter is selected.The freezing pipe material is Q345 steel.
The exchanging shield ventral brush method of shield machine described above, includes the following steps:
A, stop shield driving, determine and replace shield tail brush;
B, nitrogen supply unit is marched into the arena, and is connected liquid nitrogen import and liquid nitrogen outlet, is made liquid nitrogen in liquid nitrogen pipeline by liquid nitrogen distributor It is recycled, makes shield tail freezing soil, form the freezing curtain of sealing on rear side of shield tail brush;
C, after the completion of whole exchanging shield ventral brush, using freezing pipe as defrosting pipeline, forced thaw is carried out;
D, when Frozen Soil Cylinder loses the power that holds around to shield shell, and the soil body and shield are calculated to obtain according to thermometer hole measured temperature When the temperature of structure shell contact position is in 0 DEG C or more, shield continues to promote.
Advantageous effect:(1) freezing system of shield drive end unit described in the utility model can fast and efficiently realize shield Drive end unit soil layer freezes, and without in addition being punched on section of jurisdiction, blocking drilling, extends the durability of section of jurisdiction;(2) the utility model The exchanging shield ventral brush method simple operation, short time limit have no adverse effect to shield tunnel stability.
Description of the drawings
Fig. 1 is that freezing pipe is set to shield hull outside structural schematic diagram, and wherein a is liquid nitrogen inlet side schematic diagram, and b is liquid Nitrogen exports side schematic diagram;
Fig. 2 is that freezing pipe is set to shield case inside structural schematic diagram;
Fig. 3 is freezing pipe sectional view, wherein a is arc section freezing pipe, and b is circular cross-section freezing pipe, and c cuts for rectangle Face freezing pipe;
Fig. 4 is liquid nitrogen pipeline schematic cross-section;
Fig. 5 is liquid nitrogen pipeline and freezing pipe joint face schematic diagram;
Fig. 6 is freezing pipe looped sections distribution map;
Fig. 7 is thermometer hole layout drawing on the inside of shield tail;
Fig. 8 is thermometer hole layout drawing on the outside of shield tail;
Wherein, 1- shields shell, 2- is for nitrogen main pipe, 3- freezing pipes, 4- shield tail brushes, the circuits 5- main pipe, 6- liquid nitrogen imports, 7- Liquid nitrogen exports, the thermal insulation faces 8-, the congelation faces 9-, the sections of jurisdiction 10-, E1~E14- thermometer holes.
Specific implementation mode
Following embodiment further illustrates the content of the utility model, but should not be construed as a limitation of the present invention. Without departing substantially from the spirit of the present invention and essence, to made by the utility model method, step or condition modification and It replaces, belongs to the scope of the utility model.Unless otherwise specified, technological means used in embodiment is people in the art Conventional means known to member.
Embodiment 1
As shown in Figure 1, the freezing system of shield drive end unit, the system comprises liquid nitrogen pipeline and freezing pipe 3, liquid nitrogen pipelines It is divided into for nitrogen main pipe 2 and circuit main pipe 5, the liquid nitrogen import 6 with freezing pipe 3 and liquid nitrogen outlet 7 respectively is connect.Liquid nitrogen pipeline is set to In shield shell 1, freezing pipe 3 is set to 1 outside of shield shell, and 1 downside of shield shell is equipped with shield tail brush 4.
Inbuilt liquid nitrogen pipeline 2 uses arc hollow heat-insulated pipe in the shield tail shell 1.
As shown in Figure 1, freezing pipe 3 is set to 1 outside of shield shell, including congelation face 9 and adiabatic face 8, with shield shell It is connected by adiabatic face 8 between body 1.
As shown in figure 3, the section of the freezing pipe 3 is arc, 3 section bottom edge length of freezing pipe is 50mm, is highly 30mm。
As shown in figure 4, the section of the liquid nitrogen pipeline is arc.
As shown in figure 5, the liquid nitrogen import 6 and liquid nitrogen outlet 7 are distributed in the both sides of freezing pipe 3.
As shown in fig. 6, freezing pipe 3 is distributed by looped sections, length is selected according to shield machine diameter with segmentation spacing. The freezing pipe material is Q345 steel.
The exchanging shield ventral brush method of shield machine, includes the following steps:
A, stop shield driving, determine and replace shield tail brush 4;
B, nitrogen supply unit is marched into the arena, and connection liquid nitrogen import 6 and liquid nitrogen outlet 7 make liquid in liquid nitrogen pipeline by liquid nitrogen distributor Nitrogen is recycled, and shield tail freezing soil is made, and the freezing curtain of sealing is formed in 4 rear side of shield tail brush;
C, after the completion of whole shield tail brushes 4 are replaced, using freezing pipe 3 as defrosting pipeline, forced thaw is carried out;
D, when Frozen Soil Cylinder loses the power that holds around to shield shell 1, and according to thermometer hole measured temperature calculate the soil body with When the temperature of 1 contact position of shield shell is in 0 DEG C or more, shield continues to promote.
Embodiment 2
Shield is carried out to following engineering using the freezing system and exchanging shield ventral brush method of shield drive end unit described in embodiment 1 Ventral brush is replaced:
The stratum that Nanjing Highway Tunnel Construction mainly passes through is very soft sill clay, silty clay folder flour sand, powder Fine sand layer, Extra-fine sand, gravelly sand, boulder and cobble, siltstone etc., geological conditions is extremely complex along running tunnel, the tunnel bottom soil body For two water-bearing with high pressure of gravelly sand and cobble, replacing, the swiped through journey risk of shield tail is larger therefore pre-buried by shield tail portion Freeze pipe device and carry out frozen construction, construction procedure is as follows:
(1) stop shield driving, determine and replace shield tail brush 4, nitrogen supply unit is marched into the arena, connection liquid nitrogen import 6 and liquid nitrogen outlet 7, so that liquid nitrogen in liquid nitrogen pipeline is recycled by liquid nitrogen distributor.The temperature of liquid nitrogen storage tank outlet is controlled -190 DEG C~-170 DEG C, pressure control is advisable in 0.05MPa~0.10MPa, reaches the control of 3 inlet temperature of freezing pipe at -170 DEG C~-150 DEG C, freezes The control of 3 outlet temperature of pipe is tied at -60 DEG C, pressure control is advisable in 0.05MPa~0.1MPa, and the cut-off on liquid nitrogen storage tank can be used Valve carries out pressure adjusting, is adjusted into trip temperature with heat sink in every group of circuit.Since liquid nitrogen temperature is extremely low, pipe inside and outside temperature difference compared with Greatly, scattering and disappearing for cold is easy tod produce, therefore heat-insulated processing must be made to pipeline inner wall.Circuit main pipe does not set heat preservation, after liquid nitrogen gasification It is directly discharged to outside tunnel in air.
(2) since the tunnel bottom soil body is two water-bearing with high pressure of gravelly sand and cobble, to ensure that different water cut layer freezes Wall development speed and thickness, set 4 groups of 8 thermometer holes altogether, i.e. E1~E8 monitors frozen temperature field, judges exchanging shield ventral brush opportunity. It is farinose argillic horizon that wherein E1, E2, which correspond to the soil body,;It is fine sand layer that E3, E4, which correspond to the soil body,;It is gravel layer that E5, E6, which correspond to the soil body,; It is boulder bed that E7, E8, which correspond to the soil body,.6 temperature measuring points, i.e. E9~E14 are laid on the outside of shield tail in thermometer hole, measuring point spacing is 300mm, hole depth 1.8m, shield tail inside thermometer hole monitor case temperature, hole depth 0.64m;Two thermometer holes and 3 water of freezing pipe in section of jurisdiction Flat spacing is 500mm and 800mm;Specific Kong Weijian Fig. 7 and Fig. 8.Thermometer hole uses 76 × 5 seamless stainless steels of φ of bottom end seal Pipe is directly squeezed into.
(3) replacement of shield tail brush 4 freezes acceptance condition and is:Liquid nitrogen freezing time >=10 day, liquid nitrogen freezing effect reach design It is required that;Speculate that artesian aquifer range frost wall effective thickness reaches 1.8 meters of design requirement according to thermometer hole thermometric, frost wall has Effect frozen soil mean temperature will reach -20 DEG C and less;Thermometer hole temperature reaches 0 DEG C or less;Emergency preplan of constructing is perfect, and has Operability;Before shield tail brush 4 is replaced, survey peep hole, anhydrous outflow are pried into four water-bearing layers of shield crossing.
(4) after confirming that three shield tail brushes can all expose, under the protection of Frozen Soil Cylinder, block-by-block removes section of jurisdiction 10.
(5) after section of jurisdiction 10 is removed, the first and second bolt installation shield tail brush 4 is removed, cuts off the welding installation of third road Shield tail brush 4.The first and second bolt hole of cleaning, cleaning bolt after the completion of shield tail brush 4 is removed.When dismounting from outside to inside, from top to bottom It removes, takes out the shield tail brush 4 of damage one by one.It scrapes to the place for cutting off out-of-flatness after the old shield tail brush in third road 4 is cut off Grinding process, so that it is guaranteed that there is no installation out-of-flatness phenomenons when new shield tail brush 4 is installed.
(6) it after the completion of region shield tail brush 4 all installation, welding is removed in section of jurisdiction 10, carries out shield tail grease and smears operation, apply Fat of putting the oil applies shield tail grease using WR90 type hands.It smears after layered pushes wire brush aside and inserts grease, pay attention to the pressure in grease storehouse Power situation of change, when grease storehouse, oil pressure reaches 10bar and thinks that shield tail brush 4 reaches design requirement.All installation is complete for domain section of jurisdiction 10 Afterwards, tail seal grease of shield is pumped manually with shield tail grease pump, uncompacted shield tail brush groove and shield tail brush 4 are smeared in filling.
(7) it after the completion of shield tail brush 4 is replaced, needs to carry out forced thaw to frozen soil body, makes shield tail ambient envelope frozen soil body solution Freeze to ensure that shield continues to promote as early as possible.Directly using step freezing pipe 3 pre-buried on rear side of shield tail steel plate as defrosting pipeline, It is 0.75m that freezing zone, which is disposed about volume,3Electrical heating hot water circuit case, utilizes 0.5m3Water circulating pump is by 60 DEG C or more in water tank Hot water circuit is in coil pipe, to achieve the purpose that forced thaw.
(8) according to thermometer hole measured temperature calculate the temperature of the soil body and shield tail shell contact position be in 0 DEG C or more when, shield Structure can promote again.

Claims (5)

1. the freezing system of shield drive end unit, which is characterized in that the system comprises liquid nitrogen pipeline and freezing pipe (3), liquid nitrogen pipes Road is divided into for nitrogen main pipe (2) and circuit main pipe (5), is connected to respectively with the liquid nitrogen import of freezing pipe (3) (6) and liquid nitrogen outlet (7); Liquid nitrogen pipeline is set in shield shell (1), and freezing pipe (3) is set on the inside or outside of shield shell (1), on the downside of shield shell (1) Equipped with shield tail brush (4).
2. the freezing system of shield drive end unit according to claim 1, which is characterized in that freezing pipe (3) is set to shield shell On the outside of body (1), including congelation face (9) and adiabatic face (8), it is connected by adiabatic face (8) between shield shell (1).
3. the freezing system of shield drive end unit according to claim 1, which is characterized in that the section of the freezing pipe (3) For arc, circle or rectangle.
4. the freezing system of shield drive end unit according to claim 3, which is characterized in that the section of the freezing pipe (3) For arc.
5. the freezing system of shield drive end unit according to claim 3, which is characterized in that freezing pipe (3) presses looped sections Distribution.
CN201820248377.2U 2018-02-11 2018-02-11 The freezing system of shield drive end unit Active CN207905811U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820248377.2U CN207905811U (en) 2018-02-11 2018-02-11 The freezing system of shield drive end unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820248377.2U CN207905811U (en) 2018-02-11 2018-02-11 The freezing system of shield drive end unit

Publications (1)

Publication Number Publication Date
CN207905811U true CN207905811U (en) 2018-09-25

Family

ID=63560009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820248377.2U Active CN207905811U (en) 2018-02-11 2018-02-11 The freezing system of shield drive end unit

Country Status (1)

Country Link
CN (1) CN207905811U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108240225A (en) * 2018-02-11 2018-07-03 南京林业大学 The freezing system of shield drive end unit and exchanging shield ventral brush method
CN112392489A (en) * 2019-08-16 2021-02-23 中国石油天然气集团有限公司 Sealing member and shield structure sealing assembly comprising same

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108240225A (en) * 2018-02-11 2018-07-03 南京林业大学 The freezing system of shield drive end unit and exchanging shield ventral brush method
CN108240225B (en) * 2018-02-11 2024-07-09 南京林业大学 Freezing system for tail part of shield tunneling machine and replacement method of shield tail brush
CN112392489A (en) * 2019-08-16 2021-02-23 中国石油天然气集团有限公司 Sealing member and shield structure sealing assembly comprising same
CN112392489B (en) * 2019-08-16 2022-07-05 中国石油天然气集团有限公司 Sealing member and shield structure sealing assembly comprising same

Similar Documents

Publication Publication Date Title
CN104675408B (en) High hydraulic pressure extra long distance large cross-section tunnel liquid nitrogen freezing system and shield shield tail brush quick change method
CN108240225A (en) The freezing system of shield drive end unit and exchanging shield ventral brush method
CN105840202B (en) Annular consolidation by freezing water sealing structure and its construction method when a kind of exchanging shield ventral brush
CN107676097B (en) A kind of high hydraulic pressure soft soil layer HFE composite shield originating method
CN201460904U (en) Ultra-long horizontal freezing consolidation structure for shield entry
CN104790961B (en) A kind of shield tunnel termination vertical cup type consolidation by freezing structure and method
JP2021534337A (en) Freezing method and freezing system for connecting passages
CN104088652B (en) A kind of pipe interlude horizontal dynamic controlling freezes water-stop method
US9611608B2 (en) Zone freeze pipe
CN104806253B (en) A kind of construction method punched between rectangular top pipe passage
CN106706697A (en) Model test device for simulating pre-cooling freezing method construction under flowing effect of underground water
CN207905811U (en) The freezing system of shield drive end unit
CN205975649U (en) Freezing pipe curtain steel pipe supporting construction
CN108316952A (en) Extremely frigid zones tunnel insulation waterproof and water drainage system
CN101463724A (en) Construction method for connection passage by double-row hole horizontal freezing method
CN104963334A (en) Construction method for utilizing grouting freezing pipe to reinforce and freeze contact passage to restrain frost heaving and thaw collapsing
CN106837389B (en) A kind of Underground Subway Station vertical shaft and transverse passage-way freeze water-stopping method
CN204609889U (en) A kind of shield tunnel termination vertical cup type consolidation by freezing structure
CN109344547B (en) Freezing method model design method and device under combined stratum seepage effect
CN105239585A (en) In-pile freezing structure of deep underground space and constructing method
CN104405400A (en) Method for arranging cup-shaped horizontal freezing holes in end of large-diameter shield tunnel
CN206052685U (en) Screw thread freezing pipe
CN109209396A (en) A kind of shield tunnel end joint reinforcement structure and construction method
CN105239606A (en) Inter-pile freezing structure of deep underground space and constructing method
CN205677624U (en) Shield docks semi-circular shape consolidation by freezing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Jiangsu Rong Rui Construction Technology Co., Ltd.

Assignor: Nanjing Forestry University

Contract record no.: X2019320000077

Denomination of utility model: Freezing system at tail of shield tunneling machine and tail brush replacing method

Granted publication date: 20180925

License type: Common License

Record date: 20190923

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201215

Address after: Building 11, No.8 Shuige Road, Jiangning Economic and Technological Development Zone, Nanjing, Jiangsu Province

Patentee after: HUADONG CONSTRUCTION CO., LTD. OF CHINA RAILWAY NO.3 ENGINEERING GROUP Co.,Ltd.

Address before: No. 159, dragon pan Road, Xuanwu District, Nanjing, Jiangsu

Patentee before: NANJING FORESTRY University