CN205677624U - Shield docks semi-circular shape consolidation by freezing structure - Google Patents

Shield docks semi-circular shape consolidation by freezing structure Download PDF

Info

Publication number
CN205677624U
CN205677624U CN201620639984.2U CN201620639984U CN205677624U CN 205677624 U CN205677624 U CN 205677624U CN 201620639984 U CN201620639984 U CN 201620639984U CN 205677624 U CN205677624 U CN 205677624U
Authority
CN
China
Prior art keywords
shield
circular shape
semi
freezing
docking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620639984.2U
Other languages
Chinese (zh)
Inventor
胡俊
卫宏
刘勇
赵联桢
姚凯
佳琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan University
Original Assignee
Hainan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan University filed Critical Hainan University
Priority to CN201620639984.2U priority Critical patent/CN205677624U/en
Application granted granted Critical
Publication of CN205677624U publication Critical patent/CN205677624U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a kind of shield docking semi-circular shape consolidation by freezing structure, including two shield machines of docking, it is evenly arranged many semi-circular shape freezing pipes along shield casing circumference in one side docking shield machine, semi-circular shape layout of freezing pipes principle is 0.8 1.2m for ensureing the perforate arc length of semi-circular shape freezing pipe, it is passed through liquid nitrogen freezing in semi-circular shape freezing pipe, in ground plane, form hemispherical Frozen Soil Cylinder.The utility model is laid compared with the ruggedized construction that mode is formed with traditional shield docking linear pattern freezing pipe, ruggedized construction stress is more reasonable, freezing pipe materials greatly reduce, freezing chilling requirement also to greatly reduce, frozen swell and melt settlement amount is also very little, and duration of freezing is short, instant effect, while ensureing consolidation effect particularly stagnant water effect, it is greatly saved the energy, thus has preferable economic benefit, there is bigger application value.

Description

Shield docks semi-circular shape consolidation by freezing structure
Technical field
The utility model relates to a kind of shield docking semi-circular shape consolidation by freezing structure.
Background technology
Shield method is built tunneling technique and is applied more and more in China's underground engineering construction, most more river tunnels over strait Road and track traffic infrastructure all use the method.At present, shield tunnel has to becoming that super-large diameter, extra long distance develop Gesture, and advance distance of shield is long, necessarily brings the problems such as tail sealing, tool wear, long-distance transportation.In order to Solve these problems, typically increase relaying active well in midway.Do so will increase cost, and tunnel over strait comes for more river Saying, if increasing active well on sea, midway, necessarily environment being affected.Shield docking technique has not by ground Building limits, unrestricted choice on earth point, on surrounding enviroment impact the advantage such as little, can preferably solve shield extra long distance and execute Work problem, is with a wide range of applications.
Shield docking is that two shield machines tunnel from both sides in opposite directions to combining place, carries out docking to complete whole piece in ground The shield-tunneling construction in tunnel, has the advantages such as security, economy, time-saving and efficiency.Shield docking mode mainly has building formula to dock Dock two kinds with mechanical type.Building formula rendezvous method is by making consolidation process to earth point stratum, and reach sealing and pre-defense sector After the effect of layer unstability, complete shield and dismantle and carry out tunnel-liner;Mechanical type rendezvous method is by carrying out special setting to shield Meter, and make the method that two shield structures directly dock.Comparing mechanical type rendezvous method, building formula rendezvous method is with its economy more Conventional.
The stratum consolidation of building formula rendezvous method processes and can carry out from ground before arrival is to earth point, if ground is without reality Execute condition or edpth of tunnel too deep from ground implement reinforce uneconomical, consolidation effect cannot be ensured when, then can take from shield tunnel Road is internal uses slip casting auxiliary law to carry out consolidation process.Carry out stratum consolidation from ground and be similar to conventional foundation treatment technology, close Key is according to the suitable reinforcement means of the suitable reinforcing scope of engineering geological condition and shield size design and selection;Reinforcement means Have the methods such as high-pressure rotary-spray, Soil-cement, chemical grouting.And the method reinforced from tunnel internal has chemical grouting method and freezes Method.
Freezing process in shield docking is to install frigo in side or bilateral shield to freeze so that shield is docked Place's Freezing stratum as rapid forms closing, high-strength Frozen Soil Cylinder, stops underground water to enter mating operation face, opposing external water soil pressure, Existing intensity is provided to have again the temporary support structures of water shutoff to shield mating operation.
The laying mode of freezing pipe has three kinds:
One is to set radial linear pattern freezing pipe from unilateral shield to combine other side shield inner surface attaching freezing pipe. Attach freezing pipe for overcoming radial freezing pipe to combine can ensure to be formed continuously apart from shield deficiency farther out, two kinds of freezing pipes The Frozen Soil Cylinder closed.
Two is to set single radial linear pattern freezing pipe frozen ground respectively from both sides shield to carry out shield docking.
Three is to set double radial linear pattern freezing pipe frozen ground respectively from both sides shield to carry out shield docking.
Above-mentioned three kinds of freezing pipes are laid mode and are all also existed and squeeze into that freezing soil pipe is too much, frozen construction is loaded down with trivial details, freeze to need How the shortcoming that cold freezing process power consumption big, whole is big, frozen swell and melt settlement amount is big, find a kind of energy-efficient shield to dock Consolidation by freezing mode is key issue urgently to be resolved hurrily at present.
Chinese patent application 201110321819.4 discloses a kind of shield and to ground plane bend pipe one side freezing process and freezes Knot pipe sets device, and this freezing process uses bending freezing pipe to realize only to dispose freezing system in unilateral tunnel, its principle be from The unilateral shield of docking gets bending freezing pipe so that it is end is close to offside shield housing, and from unilateral tunnel, refrigeration freezes rear shape Cyclization, around shield docking site surrounding, the Frozen Soil Cylinder with absolute water shutoff and good strength, completes shield under its protection Structure butt-joint operation.Its freezing pipe sets device: on shield machine housing install orifice tube, and by ball valve connect linear or Shaped form seals pipe, has water shutoff blowout prevention function.Linear is selected to seal pipe during drilling rod perforate operation, when setting bending freezing pipe Shaped form is selected to seal pipe.But this patent application also exists following technical deficiency:
1st, to set device excessively loaded down with trivial details for freezing pipe, causes construction quality wayward;And it is difficult to carry out semi-circular shape to freeze Setting of knot pipe;
2nd, using salt solution cooling system, freezing system disposes time-consuming, occupation of land;And form the time of final Frozen Soil Cylinder relatively Long, affect the duration;
3rd, owing to freezing pipe sets the restriction of device, the Frozen Soil Cylinder opposing of the cincture shield docking site surrounding being formed The intensity of surrounding Water And Earth Pressures is difficult to ensure, is susceptible to intensity deficiency and results in penetrating passage, and then jeopardizes shield docking The safety of construction;
4th, owing to using salt solution cooling system, the soil body being easily caused between bending freezing pipe and docking site shield shell does not has Freeze reality completely, ultimately form the housing Frozen Soil Cylinder of bending, this Frozen Soil Cylinder with freeze compared with real hemispherical Frozen Soil Cylinder, safety Property is substantially reduced.
Utility model content
The purpose of this utility model is for overcoming above-mentioned the deficiencies in the prior art, providing a kind of shield docking semi-circular shape to freeze Knot ruggedized construction, this structure stress is reasonable, and duration of freezing is short, instant effect, it is only necessary to construction in unilateral tunnel.
For achieving the above object, the utility model employing following technical proposals:
A kind of shield docking semi-circular shape consolidation by freezing structure, including two shield machines of docking, docks shield in one side Being evenly arranged many semi-circular shape freezing pipes along shield casing circumference in machine, semi-circular shape layout of freezing pipes principle is for ensureing half The perforate arc length of annular freezing pipe is 0.8-1.2m, is passed through liquid nitrogen freezing in semi-circular shape freezing pipe, to ground connection Form hemispherical Frozen Soil Cylinder in Ceng.
A diameter of 32mm or 60mm of described semi-circular shape freezing pipe.
Described semi-circular shape freezing pipe position of opening distance docking shield machine outer casing end 2m, forms radius big in the soil body Hemispherical Frozen Soil Cylinder in 2m.
Described semi-circular shape freezing pipe material is seamless low carbon steel pipe or PVC, PPR, ABS, PE plastic tube.
Described shield machine includes shield shell and be located therein cutterhead and base bearing, base bearing by high-strength bolt respectively with shield Shell is connected with cutterhead.
Described shield shell includes precursor, middle body and the shield tail being connected by high-strength bolt, wherein, in precursor and middle body all use Outer double-deck shield shell.
The outer layer shield shell of two shield machines of docking directly welds waterproof steel plate ring as the supporting tearing machine in hole open.
Two shield machines of docking include leading shield machine and rear row shield machine.
The Butt Section of two shield machines of docking uses reinforced concrete segment or steel pipe sheet lining cutting.
It is provided with some temperature tubes in hemispherical Frozen Soil Cylinder, temperature tube is provided with thermo detector, thermo detector and outside Display device connects, a diameter of 45mm of temperature tube.
Semi-circular shape freezing pipe is connected with the liquid nitrogen storage tank in the tank car being parked in outside tunnel starting well by pipeline, semicircular ring Being additionally provided with the discharge collecting vaporization nitrogen in shape freezing pipe, the blast pipe through communicating therewith for the discharge extends to tunnel outer space Spacious place.
The utility model is laid compared with the ruggedized construction that mode is formed with traditional shield docking linear pattern freezing pipe, reinforces Structure stress is more reasonable, and freezing pipe materials greatly reduce, and freezes chilling requirement and also greatly reduces, and frozen swell and melt settlement amount is also very little, freezes Clone system is easy for installation, it is few to take up an area, and duration of freezing is short, instant effect, while ensureing consolidation effect particularly stagnant water effect, greatly Save greatly the energy, thus had preferable economic benefit, there is bigger application value.
Brief description
Fig. 1 is the utility model structural representation;
Fig. 2 is the utility model construction procedure figure;
Wherein, 1. semi-circular shape freezing pipe, 2. hemispherical Frozen Soil Cylinder, 3. docks shield machine, 4. lining segment, 5. shield Tail grouting soil.
Detailed description of the invention
With embodiment, the utility model is further illustrated below in conjunction with the accompanying drawings.
Structure depicted in this specification institute accompanying drawings, ratio, size etc., all only in order to coordinate disclosed in specification in Hold, understand for those skilled in the art and read, being not limited to the enforceable qualifications of the utility model, therefore not Have technical essential meaning, the adjustment of the modification of any structure, the change of proportionate relationship or size, do not affecting this practicality newly Under effect that type can be generated by and the purpose that can reach, all should still fall and obtain can contain at the technology contents disclosed in the utility model In the range of lid.Meanwhile, in this specification cited as " on ", D score, "left", "right", the term of " middle " and " " etc., It is merely convenient to understanding of narration, and be not used to limit the enforceable scope of the utility model, the change of its relativeness or tune Whole, without under essence change technology contents, when being also considered as the enforceable category of the utility model.
As it is shown in figure 1, stratum consolidation structure during shield docking, along shield casing circumference in one side docking shield machine 3 Being evenly arranged many semi-circular shape freezing pipes 1, semi-circular shape freezing pipe 1 arrangement principle is for ensureing semi-circular shape freezing pipe 1 perforate Spacing is 0.8-1.2m(arc length), by implementing liquid nitrogen freezing in semi-circular shape freezing pipe 1, finally rapidly to ground plane Middle formation hemispherical freezing curtain 2, under the protection of hemispherical freezing curtain 2, smoothly completes shield docking construction.Such as Fig. 1 institute Show.Semi-circular shape freezing pipe 1 diameter is generally 32 or 60mm;Outside semi-circular shape freezing pipe 1 position of opening distance docking shield machine Shell end 2m, should ensure that and form the hemispherical Frozen Soil Cylinder 2 more than 2m for the radius in the soil body;Freezing pipe material is usually seamless low Carbon steel pipe, it would however also be possible to employ the plastic tubes such as PVC, PPR, ABS, PE.
During shield docking, semi-circular shape consolidation by freezing structure docks linear pattern freezing pipe laying mode shape with traditional shield The ruggedized construction becoming is compared, and ruggedized construction stress is more reasonable, and freezing pipe materials greatly reduce, and freezes chilling requirement and also significantly subtracts Few, frozen swell and melt settlement amount is also very little, and duration of freezing is short, instant effect, while ensureing consolidation effect particularly stagnant water effect, significantly Save the energy, thus had preferable economic benefit, there is bigger application value.
Shield docking construction procedure is as shown in Figure 2.
(1) shield machine is docked
1) shield shell
Shield urogenesis grouting at the tail of the shield machine induration 5, in addition to shield tail (general shield tail is refused to remove), precursor and middle body all use double Layer shield shell.During dismounting, outer layer shield shell stays in the earth formation, after other parts are removed, welds between the outer layer shield shell that two shield structures stay Connect waterproof steel plate ring as the supporting tearing machine in hole open.Under complete steel plate ring protection, each parts of shield can be carried out safely and tear open Unload.
2) cutterhead, precursor, middle body
Cutterhead, precursor, middle body use the block design mode being readily disassembled, according to tunnel internal diameter size, after control dismounting Piece weight can suitably be divided into 3-6 block, high-strength bolt can be taked between each piece to connect, in order to dismounting with again assembled.
3) base bearing
Base bearing is the vitals of shield, typically each uses high-strength bolt to be connected with shield shell and cutterhead, and ratio is easier to In dismounting, should suitably control the structure size of base bearing, be beneficial to dismounting.
(2) shield is relative to the detection of position
For accurately grasping the relative position of docking shield in advance, it is ensured that final merging precision, following method need to be taked to shield The relative position of structure detects.
1) the actual measurement elevation using two shield structures carries out relative position control with coordinate
In shield manufacture process, in shield, 8-1 shield attitude measurement point generally individually on body steel construction, can be distributed, and The relative coordinate with shield center line and cutter head center for each measurement point is provided, each by the wire and bench mark measurement laid in tunnel The coordinate of point and elevation, then can calculate shield centre coordinate and elevation, shield vertically and the data such as level inclination.With On the basis of the position of leading shield and attitude, the tunneling direction of rear row shield is controlled with attitude.General in rear row shield With leading shield at a distance of the 200th, the 100th, the 50th, 30m when, should measure, calculate coordinate and the attitude of a shield respectively, main before 30m Want travel direction to adjust, after 30m, be substantially carried out pose adjustment.
The merging precision that the coordinate being measured respectively by two shield structures and elevation determine, is affected bigger by measure error.At shield In structure butt joint project, when length of tunnel computation and measurement deviation accumulation value is more than when allowing docking deviation, it is impossible to individually use we Method, it is necessary to boring direct detection shield is relative to position.
2) it is drilled with row shield position after exploration hole directly measures
Leading arrival precalculated position and complete section components dismounting after, in rear row shield apart from leading shield about 50m When, in leading shield, row shield is drilled with exploration hole backward, installs measurement pipe, utilizes magnetic detector system and γ line detection system Directly measuring rear row shield position, tunneling direction is controlled with attitude by rear row shield according to measurement result, revises Carry out one-shot measurement again after driving 20m, then tunneling direction is adjusted with attitude, continues to revise and tunnel to docking mileage.
(3) shield docking construction is it should be noted that item
1) loosen for section of jurisdiction after preventing shield docking from disintegrating, last 20 endless tube pieces should be carried out longitudinally connecting before shield is disintegrated Connect.After leading arrival anticipated docking mileage, for preventing shield from retreating, it is necessary to shield shell is firmly supported on last endless tube On piece.
2) for ease of the position sensing to rear row shield for the leading shield, leading shield need to remove section components, these parts Generally comprise duct piece installation machine, base bearing, middle body etc..
3) Butt Section has mostly used reinforced concrete segment or steel pipe sheet to carry out lining cutting 4, it is necessary to carry out section of jurisdiction waterproof and Connection with segment assembly.
(4) installation of semi-circular shape freezing pipe
1) Frozen wall thickness design
Freezing curtain thickness is designed by incorporation engineering feature, soil layer condition and job site situation.Semi-circular shape is frozen Knot pipe position of opening distance docking shield machine outer casing end 2m, should ensure that and form the hemispherical frozen soil more than 2m for the radius in the soil body Curtain.
2) arrangement of freezing hole
It is evenly arranged many semi-circular shape freezing pipes 1, semicircular ring along shield casing circumference in one side docking shield machine 3 Shape pipe arrangement principle is for ensureing that freezing pipe perforate spacing is 0.8-1.2m(arc length).Semi-circular shape freezing pipe 1 diameter is generally 32 Or 60mm.Freezing pipe material is usually seamless low carbon steel pipe, it would however also be possible to employ the plastic tubes such as PVC, PPR, ABS, PE.
3) thermometer hole is arranged
Purpose is mainly the temperature development situation measuring freezing curtain scope different parts, in order to take to control accordingly to arrange Execute, it is ensured that the safety of construction.Temperature tube diameter is generally 45mm.
(5) liquid nitrogen freezing
It is parked in liquid nitrogen storage tank and tank car outside tunnel starting well, utilize pipeline that liquid nitrogen is delivered to shield joint and freeze work Making in the freezing pipe in face, through cyclic absorption Formation heat, collecting vaporization nitrogen by discharge, recycling blast pipe is drained into Outside tunnel spacious at, this kind of method has that freezing system is simple, temperature is low, freezing speed is fast compared with brine freezing, good stability, freezes Soil intensity advantages of higher, and consolidation by freezing soil body flexible form, depending on the scale of freezing can be according to engineering practice.
Although detailed description of the invention of the present utility model is described by the above-mentioned accompanying drawing that combines, but not new to this practicality The restriction of type protection domain, one of ordinary skill in the art should be understood that on the basis of the technical solution of the utility model, ability Field technique personnel do not need to pay the various modification that creative work can make or deformation still at protection model of the present utility model Within enclosing.

Claims (10)

1. a shield docking semi-circular shape consolidation by freezing structure, is characterized in that, including two shield machines of docking, right in one side Being evenly arranged many semi-circular shape freezing pipes along shield casing circumference in connecing shield machine, semi-circular shape layout of freezing pipes principle is The perforate arc length of guarantee semi-circular shape freezing pipe is 0.8-1.2m, is passed through liquid nitrogen freezing in semi-circular shape freezing pipe, To formation hemispherical Frozen Soil Cylinder in ground plane.
2. shield docking semi-circular shape consolidation by freezing structure as claimed in claim 1, is characterized in that, described semi-circular shape is freezed Manage a diameter of 32mm or 60mm.
3. shield docking semi-circular shape consolidation by freezing structure as claimed in claim 1, is characterized in that, described semi-circular shape is freezed Pipe position of opening distance docking shield machine outer casing end 2m, forms the hemispherical Frozen Soil Cylinder more than 2m for the radius in the soil body.
4. shield docking semi-circular shape consolidation by freezing structure as claimed in claim 1, is characterized in that, described semi-circular shape is freezed Tubing matter is seamless low carbon steel pipe, PVC, PPR, ABS or PE plastic tube.
5. shield docking semi-circular shape consolidation by freezing structure as claimed in claim 1, is characterized in that, described shield machine includes shield Shell and be located therein cutterhead and base bearing, base bearing is connected with shield shell and cutterhead respectively by high-strength bolt.
6. shield docking semi-circular shape consolidation by freezing structure as claimed in claim 5, is characterized in that, described shield shell includes passing through Precursor, middle body and the shield tail that high-strength bolt connects, wherein, precursor and middle body all use inside and outside double-deck shield shell.
7. shield docking semi-circular shape consolidation by freezing structure as claimed in claim 6, is characterized in that, two shield machines of docking Outer layer shield shell directly weld waterproof steel plate ring as the supporting tearing machine in hole open.
8. shield docking semi-circular shape consolidation by freezing structure as claimed in claim 1, is characterized in that, two shield machines of docking Butt Section use reinforced concrete segment or steel pipe sheet lining cutting.
9. shield docking semi-circular shape consolidation by freezing structure as claimed in claim 1, is characterized in that, at hemispherical Frozen Soil Cylinder In be provided with some temperature tubes, temperature tube is provided with thermo detector, thermo detector is connected with exterior display device, and temperature tube is a diameter of 45mm。
10. shield docking semi-circular shape consolidation by freezing structure as claimed in claim 1, is characterized in that, semi-circular shape freezing pipe Connected with the liquid nitrogen storage tank in the tank car being parked in outside tunnel starting well by pipeline, semi-circular shape freezing pipe is additionally provided with collection The discharge of vaporization nitrogen, the blast pipe through communicating therewith for the discharge extends at spacious outside tunnel.
CN201620639984.2U 2016-06-27 2016-06-27 Shield docks semi-circular shape consolidation by freezing structure Expired - Fee Related CN205677624U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620639984.2U CN205677624U (en) 2016-06-27 2016-06-27 Shield docks semi-circular shape consolidation by freezing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620639984.2U CN205677624U (en) 2016-06-27 2016-06-27 Shield docks semi-circular shape consolidation by freezing structure

Publications (1)

Publication Number Publication Date
CN205677624U true CN205677624U (en) 2016-11-09

Family

ID=57429704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620639984.2U Expired - Fee Related CN205677624U (en) 2016-06-27 2016-06-27 Shield docks semi-circular shape consolidation by freezing structure

Country Status (1)

Country Link
CN (1) CN205677624U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113310849A (en) * 2021-05-13 2021-08-27 华侨大学 Grouting reinforcement test device and method for simulating shield underground butt joint
CN113775342A (en) * 2021-09-23 2021-12-10 海南大学 Shield butt-joint freezing and reinforcing method and device
CN114060038A (en) * 2021-10-29 2022-02-18 五邑大学 Freezing reinforcement device and shield butt joint reinforcement method thereof
CN114922635A (en) * 2022-05-27 2022-08-19 中建交通建设集团有限公司 Parallel freezing system for shield underground butt joint and abandoned shell disassembly and construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113310849A (en) * 2021-05-13 2021-08-27 华侨大学 Grouting reinforcement test device and method for simulating shield underground butt joint
CN113775342A (en) * 2021-09-23 2021-12-10 海南大学 Shield butt-joint freezing and reinforcing method and device
CN114060038A (en) * 2021-10-29 2022-02-18 五邑大学 Freezing reinforcement device and shield butt joint reinforcement method thereof
CN114060038B (en) * 2021-10-29 2024-02-13 五邑大学 Freezing reinforcement device and shield butt joint reinforcement method thereof
CN114922635A (en) * 2022-05-27 2022-08-19 中建交通建设集团有限公司 Parallel freezing system for shield underground butt joint and abandoned shell disassembly and construction method

Similar Documents

Publication Publication Date Title
CN205677624U (en) Shield docks semi-circular shape consolidation by freezing structure
Hong Typical underwater tunnels in the mainland of China and related tunneling technologies
CN201460904U (en) Ultra-long horizontal freezing consolidation structure for shield entry
CN104963334B (en) Reinforced with slip casting freezing pipe and freeze the construction method that service channel suppresses frozen swell and melt settlement
CN107119669A (en) For shield, the pre-pouring grout consolidated subsoil method in house is worn in side in water-rich sand layer
CN104088652B (en) A kind of pipe interlude horizontal dynamic controlling freezes water-stop method
CN105240019A (en) Pipe jacking construction method
CN108071400A (en) Horizontal freezing consolidation combines shield driving construction method with steel jacket box
CN101418567A (en) Protective cutting construction method for tunnel segment
CN103711492B (en) A kind of jacking-type cable sleeve channel construction method
CN111287653A (en) Large-caliber forward reaming construction method for horizontal directional drilling of hard rock
CN106121686B (en) Underground excavation tunnel water stop structure for protecting groundwater environment and construction method thereof
CN105909259B (en) Existing shield tunnel pipe curtain construction settlement control system and method are closely worn down
CN103235110A (en) Freezing reinforcement simulation test method and freezing reinforcement simulation test device suitable for shield ground butt joint
CN109296371A (en) MJS method and horizontal freezing joint reinforcement pressure-bearing rich water arenaceous stratum overlap the system and its construction method that section is worn under station
CN110080202A (en) A kind of Foundation Pit bottom Horizontal Freezing structure and construction method
CN102262712A (en) Method for calculating front load of shield cutter head under geological conditions of upper and lower layers
CN203129183U (en) Nuclear power plant sea area drainage structure constructed in immersed tube method
CN108661078A (en) A kind of composite type Tunnel Design construction method
Yang et al. A new cryogenic sealing process for the launch and reception of a tunnel shield
CN107034874A (en) Double-screw type slip casting type freezing plant and construction method
CN104389613B (en) Slurry balance shield passes through the construction method of jeopardously underground pipelines
CN208310757U (en) A kind of rich water weak soil, the artificial bore detecting device of thin silt ultra-deep pipeline
CN208346822U (en) grouting device
CN106351675A (en) Total-depth curtain freezing and water stopping system of water and sand rich sandy gravel formation deeply-buried station excavated in concealed mode

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161109

Termination date: 20180627