CN107034874A - Double-screw type slip casting type freezing plant and construction method - Google Patents

Double-screw type slip casting type freezing plant and construction method Download PDF

Info

Publication number
CN107034874A
CN107034874A CN201710129361.XA CN201710129361A CN107034874A CN 107034874 A CN107034874 A CN 107034874A CN 201710129361 A CN201710129361 A CN 201710129361A CN 107034874 A CN107034874 A CN 107034874A
Authority
CN
China
Prior art keywords
slip casting
pipe
freezing
helical
salt solution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710129361.XA
Other languages
Chinese (zh)
Other versions
CN107034874B (en
Inventor
彭世龙
程桦
荣传新
黎明镜
张楠
林键
段寅
王志
王彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN201710129361.XA priority Critical patent/CN107034874B/en
Publication of CN107034874A publication Critical patent/CN107034874A/en
Application granted granted Critical
Publication of CN107034874B publication Critical patent/CN107034874B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/11Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electro-chemical means
    • E02D3/115Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electro-chemical means by freezing
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention provides a kind of double-screw type slip casting type freezing plant and construction method, including double-screw type slip casting type freezing pipe, the double-screw type slip casting type freezing pipe includes salt solution feed pipe and the outer tube being enclosed on outside the salt solution feed pipe, two helical ducts are provided between the tube wall of the salt solution feed pipe and the tube wall of the outer tube, two helical ducts share tube wall with the salt solution feed pipe and the outer tube, wherein it is slip casting helical pipe that a helical duct, which is salt solution helical pipe, another helical duct,.Double-screw type slip casting type freezing plant and construction method that the present invention is provided, realize the combination of grouting for water blocking, strengthening stratum technology and manual pipe jacking special construction technique, and the subterranean pipe line of two kinds of construction technologies is arranged in same pipeline, not only simplify construction method but also save drilling and pipeline cost.

Description

Double-screw type slip casting type freezing plant and construction method
Technical field
The present invention relates to artificial stratum freezing engineering field, particularly a kind of double-screw type slip casting type freezing plant and construction Method.
Background technology
Freeze-wellboring is before underground engineering construction, to beat a number of around the underground space to be excavated first Frigo is installed, hypothermic saline flows in frigo, the heat of its surrounding formation is absorbed, loose, aqueous in freezing hole, hole Formed in caving ground and freeze cylinder, freeze cylinder gradually expand and connect into closing, meet design thickness and intensity Cylinder-dog collar, to resist native, water pressure, completely cuts off underground water, so that safety passes through aquifer water-bearing stratum, is that one kind is made by artificial The special construction method of the cold temporary transient strengthening stratum of means and cut-off underground water.
Early in earlier 1800s, Russian begins to utilize weather freezing layer cutting vertical gold mining in Siberia.1862 Year, Britain reinforced foundation ditch first with artificial freezing technology.German engineer Bo Cishu in 1883 is used in Alba Reed Coal Exploitation Freezing process digs depth 103m pit shaft, and obtains the patent of freeze-wellboring.From this, this technology is widely used in many states In the engineering construction of family.The U.S. often carries out the reinforcing on basis using freezing process;The former Soviet Union once repeatedly made in subway tunnel construction Stratum consolidation measure is used as with freezing technology;Freezing process is applied in the strengthening construction of bridges and culverts and Tunnel Engineering by the Western European countries; Osaka, Japan Department of Communications freezes soil body volume up to 70m in No. five line engineering constructions of city's subway using freezing process3, to ensure Shield is smoothly appeared.China to nineteen fifty-five with the help of Polish expert using freezing process establish out Luan First Weighting On Linxi Coal Mine ventilating shaft with Come, freeze-wellboring obtains extensive popularization and application in China.
While engineering with artificial freezing method strengthening stratum is widely used in caving ground pit shaft construction project, in other Geotechnical Engineerings Promoted rapidly in the particularly city underground engineering of field.Abroad, construction freezing method technology turn into it is a kind of feasible and The weak soil of great competitiveness, unstable aquifer water-bearing stratum are reinforced, the effective ways of closure water.Germany is in Eisbach river bed within 1991 In the cave-in accident occurred during three Parallel Tunnel constructions, liquid nitrogen freezing method has been used to carry out soil layer reinforcing to collapsing position, Receive good effect;Frozen soil is carried out in subway expansion works near the railway station of German Dusseldorf downtowns within 1994 Laboratory test, it is found that its intensity and anti-deformation could meet requirement when the saturation degree of soil reaches more than 60%.And now With the development of China's Geotechnical Engineering, deep foundation and other underground municipal works are continued to bring out, and freezing process building enclosure is with it Unique superiority and be increasingly taken seriously, ground freezing technique enters China's city underground engineering field comprehensively.
,, can band with the flowing of underground water if required frozen ground has Groundwater Flow in artificial Freezing stratum as rapid The cold of a large amount of freezing pipes is walked, so that the cylinder that freezes for causing current top freezing pipe to be formed is difficult and current lower section freezing pipe The cylinder that freezes formed hands over circle, and the cycle of whole frost wall greatly lengthens.Simultaneously because the flowing of underground water causes to freeze First freeze below wall formation existence position difference, current, current freeze behind top, and frost wall partly belongs to relatively thin above current The stress of frost wall during weak position, influence freeze-wellboring.Often through increasing freezing pipe caliber, increasing in engineering Freeze the method for hypothermic saline usage amount and reduction hypothermic saline temperature to handle relevant issues, significantly increase energy consumption.For There is provided a kind of new freezing pipe for freezing the stratum containing Groundwater Flow and construction work for the call of response modern society energy-saving and emission-reduction Skill is particularly important.
The content of the invention
It is an object of the invention to provide a kind of double-screw type slip casting type freezing plant and construction method, it can overcome existing The current flowing when freezing stratum containing Groundwater Flow of freezing pipe and construction freezing method technique causes substantial amounts of loss of refrigeration capacity, freezed Wall is extremely difficult hand over circle, duration of freezing is longer, can not ensure frost wall uniformly freezes, after freeze thawing outer shaft wall by water pressure is excessive and nothing Method is by slip casting the problems such as frozen construction is combined.
To achieve these goals, the present invention provides following technical scheme:
A kind of double-screw type slip casting type freezing plant, including double-screw type slip casting type freezing pipe, the double-screw type slip casting Type freezing pipe includes salt solution feed pipe and the outer tube that is enclosed on outside the salt solution feed pipe, the salt solution feed pipe tube wall and Be provided with two helical ducts between the tube wall of the outer tube, two helical ducts with the salt solution feed pipe and described Outer tube shares tube wall, wherein it is slip casting spiral that a helical duct, which is salt solution helical pipe, another helical duct, Pipeline;Two holes are provided with the upper end tube wall of the outer tube, two holes respectively as salt solution outlet end and slurries feed flow end, Multiple slurries slurry outlets are provided with the outer tube;The slurries feed flow end is connected with one end of connecting tube, the connecting tube and set It is equipped with into slurry ball valve, the other end of the connecting tube is connected with three-way pipe end, enters to starch ball valve and described three described Grouting pressure table is provided with connecting tube between siphunculus, second end of the three-way pipe is provided with venting ball valve, described 3rd end of three-way pipe, which is connected with grouting pump, the grouting pump, is provided with pressure gauge, the grouting pump and air compressor machine phase Even.
Further, in above-mentioned double-screw type slip casting type freezing plant, the upper end of the slip casting helical pipe is provided with Upper end helical baffle, the lower end of the slip casting helical pipe is provided with lower end helical baffle.
Further, it is the salt solution feed pipe, the outer tube, described in above-mentioned double-screw type slip casting type freezing plant Freeze salt solution helical pipe and the slip casting helical pipe to be made of low temperature mild steel;
Preferably, the slurries feed flow end is welded to connect with the connecting tube.
Further, in above-mentioned double-screw type slip casting type freezing plant, multiple slurries slurry outlets are in the outer tube On in the shape of a spiral distribution and it is corresponding with the position of the slip casting helical pipe.
Further, in above-mentioned double-screw type slip casting type freezing plant, multiple grouting pressures are installed on the outer tube Sensor;Preferably, multiple grouting pressure sensors on the outer tube in the shape of a spiral distribution and with the slip casting spiral The position correspondence of pipeline, the grouting pressure sensor is distributed with the slurries slurry outlet batch (-type).
Further, in above-mentioned double-screw type slip casting type freezing plant, multiple solidification points are installed on the outer tube Sensor, multiple solidification point sensors on the outer tube in the shape of a spiral distribution and with the position of the salt solution helical pipe Put correspondence.
On the other hand there is provided a kind of construction method of double-screw type slip casting type freezing plant, comprise the following steps:
(1) vertical freezing hole, and the installation double-screw type slip casting type freezing pipe in the freezing hole are bored in the soil body;
(2) grouting equipment is used, inject injecting paste material by slip casting helical pipe carries out freezing preceding pre-pouring grout to the soil body;
(3) freezing system is used, refrigerant is injected by salt solution helical duct the soil body is freezed.
Further, in the above-mentioned methods, methods described is additionally included in step (1) using the inspection of theodolite Inclination Measurement by Light method The depth of the perpendicularity, then repetition measurement freezing hole of double-screw type slip casting type freezing pipe is surveyed, and carries out salt solution helical duct and suppresses examination The step of leakage;
Preferably, in step (2), after grouting equipment and corollary equipment are all connected, slip casting helical pipe is checked It is whether normal, grouting pump is connected into slurries and pneumatic air compressor machine after inspection is errorless, venting ball valve is opened, closes into slurry ball valve, treat When having slurries outflow in venting ball valve, slurries situation is observed, venting ball valve is closed, opens into slurry ball valve, utilize slip casting helix tube Road carries out freezing preceding pre-pouring grout to the soil body;
Preferably, methods described, which is additionally included in install between step (2) and step (3), freezes station equipment, is debugged, tried The step of operating, and leak test suppressed to the progress of salt solution helical duct is secondary.
On the other hand there is provided the construction method of another double-screw type slip casting type freezing plant, comprise the following steps:
(1) vertical freezing hole, and the installation double-screw type slip casting type freezing pipe in the freezing hole are bored in the soil body;
(2) freezing system is used, refrigerant is injected by salt solution helical duct the soil body is freezed;
(3) grouting equipment is used, inject injecting paste material by slip casting helical pipe carries out freezing grouting behind shaft or drift lining to the soil body.
Further, in the above-mentioned methods, methods described is additionally included in step (1) using the inspection of theodolite Inclination Measurement by Light method The depth of the perpendicularity, then repetition measurement freezing hole of double-screw type slip casting type freezing pipe is surveyed, and carries out salt solution helical duct and suppresses examination The step of leakage;
Preferably, methods described, which is additionally included in install between step (1) and step (2), freezes station equipment, is debugged, tried The step of operating;
Preferably, in step (3), after grouting equipment and corollary equipment are all connected, slip casting helical pipe is checked It is whether normal, grouting pump is connected into slurries and pneumatic air compressor machine after inspection is errorless, venting ball valve is opened, closes into slurry ball valve, treat When having slurries outflow in venting ball valve, slurries situation is observed, venting ball valve is closed, opens into slurry ball valve, utilize slip casting helix tube Road carries out freezing grouting behind shaft or drift lining to the soil body.
Analysis understands that double-screw type slip casting type freezing plant disclosed by the invention and construction method realize following technology Effect:
(1) double-screw type slip casting type freezing pipe is formed by salt solution feed pipe is nested with outer tube, salt solution feed pipe and outer tube it Between provided with two helical channels, respectively as the passage for freezing brine recycling and stratum slip casting.Realize grouting for water blocking, add Gu the combination of stratum technology and manual pipe jacking special construction technique, and the subterranean pipe line of two kinds of construction technologies is arranged on same In pipeline, construction method was not only simplified but also had saved drilling and pipeline cost.
(2) pressure gauge is mounted on the three-way pipe and grouting pump at slurries feed flow end, by observing note during slip casting The change of pressure is starched, the progress of slip casting can be reasonably controlled, grouting pressure can be avoided excessive and double-screw type slip casting is damaged by pressure Type freezing pipe, can be avoided because pressure of freezing wall is not enough and causes the problem of slip casting is insufficient again.
(3) choose a kind of in the two kinds of different construction methods that can be provided in the present invention by geological prospecting, according to Pre-pouring grout or freeze grouting behind shaft or drift lining before actual conditions selection is freezed and be capable of the flowing of effective control freezing stratum water, and examine in real time The pressure of slip casting and the temperature of freezing process are surveyed, is conducive to rationally controlling slip casting and freezing process, it is ensured that frost wall Formed and the security in digging process.By geological prospecting, it can obtain freezing the flow condition of aquifer water-bearing stratum, if underground water Flow velocity is less than 5m/d, it is only necessary to freezed, it is not necessary to stratum grouting and reinforcing is carried out after freezing;If groundwater velocity be 5m/d~ 20m/d, can be freezed by increasing freezing pipe quantity, reducing the methods such as the temperature for freezing liquid, the caliber for increasing freezing pipe, be frozen Need to carry out stratum grouting and reinforcing after knot;If groundwater velocity is more than 20m/d, need again to enter after first carrying out stratum grouting and reinforcing Row freezes.Above-mentioned groundwater velocity is only term of reference, and Practical Project geological state should be combined during construction, is suitably adjusted.
(4) if groundwater velocity is more than 20m/d, need first to carry out again to be freezed after the grouting and reinforcing of stratum to choose the A kind of construction method, carries out pre-pouring grout water blockoff to stratum containing Groundwater Flow by freezing preceding pre-pouring grout, reduces due to current The loss of refrigeration capacity for flowing and causing so that the friendship circle of freezing pipe is more prone to, and shortens duration of freezing, and ensure that frost wall Uniformly freeze, it is ensured that the security in frost wall formation and digging process.
(5) if groundwater velocity is 5m/d~20m/d, the temperature of liquid can be freezed by increasing freezing pipe quantity, reduction, increased The methods such as the caliber of big freezing pipe are freezed, and need to carry out stratum grouting and reinforcing after freezing.Second of construction method is chosen, Water blockoff is carried out to stratum containing Groundwater Flow by frost wall freeze thawing grouting behind shaft or drift lining, it is therefore prevented that a large amount of effect of water pressure on the borehole wall, Reduce the seepage flow damage of the borehole wall, it is ensured that using for the borehole wall is safe.
Brief description of the drawings
The Figure of description for constituting the part of the application is used for providing a further understanding of the present invention, and of the invention shows Meaning property embodiment and its illustrate be used for explain the present invention, do not constitute inappropriate limitation of the present invention.Wherein:
Fig. 1 is the overall system architecture schematic diagram of one embodiment of the invention;
Fig. 2 is the structural representation in Fig. 1 embodiment middle external tubes;
Fig. 3 is the diagrammatic cross-section of embodiment in Fig. 1;
Fig. 4 is the outer tube structure schematic diagram in Fig. 1 embodiments;
Fig. 5 is the first construction method flow chart of one embodiment of the invention;
Fig. 6 is second of construction method flow chart of one embodiment of the invention.
Description of reference numerals:1st, salt solution feed pipe, 2, outer tube, 3, salt solution outlet end, 4, slurries feed flow end, 5, air compressor machine, 6th, grouting pump, 7, three-way pipe, 8, venting ball valve, 9, grouting pressure table, 10, enter to starch ball valve, 11, connecting tube, 12, salt solution helix tube Road, 13, slip casting helical pipe, 14, upper end helical baffle, 15, lower end helical baffle, 16, slurries slurry outlet, 17, slurry pressure passes Sensor, 18, solidification point sensor, 19, frozen soil, 20, non-frozen soil body.
Embodiment
Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.It should be noted that in the feelings not conflicted Under condition, the feature in embodiment and embodiment in the application can be mutually combined.
In the description of the invention, term " longitudinal direction ", " transverse direction ", " on ", " under ", "front", "rear", "left", "right", " perpendicular Directly ", the orientation or position relationship of the instruction such as " level ", " top ", " bottom " are, based on orientation shown in the drawings or position relationship, to be only For the ease of the description present invention rather than require that the present invention must be therefore it is not intended that right with specific azimuth configuration and operation The limitation of the present invention.The term " connected " that is used in the present invention, " connection " should be interpreted broadly, for example, it may be fixedly connected, Can also be detachably connected;Can be joined directly together, can also be indirectly connected to by intermediate member, for the common of this area For technical staff, the concrete meaning of above-mentioned term can be understood as the case may be.
As shown in Figures 1 to 4, there is provided a kind of double-screw type slip casting type freezing plant, bag for embodiments in accordance with the present invention Double-screw type slip casting type freezing pipe is included, double-screw type slip casting type freezing pipe includes salt solution feed pipe 1 and is enclosed on outside salt solution feed pipe 1 The outer tube 2 in portion, is provided with two helical ducts, two helical ducts between the tube wall of salt solution feed pipe 1 and the tube wall of outer tube 2 Tube wall is shared with salt solution feed pipe 1 and outer tube 2, wherein a helical duct is salt solution helical pipe 12, another spiral leads to Road is slip casting helical pipe 13;Salt solution helical pipe 12 is used as ground as the passage for freezing brine recycling, slip casting helical pipe 13 The passage of layer slip casting.
Two holes are provided with the upper end tube wall of outer tube 2, two holes are respectively as salt solution outlet end 3 and slurries feed flow end 4, salt Water outlet end 3 is connected with the hypothermic saline circulatory system, and slurries feed flow end 4 is connected with slurries supply system, it is ensured that hypothermic saline Circularly cooling, recycle.Multiple slurries slurry outlets 16 are provided with outer tube 2.
Slurries feed flow end 4 is connected with one end of connecting tube 11, is provided with connecting tube 11 into slurry ball valve 10, connecting tube 11 The other end is connected with an end of three-way pipe 7, in the connecting tube 11 for entering to starch between ball valve 10 and three-way pipe 7 (preferably adjacent to At the position of three-way pipe 7) grouting pressure table 9 is provided with, second end of three-way pipe 7 is provided with venting ball valve 8, three-way pipe 7 The 3rd end be connected with grouting pump 6, grouting pump 6 pressure gauge be installed, grouting pump 6 is connected with air compressor machine 5.
Double-screw type slip casting type freezing pipe is by the concentric bilayer cylinder nested with outer tube 2 of salt solution feed pipe 1.Pass through Concentrically nested integration is cast, it is ensured that the salt solution helical pipe 12 that the uniform inwall around salt solution feed pipe 1 and outer tube 2 is made With slip casting helical pipe 13 so that salt solution helical pipe 12 and slip casting helical pipe 13 can provide the salt solution of uniform spiral flowing And slurries.Facilitated spiral salt solution helical pipe 12 is arranged to for the brine pipeline freezed in freezing process, it is low The bottom of warm saline from salt solution feed pipe 1 is flowed upwards out, and is flowed in the shape of a spiral around salt solution feed pipe 1, that is, increases flow velocity, Improve and freeze efficiency, and sufficiently absorb the cold of hypothermic saline in salt solution feed pipe 1.Spiral slip casting spiral is set Pipeline 13 is easy to during slip casting, and slurries are flowed downward out from slurries feed end 4, and is flowed in the shape of a spiral around salt solution feed pipe 1 It is dynamic, on the premise of not influenceing to freeze, grouting for water blocking is carried out to there is the stratum of Groundwater Flow, the shape around outer tube 2 Into frozen soil 19, the periphery of frozen soil 19 is non-frozen soil body 20, improves the stability on stratum.
Further, the upper end of slip casting helical pipe 13 is provided with upper end helical baffle 14, slip casting helical pipe 13 End is provided with lower end helical baffle 15.Lower end helical baffle 15 avoids the hypothermic saline flowed out by salt solution feed pipe 1 and flows into note Helical pipe 13 is starched, upper end helical baffle 14, which avoids the slurries flowed into by slurries feed flow end 4 and flowed into, freezes salt solution helical pipe 12, it is ensured that freeze the separate flowing with hypothermic saline and grouting serous fluid.Salt solution feed pipe 1, outer tube 2, freeze salt solution spiral shell Coil road 12 and slip casting helical pipe 13 can be made of low temperature mild steel, and ordinary carbon steel can be avoided using low temperature carbon steel Under cryogenic because toughness reduces the fracture of freezing pipe accident for occurring brittle failure and causing.
Further, multiple slurries slurry outlets 16 on outer tube 2 in the shape of a spiral distribution and with the position of slip casting helical pipe 13 Put correspondence.Slurries slurry outlet 16 is distributed in the shape of a spiral to be easy to during slip casting, and slurries can be with salt solution feed pipe 1 in the shape of a spiral Slip casting is carried out to stratum, it is to avoid the problem of slip casting for carrying out slip casting in a direction and bringing is uneven.
Further, multiple grouting pressure sensors 17 are installed on outer tube 2.Preferably, multiple grouting pressure sensors 17 are distributed and corresponding with the position of slip casting helical pipe 13 in the shape of a spiral on outer tube 2, and grouting pressure sensor 17 goes out with slurries Starch the distribution of the batch (-type) of hole 16.The slip casting on the stratum during slip casting can be monitored in real time by being arranged such grouting pressure sensor 17 Pressure, and then the intensity and progress of slip casting can be effectively controlled, while spiral distribution can improve the reliability of monitoring.
Further, multiple solidification point sensors 18 are installed, multiple solidification point sensors 18 are in outer tube on outer tube 2 It is distributed in the shape of a spiral and corresponding with the position of salt solution helical pipe 12 on 2.Being arranged such solidification point sensor 18 can be real-time Monitoring stratum in freezing process and frozen-thaw process temperature change, and then reasonably freezing strength and time can be entered Row effectively control, efficiency is freezed in raising, while spiral distribution can improve the reliability of monitoring.
Further, slurries feed flow end 4 is welded to connect with connecting tube 11.The outside weld connecting tube 11 of slurries feed flow end 4, connecting tube Slurry ball valve 10 is installed on 11, and is connected with three-way pipe 7.By in the connecting tube 11 for entering to starch between ball valve 10 and three-way pipe 7 (at the position of three-way pipe 7) sets grouting pressure table 9 to observe the change of grouting pressure, it is to avoid because pressure is excessive And damaged to entirely freezing grouting device.The lower end of three-way pipe 7 is provided with venting ball valve 8, to observe slurry before slip casting The mobility status of liquid, the other end of three-way pipe 7 is connected with grouting pump 6.Pressure gauge is installed on grouting pump 6, is easy to control slip casting The intensity of the defeated slurry of pump 6, grouting pump 6 is connected with air compressor machine 5.
The invention also discloses a kind of construction method using above-mentioned double-screw type slip casting type freezing plant, as shown in figure 5, Comprise the following steps:
(1) build construction foot stool, drilling equipment is installed;
(2) perpendicularity of drilling rod in drilling equipment is verified, freezing hole is bored;
(3) it is put into double-screw type slip casting type freezing pipe in freezing hole, and by the top of double-screw type slip casting type freezing pipe It is welded on support;
(4) perpendicularity of double-screw type slip casting type freezing pipe is detected using theodolite Inclination Measurement by Light method, then repetition measurement freezes The depth in hole, and carry out salt solution helical duct and suppress leak test;
(5) by after grouting equipment and corollary equipment all connection, check whether slip casting helical pipe 13 is normal, checks nothing Grouting pump 6 is connected into slurries and pneumatic air compressor machine 5 after by mistake, venting ball valve 8 is opened, closes into slurry ball valve 10, treat in venting ball valve 8 When having slurries outflow, slurries situation is observed, venting ball valve 8 is closed, opened into 10 pairs of 13 pairs of utilization slip casting helical pipes of slurry ball valve The soil body carries out freezing preceding pre-pouring grout;
(6) install and freeze station equipment, debugged, test running, and leak test is suppressed to the progress of salt solution helical duct is secondary;
(7) actively freezed after freezing system works well;
(8) after main structure construction is finished, stopping is freezed, extracts double-screw type slip casting type freezing pipe and fill out freezing hole It is real.
In this construction method, slip casting, the slurries of use are carried out to slip casting helical pipe 13 before Freezing stratum as rapid construction For low temperature resistant injecting paste material, (composition of low temperature resistant injecting paste material herein refers to application number respectively CN201510700150.8 With the low temperature resistant injecting paste material in CN201310333588.8 application for a patent for invention), it is to avoid made due to freezing after slip casting Low temperature can not be born into institute's injection slurry and is failed.
The invention also discloses another construction method using above-mentioned double-screw type slip casting type freezing plant, such as Fig. 6 institutes Show, comprise the following steps:
(1) build construction foot stool, drilling equipment is installed;
(2) perpendicularity of drilling rod in drilling equipment is verified, freezing hole is bored;
(3) it is put into freezing hole shaping double-screw type slip casting type freezing pipe, and by double-screw type slip casting type freezing pipe Top is welded on support;
(4) perpendicularity of double-screw type slip casting type freezing pipe is detected using theodolite Inclination Measurement by Light method, then repetition measurement freezes Hole depth, and carry out salt solution helical duct and suppress leak test;
(5) install and freeze station equipment, debugged, test running;
(6) actively freezed after freezing system works well;
(7) after main structure construction is finished, stop freezing;
(8) by after grouting equipment and corollary equipment all connection, check whether slip casting helical pipe 13 is normal, checks nothing Grouting pump 6 is connected into slurries and pneumatic air compressor machine 5 after by mistake, venting ball valve 8 is opened, closes into slurry ball valve 10, treat in venting ball valve 8 When having slurries outflow, slurries situation is observed, venting ball valve 8 is closed, opens and slip casting helical pipe 13 is frozen into slurry ball valve 10 Tie grouting behind shaft or drift lining.
In this construction method, slip casting is carried out to slip casting helical pipe 13 after frost wall freeze thawing, the slurries of use can For general injecting paste material, (general injecting paste material can carry out mortar depositing construction at normal temperatures, based on cement-based grout:Unconsolidated formation with Based on cement-fly ash slurries, wind oxidized zone adds triethanolamine, salt or waterglass if necessary based on single liquid cement mortar As external additive, to adjust serum viscosity and first final setting time) or low temperature resistant injecting paste material, it is respectively suitable for frozen soil complete With the grouting in soil mass of frost free period after defrosting.
As can be seen from the above description, the above embodiments of the present invention realize following technique effect:
Double-screw type slip casting type freezing plant and construction method that the present invention is provided, overcome existing freezing pipe and freezing process Construction technology current flowing when freezing stratum containing Groundwater Flow causes substantial amounts of loss of refrigeration capacity, frost wall are extremely difficult hand over circle, freeze The knot cycle is longer, can not ensure frost wall uniformly freezes, outer shaft wall is excessive and can not be by slip casting with freezing by water pressure after freeze thawing The problems such as knot construction is combined.Different sequences of construction can be chosen by geological prospecting, by freezing preceding pre-pouring grout or freezing The flowing of the effective control freezing stratum water of grouting behind shaft or drift lining, and the pressure and the temperature of freezing process of detection slip casting in real time, favorably Rationally controlled in slip casting and freezing process, it is ensured that the security in frost wall formation and digging process.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for those skilled in the art For member, the present invention can have various modifications and variations.Any modification within the spirit and principles of the invention, being made, Equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (10)

1. a kind of double-screw type slip casting type freezing plant, it is characterised in that including double-screw type slip casting type freezing pipe, described pair of spiral shell Rotating slip casting type freezing pipe includes salt solution feed pipe and the outer tube being enclosed on outside the salt solution feed pipe, in the salt solution feed pipe Tube wall and the outer tube tube wall between be provided with two helical ducts, two helical ducts with the salt solution feed flow Pipe and the outer tube share tube wall, wherein a helical duct is salt solution helical pipe, another helical duct is Slip casting helical pipe;
Two holes are provided with the upper end tube wall of the outer tube, two holes respectively as salt solution outlet end and slurries feed flow end, Multiple slurries slurry outlets are provided with the outer tube;
The slurries feed flow end, which is connected with one end of connecting tube, the connecting tube, to be provided with into slurry ball valve, the connecting tube The other end is connected with an end of three-way pipe, enters to starch and be provided with note in connecting tube between ball valve and the three-way pipe described Pressure gauge is starched, second end of the three-way pipe is provided with venting ball valve, and the 3rd end of the three-way pipe is connected with note Pressure gauge is installed, the grouting pump is connected with air compressor machine on stock pump, the grouting pump.
2. double-screw type slip casting type freezing plant according to claim 1, it is characterised in that the slip casting helical pipe Upper end is provided with upper end helical baffle, and the lower end of the slip casting helical pipe is provided with lower end helical baffle.
3. double-screw type slip casting type freezing plant according to claim 1, it is characterised in that the salt solution feed pipe, institute Outer tube, salt solution helical pipe and the slip casting helical pipe of freezing is stated to be made of low temperature mild steel;
Preferably, the slurries feed flow end is welded to connect with the connecting tube.
4. double-screw type slip casting type freezing plant according to claim 1, it is characterised in that multiple slurries slurry outlets It is distributed in the shape of a spiral and corresponding with the position of the slip casting helical pipe on the outer tube.
5. double-screw type slip casting type freezing plant according to claim 4, it is characterised in that be provided with the outer tube many Individual grouting pressure sensor;Preferably, multiple grouting pressure sensors on the outer tube in the shape of a spiral distribution and with institute The position correspondence of slip casting helical pipe is stated, the grouting pressure sensor is distributed with the slurries slurry outlet batch (-type).
6. double-screw type slip casting type freezing plant according to claim 1, it is characterised in that be provided with the outer tube many Individual solidification point sensor, multiple solidification point sensors on the outer tube in the shape of a spiral distribution and with the salt solution spiral shell The position correspondence in coil road.
7. using the construction method of the double-screw type slip casting type freezing plant any one of claim 1~6, its feature exists In comprising the following steps:
(1) vertical freezing hole, and the installation double-screw type slip casting type freezing pipe in the freezing hole are bored in the soil body;
(2) grouting equipment is used, inject injecting paste material by slip casting helical pipe carries out freezing preceding pre-pouring grout to the soil body;
(3) freezing system is used, refrigerant is injected by salt solution helical duct the soil body is freezed.
8. method according to claim 7, it is characterised in that
Methods described is additionally included in hanging down using theodolite Inclination Measurement by Light method detection double-screw type slip casting type freezing pipe in step (1) Straight degree, the then depth of repetition measurement freezing hole, and carry out the step of salt solution helical duct suppresses leak test;
Preferably, in step (2), after grouting equipment and corollary equipment are all connected, whether slip casting helical pipe is checked Normally, grouting pump is connected into slurries and pneumatic air compressor machine after inspection is errorless, venting ball valve is opened, closes into slurry ball valve, wait to be vented When having slurries outflow in ball valve, slurries situation is observed, venting ball valve is closed, opens into slurry ball valve, utilize slip casting helical pipe pair The soil body carries out freezing preceding pre-pouring grout;
Preferably, methods described, which is additionally included in install between step (2) and step (3), freezes station equipment, is debugged, test run The step of turning, and leak test suppressed to the progress of salt solution helical duct is secondary.
9. using the another construction method of the double-screw type slip casting type freezing plant any one of claim 1~6, it is special Levy and be, comprise the following steps:
(1) vertical freezing hole, and the installation double-screw type slip casting type freezing pipe in the freezing hole are bored in the soil body;
(2) freezing system is used, refrigerant is injected by salt solution helical duct the soil body is freezed;
(3) grouting equipment is used, inject injecting paste material by slip casting helical pipe carries out freezing grouting behind shaft or drift lining to the soil body.
10. method according to claim 9, it is characterised in that
Methods described is additionally included in hanging down using theodolite Inclination Measurement by Light method detection double-screw type slip casting type freezing pipe in step (1) Straight degree, the then depth of repetition measurement freezing hole, and carry out the step of salt solution helical duct suppresses leak test;
Preferably, methods described, which is additionally included in install between step (1) and step (2), freezes station equipment, is debugged, test running The step of;
Preferably, in step (3), after grouting equipment and corollary equipment are all connected, whether slip casting helical pipe is checked Normally, grouting pump is connected into slurries and pneumatic air compressor machine after inspection is errorless, venting ball valve is opened, closes into slurry ball valve, wait to be vented When having slurries outflow in ball valve, slurries situation is observed, venting ball valve is closed, opens into slurry ball valve, utilize slip casting helical pipe pair The soil body carries out freezing grouting behind shaft or drift lining.
CN201710129361.XA 2017-03-06 2017-03-06 Double-screw type slip casting type freezing plant and construction method Active CN107034874B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710129361.XA CN107034874B (en) 2017-03-06 2017-03-06 Double-screw type slip casting type freezing plant and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710129361.XA CN107034874B (en) 2017-03-06 2017-03-06 Double-screw type slip casting type freezing plant and construction method

Publications (2)

Publication Number Publication Date
CN107034874A true CN107034874A (en) 2017-08-11
CN107034874B CN107034874B (en) 2019-01-25

Family

ID=59533189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710129361.XA Active CN107034874B (en) 2017-03-06 2017-03-06 Double-screw type slip casting type freezing plant and construction method

Country Status (1)

Country Link
CN (1) CN107034874B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086301A (en) * 2018-01-31 2018-05-29 王楠 Sensitivity is built, structures reinforce deformation controller in hole
CN110159273A (en) * 2019-06-18 2019-08-23 中国水利水电第八工程局有限公司 It is a kind of with flowing to the construction freezing method of handoff functionality with every leaky refrigerating plant
CN114017064A (en) * 2021-11-02 2022-02-08 南京康泰建筑灌浆科技有限公司 Remote feeding equipment for subway grouting
CN114017039A (en) * 2021-11-11 2022-02-08 核工业井巷建设集团有限公司 Drilling and blasting tunneling device and drilling and blasting tunneling method for weak water-rich stratum
CN114991118A (en) * 2022-06-24 2022-09-02 中交一公局集团有限公司 Soil body reinforcing method by freezing method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100783356B1 (en) * 2006-04-10 2007-12-10 한밭대학교 산학협력단 Method for the treatment of wastewater using freeze concentration
KR20130106118A (en) * 2012-03-19 2013-09-27 두산건설 주식회사 Ground freezing pipe having inner filler and ground freezing method using freezimg pipe
CN104963334A (en) * 2015-07-13 2015-10-07 南京林业大学 Construction method for utilizing grouting freezing pipe to reinforce and freeze contact passage to restrain frost heaving and thaw collapsing
JP2015224521A (en) * 2014-05-30 2015-12-14 ケミカルグラウト株式会社 Freezing method and freezing method execution system
CN105257297A (en) * 2015-11-04 2016-01-20 中铁十八局集团有限公司 Construction method for precisely controlling frozen soil curtain among pipes

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100783356B1 (en) * 2006-04-10 2007-12-10 한밭대학교 산학협력단 Method for the treatment of wastewater using freeze concentration
KR20130106118A (en) * 2012-03-19 2013-09-27 두산건설 주식회사 Ground freezing pipe having inner filler and ground freezing method using freezimg pipe
JP2015224521A (en) * 2014-05-30 2015-12-14 ケミカルグラウト株式会社 Freezing method and freezing method execution system
CN104963334A (en) * 2015-07-13 2015-10-07 南京林业大学 Construction method for utilizing grouting freezing pipe to reinforce and freeze contact passage to restrain frost heaving and thaw collapsing
CN105257297A (en) * 2015-11-04 2016-01-20 中铁十八局集团有限公司 Construction method for precisely controlling frozen soil curtain among pipes

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086301A (en) * 2018-01-31 2018-05-29 王楠 Sensitivity is built, structures reinforce deformation controller in hole
CN110159273A (en) * 2019-06-18 2019-08-23 中国水利水电第八工程局有限公司 It is a kind of with flowing to the construction freezing method of handoff functionality with every leaky refrigerating plant
CN110159273B (en) * 2019-06-18 2024-05-14 中国水利水电第八工程局有限公司 Leakage-proof type refrigerating device with flow direction switching function for freezing method construction
CN114017064A (en) * 2021-11-02 2022-02-08 南京康泰建筑灌浆科技有限公司 Remote feeding equipment for subway grouting
CN114017064B (en) * 2021-11-02 2024-01-23 南京康泰建筑灌浆科技有限公司 Remote feeding equipment for subway grouting
CN114017039A (en) * 2021-11-11 2022-02-08 核工业井巷建设集团有限公司 Drilling and blasting tunneling device and drilling and blasting tunneling method for weak water-rich stratum
CN114991118A (en) * 2022-06-24 2022-09-02 中交一公局集团有限公司 Soil body reinforcing method by freezing method
CN114991118B (en) * 2022-06-24 2024-03-15 中交一公局集团有限公司 Soil body reinforcing method by freezing method

Also Published As

Publication number Publication date
CN107034874B (en) 2019-01-25

Similar Documents

Publication Publication Date Title
CN107034874B (en) Double-screw type slip casting type freezing plant and construction method
CN104963334B (en) Reinforced with slip casting freezing pipe and freeze the construction method that service channel suppresses frozen swell and melt settlement
CN105257297B (en) The construction method of Frozen Soil Cylinder is precisely controlled between a kind of pipe
CN103291325B (en) The preventing control method of Coal-mining Above Confined-water floor strata gushing water
CN104695964B (en) Subway shield tunnel freeze entering method
CN109208637A (en) Increase the construction method of open-cut station newly on the basis of existing tunnel
CN105781573B (en) The two-tube canopy pipe-following drilling construction method of vcehicular tunnel bilayer sleeve reinforcement is worn under railway
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN105908765B (en) For protecting the open trench tunnel water sealing structure and construction method of groundwater environment
CN105909260B (en) Subway station water stop structure for protecting groundwater environment and construction method thereof
CN106014201B (en) A kind of outer release hole safe construction technique of tunnel grouting curtain
CN101418567A (en) Protective cutting construction method for tunnel segment
CN106979012B (en) Hidden conduit pipe Comprehensive Treatment method in shaft of vertical well freezing hole
CN105041325A (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN107119669A (en) For shield, the pre-pouring grout consolidated subsoil method in house is worn in side in water-rich sand layer
CN101929340A (en) Coal mine underground flat inclined tunnel pipe shed pre-grouting advance support construction process
CN110735653A (en) deep-hole retreating type grouting water plugging construction method for igneous rock water-rich fault
CN106121686B (en) Underground excavation tunnel water stop structure for protecting groundwater environment and construction method thereof
CN108756898A (en) Using the front pre-grouting construction method of HSC grouting materials
CN108071400A (en) Horizontal freezing consolidation combines shield driving construction method with steel jacket box
CN105863646A (en) Freezing construction method in steel pipe curtain of large-section subsurface tunnel
CN102518470A (en) Method for preventing and controlling water by using freezing pipes in annular water intercepting tunnel
CN109296371A (en) MJS method and horizontal freezing joint reinforcement pressure-bearing rich water arenaceous stratum overlap the system and its construction method that section is worn under station
CN105909265B (en) Pass through the anti-protuberance retrusive deep hole grouting system and method for existing shield tunnel
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant