CN207878504U - 城市管廊自动连浇施工模车 - Google Patents
城市管廊自动连浇施工模车 Download PDFInfo
- Publication number
- CN207878504U CN207878504U CN201820022083.8U CN201820022083U CN207878504U CN 207878504 U CN207878504 U CN 207878504U CN 201820022083 U CN201820022083 U CN 201820022083U CN 207878504 U CN207878504 U CN 207878504U
- Authority
- CN
- China
- Prior art keywords
- piping lane
- lifting
- mould vehicle
- frame
- shifting formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本实用新型公开了一种城市管廊自动连浇施工模车。为了克服现有城市综合管廊混泥土浇筑施工仍然沿用传统装模拆模工具和方式,缺乏高效自动装模拆模装置,混泥土浇筑效率低、成本高、质量标椎化程度低、容易发生浇筑安全事故等不足,本实用新型在所述移模台车上设有导向柱,在所述导向柱安装了升降主梁,所述升降主梁与安装于移模台车的升降油缸连接,所述升降主梁通过横移模车与顶模架连接,所述升降主梁通过侧油缸与侧模架连接。本实用新型用于城市综合管廊混凝土浇筑施工,它可以自动组合装模拆模,整体移模,浇筑效率高、浇筑成本低、质量标椎化程度好、可以防止浇筑安全事故。
Description
技术领域
本实用新型涉及一种用于安置管、线的城市综合管廊混泥土浇筑装模拆模施工装置,具体为一种城市管廊自动连浇施工模车。
背景技术
现有城市建设中的大量管、线需要安放在专门的综合管廊中。现有管廊的混泥土浇筑仍然沿用传统的装模拆模工具和方式,缺乏高效的自动装模拆模装置,使得管廊混泥土浇筑效率低、浇筑成本高、质量标椎化程度低、容易发生浇筑安全事故。
实用新型内容
本实用新型的目的就是针对上述不足,提供一种城市管廊自动连浇施工模车,它可以自动组合装模拆模,整体移模,浇筑效率高、浇筑成本低、质量标椎化程度好、可以防止浇筑安全事故。
为达到上述目的,本实用新型的技术方案是,该城市管廊自动连浇施工模车,包括移模台车,在所述移模台车上设有导向柱,在所述导向柱安装了升降主梁,所述升降主梁与安装于移模台车的升降油缸连接,所述升降主梁通过横移模车与顶模架连接,所述升降主梁通过侧油缸与侧模架连接,所述顶模架与侧模架活动连接。
所述横移模车与安装在升降主梁上的横移油缸连接。
所述侧模架的上部具有连接顶模架的弯曲部,在所述顶模架与侧模架的连接处的下面设有活动连接机构,该活动连接机构可以采用类似传统房门活页的结构。
本实用新型油缸指液压缸。
本实用新型实现了城市综合管廊混凝土浇筑施工中内模架的自动组合安装、拆模、移模,内模架的顶模架上面的混凝土按照施工厚度荡平即可,内模架的侧模架之外可以开挖形成的土坎面或者岩石壁作为外模,按照施工厚度浇筑侧壁混凝土。
本实用新型用于城市综合管廊混凝土浇筑施工,它可以自动组合装模拆模,整体移模,浇筑效率高、浇筑成本低、质量标椎化程度好、可以防止浇筑安全事故。
附图说明
图1是本实用新型使用状态的端部正视示意图。
图中,1. 移模台车,2. 导向柱,3. 升降油缸,4. 升降主梁,5. 横移油缸,6. 顶模架,7. 横移模车,8. 侧模架,9. 侧油缸。
具体实施方式
如图1所示,该城市管廊自动连浇施工模车,包括移模台车1,在所述移模台车1上设有导向柱2,在所述导向柱2套装了升降主梁4,升降主梁4可以在导向柱2上下滑动升降,所述升降主梁4与安装于移模台车1的升降油缸3连接,所述升降主梁4通过横移模车7与顶模架6连接,横移模车7可以在升降主梁4上横向移动,所述升降主梁4通过侧油缸9与侧模架8连接,所述顶模架6与侧模架8活动连接所述横移模车7与安装在升降主梁4上的横移油缸5连接,所述侧模架8的上部具有连接顶模架的弯曲部,在所述顶模架6与侧模架8的连接处的下面设有类似传统房门活页的活动连接机构。
本实用新型实现了城市综合管廊混凝土浇筑施工中内模架的自动组合安装、拆模、移模,内模架的顶模架上面的混凝土按照施工厚度荡平即可,内模架的侧模架之外可以开挖形成的土坎面或者岩石壁作为外模,按照施工厚度浇筑侧壁混凝土;也可以在本实用新型的前端导向柱上部(靠近开挖施工处的一端的导向柱),沿管廊轴向设置具有横梁的模架车,所述横梁的两端部通过可移动连接机构与外模架连接,实现内、外模架自动整体组合安装、拆卸、移动。
Claims (3)
1.一种城市管廊自动连浇施工模车,包括移模台车(1),其特征是:在所述移模台车(1)上设有导向柱(2),在所述导向柱(2)安装了升降主梁(4),所述升降主梁(4)与安装于移模台车(1)的升降油缸(3)连接,所述升降主梁(4)通过横移模车(7)与顶模架(6)连接,所述升降主梁(4)通过侧油缸(9)与侧模架(8)连接,所述顶模架(6)与侧模架(8)活动连接。
2.根据权利要求1所述的城市管廊自动连浇施工模车,其特征是,所述横移模车(7)与安装在升降主梁(4)上的横移油缸(5)连接。
3.根据权利要求1或者2所述的城市管廊自动连浇施工模车,其特征是,所述侧模架(8)的上部具有连接顶模架的弯曲部,在所述顶模架(6)与侧模架(8)的连接处的下面设有活动连接机构。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820022083.8U CN207878504U (zh) | 2018-01-08 | 2018-01-08 | 城市管廊自动连浇施工模车 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820022083.8U CN207878504U (zh) | 2018-01-08 | 2018-01-08 | 城市管廊自动连浇施工模车 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207878504U true CN207878504U (zh) | 2018-09-18 |
Family
ID=63505849
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820022083.8U Active CN207878504U (zh) | 2018-01-08 | 2018-01-08 | 城市管廊自动连浇施工模车 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207878504U (zh) |
-
2018
- 2018-01-08 CN CN201820022083.8U patent/CN207878504U/zh active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106968712B (zh) | 富水地层隧底排水结构及其施工方法 | |
CN201003145Y (zh) | 上行自行式移动模架 | |
CN108166525A (zh) | 一种用现浇暗梁拼接的半预制装配式综合管廊及其施工方法 | |
CN108086354A (zh) | 一种用现浇暗梁拼接的预制装配式综合管廊及其施工方法 | |
CN208219366U (zh) | 现浇混凝土排水沟轨滑式模架体系 | |
CN109610509A (zh) | 一种综合管廊自控断面的可调模架系统和施工方法 | |
CN205618174U (zh) | 箱型涵洞台车 | |
CN207567810U (zh) | 一种用于综合管廊现浇混凝土滑模施工的模板台车 | |
CN201520942U (zh) | 解决现浇梁混凝土施工的移动模架布料机 | |
CN208563380U (zh) | 一种自行式综合管廊模板装置 | |
CN207131969U (zh) | 地铁隧道内整体道床现浇施工用轨行式混凝土泵管托架 | |
CN207878504U (zh) | 城市管廊自动连浇施工模车 | |
CN203684060U (zh) | 钢架便桥 | |
CN209053124U (zh) | 一种板块化预制的装配式管廊 | |
CN209228383U (zh) | 隧道二衬拱顶浇筑台车 | |
CN208105310U (zh) | 高效装模拆模城市管廊自动连浇施工模车 | |
CN205955749U (zh) | 一种隧道仰拱施工装置 | |
CN215593527U (zh) | 一种公路道路路基防护结构 | |
CN206359897U (zh) | 一种铰接式钢芯模单元 | |
CN214574494U (zh) | 一种环保透水材料水沟盖板安装装置 | |
CN110016934A (zh) | 城市管廊自动连浇施工模车 | |
CN209228386U (zh) | 一种暗挖地铁区间大断面停车线二衬用新型模板台车 | |
CN209066486U (zh) | 一种管廊内部支墩结构 | |
CN107237255A (zh) | 一种桥墩式道路施工用雨水集中排放结构 | |
CN209633287U (zh) | 一种预制管廊快速成型装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Automatic continuous casting construction mold trolley for urban pipe gallery Effective date of registration: 20191220 Granted publication date: 20180918 Pledgee: China Postal Savings Bank Limited by Share Ltd Huaihua branch Pledgor: Huaihua Zhongjian machine steel mould manufacturing Co., Ltd. Registration number: Y2019980001195 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |