CN207828973U - A kind of processing system that building special foundation is reinforced - Google Patents

A kind of processing system that building special foundation is reinforced Download PDF

Info

Publication number
CN207828973U
CN207828973U CN201720696765.2U CN201720696765U CN207828973U CN 207828973 U CN207828973 U CN 207828973U CN 201720696765 U CN201720696765 U CN 201720696765U CN 207828973 U CN207828973 U CN 207828973U
Authority
CN
China
Prior art keywords
steel
pipe pile
building
pile
piling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720696765.2U
Other languages
Chinese (zh)
Inventor
吴如军
唐军
刘文汉
赵正兴
王敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Shengte Building Technology Development Co Ltd
Original Assignee
Guangzhou Shengte Building Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Shengte Building Technology Development Co Ltd filed Critical Guangzhou Shengte Building Technology Development Co Ltd
Priority to CN201720696765.2U priority Critical patent/CN207828973U/en
Application granted granted Critical
Publication of CN207828973U publication Critical patent/CN207828973U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a kind of processing system that building special foundation is reinforced, when encountering sandstone, boulder during piling, when stake can not sink, the utility model uses steel-pipe pile bottom opening, and install the improved procedure of vibratory equipment additional, it is broken to sandstone, boulder by vibratory equipment, so that steel-pipe pile is smoothly sunk.Steel pipe pile lining is equipped with several through-holes simultaneously, and through-hole is used for steel-pipe pile to periphery soil body consolidation by grouting.A kind of technical solution of the system of building strengthening of foundation of the utility model includes:Piling hole, anchor pole, pile driving frame, jack, steel-pipe pile and vibratory equipment;The piling hole is set on the basis of building;The anchor pole is embedded in the periphery in the piling hole;The pile driving frame is set on the basis of the building above the piling hole, and is connected with the anchor pole;The jack is set on the pile driving frame, for gradually to the steel-pipe pile piling in the piling hole, the bottom of the steel-pipe pile to be equipped with opening.

Description

A kind of processing system that building special foundation is reinforced
Technical field
The utility model is related to building technical fields, and in particular to a kind of processing system that building special foundation is reinforced System.
Background technology
At present in civilian or public utility, in civilian or office premises process of construction, in order to enable building The higher that object is made is more stable, and between building is set up, the reinforcing to ground is typically all to be assigned with pile pile or square pile In underground, play the role of supporting building, is typically all to be pressed into soil by way of pushing as pile pile or square pile In, but due to would ordinarily be encountered sandstone, boulder during piling, piling can not sink.
Utility model content
The utility model provides a kind of processing system that building special foundation is reinforced, and is equipped with and is opened using the bottom of steel-pipe pile Mouthful, and install the mode of vibratory equipment additional, and it is broken to sandstone, boulder by vibratory equipment, so that steel-pipe pile is smoothly sunk, this outer steel pipe Pile lining is equipped with several through-holes, and through-hole is used for steel-pipe pile to periphery soil body consolidation by grouting.
The technical solution for the processing system that a kind of building special foundation of the utility model is reinforced includes:
Piling hole, anchor pole, pile driving frame, jack, steel-pipe pile and vibratory equipment;
The piling hole is set on the basis of building;
The anchor pole is embedded in the periphery in the piling hole;
The pile driving frame is set on the basis of the building above the piling hole, and is connected with the anchor pole;
The jack is set on the pile driving frame, for gradually to the steel-pipe pile pressure in the piling hole The bottom of stake, the steel-pipe pile is equipped with opening.
Preferably,
The system also includes the drilling rod that fetches earth, the drilling rod that fetches earth rotatably is interspersed in inside the steel-pipe pile.
Preferably,
The steel pipe pile lining is equipped with several through-holes, and the through-hole is used for the steel-pipe pile to periphery soil body consolidation by grouting.
Preferably,
The vibratory equipment is located on the inner wall of the steel-pipe pile, for being crushed rubble and/or boulder.
Preferably,
Section steel beam is transversely mounted on the pile driving frame, the jack is installed in the section steel beam lower face.
Preferably,
The anchor pole fixes the pile driving frame by nut.
Preferably,
The pile driving frame is perpendicular to building basis.
It is using the advantageous effect of above-mentioned technical proposal:
When encountering sandstone, boulder during piling, when stake can not sink, the utility model is set using the bottom of steel-pipe pile There is opening, and installs the mode of vibratory equipment additional, it is broken to sandstone, boulder by vibratory equipment, so that stake is smoothly sunk.Steel pipe pile lining Equipped with several through-holes, through-hole is used for steel-pipe pile to periphery soil body consolidation by grouting.
Description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is the embodiments of the present invention, for those of ordinary skill in the art, without creative efforts, also Other attached drawings can be obtained according to the attached drawing of offer.
Fig. 1 is a kind of flow chart for the processing method that building special foundation is reinforced;
Fig. 2 is the structure chart for the processing system that a kind of building special foundation of the utility model is reinforced.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
Referring to Fig. 1, a kind of technical solution for the processing method that building special foundation is reinforced is:
101, it is provided with piling hole on the basis of building, anchor pole is buried on the periphery in the piling hole;
102, the pile driving frame that installation is connected with the anchor pole on the basis of the building above the corresponding piling hole, the pressure Pile frame is equipped with jack;
In the present embodiment, section steel beam is transversely mounted on the pile driving frame, the jack is installed in the section steel beam lower face. Further, the anchor pole fixes the pile driving frame by nut, and the pile driving frame is perpendicular to building basis.
103, steel-pipe pile is put into the piling hole, and the jack gradually carries out piling to the steel-pipe pile;
In the present embodiment, the steel pipe pile bottom is equipped with opening, and the steel pipe pile lining is equipped with several through-holes, the through-hole For the steel-pipe pile to periphery soil body consolidation by grouting.Further, the steel-pipe pile inner wall is equipped with vibratory equipment, described to shake Dynamic equipment is specifically as follows vibration head.
104, during piling, the soil in the steel-pipe pile is taken out, and be in the milk to the periphery soil body by the steel-pipe pile It reinforces.
In the present embodiment, during piling, the soil in the steel-pipe pile is taken out, and native to periphery by the steel-pipe pile Body consolidation by grouting specifically includes:
During piling, the drilling rod that fetches earth is interspersed in inside steel-pipe pile, described in the rotation taking-up by the drilling rod that fetches earth Soil in steel-pipe pile;
The steel pipe pile lining is equipped with several through-holes, and the through-hole is used for the steel-pipe pile to periphery soil body consolidation by grouting.
Referring to Fig. 2, the technical solution for the processing system that a kind of building special foundation of the utility model is reinforced is:
Piling hole, anchor pole, pile driving frame, jack, steel-pipe pile and vibratory equipment, wherein:
The piling hole is set on the basis of building;
The anchor pole is embedded in the periphery in the piling hole;
The pile driving frame is set on the basis of the building above the piling hole, is connected with the anchor pole;
The jack is set on the pile driving frame, for gradually to the steel-pipe pile pressure in the piling hole The bottom of stake, the steel-pipe pile is equipped with opening.It is specifically as follows:Section steel beam, the section steel beam are transversely mounted on the pile driving frame Lower face is installed by the jack.The anchor pole fixes the pile driving frame by nut, and the pile driving frame is built perpendicular to described Build object basis.
The steel-pipe pile 1 is equipped in the piling hole, and the jack gradually carries out piling to the steel-pipe pile 1.Institute It states steel pipe pile lining and is equipped with several through-holes, the through-hole is used for the steel-pipe pile to periphery soil body consolidation by grouting.The steel-pipe pile Inner wall is equipped with vibratory equipment 2, and vibratory equipment 2 is specifically as follows vibration head.
The processing system that above-mentioned building special foundation is reinforced further includes the drilling rod that fetches earth, and the drilling rod that fetches earth rotatably is worn It is inserted in inside the steel-pipe pile.
Above example is only to illustrate the technical solution of the utility model, rather than its limitations;Although with reference to aforementioned reality Example is applied the utility model is described in detail, it will be understood by those of ordinary skill in the art that:It still can be to preceding The technical solution recorded in each embodiment is stated to modify or equivalent replacement of some of the technical features;And these Modification or replacement, the spirit and model of various embodiments of the utility model technical solution that it does not separate the essence of the corresponding technical solution It encloses.

Claims (7)

1. the processing system that a kind of building special foundation is reinforced, which is characterized in that including:Piling hole, anchor pole, pile driving frame, thousand Jin top, steel-pipe pile and vibratory equipment;
The piling hole is set on the basis of building;
The anchor pole is embedded in the periphery in the piling hole;
The pile driving frame is set on the basis of the building above the piling hole, and is connected with the anchor pole;
The jack is set on the pile driving frame, for gradually to the steel-pipe pile piling in the piling hole, institute The bottom for stating steel-pipe pile is equipped with opening.
2. the processing system that building special foundation according to claim 1 is reinforced, which is characterized in that the system is also wrapped The drilling rod that fetches earth is included, the drilling rod that fetches earth rotatably is interspersed in inside the steel-pipe pile.
3. the processing system that building special foundation according to claim 2 is reinforced, which is characterized in that the steel pipe pile lining Several through-holes are equipped with, the through-hole is used for the steel-pipe pile to periphery soil body consolidation by grouting.
4. the processing system that building special foundation according to claim 3 is reinforced, which is characterized in that the vibratory equipment On the inner wall of the steel-pipe pile, for being crushed rubble and/or boulder.
5. the processing system that building special foundation according to claim 4 is reinforced, which is characterized in that on the pile driving frame It is transversely mounted section steel beam, the jack is installed in the section steel beam lower face.
6. the processing system that building special foundation according to claim 5 is reinforced, which is characterized in that the anchor pole passes through Nut fixes the pile driving frame.
7. the processing system that building special foundation according to claim 6 is reinforced, which is characterized in that the pile driving frame hangs down Directly in building basis.
CN201720696765.2U 2017-06-15 2017-06-15 A kind of processing system that building special foundation is reinforced Active CN207828973U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720696765.2U CN207828973U (en) 2017-06-15 2017-06-15 A kind of processing system that building special foundation is reinforced

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720696765.2U CN207828973U (en) 2017-06-15 2017-06-15 A kind of processing system that building special foundation is reinforced

Publications (1)

Publication Number Publication Date
CN207828973U true CN207828973U (en) 2018-09-07

Family

ID=63383735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720696765.2U Active CN207828973U (en) 2017-06-15 2017-06-15 A kind of processing system that building special foundation is reinforced

Country Status (1)

Country Link
CN (1) CN207828973U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059870A (en) * 2017-06-15 2017-08-18 广州市胜特建筑科技开发有限公司 The processing method and system that a kind of building special foundation is reinforced

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059870A (en) * 2017-06-15 2017-08-18 广州市胜特建筑科技开发有限公司 The processing method and system that a kind of building special foundation is reinforced

Similar Documents

Publication Publication Date Title
CN102155009A (en) Crushed rock pile used for strengthening extremely soft soil foundation and construction method thereof
US20120301227A1 (en) Foundation pile and installing method thereof
CN102116030A (en) Combined bracing structure for foundation pit and construction method thereof
CN102704480B (en) Construction method for processing ultra-thick quicksand layer of pile foundation by using front-end vibration steel casing
CN103669369A (en) Supporting structure and supporting method for foundation pit
CN104532853A (en) Deep foundation pit supporting method and system characterized by steel reinforced cement-soil piles, bolts easy to detach and automatic monitoring and early warning
CN105386610A (en) Protective construction method for natural-foundation ancient architectures at top of asymmetric deep foundation pit
CN108316328A (en) A kind of pressurization sinking device and its construction method for open caisson construction
CN103938641A (en) Foundation construction technology of large-scale photovoltaic power station in desert
CN207828973U (en) A kind of processing system that building special foundation is reinforced
CN204401612U (en) A kind of super-large diameter all steel casing does operation pore-creating filling pile construction equipment
CN203701129U (en) Bridge reinforcement foundation and bridge
CN109056870A (en) A kind of rammed earth trench machine equipment built for house
CN102817349B (en) Method for consolidating soft soil foundations through fine dynamic compaction replacement
CN107288147A (en) Rock foundation pole and tower foundation construction method
CN106120790A (en) The special equipment of the compacted guncreting pile of high frequency and method
CN201202114Y (en) Bearing pile
CN207047834U (en) A kind of construction system of hollow preformed pile
CN107059870A (en) The processing method and system that a kind of building special foundation is reinforced
CN206233232U (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN202099795U (en) Crushed stone pile for reinforcing extremely soft soil foundation
CN107842033A (en) A kind of composite screw anchor foundation and its construction method
CN209585072U (en) It is a kind of for high slope, the retaining structure in narrow location
CN203924043U (en) A kind of bamboo concrete stake
CN203701128U (en) Micro pile-reinforced bridge foundation and bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant