CN201202114Y - Bearing pile - Google Patents

Bearing pile Download PDF

Info

Publication number
CN201202114Y
CN201202114Y CNU2008201185965U CN200820118596U CN201202114Y CN 201202114 Y CN201202114 Y CN 201202114Y CN U2008201185965 U CNU2008201185965 U CN U2008201185965U CN 200820118596 U CN200820118596 U CN 200820118596U CN 201202114 Y CN201202114 Y CN 201202114Y
Authority
CN
China
Prior art keywords
stake
bearing peg
drainage channel
mentioned
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008201185965U
Other languages
Chinese (zh)
Inventor
张国梁
殷学智
刘锋
史生军
梁彦伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC COMMUNICATION CONSTRUCTION GROUP CO., LTD.
Original Assignee
MCC COMMUNICATION ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC COMMUNICATION ENGINEERING TECHNOLOGY Co Ltd filed Critical MCC COMMUNICATION ENGINEERING TECHNOLOGY Co Ltd
Priority to CNU2008201185965U priority Critical patent/CN201202114Y/en
Application granted granted Critical
Publication of CN201202114Y publication Critical patent/CN201202114Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Foundations (AREA)

Abstract

The utility model aims at providing a bearing pile, which can greatly reduce the decrease of bearing force caused by soil liquefaction. The bearing pile is characterized in that the inner portion of the bearing pile is provided with a drainage channel which is communicated with the outer circumference of the pile, in order to realize the exhaust of water in foundation soil, thereby reducing the weakening of the bearing force of the bearing pile. And the drainage channel comprises horizontal holes (1) and vertical holes (2).

Description

Bearing peg
Technical field
The utility model relates to field of civil engineering, particularly relates to a kind of bearing peg as the basis.
Background technology
In the past, bearing peg is often adopted on the basis of civil engineering, for this bearing peg, in the relatively poor occasion of many geological conditionss, its essence is passed through frictional force, support to upper building is provided, but, running into liquefaction soil, such as, during the loosening sand layer, often because the vibration that the dynamic load on tops such as earthquake, highway, railroad bridge produces stake, the end resistance of the frictional force of pile vibrosinking, the equipment that dynamic load is bigger, the factory building perisporium of above-mentioned stake because of liquefaction of soil mass makes or stake bottom soil reduces, and the bearing capacity of stake is reduced.In addition, because liquefaction of soil mass also can cause the reduction of liquefaction soil to the horizontal resistance of stake.
The disclosure of an invention scheme
The purpose of this utility model is to provide a kind of bearing peg, and it can lower the reduction of the bearing capacity that causes because of liquefaction of soil mass greatly.
Above-mentioned purpose of the present utility model is to realize by following bearing peg, in this bearing peg,, has the drainage channel of the periphery wall of the stake of being communicated in the inside of this bearing peg, so that the discharge of the water in the realization foundation soil body reduces the weakening to the bearing capacity of bearing peg.
According to such scheme, owing to drainage channel is set in the inside of stake, its periphery wall with stake is communicated with, so the stake perisporium water on every side that liquefaction is caused is discharged to this permeable partial interior, and discharges by drainage channel, when weakening because of pile driving construction so greatly (such as, high frequency liquid shakes formula hammering stake and the vibration that produces) liquefaction cause to pile lining frictional force, horizontal force, the harmful effect of stake end power, thereby can keep stable pile capacity, or improve pile capacity.
In above-mentioned bearing peg, above-mentioned drainage channel is included in the lateral aperture of all wall openings of stake.
According to such scheme, be opened on a lateral aperture of side perisporium owing to be provided with, so can prevent a liquefaction of the foundation soil body of side perisporium.
In above-mentioned bearing peg, above-mentioned lateral aperture has a plurality of, also comprises the vertical row water hole in addition, and it is communicated with above-mentioned lateral aperture.
According to such scheme,, in the bigger long scope of stake, prevent the liquefaction of foundation soil body more effectively because the vertical row water hole of a plurality of lateral apertures and these a plurality of lateral apertures of connection is set.
In above-mentioned bearing peg,, above-mentioned drainage channel is set in the stake bottom.
According to such scheme, owing to, above-mentioned drainage channel is set in the stake bottom, thus water can be discharged fast, thus excess hydrostatic pressure reduced, reduce end resistance, the quick sinking of convenient stake in sinking to process.
In above-mentioned bearing peg, above-mentioned bearing peg is that above-mentioned stake is precast reinforced concrete pile, precast prestressed reinforced concrete pile, steel pipe pile, steel tube concrete pile.
In above-mentioned bearing peg, above-mentioned drainage channel is vertical along stake, from the stake top, extends to a bottom.
According to such scheme, because longitudinally connecting from top to bottom, drainage channel is provided with, so can in the long scope of whole stake, prevent liquefaction to frictional force, the harmful effect that horizontal bearing capacity causes effectively.
In above-mentioned bearing peg, be provided with the stopple that to meet water-solubleization in the above-mentioned drainage channel, to avoid in the sinking process by the soil obstruction.
According to such scheme, because above-mentioned stopple so can avoid the obstruction of drainage channel, can be realized effective draining.
In above-mentioned bearing peg, above-mentioned drainage channel is communicated with pump.
According to such scheme, owing to above-mentioned drainage channel is communicated with pump, so can discharge ground water effectively apace.
Brief description of drawings
Fig. 1 is the elevation as the bearing peg of an embodiment of the present utility model;
Fig. 2 is the transverse sectional view as the bearing peg of an embodiment of the present utility model.
The embodiment that is used to carry out an invention
As illustrated in fig. 1 and 2, precast reinforced concrete pile 1 as an embodiment of the present utility model is pile tube, it comprises a plurality of lateral apertures 1 as drainage channel that are arranged in tube wall, comprise the vertical hole 2 that is arranged in tube wall in addition, this vertical hole 2 is communicated with above-mentioned a plurality of lateral apertures 1, above-mentioned vertical hole 2 up/down perforations, and a plurality of lateral aperture 1 is opened on the periphery wall of pile tube 1, is embedded with reinforcing bar 4 in the concrete of tube wall.Because a plurality of lateral apertures 1 are set, its periphery wall with stake is communicated with, like this can be in the work progress of stake, and the water of the liquefaction of soil mass in the stake side perisporium foundation soil body on every side that causes because of the stake of high frequency liquid vibration beating is effectively discharged.In addition, vertically a bottom is led in hole 2, thereby can discharge the water of a bottom, in the piling construction process, can reduce to squeeze into when beating the degree of depth, because of excess hydrostatic pressure forms bigger penetrating resistance like this.Stake vertically, from top to bottom, have liquefiable powder soil horizon, sand layer and gravel soil layer.In liquefiable powder soil horizon, sand layer and gravel soil layer, because of outer thereby generation liquefaction, the water that is produced can enter in the stake from lateral aperture 1 in the liquefiable sand layer.In addition, stake bottom surrounding soil can take place in sand layer and gravel soil layer produce excess hydrostatic pressure, because perpendicular person hole 2 extends to a bottom, so can reduce this excess hydrostatic pressure.In addition, be provided with the stopple that to meet water-solubleization in the above-mentioned drainage channel, to avoid in the sinking process by the soil obstruction, though not shown in the drawings about this point.

Claims (8)

1. a bearing peg is characterized in that the inside at this bearing peg, has the drainage channel of the periphery wall of the stake of being communicated to, so that realize the discharge of the water in the foundation soil body, reduces the weakening to the bearing capacity of bearing peg.
2. bearing peg according to claim 1 is characterized in that above-mentioned drainage channel is included in the lateral aperture of all wall openings of stake, so that prevent a liquefaction of the foundation soil body of side perisporium.
3. bearing peg according to claim 2, it is a plurality of to it is characterized in that above-mentioned lateral aperture has, and also comprises the vertical row water hole in addition, and it is communicated with above-mentioned lateral aperture, so that prevent the liquefaction of foundation soil body more effectively in the bigger long scope of stake.
4. bearing peg according to claim 1 is characterized in that in the stake bottom above-mentioned drainage channel being set, so that water is discharged fast, thereby reduces excess hydrostatic pressure, reduces end resistance, the quick sinking of convenient stake in sinking to process.
5. bearing peg according to claim 4 is characterized in that above-mentioned stake is precast reinforced concrete pile, precast prestressed reinforced concrete pile, steel pipe pile or steel tube concrete pile.
6. bearing peg according to claim 5, it is characterized in that above-mentioned drainage channel along stake vertically, from the stake top, extend to a bottom.
7. bearing peg according to claim 1 is characterized in that being provided with in the above-mentioned drainage channel stopple that can meet water-solubleization, to avoid in the sinking process by the soil obstruction.
8. bearing peg according to claim 1 is characterized in that above-mentioned drainage channel is communicated with pump.
CNU2008201185965U 2008-05-29 2008-05-29 Bearing pile Expired - Lifetime CN201202114Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201185965U CN201202114Y (en) 2008-05-29 2008-05-29 Bearing pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201185965U CN201202114Y (en) 2008-05-29 2008-05-29 Bearing pile

Publications (1)

Publication Number Publication Date
CN201202114Y true CN201202114Y (en) 2009-03-04

Family

ID=40424426

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201185965U Expired - Lifetime CN201202114Y (en) 2008-05-29 2008-05-29 Bearing pile

Country Status (1)

Country Link
CN (1) CN201202114Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102261066A (en) * 2011-05-13 2011-11-30 南京工业大学 Self-adaptive pressure-reducing drainage pipe pile and preparation process thereof
CN105648872A (en) * 2016-02-03 2016-06-08 济南轨道交通集团有限公司 Device and construction method for prefabricated seepage column
CN108265704A (en) * 2018-03-26 2018-07-10 东北大学 A kind of anti-liquefaction stake of laminated soil Non-carrying type
CN108708365A (en) * 2018-04-10 2018-10-26 河海大学 Prevent the liquefied novel steel tube pile foundation of soil around pile under wave action

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102261066A (en) * 2011-05-13 2011-11-30 南京工业大学 Self-adaptive pressure-reducing drainage pipe pile and preparation process thereof
CN105648872A (en) * 2016-02-03 2016-06-08 济南轨道交通集团有限公司 Device and construction method for prefabricated seepage column
CN108265704A (en) * 2018-03-26 2018-07-10 东北大学 A kind of anti-liquefaction stake of laminated soil Non-carrying type
CN108708365A (en) * 2018-04-10 2018-10-26 河海大学 Prevent the liquefied novel steel tube pile foundation of soil around pile under wave action

Similar Documents

Publication Publication Date Title
CN101560770B (en) Novel deep building foundation pit supporting system
CN108842791B (en) Detachable load pile anchor multistage supporting structure and construction method
KR20100068597A (en) A shoring method using arch plate pile and h-pile
CN106368219A (en) Supporting reinforcing structure of deep foundation pit and construction method
WO2007129693A1 (en) Soil improvement method
CN105714773A (en) Foundation treatment method
CN101440619B (en) Seismic ecological bearing pile
KR20100059209A (en) A drainage system for soft ground
CN201202114Y (en) Bearing pile
CN201873997U (en) Support structure of foundation pit
US20120301227A1 (en) Foundation pile and installing method thereof
US10669687B1 (en) Systems and methods for constructing retaining wall structure and well point in granular soils under groundwater level
CN103572770B (en) A kind of stake case hydraulic structures and construction method thereof
KR20110121043A (en) Pile foundation and method for constucting the same
CN101586341B (en) Water sealing method for civil engineering groundwork
KR20120102480A (en) Phc pile with improved end bearing capacity and piling method of phc pile using the same
CN205591212U (en) Multi -functional precast tubular pile
JP2013224529A (en) Structure and method for reinforcing pile foundation
KR20070014547A (en) Support reinforcement-machine fot tip of still pile pipe
CN201202113Y (en) Concrete bearing pile
CN106400814A (en) Foundation pit supporting method
CN203129143U (en) Static pressure jet flow piling wall forming equipment
CN212656218U (en) Heavy pile machine load underpinning structure
CN201598650U (en) Device for reinforcing loose rubble underpinning in ancient building
WO2014174525A2 (en) Slotted holes mesh filtered steel pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 100028, Beijing, Chaoyang District, No. 28, west of China Metallurgical Building, 18 and 19

Patentee after: MCC Communication Engineering Technology Co., Ltd.

Address before: 100176, No. 1, Kangding street, Daxing District economic and Technological Development Zone, Beijing, B2

Patentee before: MCC Communication Engineering Technology Co., Ltd.

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100028, Beijing, Chaoyang District, No. 28, west of China Metallurgical Building, 18 and 19

Patentee after: MCC COMMUNICATION CONSTRUCTION GROUP CO., LTD.

Address before: 100028, Beijing, Chaoyang District, No. 28, west of China Metallurgical Building, 18 and 19

Patentee before: MCC Communication Engineering Technology Co., Ltd.

DD01 Delivery of document by public notice

Addressee: MCC COMMUNICATION CONSTRUCTION GROUP CO., LTD.

Document name: Notification of Passing Examination on Formalities

CX01 Expiry of patent term

Granted publication date: 20090304

CX01 Expiry of patent term
DD01 Delivery of document by public notice

Addressee: MCC COMMUNICATION CONSTRUCTION GROUP CO., LTD.

Document name: Notification of Expiration of Patent Right Duration

DD01 Delivery of document by public notice