CN107288147A - Rock foundation pole and tower foundation construction method - Google Patents

Rock foundation pole and tower foundation construction method Download PDF

Info

Publication number
CN107288147A
CN107288147A CN201710706133.4A CN201710706133A CN107288147A CN 107288147 A CN107288147 A CN 107288147A CN 201710706133 A CN201710706133 A CN 201710706133A CN 107288147 A CN107288147 A CN 107288147A
Authority
CN
China
Prior art keywords
rock
pole
earth anchor
fitting
drilling platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710706133.4A
Other languages
Chinese (zh)
Inventor
杨大楼
张鹰
邵明山
高学存
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan And Germany New Energy Co Ltd
Original Assignee
Henan And Germany New Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan And Germany New Energy Co Ltd filed Critical Henan And Germany New Energy Co Ltd
Priority to CN201710706133.4A priority Critical patent/CN107288147A/en
Publication of CN107288147A publication Critical patent/CN107288147A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Abstract

The invention discloses a kind of rock foundation pole and tower foundation construction method, one, in pole and tower foundation boundary of works area with concrete build horizontal drilling platform;2nd, basic hole is bored downwards in horizontal drilling platform surface using rig extend to rock interior;3rd, in horizontal drilling platform surface, several earth anchor reinforced holes are bored downwards around basic hole and extend to rock interior;4th, steel reinforcement cage built-in fitting is placed in basic hole, earth anchor reinforcing bar is placed in earth anchor reinforced hole;5th, spiral stiffener is made to cover and be sleeved on around steel reinforcement cage built-in fitting;The 6th, concrete cast template, the concrete plummer of the casting concrete formation cladding steel reinforcement cage built-in fitting, earth anchor reinforcing bar and spiral stiffener set are installed on horizontal drilling platform.Advantage of the present invention is mainly reflected in the stability that overall pole and tower foundation structure takes full advantage of rock in ground, is excavated due to that need not carry out explosion and large area, reduces vegetation deterioration, eliminates the potential safety hazard that ground loosening belt comes.

Description

Rock foundation pole and tower foundation construction method
Technical field
The present invention relates to pole and tower foundation construction method, more particularly, to rock foundation pole and tower foundation construction method.
Background technology
Pole and tower foundation is to fix shaft tower on the ground, for stablizing shaft tower, it is ensured that shaft tower not run-off the straight, collapse, under It is heavy and on the facility that pulls out etc..On the basis of shaft tower is fixed on by foundation bolt.Shaft tower include photovoltaic plant tower bar, communication iron tower, Electric force pole tower etc..The selection of pole and tower foundation pattern, the features such as shaft tower construction regional geology, execution conditions and shaft tower pattern should be combined Consider;Pole and tower foundation construction generally uses digging up and filling in mode, and the force request of shaft tower is met by concrete chassis.
For ragstone ground, generally using rock anchor assembly class basis, dowel or foundation bolt are directly embedded into petrosal foramen It is interior, then dowel or foundation bolt is become entirety with rock by concrete grouting.Rock anchor assembly class basis
There are rigors for the intensity of rock in ground, and engineering site geological environment complexity is various, differs and surely meets rock The requirement of killagh pile foundation, such as hard crisp stone body, the relatively low stone body of compression strength etc.;And field geology environment prospecting difficulty Height, cost is high, and time-consuming.Also, the relatively low roughness of rock surface of most rate of decay is low, combined with concrete it is insecure, If directly building concrete frame tower foundation on rock foundation, overall construction intensity is low, anti-to topple over ability, it is impossible to actual to answer With.Unstable problem is combined for rock and concrete, is tied if strengthening both by squeezing into stiffener in rock With joint efforts, there is problem is rock foundation surface irregularity, and miniature portable churn can not work, and part mountain area large type drill is not It can show up, cause constructional difficulties.If destroying rock texture using the method for explosion, then bar is built by the method for digging up and filling in Tower foundation, the problem of existing be:1st, explosion can cause the region ground to loosen, and destroy the stability of original ground, though backfill Also it is difficult to the native structural strength that restores to the original state by compacting;To meet the stability requirement on basis, it is necessary to increase the size on basis, Construction cost increase.2nd, without the stability using rock in itself with periphery soil layer strong bonded.3rd, applying needed for digging up and filling in Work cost, cost of labor and equipment cost are all higher, and inconvenient in the severe mountain environment construction of conditions of transportation.
The content of the invention
Present invention aims at provide a kind of safe and reliable, stabilized structure, low construction cost, short time limit, geographical environment office Sex-limited small rock foundation pole and tower foundation construction method.
To achieve the above object, the present invention takes following technical proposals:
Rock foundation pole and tower foundation construction method of the present invention, comprises the steps:
The first step, it is determined that on the ground of pole and tower foundation position clear up debris earthing to rock surface is exposed, then in the bar Build one-shot job horizontal plane as horizontal drilling platform with concrete in tower foundation boundary of works area, the horizontal drilling platform with The rock peak flushes with or slightly higher than rock peak;
Second step, the position for determining pole and tower foundation central point and the placement of steel reinforcement cage built-in fitting, are existed using portable large-diameter drill The horizontal drilling platform surface bores downwards basic hole, and the basic hole extends to the rock interior, forms connection " mortise and tenon " Structure;The diameter in basic hole is determined according to the shapes and sizes of the steel reinforcement cage built-in fitting, is met filling and is required;
3rd step, in the horizontal drilling platform surface, bore several ground downwards using portable impact drill around the basic hole Anchor reinforced hole, each earth anchor reinforced hole all extends to the rock interior, the diameter of earth anchor reinforced hole, position, quantity by The size of rock, the size of pole and tower foundation are determined according to design discipline;
4th step, the steel reinforcement cage built-in fitting is placed in the basic hole, earth anchor reinforcing bar is placed in the earth anchor reinforced hole, Extend the horizontal drilling platform surface in the top of steel reinforcement cage built-in fitting and earth anchor reinforcing bar;
5th step, making spiral stiffener cover and are sleeved on around steel reinforcement cage built-in fitting, the spiral stiffener set It can prevent that the concrete foundation after solidification from being influenceed and fractureed by external force in use;
6th step, concrete cast template is installed on the horizontal drilling platform, the casting concrete formation cladding reinforcing bar The concrete plummer of cage built-in fitting, earth anchor reinforcing bar and spiral stiffener set;It is noted that steel reinforcement cage is pre-buried in casting process Part position whether deviation, upper surface whether level, if any deviation, adjustment built-in fitting position, is reaffirmed after the completion of pouring in time Built-in fitting position does not have after deviation, waits the solidification of concrete plummer, pole and tower foundation is conserved, wait pole and tower foundation structure Firm shaping.
In 5th step, the upper and lower part of the spiral stiffener set is set in the steel reinforcement cage built-in fitting Upper and lower part, spiral stiffener set middle part be sleeved on the earth anchor reinforcing bar for extending the horizontal drilling platform.
The steel reinforcement cage built-in fitting is by many vertical main reinforcements and the stirrup being fixed on many vertical main reinforcements The rectangle stand constituted;The lower end of many vertical main reinforcements is the U-shaped structure extended laterally, many vertical main reinforcements Upper end is foundation bolt structure, for the shaft tower that is connected.
It is inverted T-shaped structure positioned at the concrete plummer longitudinal section of the horizontal drilling platform upper surface.
Advantage major embodiment of the present invention is in the following areas:
1st, overall pole and tower foundation structure takes full advantage of the stability of rock in ground.Each built-in fitting of concrete plummer bottom With concrete integrative-structure down into rock interior, " mortise and tenon " structure of high bonding strength is formed with rock foundation.
2nd, there are some earth anchor reinforcing bars between concrete plummer and rock, add pole and tower foundation structural strength, enhance The anti-ability of toppling over of shaft tower;By pre-buried spiral stiffener set, the connection between concrete plummer and ground is enhanced, together When effect of contraction is played to concrete, enhance cracking resistance, the rupture strength of concrete plummer;Pre-buried spiral stiffener set Certain effect of contraction is also played to the rock in ground with earth anchor reinforcing bar collective effect, makes rock formation one integrated High-strength structure body, reduces dependence of the overall structure to rock strength.
3rd, construction process does not need explosion, is excavated without large area, without backfill and backfill rammed earth, both reduces cost Ensure safety again;Concrete horizontal drilling platform is built on rock, construction bar is provided for small portable large-diameter drill Part, work progress does not need large scale equipment, and small portable instrument can be completed, and easy construction is affected by environment small, practicality By force, be conducive in the severe Mountainous Regions popularization and application of conditions of transportation, can save 70% expense through site operation checking, contract Short 60% duration.Simultaneously as explosion and large area excavation need not be carried out, vegetation deterioration is reduced, original ground is not destroyed Steadiness, eliminates the potential safety hazard that ground loosening belt comes.
Brief description of the drawings
Fig. 1 is the rock foundation pole and tower foundation structural representation constructed according to the inventive method.
Fig. 2 is steel reinforcement cage embedded part structure schematic diagram of the present invention.
Fig. 3 is Fig. 2 A-A to cross section structure diagram.
Embodiment
Embodiments of the invention are elaborated below in conjunction with the accompanying drawings, the present embodiment using technical solution of the present invention before Put and implemented, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to down State embodiment.
As Figure 1-3, rock foundation pole and tower foundation construction method of the present invention, comprises the steps:
The first step, on the ground 1 of the pole and tower foundation position determined debris earthing is cleared up to exposing the surface of rock 2, Ran Hou Build one-shot job horizontal plane as horizontal drilling platform 2 with concrete in pole and tower foundation boundary of works area, horizontal drilling platform 3 with The peak of rock 2 flushes with or slightly higher than the peak of rock 2;
Second step, the position for determining pole and tower foundation central point and the placement of steel reinforcement cage built-in fitting, are existed using portable large-diameter drill Basic hole is bored downwards on the surface of horizontal drilling platform 3, and basic hole extends to the rock interior, forms connection " mortise and tenon " structure;Base The diameter in plinth hole is determined according to the shapes and sizes of steel reinforcement cage built-in fitting, is met filling and is required;
3rd step, on the surface of horizontal drilling platform 3, bore several earth anchor reinforcing bars downwards using portable impact drill around basic hole Hole, each earth anchor reinforced hole is all extended to inside rock 2, size by rock 2 of the diameter, position, quantity of earth anchor reinforced hole, bar The size of tower foundation is determined according to design discipline;
4th step, steel reinforcement cage built-in fitting is placed in basic hole, earth anchor reinforcing bar 4 is placed in each earth anchor reinforced hole, steel reinforcement cage Extend the surface of horizontal drilling platform 3 in the top of built-in fitting and earth anchor reinforcing bar 4;
5th step, make spiral stiffener set 5, it is pre- that the upper and lower part of spiral stiffener set 5 is set in steel reinforcement cage The upper and lower part of embedded part, the middle part of spiral stiffener set 5 is sleeved on the earth anchor reinforcing bar 4 for extending horizontal drilling platform 3; Spiral stiffener set 5 can prevent that the concrete foundation after solidification from being influenceed and fractureed by external force in use;
6th step, concrete cast template is installed on horizontal drilling platform 3, casting concrete formation cladding reinforcing steel bar cage is pre-buried The concrete plummer 6 of part, earth anchor reinforcing bar 4 and spiral stiffener set 5;It is noted that steel reinforcement cage built-in fitting position in casting process Put whether deviation, upper surface whether level, if any deviation, adjustment built-in fitting position, reinforcing bar is reaffirmed after the completion of pouring in time Whether cage built-in fitting position waits concrete plummer 6 to solidify, pole and tower foundation is conserved after deviation, wait pole and tower foundation Stabilized structure is molded;It is inverted T-shaped structure positioned at the longitudinal section of the concrete plummer 6 of the upper surface of horizontal drilling platform 3.
In 5th step, as shown in Figure 2,3, steel reinforcement cage built-in fitting is to be fixed on four by four vertical main reinforcements 7 and interval The rectangle stand that multiple stirrups 8 on vertical main reinforcement 7 are constituted(Certainly, steel reinforcement cage built-in fitting is alternatively other structures form Stand);The lower end of four vertical main reinforcements 7 is the structure of U-shaped 9 extended laterally, and the upper end of four vertical main reinforcements 7 is equal For the structure of foundation bolt 10, for the shaft tower that is connected.

Claims (4)

1. a kind of rock foundation pole and tower foundation construction method, it is characterised in that:Comprise the steps:
The first step, it is determined that on the ground of pole and tower foundation position clear up debris earthing to rock surface is exposed, then in the bar One-shot job horizontal plane is built with concrete be used as horizontal drilling platform in tower foundation boundary of works area;
Second step, the position for determining the pole and tower foundation central point and the placement of steel reinforcement cage built-in fitting, are bored using portable heavy caliber Machine bores downwards basic hole in the horizontal drilling platform surface, and the basic hole extends to the rock interior;Basic hole it is straight Footpath is determined according to the shapes and sizes of the steel reinforcement cage built-in fitting, is met filling and is required;
3rd step, in the horizontal drilling platform surface, bore several earth anchor steel downwards using impact drill around the basic hole Muscle hole, each earth anchor reinforced hole all extends to the rock interior, and the diameter of earth anchor reinforced hole, position, quantity are by rock Size, the size of pole and tower foundation determines according to design discipline;
4th step, the steel reinforcement cage built-in fitting is placed in the basic hole, earth anchor reinforcing bar is placed in the earth anchor reinforced hole, Extend the horizontal drilling platform surface in the top of steel reinforcement cage built-in fitting and earth anchor reinforcing bar;
5th step, making spiral stiffener cover and are sleeved on around steel reinforcement cage built-in fitting;
6th step, concrete cast template is installed on the horizontal drilling platform, the casting concrete formation cladding reinforcing bar The concrete plummer of cage built-in fitting, earth anchor reinforcing bar and spiral stiffener set.
2. rock foundation pole and tower foundation construction method according to claim 1, it is characterised in that:In 5th step, institute The upper and lower part for stating spiral stiffener set is set in the upper and lower part of the steel reinforcement cage built-in fitting, and spiral strengthens steel The middle part of muscle set is sleeved on the earth anchor reinforcing bar for extending the horizontal drilling platform.
3. rock foundation pole and tower foundation construction method according to claim 1 or 2, it is characterised in that:The steel reinforcement cage is pre- Embedded part is the rectangle stand that is made up of many vertical main reinforcements and the stirrup being fixed on many vertical main reinforcements;It is many The lower end of the vertical main reinforcement of root is the U-shaped structure extended laterally, and the upper end of many vertical main reinforcements is foundation bolt knot Structure.
4. rock foundation pole and tower foundation construction method according to claim 1 or 2, it is characterised in that:Positioned at the level The concrete plummer longitudinal section of drilling platform upper surface is inverted T-shaped structure.
CN201710706133.4A 2017-08-17 2017-08-17 Rock foundation pole and tower foundation construction method Withdrawn CN107288147A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710706133.4A CN107288147A (en) 2017-08-17 2017-08-17 Rock foundation pole and tower foundation construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710706133.4A CN107288147A (en) 2017-08-17 2017-08-17 Rock foundation pole and tower foundation construction method

Publications (1)

Publication Number Publication Date
CN107288147A true CN107288147A (en) 2017-10-24

Family

ID=60106166

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710706133.4A Withdrawn CN107288147A (en) 2017-08-17 2017-08-17 Rock foundation pole and tower foundation construction method

Country Status (1)

Country Link
CN (1) CN107288147A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589759A (en) * 2018-05-15 2018-09-28 中国电力科学研究院有限公司 A kind of shaft tower composite foundation
CN111197318A (en) * 2018-11-19 2020-05-26 纳布拉风力技术公司 Foundation for a tower of a wind turbine
CN112411605A (en) * 2020-11-30 2021-02-26 国网四川省电力公司电力科学研究院 Reinforcement reinforcing method and system for foundation anchor bolt of power transmission tower

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589759A (en) * 2018-05-15 2018-09-28 中国电力科学研究院有限公司 A kind of shaft tower composite foundation
CN111197318A (en) * 2018-11-19 2020-05-26 纳布拉风力技术公司 Foundation for a tower of a wind turbine
CN111197318B (en) * 2018-11-19 2023-03-14 纳布拉温德科技有限公司 Foundation for a tower of a wind turbine
CN112411605A (en) * 2020-11-30 2021-02-26 国网四川省电力公司电力科学研究院 Reinforcement reinforcing method and system for foundation anchor bolt of power transmission tower

Similar Documents

Publication Publication Date Title
CN102444142A (en) Pile group column replacement expanded basement and construction method of same
CN109538246A (en) Ledge method tunneling subway station arch springing ruggedized construction and construction method
CN108035361A (en) A kind of advanced support supporting construction and its construction method
CN110777836A (en) Reinforced concrete plate-anchor rod composite foundation and using method thereof
CN107288147A (en) Rock foundation pole and tower foundation construction method
CN104532853A (en) Deep foundation pit supporting method and system characterized by steel reinforced cement-soil piles, bolts easy to detach and automatic monitoring and early warning
CN110409525B (en) Soft soil and unfavorable geology composite foundation reinforcing method
CN211898463U (en) Reinforcing device combining micro-steel pipe pile and anchor rod
CN109914422A (en) A kind of steel pipe and soil nailing combined type foundation pit supporting construction and construction method
CN108316328A (en) A kind of pressurization sinking device and its construction method for open caisson construction
CN207109842U (en) A kind of rock foundation pole and tower foundation structure
CN109577322A (en) A kind of constructing device for inside soil body existing pile foundation pile extension
JPS5985028A (en) Steel pipe pile and laying work thereof
JP6413469B2 (en) Pile foundation and pile foundation construction method
CN1036729C (en) The method of supporting deep-foundation side wall
CN206368375U (en) A kind of electric power pylon basis
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN109024711A (en) Underground structure anti-floating system and its construction method
CN212983885U (en) Foundation pit structure
CN209324377U (en) Ledge method tunneling subway station arch springing ruggedized construction
TWI683941B (en) Stone cage fixing method
CN107842033A (en) A kind of composite screw anchor foundation and its construction method
CN210104765U (en) High and large retaining structure of soft geological side slope
CN217480138U (en) Be suitable for harder stratum's photovoltaic mud jacking precast pile installation component, solar photovoltaic board support
CN106013238A (en) Subsidence control method for soft and weak stratum large-earthing open trench tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20171024