CN1036729C - The method of supporting deep-foundation side wall - Google Patents
The method of supporting deep-foundation side wall Download PDFInfo
- Publication number
- CN1036729C CN1036729C CN 93110191 CN93110191A CN1036729C CN 1036729 C CN1036729 C CN 1036729C CN 93110191 CN93110191 CN 93110191 CN 93110191 A CN93110191 A CN 93110191A CN 1036729 C CN1036729 C CN 1036729C
- Authority
- CN
- China
- Prior art keywords
- anchor pole
- steel
- cement mortar
- foundation trench
- dark
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The invention provides a kind of method of supporting deep-foundation side wall, excavate dark foundation trench 8 at ground building line inner edge, at the dark longitudinal and transverse up-hole of foundation trench 8 sidewalls, cement injection mortar, insertion anchor pole 2, on dark foundation trench 8 side wall surfaces, lay U-steel 1, U-steel 1 joins with anchor pole 2, constitutes retaining wall integral body together.Do not need to do again reinforced concrete pile, castinplace pile, diaphragm wall and explosion reaming, can supporting, have advantages such as short construction period, construction costs be low while excavating.
Description
The invention belongs to a kind of method of ground foundation engineering, particularly about a kind of method of supporting deep-foundation side wall.
All disclose a kind of " soil bolt construction " in the 573rd~574 page of in March, 1987 disclosed " Encyclopadia Sinica civil engineering " and " soil bolt design and construction standard ", the purpose of this job practices is stablizing in order to the soil layer of keeping building and institute's supporting.But as the anchor pole that pattern foundation pit supporting structure is used is after finishing the reinforced concrete pile of foundation pit enclosure structure, castinplace pile or diaphragm wall, ligand protects the excavation process, when digging the anchor pole projected depth, carry out anchor bolt construction to soil layer inside, this job practices, not only exist long construction period, shortcomings such as construction costs height, and when particularly running into hard soil layer, rock stratum, reinforced concrete pile just can't be squeezed into desired depth, and the quality of castinplace pile is difficult to guarantee, like this, the soil bolt construction just is difficult to carry out.In order to address this problem, a kind of " the explosion soil anchor bolt is stablized the reinforcing theory and the design and construction method of deep foundation pit slope " disclosed in " the geotechnical engineering journal " delivered in January, 1989, this is a kind of method that adopts horizontal blasting soil anchor bolt and channel-section steel to combine supporting deep-foundation side wall, though solved the simple soil bolt existing problem of constructing, also have following problem: 1, the explosion soil anchor bolt need be used the explosive reaming.2, owing to adopted the explosion soil anchor bolt that toe stress is concentrated, then adopt the method for digging " Ma Kou " of jumping, still do not break away from " cantilever adds anchor pole and props up retaining " form of structure at the toe place of nearly base plate.
The purpose of this invention is to provide that a kind of construction costs is low, the method for the supporting deep-foundation side wall of short construction period.
Technical solution of the present invention is: a kind of method of supporting deep-foundation side wall, its step is to be suitable for panelling construction along ground building line inner edge excavation to make things convenient for dark basic 8 of the width and the degree of depth, vertically hole at dark foundation trench 8 sidewalls apart from the following 1m of above-ground route absolute altitude place, cement injection mortar 3 in the hole, after cement mortar 3 is filled, in the hole, insert anchor pole 2, constituted cement mortar anchor pole 4 by cement mortar 3 and anchor pole 2, down lay a cement mortar anchor pole 4 again every 1.5~2.5m, laterally also lay a cement mortar anchor pole 4 at dark foundation trench 8 sidewalls every 1.5~2.5m, cement mortar anchor pole 4 has upwards constituted quincuncial arrangement in length and breadth at dark foundation trench 8 sidewalls, after having laid cement mortar anchor pole 4, transversely lay a U-steel 1 that is fastenedly connected with anchor pole 2 at dark foundation trench 8 side wall surfaces every 0.5~1.5m, cannelure shaped steel 1 length is identical with dark foundation trench 8 groove depths, lay a horizontal steel plate rib 6 every 0.5~1.5m between per two U-steels 1, constitute one deck retaining wall integral body, after finishing the upper strata panelling construction, repeat above-mentioned job practices again, and lower floor's U-steel 1 welded mutually with upper strata U-steel 1, the rest may be inferred, until subfoundation, constitute whole retaining wall.
Between described per two U-steels 1, fall for preventing miscellaneous fill, lay steel mesh reinforcement 9 on U-steel 1 top, steel mesh reinforcement 9 is connected together with U-steel 1.
The present invention compares with prior art, owing to need not do reinforced concrete pile, castinplace pile or diaphragm wall, and need not the explosive reaming, but the supporting while excavating, and therefore, short construction period, construction costs is low and can guarantee the retaining wall quality.
Fig. 1 is an embodiment of the invention first floor dado structure schematic diagram.
Fig. 2 is the embodiment of the invention second layer retaining wall schematic diagram of constructing.
Fig. 3 is an embodiment of the invention retaining wall Facad structure schematic diagram.
Fig. 4 calculates the rock-bolt length schematic diagram for the present invention.
Fig. 5 is effective rock-bolt length schematic diagram for the present invention calculates.
Below in conjunction with the description of drawings specific embodiment of the invention: when construction, at first excavate the dark foundation trench 8 of wide 4m, dark 3m along foundation building line inner edge, vertically be drilled to the hole with the 80mm hidden hole drilling at dark foundation trench 8 sidewalls apart from the following 1m of ground level place, the hole is an angling hole, hole depth or determine according to rock-bolt length, cement injection mortar 3 in the hole, after cement mortar 3 is filled, in the hole, insert Φ 22 anchor poles 2, rock-bolt length is divided into non-anchoring section 10 and anchoring section 11, determines non-anchoring section 10 and anchoring section 11 according to soil body slip-crack surface 12 sizes.Effective anchor rod anchored length utilizes on the slip-crack surface ratio of normal force and shearing to determine: and promptly (the tg Φ=KT of σ+δ), in the formula: σ--normal force on the slip-crack surface (KN); δ--anchoring section anchored force (KN); The K--safety factor, temporary supporting is got K=1.5; Shearing on the T--slip-crack surface (KN) calculates behind the anchored force δ divided by every meter anchored force (4T/m~6T/m) be anchor rod effective length Le, promptly
In the hole cement injection mortar 3 with insert anchor pole 2 after constituted cement mortar anchor pole 4, cement mortar anchor pole 4 is a column type inclination anchor pole, down the every 2m of the degree of depth also lays a cement mortar anchor pole 4 again, and adjacent cement mortar anchor pole 4 is the phase anchor each other, forms quincuncial arrangement.After having laid cement mortar anchor pole 4, transversely laying one every 1m at dark foundation trench 8 side wall surfaces welds mutually with anchor pole 2, and the U-steel 1 that adopts nut 5 and anchor pole 2 to be fastened, U-steel 1 adopts 16~18 model U-steels, nut adopts M22 nut 5, cannelure shaped steel 1 length is identical with dark foundation trench 8 groove depths, between per two U-steels 1, lay a steel plate rib 6 every 1m, steel plate rib 6 adopts thickness 15mm, width 100~150mm, U-steel 1 joins and cement mortar anchor pole 4 connects and constitutes retaining wall integral body through anchor pole 2, after finishing the upper strata wall protecting method, excavate lower floor again, lower floor's U-steel 1 and upper strata U-steel 1 adopt the form of butt welding solder joint 7, and lower floor's retaining wall repeats the upper strata wall protecting method according to this, for miscellaneous fill, lay steel mesh reinforcement 9 at an upper portion thereof between per two U-steels 1, steel mesh reinforcement 9 adopts Φ 6a 250 * 250 nets, and steel mesh reinforcement 9 welds together with U-steel 1.
Claims (2)
1, a kind of method of supporting deep-foundation side wall, its step is to be suitable for the dark foundation trench [8] that panelling construction makes things convenient for the width and the degree of depth along ground building line inner edge excavation, vertically hole at dark foundation trench [8] sidewall apart from the following 1m of above-ground route absolute altitude place, cement injection mortar [3] in the hole, after cement mortar [3] is filled, in the hole, insert anchor pole [2], constituted cement mortar anchor pole [4] by cement mortar [3] and anchor pole [2], down lay a cement mortar anchor pole [4] again every 1.5~2.5m, laterally also lay a cement mortar anchor pole [4] at dark foundation trench [8] sidewall every 1.5~2.5m, cement mortar anchor pole [4] has upwards constituted quincuncial arrangement in length and breadth at dark foundation trench [8] sidewall, after having laid cement mortar anchor pole [4], transversely lay a U-steel [1] that is fastenedly connected with anchor pole [2] at dark foundation trench [8] side wall surface every 0.5~1.5m, cannelure shaped steel [1] length is identical with dark foundation trench [8] groove depth, lay a horizontal steel plate rib [6] every 0.5~1.5m between per two U-steels [1], constitute one deck retaining wall integral body, after finishing the upper strata panelling construction, repeat above-mentioned job practices again, and lower floor's U-steel [1] welded mutually with upper strata U-steel [1], the rest may be inferred, until subfoundation, constitute whole retaining wall.
2, the method for a kind of supporting deep-foundation side wall according to claim 1 is characterized in that between described per two U-steels [1], falls for preventing miscellaneous fill, lays steel mesh reinforcement [9] on U-steel [1] top, and steel mesh reinforcement [9] is connected together with U-steel [1].
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 93110191 CN1036729C (en) | 1993-03-20 | 1993-03-20 | The method of supporting deep-foundation side wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 93110191 CN1036729C (en) | 1993-03-20 | 1993-03-20 | The method of supporting deep-foundation side wall |
Publications (3)
Publication Number | Publication Date |
---|---|
CN1078518A CN1078518A (en) | 1993-11-17 |
CN1027387C CN1027387C (en) | 1995-01-11 |
CN1036729C true CN1036729C (en) | 1997-12-17 |
Family
ID=4988095
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 93110191 Expired - Fee Related CN1036729C (en) | 1993-03-20 | 1993-03-20 | The method of supporting deep-foundation side wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1036729C (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102433882A (en) * | 2010-09-29 | 2012-05-02 | 李宪奎 | Construction method for forming foundation pit support through combining concrete pile wall and jet grouting anchor piles and anchor bar structural piece |
CN102493460B (en) * | 2011-12-12 | 2015-12-09 | 中国建筑西南勘察设计研究院有限公司 | Soil hole digging circular hidden rib anchor rod and soft rock soil nailing composite supporting construction |
CN103061347A (en) * | 2013-01-15 | 2013-04-24 | 中冶沈勘工程技术有限公司 | Deep foundation pit support structure acting with soil |
CN103967025B (en) * | 2013-01-25 | 2016-04-13 | 深圳市勘察测绘院有限公司 | Manually digging hole expanding method and manually digging hole reaming rock-steady structure |
CN103266609A (en) * | 2013-04-25 | 2013-08-28 | 中天建设集团有限公司 | Process for constructing prestressed anchor rod in deep foundation pit supporting system |
CN105951874B (en) * | 2016-06-24 | 2017-10-10 | 山西省交通规划勘察设计院 | A kind of retaining wall reinforcement structure and its construction method |
CN107700527A (en) * | 2017-11-07 | 2018-02-16 | 兰州理工大学 | Add the cantilever retaining wall and construction method of pilaster and anchor pole |
CN108343835A (en) * | 2018-02-26 | 2018-07-31 | 泰州市新龙翔金属制品有限公司 | A kind of steady type channel steel |
-
1993
- 1993-03-20 CN CN 93110191 patent/CN1036729C/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN1078518A (en) | 1993-11-17 |
CN1027387C (en) | 1995-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102966119B (en) | Geogrid reinforced wall and construction method thereof | |
CN105525627B (en) | A kind of two-way anchor fixed board retaining wall and its construction method | |
CN111560962A (en) | Backfill area foundation pit supporting structure and construction method thereof | |
CN104631440B (en) | A kind of existing large-section in-situ concrete pile strength core increases foundation pit supporting construction and constructional method | |
CN110685286A (en) | Deep foundation pit supporting construction process for adjacent road under complex geological condition | |
CN205382507U (en) | Two -way anchored retaining wall by tie rods | |
CN101838957B (en) | Integral type T-shaped outer cantilever roads and construction method thereof | |
CN109914422A (en) | A kind of steel pipe and soil nailing combined type foundation pit supporting construction and construction method | |
CN211200426U (en) | Anti-sliding supporting and retaining structure for miniature steel pipe pile retaining wall | |
CN1036729C (en) | The method of supporting deep-foundation side wall | |
CN107165173A (en) | A kind of foundation pit supporting system and its construction method | |
CN107829748B (en) | A kind of complementary cycle formula excavation method suitable for floating pebble layer large cross-section tunnel | |
CN206800370U (en) | It is a kind of to excavate the continuous side wall supporting and retaining system protective construction in underground without fertile groove | |
CN113832991A (en) | Reverse construction method of pile plate wall | |
CN114622574B (en) | Water-rich throwing filling deep foundation pit water interception excavation supporting method and supporting device | |
CN214460477U (en) | Combined foundation pit support | |
CN111911183B (en) | Tunnel hole entering construction method based on end wall type guide wall structure | |
CN213571956U (en) | Combined construction method pile supporting structure | |
CN211080248U (en) | Deep foundation pit supporting structure of adjacent road under complex geological condition | |
CN217480236U (en) | Pile-plate type retaining wall suitable for high slope | |
CN117145523B (en) | Sylvite inclined shaft mudstone section roof-falling treatment reinforcing structure and method | |
CN220150349U (en) | Space-limited slope upper filling slope retaining structure | |
CN217174817U (en) | Composite supporting system for deep and large foundation pit in complex soil layer environment | |
CN112854237B (en) | Construction method for steel sheet pile support in case of boulder | |
CN110258621B (en) | Assembled retaining wall convenient to quick construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C57 | Notification of unclear or unknown address | ||
DD01 | Delivery of document by public notice |
Addressee: Zhao Guojun Document name: Notice of defects in the request for cancellation of the patent right |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |