CN207761668U - A kind of supporting construction of novel tunnel - Google Patents

A kind of supporting construction of novel tunnel Download PDF

Info

Publication number
CN207761668U
CN207761668U CN201721794299.8U CN201721794299U CN207761668U CN 207761668 U CN207761668 U CN 207761668U CN 201721794299 U CN201721794299 U CN 201721794299U CN 207761668 U CN207761668 U CN 207761668U
Authority
CN
China
Prior art keywords
wall column
middle wall
hole
leading hole
leading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721794299.8U
Other languages
Chinese (zh)
Inventor
李德宏
朱红兴
李灿德
罗顺江
尹川
刘昆珏
胡俊
徐勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction and Investment Holding Group Co Ltd
Original Assignee
Yunnan Construction and Investment Holding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction and Investment Holding Group Co Ltd filed Critical Yunnan Construction and Investment Holding Group Co Ltd
Priority to CN201721794299.8U priority Critical patent/CN207761668U/en
Application granted granted Critical
Publication of CN207761668U publication Critical patent/CN207761668U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of supporting construction of novel tunnel, including leading hole, Hou Hangdong, middle wall column, the leading hole and the rear row hole are connected with each other, the left side in row hole in the rear is arranged in the leading hole, poured filler on the leading hole surface, in the leading hole in the side close to rear row hole is vertically arranged with wall column, the top and bottom of the middle wall column are connected with the packing support poured on the surface in the leading hole.The double layer bar for 20cm × 20cm that bar diameter is 8mm is provided in middle wall column, supporting more conducively is carried out to the construction of waterproof layer in leading hole, it ensure that the stabilized structure of middle wall column, middle wall column has material to be supported for the stull of timber, diagonal brace, and the structure of middle wall column is further secured.

Description

A kind of supporting construction of novel tunnel
Technical field
The utility model is related to tunnel support equipment technical fields, and in particular to a kind of supporting construction of novel tunnel.
Background technology
The construction in tunnel is carried out in the larger region of pressure from surrounding rock, is easy to happen and caves in compared with ordinary circumstance, to ensure tunnel Construction safety and construction quality, prevent landslip phenomenon generation, need to tunnel carry out supporting.
Utility model content
The purpose of this utility model is to provide a kind of supporting construction of novel tunnel, and the utility model is well to construction Tunnel carry out supporting, ensure that the construction safety and construction quality in tunnel.
In order to solve the above technical problems, the utility model uses following technical scheme:
A kind of supporting construction of novel tunnel, including leading hole, Hou Hangdong, middle wall column, the leading hole and it is described after Row hole is connected with each other, and the left side in row hole in the rear is arranged in the leading hole, and filler has been poured on the leading hole surface, described Wall column, the top and bottom of the middle wall column are and described in the side close to rear row hole is vertically arranged in leading hole The packing support connection poured on the surface in leading hole.
Further, on the basis of the middle wall column, the shape phase in the leading holes of the middle wall column both sides, rear row hole It is mutually symmetrical.
Further, the middle wall column is reinforced concrete structure, and it is 8mm that bar diameter is provided in the middle wall column 20cm × 20cm double layer bar.
Further, waterproof layer has been poured on the inner surface of the filler poured on the surface in the leading hole.
Further, the filler branch poured on surface of the middle wall column by three stulls, four diagonal braces and leading hole Support connection.
Further, three stull, four diagonal brace are arranged at middle wall column in the side of Hou Hangdong.
Further, three stull, four diagonal brace the material timber that is.
Compared with prior art, the utility model has the beneficial effects that:
1, the double layer bar for 20cm × 20cm that bar diameter is 8mm is provided in middle wall column, more conducively to leading The construction of waterproof layer in hole carries out supporting, ensure that the stabilized structure of middle wall column.
2, middle wall column has material to be supported for the stull of timber, diagonal brace, and the structure of middle wall column is further firm Gu.
Description of the drawings
Fig. 1 is the structure chart of the utility model.
In figure, row hole after wall column, 5- diagonal braces, 6- stulls, 7- in 1- fillers, 2- waterproof layers, the leading holes 3-, 4-.
Specific implementation mode
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only used to explain The utility model is not used to limit the utility model.
Embodiment 1:
A kind of supporting construction of novel tunnel, including leading hole 3, rear row hole 7, middle wall column 4, the leading hole 3 and institute Row hole 7 is connected with each other after stating, and the left side in row hole 7 in the rear is arranged in the leading hole 3, has been poured on 3 surface of leading hole Filler 1, wall column 4 during the interior side close to rear row hole 7 in the leading hole 3 is vertically arranged with, the upper end of the middle wall column 4 The filler 1 and on the surface in the leading hole 3 poured with lower end supports connection.
Embodiment 2:
On the basis of Examples 1 to 3, on the basis of the middle wall column 4, in the leading of middle 4 both sides of wall column Hole 3, the shape in rear row hole 7 are symmetrical.
Embodiment 3:
On the basis of Examples 1 to 3, the middle wall column 4 is reinforced concrete structure, is set in the middle wall column 4 It is equipped with the double layer bar for 20cm × 20cm that bar diameter is 8mm.Such structure ensure that the stabilized structure of middle wall column, Middle wall column will not be destroyed during ensureing subsequent construction.
Embodiment 4:
On the basis of Examples 1 to 3, poured on the inner surface of the filler 1 poured on the surface in the leading hole 3 Waterproof layer 2.The thickness of the waterproof layer is thicker.
Embodiment 5:
On the basis of Examples 1 to 3, the middle wall column 4 passes through three stulls 6, four diagonal braces 5 and leading hole 3 The support connection of filler 1 poured on surface.During carrying out the construction of waterproof layer in leading hole, since quality of waterproof layer is larger, To prevent middle wall pillar construction built on the sand, adds three stulls 6 and connected with middle wall upright supports apart from uniform, four diagonal braces Wall column agency is firm in 5 further supports.
Embodiment 6:
On the basis of Examples 1 to 3, three stull 6, four diagonal brace 5 are arranged at middle wall column 4 rear The side in row hole 7.
Embodiment 7:
On the basis of Examples 1 to 3, three stull 6, four diagonal brace 5 the material timber that is.It is described Timber has certain elasticity, to middle wall column and condiment support connection in can suitably adjust stull 6, diagonal brace 5 position, make Stull 6,5 better centering wall column of diagonal brace are supported.
The course of work of the utility model is:
In the work progress for carrying out tunnel, the leading hole surface excavated first pours one layer of filler, and filler is for split The leading hole for digging more rock mass is backfilled, after also having support action, filler to pour solidification in the leading hole excavated, leading In hole 3 in the side close to rear row hole 7 pours wall column 4, middle wall column 4 is with the stull 6 that material is timber, diagonal brace 5 into one Firm supporting is walked, the middle wall column of firm supporting is carrying out having good support action when waterproof layer pours, ensure that waterproof layer Construction safety in casting process, after waterproof layer pours, the excavation in row hole after being carried out after dismounting partial filler, stull, diagonal brace.
Although reference be made herein to the utility model is described in multiple explanatory embodiments of the utility model, still, It should be understood that those skilled in the art can be designed that a lot of other modification and implementations, these modifications and implementations It will fall within scope and spirit disclosed in the present application.More specifically, it discloses in the application, drawings and claims In range, a variety of variations and modifications can be carried out to the building block and/or layout of theme combination layout.In addition to building block And/or outside the modification and improvement of layout progress, to those skilled in the art, other purposes also will be apparent.

Claims (7)

1. a kind of supporting construction of novel tunnel, it is characterised in that:Including leading hole (3), Hou Hangdong (7), middle wall column (4), The leading hole (3) and the rear row hole (7) are connected with each other, and the left side of row hole (7) in the rear is arranged in the leading hole (3), Filler (1) has been poured on leading hole (3) surface, has been vertically arranged in the side close to rear row hole (7) in the leading hole (3) There are middle wall column (4), the filler that the top and bottom of the middle wall column (4) and on the surface of the leading hole (3) pour (1) support connection.
2. a kind of supporting construction of novel tunnel according to claim 1, it is characterised in that:With the middle wall column (4) On the basis of, it is symmetrical in the leading hole (3) of middle wall column (4) both sides, the shape of Hou Hangdong (7).
3. a kind of supporting construction of novel tunnel according to claim 1, it is characterised in that:The middle wall column (4) is Reinforced concrete structure, the interior double layer bar for being provided with 20cm × 20cm that bar diameter is 8mm of the middle wall column (4).
4. a kind of supporting construction of novel tunnel according to claim 1, it is characterised in that:In the leading hole (3) Waterproof layer (2) has been poured on the inner surface of the filler (1) poured on surface.
5. a kind of supporting construction of novel tunnel according to claim 1, it is characterised in that:The middle wall column (4) is logical Cross filler (1) the support connection poured on the surface of three stulls (6), four diagonal braces (5) and leading hole (3).
6. a kind of supporting construction of novel tunnel according to claim 5, it is characterised in that:Three stull (6), institute State four diagonal braces (5) be arranged at middle wall column (4) (7) Hou Hangdong side.
7. a kind of supporting construction of novel tunnel according to claim 5, it is characterised in that:Three stull (6), institute State the timber that the material of four diagonal braces (5) is.
CN201721794299.8U 2017-12-20 2017-12-20 A kind of supporting construction of novel tunnel Expired - Fee Related CN207761668U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721794299.8U CN207761668U (en) 2017-12-20 2017-12-20 A kind of supporting construction of novel tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721794299.8U CN207761668U (en) 2017-12-20 2017-12-20 A kind of supporting construction of novel tunnel

Publications (1)

Publication Number Publication Date
CN207761668U true CN207761668U (en) 2018-08-24

Family

ID=63188025

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721794299.8U Expired - Fee Related CN207761668U (en) 2017-12-20 2017-12-20 A kind of supporting construction of novel tunnel

Country Status (1)

Country Link
CN (1) CN207761668U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441480A (en) * 2018-11-02 2019-03-08 云南建投第三建设有限公司 Row hole face gib construction after a kind of multiple-arch tunnel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441480A (en) * 2018-11-02 2019-03-08 云南建投第三建设有限公司 Row hole face gib construction after a kind of multiple-arch tunnel
CN109441480B (en) * 2018-11-02 2020-06-09 云南建投第三建设有限公司 Temporary supporting construction method for backward tunnel face of multi-arch tunnel

Similar Documents

Publication Publication Date Title
CN205895269U (en) Be used for handling stable structure that solution cavity caves in in karst tunnel
CN207714314U (en) A kind of pile foundation construction supporting construction in soft soil foundation
CN205242436U (en) Supplementary soleplate traded interim bearing structure who props during system was gone along with sb. to guard him to underground complex
CN206928305U (en) A kind of rigid passive area buttress type supporting construction
CN105926672B (en) A kind of Underground Subway Station steel pipe column construction method
CN103195450A (en) Hydraulic tunnel inverted arch operation trolley and inverted arch construction method
CN206092042U (en) Loess tunnel strutting arrangement that is under construction
CN207761668U (en) A kind of supporting construction of novel tunnel
CN110130923B (en) A shaped steel supporting bow member structure for tunnel
CN105019553A (en) Bracing structure for annular supports of basement
CN108590705A (en) A kind of shield beginning well north and south side reserved opening formwork support system
CN204941565U (en) A kind of novel tunnel inverted arch structure
CN107938675A (en) A kind of Vertical spots concrete placings technique and device
CN207727593U (en) A kind of slope reinforcement structure
CN207110521U (en) A kind of historical building remains exterior wall protection structure
CN105065038A (en) Tunnel collapse disposing method and tunnel collapse support structure
CN105421488B (en) The construction method of sole plate support replacement in the combined fender construction system of underground
CN103397668B (en) The regulation method of each sections uneven settlement of foundation of a kind of railway tunnels
CN203440821U (en) Closed type barrel supporting structure
CN103374915B (en) Continuous closed hanging-upside-down shotcreting supporting system and construction method thereof
CN105178356A (en) Setting-up construction method for vertical joint bars of columns in reverse building method
CN205918362U (en) Take drill bit of bore bit
CN105780805B (en) Many hole bank tower intake combined layout column foot foundation processing structures
CN208650088U (en) A kind of street lamp post installation armored concrete prefabricated foundation structure
CN207892629U (en) The grid steel frame of steel concrete supporting is used in a kind of constructing tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180824

Termination date: 20191220