CN205895269U - Be used for handling stable structure that solution cavity caves in in karst tunnel - Google Patents

Be used for handling stable structure that solution cavity caves in in karst tunnel Download PDF

Info

Publication number
CN205895269U
CN205895269U CN201620462092.XU CN201620462092U CN205895269U CN 205895269 U CN205895269 U CN 205895269U CN 201620462092 U CN201620462092 U CN 201620462092U CN 205895269 U CN205895269 U CN 205895269U
Authority
CN
China
Prior art keywords
concrete
solution cavity
steel pipe
arch
rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620462092.XU
Other languages
Chinese (zh)
Inventor
朱兴礼
梁金宝
宋贵杰
李红英
苏国举
许振浩
张文坤
刘亚光
王振元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 14th Bureau Co Ltd filed Critical Second Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Priority to CN201620462092.XU priority Critical patent/CN205895269U/en
Application granted granted Critical
Publication of CN205895269U publication Critical patent/CN205895269U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model relates to a be used for handling stable structure that solution cavity caves in in karst tunnel fills out step, concrete spray layer, concrete arch and forms by supporting I -shaped steelframe, steel pipe grid rack, piling, support I -shaped steelframe and steel pipe grid rack component and strut the bow member, it has the concrete to execute among the steel pipe grid rack to do, the last work buffering of executing of concrete arch is blown sand, concrete arch thickness 30 40cm, it is 20cm to cushion the thickness of blowing sand, dissolve the intracavity delimitation and dissolve chamber profile, dissolve chamber profile and cover one deck concrete spray layer, steel pipe grid rack arranges according to its atress structure in supporting the I -shaped steelframe, and the vault is close with the distribution of hunch foot, and other positions are dredged, this kind of structure can be fine a processing solution cavity difficult problem of collapsing, guarantee the tunnel and be under construction smoothly along excavation face, avoid because the incident that the solution cavity collapses and brings to stable in structure, the construction is simple and convenient.

Description

It is used in a kind of Karst Tunnel processing the rock-steady structure that solution cavity caves in
Technical field
This utility model is related to solution cavity and caves in process structure, especially relate to geological conditions especially complex in the case of one Plant in Karst Tunnel for processing the rock-steady structure that solution cavity caves in.
Background technology
Karst Tunnel is built, and due to being located in complex geologic conditions, therefore various disasters occur at any time, particularly karst distribution Location, is likely to during excavation to run into solution cavity and caves in, and then affects the construction of engineering, if process improper it is more likely that Cause secondary cave in, directly result in overall the stablizing in tunnel.
The presence harm of solution cavity is big, but because the position of solution cavity has difference, solution cavity is of different sizes, and the harm causing is also Difference, typically encounters solution cavity and caves in, tradition solve method be exactly that direct slip casting is tamped, but the drawbacks of this method precisely due to Directly tamped with concrete, concrete well and rock mass forms unified surrounding rock structure also can not cannot have self-bearing ability, It is susceptible to the secondary possibility caved in, the loss that causes is bigger.
Content of the invention
In order to solve Karst Tunnel build in, traditional solution cavity cave in presence structural instability, be susceptible to secondary collapsing The problem collapsed, devises and is used for processing the rock-steady structure that solution cavity caves in a kind of Karst Tunnel, and this structure construction is easy, structure Stable, can be very good to solve the difficult problem that solution cavity caves in Karst Tunnel.
This utility model is to be used in a kind of Karst Tunnel processing the rock-steady structure that solution cavity caves in, and is by support i-beam frame (1), steel pipe gratings (2), landfill step (3), concrete spray coating (61), concrete arch (7) composition;Supporting bow member (10) is by supporting I-beam frame (1) and steel pipe gratings (2) composition;I-beam frame (1) is supported to be close to country rock (4);Landfill step (3) applies in support Under i-beam frame (1);Supporting bow member (10) is upper to arrange concrete arch (7).
As improvement, in steel pipe gratings, apply concrete;Buffering is applied on concrete arch blow sand;Concrete arch thickness 30-40cm, buffering blows sand thickness for 20cm.
As improvement, molten intracavity delimit molten chamber profile, and molten chamber profile covers a layer concrete spray-up.
As improvement, steel pipe gratings arranges according to its force structure in supporting i-beam frame, and vault and arch springing distribution are close, Other positions are dredged.
The beneficial effects of the utility model:
1. using the supporting bow member supporting i-beam frame and steel pipe gratings composition, define very strong bearing capacity, have very Stable structure.
2. speed of application can be increased by landfill step, reduce and apply space, be easy to construct.Mixed in the injection of solution cavity profile Solidifying soil spray-up, prevents the solution cavity rubble exposing from producing and drops.
3. concrete arch is set on supporting bow member, this is to form a kind of natural arcuation state, can be in order to be formed with rock mass Overall structure, produces self-bearing ability;On concrete arch, setting buffering is blown sand and can be reduced the solution cavity stone dropping to concrete arch Destruction.
Brief description
Fig. 1 overall structure diagram
Fig. 2 longitudinal profile applies space diagram
Fig. 3 longitudinal profile detail of construction
Fig. 4 scaffold figure
Reference:
Wherein support i-beam frame 1, steel pipe gratings 2, concrete 21, landfill step 3, country rock 4, molten chamber 5, molten chamber profile 6, Concrete spray coating 61, concrete arch 7, buffering blows sand 8, excavation contour line 9, supporting bow member 10, pumping line 11.
Specific embodiment
With reference to the accompanying drawings: this utility model be in a kind of Karst Tunnel be used for process the rock-steady structure that solution cavity caves in, be by Support i-beam frame (1), steel pipe gratings (2), landfill step (3), concrete spray coating (61), concrete arch (7) composition;Supporting bow member (10) it is made up of support i-beam frame (1) and steel pipe gratings (2);I-beam frame (1) is supported to be close to country rock (4);Landfill step (3) Apply under support i-beam frame (1);Supporting bow member (10) is upper to arrange concrete arch (7).
As improvement, in steel pipe gratings (2), apply concrete (21);Buffering is applied on concrete arch (7) and blows sand (8); Concrete arch (7) thickness 30-40cm, buffering blows sand (8) thickness for 20cm.
As improvement, in molten chamber (5), delimit molten chamber profile (6), molten chamber profile (6) covers a layer concrete spray-up (61).
As improvement, steel pipe gratings (2) is in supporting i-beam frame (1) according to the arrangement of its force structure, vault and arch springing Distribution is close, and other positions are dredged.
During Specific construction, first passing through landfill step (3) can increase speed of application, reduce and apply space, be easy to construct. Then in solution cavity profile (6) gunite concrete spray-up (61), prevent the solution cavity exposing from producing and drop.Using support i-beam frame (1) and the supporting bow member (10) that forms of steel pipe gratings (2), define very strong bearing capacity, there is very stable structure.In supporting Setting concrete arch (7) on bow member, this is to form a kind of natural arcuation state, can produce in order to form overall structure with rock mass Self-bearing ability;Concrete arch (7) is upper arrange buffering blow sand (8) the solution cavity stone dropping can be reduced concrete arch (7) is broken Bad.

Claims (4)

1. be used in a kind of Karst Tunnel processing the rock-steady structure that solution cavity caves in it is characterised in that: by support i-beam frame (1), Steel pipe gratings (2), landfill step (3), concrete spray coating (61), concrete arch (7) composition;Supporting bow member (10) is by support I-shaped Steelframe (1) and steel pipe gratings (2) composition;I-beam frame (1) is supported to be close to country rock (4);Landfill step (3) applies in support I-shaped Under steelframe (1);Supporting bow member (10) is upper to arrange concrete arch (7).
2. be used in a kind of Karst Tunnel according to claim 1 processing the rock-steady structure that solution cavity caves in it is characterised in that: Concrete (21) has been applied in steel pipe gratings (2);Buffering is applied on concrete arch (7) and blows sand (8);Concrete arch (7) thickness 30- 40cm, buffering blows sand (8) thickness for 20cm.
3. be used in a kind of Karst Tunnel according to claim 1 processing the rock-steady structure that solution cavity caves in it is characterised in that: Molten chamber profile (6) delimited, molten chamber profile covers a layer concrete spray-up (61) in molten chamber (5).
4. be used in a kind of Karst Tunnel according to claim 1 processing the rock-steady structure that solution cavity caves in it is characterised in that: Steel pipe gratings (2) arranges according to its force structure in supporting i-beam frame (1), and vault and arch springing distribution are close, and other positions are dredged.
CN201620462092.XU 2016-05-20 2016-05-20 Be used for handling stable structure that solution cavity caves in in karst tunnel Expired - Fee Related CN205895269U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620462092.XU CN205895269U (en) 2016-05-20 2016-05-20 Be used for handling stable structure that solution cavity caves in in karst tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620462092.XU CN205895269U (en) 2016-05-20 2016-05-20 Be used for handling stable structure that solution cavity caves in in karst tunnel

Publications (1)

Publication Number Publication Date
CN205895269U true CN205895269U (en) 2017-01-18

Family

ID=57765824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620462092.XU Expired - Fee Related CN205895269U (en) 2016-05-20 2016-05-20 Be used for handling stable structure that solution cavity caves in in karst tunnel

Country Status (1)

Country Link
CN (1) CN205895269U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331595A (en) * 2018-01-08 2018-07-27 深圳市东进技术服务有限公司 One kind is soft to mould the body Karst Tunnel reinforcement process that caves in
CN109026031A (en) * 2018-06-26 2018-12-18 中铁建大桥工程局集团第五工程有限公司 A kind of macroseism after gas Tunnel Landslide section reconstruction construction method
CN109356622A (en) * 2018-12-04 2019-02-19 中国电建集团贵阳勘测设计研究院有限公司 Structure for processing tunnel roof fall and implementation method
CN110219671A (en) * 2019-03-28 2019-09-10 中铁二院工程集团有限责任公司 It is a kind of to pass through large-scale relieving arch backfill structure and construction method without filling solution cavity tunnel
CN110656954A (en) * 2019-10-23 2020-01-07 中国电建集团成都勘测设计研究院有限公司 Tunnel collapse processing method for convergent collapsed cavity
CN111119904A (en) * 2019-12-18 2020-05-08 浙江大学城市学院 Construction method of soft surrounding rock karst section tunnel
WO2021179507A1 (en) * 2020-03-11 2021-09-16 山东科技大学 Method for treating tunnel collapse by using pavilion-type support
WO2021179508A1 (en) * 2020-03-11 2021-09-16 山东科技大学 Method for treating tunnel collapse by using roof-contacted shield plate support
CN113982640A (en) * 2021-10-16 2022-01-28 北京城建道桥建设集团有限公司 Mountain tunnel arch part non-roof collapse construction processing method and structure

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331595A (en) * 2018-01-08 2018-07-27 深圳市东进技术服务有限公司 One kind is soft to mould the body Karst Tunnel reinforcement process that caves in
CN109026031A (en) * 2018-06-26 2018-12-18 中铁建大桥工程局集团第五工程有限公司 A kind of macroseism after gas Tunnel Landslide section reconstruction construction method
CN109356622A (en) * 2018-12-04 2019-02-19 中国电建集团贵阳勘测设计研究院有限公司 Structure for processing tunnel roof fall and implementation method
CN110219671A (en) * 2019-03-28 2019-09-10 中铁二院工程集团有限责任公司 It is a kind of to pass through large-scale relieving arch backfill structure and construction method without filling solution cavity tunnel
CN110656954A (en) * 2019-10-23 2020-01-07 中国电建集团成都勘测设计研究院有限公司 Tunnel collapse processing method for convergent collapsed cavity
CN111119904A (en) * 2019-12-18 2020-05-08 浙江大学城市学院 Construction method of soft surrounding rock karst section tunnel
CN111119904B (en) * 2019-12-18 2021-03-30 浙江大学城市学院 Construction method of soft surrounding rock karst section tunnel
WO2021179507A1 (en) * 2020-03-11 2021-09-16 山东科技大学 Method for treating tunnel collapse by using pavilion-type support
WO2021179508A1 (en) * 2020-03-11 2021-09-16 山东科技大学 Method for treating tunnel collapse by using roof-contacted shield plate support
CN113982640A (en) * 2021-10-16 2022-01-28 北京城建道桥建设集团有限公司 Mountain tunnel arch part non-roof collapse construction processing method and structure
CN113982640B (en) * 2021-10-16 2022-07-12 北京城建道桥建设集团有限公司 Mountain tunnel arch part non-roof collapse construction processing method and structure

Similar Documents

Publication Publication Date Title
CN205895269U (en) Be used for handling stable structure that solution cavity caves in in karst tunnel
CN105422146A (en) Underground stope artificial pillar expansion jacking device and construction method
CN104213565B (en) A kind of formwork system that is applicable to large-scale deep trouth hole sty bed course and formwork thereof water smashes construction method
CN101672041A (en) Top-down construction method of large underground structure outer wall
CN106930277A (en) A kind of construction of manual-excavation cast-in-place pile method
CN101565949A (en) Forming method of large shallow foundation pit with soft soil foundation
CN105951875A (en) Adjustable assembly retaining wall with pressure reduction plate structures
CN104196032A (en) Subway station supporting plate and inversed operation combined construction method
CN102425153A (en) Method for immersing collapsed loess site
CN105421488B (en) The construction method of sole plate support replacement in the combined fender construction system of underground
CN106968241A (en) Continuous underground wall structure and retaining design construction method
CN206873459U (en) A kind of large-span steel-reinforced concrete foundation ditch support system
CN103790173B (en) The device and method of lime-soil compaction pile and CFG rigid pile Combined Treatment collapsible loess
CN203049588U (en) Pit-in-pit cylindrical mould
CN206706748U (en) Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation
CN205712144U (en) A kind of karst talus anchor pole reinforcement retaining structure
CN101845822B (en) Method for constructing gravity-type cellular underground continuous wall
CN203755332U (en) Device for treating collapsible loess with lime-soil compaction piles and CFG rigid piles combined
CN204199298U (en) A kind of formwork system being applicable to large-scale deep trouth hole sty bed course
CN109296382B (en) Large-span underground cavern horizontal-diagonal four-fork excavation supporting method
CN204139190U (en) A kind of Liftable preformed bricks fetal membrane
CN207761668U (en) A kind of supporting construction of novel tunnel
CN204151807U (en) The assembled steel open caisson that can reuse
CN203925505U (en) A kind of preliminary bracing structure and constructing structure of underground construction
CN106930767B (en) Big cross section arcading tunnel construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170118