CN106968241A - Continuous underground wall structure and retaining design construction method - Google Patents

Continuous underground wall structure and retaining design construction method Download PDF

Info

Publication number
CN106968241A
CN106968241A CN201710366481.1A CN201710366481A CN106968241A CN 106968241 A CN106968241 A CN 106968241A CN 201710366481 A CN201710366481 A CN 201710366481A CN 106968241 A CN106968241 A CN 106968241A
Authority
CN
China
Prior art keywords
steel pipe
steel
support column
wall structure
cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710366481.1A
Other languages
Chinese (zh)
Inventor
田敬尚
操海滨
王�义
黄英才
田仓米
朱秀莉
王振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Geological And Mineral Construction Co Ltd
Original Assignee
Zhejiang Geological And Mineral Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Geological And Mineral Construction Co Ltd filed Critical Zhejiang Geological And Mineral Construction Co Ltd
Priority to CN201710366481.1A priority Critical patent/CN106968241A/en
Publication of CN106968241A publication Critical patent/CN106968241A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention provides a kind of continuous underground wall structure and retaining design construction method, it is related to underground construction technology field, continuous underground wall structure includes multiple support columns played a supportive role, multiple position-limited racks for preventing support column from relatively moving and the capping beam for fixing support column and position-limited rack;Support column is provided with the first cavity of bottom opening, support column and position-limited rack are arranged at intervals and are detachably connected, the second cavity of bottom opening is formed between support column and adjacent position-limited rack, foundation soil is filled with first cavity and the second cavity, capping beam is detachably connected with multiple support columns and multiple position-limited racks.Solve construction of diaphragm wall of the prior art cause reinforcing bar, the waste of coagulation soil resource and when transport transfer construction the mud that produces or the earthwork and caused by the high technical problem of labour cost.

Description

Continuous underground wall structure and retaining design construction method
Technical field
The present invention relates to underground construction technology field, in particular to a kind of continuous underground wall structure and retaining design Construction method.
Background technology
Diaphram wall is that foundation engineering uses a kind of trench machine on the ground, along the periphery axle of deep excavation project Line, under the conditions of mud off, excavates out after a long and narrow deep trouth, clear groove, steel reinforcement cage is hung in groove, tremie method is then used Underwater concreting with tremie method builds up a unit groove section, so carries out paragraph by paragraph, and continuous reinforced concrete wall together is built up in underground Wall, as intercepting water, antiseepage, load-bearing, water-retaining structure.
The retaining design formed using aforesaid way needs campshed after the completion of a large amount of reinforcing bars, concrete, but basement construction It is i.e. ineffective, it can not also reclaim, cause greatly waste;Meanwhile, substantial amounts of mud or earthwork production are also had in the process It is raw, transfer etc. is transported to it and also generates very high labour cost, it is impossible to the demand of people is met.
The content of the invention
It is an object of the invention to provide a kind of continuous underground wall structure and retaining design construction method, to solve existing skill Construction of diaphragm wall in art cause reinforcing bar, the waste of coagulation soil resource and during because of transport transfer construction the mud that produces or Cubic metre of earth and cause the high technical problem of labour cost.
The present invention provides a kind of continuous underground wall structure, including multiple support columns played a supportive role, multiple is used to prevent The position-limited rack of the support column relative movement and the capping beam for fixing the support column and the position-limited rack;
The support column is provided with the first cavity of bottom opening, and the support column and the position-limited rack are arranged at intervals, institute Support column is stated between the adjacent position-limited rack and is formed the second cavity of bottom opening, first cavity and described second empty Intracavitary is filled with foundation soil, and the capping beam is fixedly connected with multiple support columns and multiple position-limited racks.
Further;The support column is the steel pipe of both ends open, and the cross section of the steel pipe is annular.
Further;The position-limited rack is H profile steel, and the H profile steel includes two flange plates arranged in parallel and company The web of the flange plate is connect, two flange plates are located at the edge of the web homonymy and the lateral wall of the adjacent steel pipe Abut.
Further;Angle between the end face at flange plate edge inner face adjacent thereto is obtuse angle.
Further;The external diameter of the steel pipe is 800-2000mm, and wall thickness is 100-250mm.
Further;0.5d < h1< d, wherein, h1For the height of the web (22), d is the external diameter of the steel pipe (1).
Further;The height h of the web (22)1=0.8d.
Further;The thickness h of the flange plate (21)2Scope is 100-250mm, the thickness h of the web (22)3Model Enclose for (1/4-1/3) h2
The present invention also provides a kind of retaining design construction method, and underground is connected using continuous underground wall structure described above Continuous wall is designed, and is in turn included the following steps:
S1:Smooth location, marking out needs the specific region of construction diaphram wall;
S2:In the region of mark, steel pipe and H profile steel are sink to designated depth, multiple successively using high-frequency vibratory hammer Continuous assembly is formed every the steel pipe and H profile steel of design, is joined end to end by assembly described in multistage, going along with sb. to guard him for closing is formed System;
S3:Capping beam is poured on the assembly, makes capping beam while being fixedly connected with steel pipe and H profile steel;
S4:The two ends of conventional shaped steel or concrete-pile are set to be detachably connected the adjacent or relative assembly respectively, For in closed area foundation soil hollow out after balance the do not construct earthwork of side of the assembly assembly applied Pressure;
S5:Foundation soil is excavated in the region that the assembly is surrounded, basement structure of constructing;
S6:After basement completion, remove capping beam, remove conventional shaped steel or concrete-pile, and using high-frequency vibratory hammer according to Secondary extraction steel pipe and H profile steel.
Further;Before the S2 steps, it is installed with place for ensureing that steel pipe and H profile steel vertically sink to underground The first through hole that can be passed through for the steel pipe and H profile steel and the second through hole are interval with pile frame, the pile frame.
The continuous underground wall structure and the beneficial effect of retaining design construction method provided relative to prior art, the present invention It is as follows:
The continuous underground wall structure that the present invention is provided includes multiple spaced support columns and position-limited rack, multiple support columns Continuous wall shape assembly is formed with multiple position-limited racks, position-limited rack is relatively moved for hithermost two support columns, also simultaneously Support column and position-limited rack are fixedly connected with by capping beam simultaneously, to ensure the integrally-built stabilization of wall shape assembly.
Meanwhile, during support column and position-limited rack sink to underground, make the first cavity and the second cavity of bottom opening Interior to be filled with foundation soil, foundation soil further enhancing the support strength of support column and position-limited rack, also by the first cavity and the The setting of two cavitys, reduces the weight of support column and position-limited rack, and both directly can sink to underground in ground grading, subtract Lack the process that grooving is fetched earth, save labour cost.
Also mutually it is detachably connected between support column, position-limited rack and capping beam by setting, completes basement construction Afterwards, the support column and position-limited rack of steel construction can recyclings, it is to avoid the waste of steel.
The retaining design construction method that the present invention is provided, marks out the region for needing to construct, then in the region first Steel pipe and H profile steel are sunk to by designated depth by high-frequency vibratory hammer successively, wherein, the high-frequency vibrational energy of high-frequency vibratory hammer accelerates Soft of soil, reduces steel pipe and H profile steel and the resistance of surrounding foundation soil, and efficiency is sunk in raising;The steel pipe and H of multiple spaced designs During shaped steel sinks to, the cavity in steel pipe and H profile steel is gradually filled by foundation soil, until sinking to designated depth, all without there is mud Soil overflows, the process for reducing transport transfer foundation soil, saves labour cost;Meanwhile, H profile steel plays position-limiting action to steel pipe While, additionally it is possible to effectively prevent the foundation soil in cavity to be lost in.Then, (underground of section setting is represented into multiple assemblys Continuous wall construction) adjacent formed on enclosed retaining design of head and the tail pour capping beam, and capping beam is concrete structure, and it solidifies Fix steel pipe and H profile steel simultaneously afterwards, it is ensured that the integrally-built stability of diaphragm wall;Then, then conventional shaped steel or coagulation are passed through Native stake removably connects adjacent or relative assembly, it is ensured that after the foundation soil in closed area is dug out, balance outside The pressure that is caused to assembly of foundation soil.After the completion of basement construction, the conventional shaped steel of dismounting or concrete-pile, concrete knot The capping beam of structure can also be removed by percussion vibration from steel pipe and H profile steel, now, then be extracted successively by high-frequency vibratory hammer Both are carried out reclaiming wait utilization next time after simply maintenance, complete whole work progress by steel pipe and H profile steel.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art The accompanying drawing used required in embodiment or description of the prior art is briefly described, it should be apparent that, in describing below Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation after steel pipe in continuous underground wall structure provided in an embodiment of the present invention and H profile steel fixation;
Fig. 2 is the schematic top plan view after steel pipe in continuous underground wall structure provided in an embodiment of the present invention and H profile steel fixation;
Fig. 3 is the structural representation of H profile steel in continuous underground wall structure provided in an embodiment of the present invention;
Fig. 4 is the structural representation of capping beam in continuous underground wall structure provided in an embodiment of the present invention.
Icon:1- steel pipes;2-H shaped steel;The cavitys of 3- first;The cavitys of 4- second;5- capping beams;21- flange plates; 22- webs;The projections of 51- first;The projections of 52- second.
Embodiment
Technical scheme is clearly and completely described below in conjunction with accompanying drawing, it is clear that described implementation Example is a part of embodiment of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill The every other embodiment that personnel are obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
In the description of the invention, it is necessary to explanation, term " " center ", " on ", " under ", "left", "right", " vertical ", The orientation or position relationship of the instruction such as " level ", " interior ", " outer " be based on orientation shown in the drawings or position relationship, merely to Be easy to the description present invention and simplify description, rather than indicate or imply signified device or element must have specific orientation, With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ", " the 3rd " is only used for describing purpose, and it is not intended that indicating or implying relative importance.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this Concrete meaning in invention.
Fig. 1 is the structural representation after steel pipe in continuous underground wall structure provided in an embodiment of the present invention and H profile steel fixation; Fig. 2 is the schematic top plan view after steel pipe in continuous underground wall structure provided in an embodiment of the present invention and H profile steel fixation;Fig. 3 is this The structural representation of H profile steel in the continuous underground wall structure that inventive embodiments are provided;Fig. 4 is underground provided in an embodiment of the present invention The structural representation of capping beam in continuous wall construction.
Embodiment one
As Figure 1-Figure 4, the embodiment of the present invention provides a kind of continuous underground wall structure, including multiple plays a supportive role Support column, multiple position-limited racks and capping beam for fixing support column and position-limited rack for being used to prevent that support column from relatively moving 5;Support column is provided with the first cavity 3 of bottom opening, and support column and position-limited rack be arranged at intervals and be detachably connected, support column and Formed between adjacent position-limited rack in the second cavity 4 of bottom opening, the first cavity 3 and the second cavity 4 and be filled with foundation soil, pressure Back timber 5 is detachably connected with multiple support columns and multiple position-limited racks.
Continuous underground wall structure provided in an embodiment of the present invention includes multiple spaced support columns and position-limited rack, multiple Support column and multiple position-limited racks form continuous wall shape assembly, and position-limited rack is relatively moved for hithermost two support columns, Support column and position-limited rack are also fixedly connected with by capping beam 5 simultaneously simultaneously, to ensure the integrally-built stabilization of wall shape assembly.
Meanwhile, during support column and position-limited rack sink to underground, make the first cavity 3 and the second cavity of bottom opening Foundation soil is filled with 4, foundation soil further enhancing the support strength of support column and position-limited rack, also by the He of the first cavity 3 The setting of second cavity 4, reduces the weight of support column and position-limited rack, and both directly can sink to ground in ground grading Under, the process that grooving is fetched earth is reduced, labour cost is saved.
Also mutually it is detachably connected between support column, position-limited rack and capping beam 5 by setting, completes basement construction Afterwards, the support column and position-limited rack of steel construction can recyclings, it is to avoid the waste of steel.
Specifically, continuous underground wall structure in the present embodiment is described in detail below:
In order to ensure the intensity of support column, as depicted in figs. 1 and 2, the present embodiment sets support column to be steel pipe 1, specifically, , can be very for the round steel pipe 1 that cross section is annular, its steel design and in the first cavity 3 under the support of foundation soil The earthwork of the good side that prevents from not constructing is caved in;Meanwhile, round steel pipe 1 is other shapes of steel pipe 1 (such as side compared to cross section Pipe), in the case that ability longitudinal section area is certain, steel usage amount is less, and then weight is lighter, and convenient construction, investment reduction takes With.
Further, as shown in figure 3, the present embodiment sets position-limited rack to be H profile steel 2, it is apparent from, H profile steel 2 includes two mutually The flange plate 21 and the web 22 of connection flange plate 21 be arrangeding in parallel, by setting two flange plates 21 to be located at the homonymy of web 22 Edge is abutted with the lateral wall of adjacent steel pipe 1, multiple steel pipes 1 and H profile steel 2 is mutually abutted in this way and is formed continuous assembly Afterwards, two flange plates 21 of H profile steel 2 can prevent the steel pipe 1 at two ends from relatively moving, and make under the pressure for the earthwork do not constructed, steel Pipe 1 will not be ejected from continuous assembly, it is ensured that the stabilization of continuous composite unit structure.
Meanwhile, H profile steel 2 forms the second cavity 4 of all round closure after being abutted with steel pipe 1, it is therefore prevented that ground in the second cavity 4 Overflow in the loss of soil, the gap of the foundation soil or mud of the one end that further it also avoid not constructing between H profile steel 2 and steel pipe 1 It is lost in, it is ensured that diaphragm wall intercepts water, antiseepage function.
Further, the angle that the present embodiment is also set up between the end face inner face adjacent thereto at the edge of flange plate 21 is Obtuse angle.Now, be that the end face at the edge of flange plate 21 is abutted with the lateral surface of steel pipe 1, rather than flange plate 21 end face and its phase The intersecting side of adjacent inner face is abutted with the lateral surface of steel pipe 1, it is ensured that H profile steel 2 and steel pipe 1 sink to underground or extracted from underground When, the contact portion between H profile steel 2 and steel pipe 1 will not excessive wear.
Further, the steel pipe 1 in the present embodiment is on the basis of Land leveling, directly to be sunk to by high-frequency vibratory hammer Underground, it is necessary to consider the soil compaction effect produced therewith during sinking to squeezing into soil layer, soil compaction effect is easily caused neighbouring applied The steel pipe 1 or H profile steel 2 of work deform, are broken, misplace or floated, and influence the shaping of diaphragm wall.And the power and steel of soil compaction effect The diameter of pipe 1 and the thickness of tube wall have direct relation, and the present embodiment sets the external diameter of steel pipe 1 to be 800-2000mm, and wall thickness is 100-250mm, when the steel pipe 1 in the number range sinks, foundation soil is not the surrounding for being pressed against steel pipe 1, but is squeezed into In first cavity 3, and the height of foundation soil can be higher than the height that steel pipe 1 sinks in the first cavity 3, reduces the soil compaction of steel pipe 1 Effect, further ensures the stability of continuous composite unit structure.
On the basis of the determination of the external diameter of steel pipe 1,0.5d < h are also set up1< d, wherein, h1For the height of web 22, d is steel The external diameter of pipe 1.The height size of web 22 decides the position that the edge of flange plate 21 is contacted with the lateral surface of steel pipe 1, if its height It is too small, then H profile steel 2 can not spacing steel pipe 1 well, the stress of steel pipe 1 easily releases when excessive;If it is highly excessive, whole In assembly, H profile steel 2 just increases the surface area accounting for side foundation soil of not constructing, makes flange plate 21 by side of not constructing The bigger pressure of foundation soil, easily deforms flange plate 21, does not also meet the original intention that H profile steel 2 mainly plays position-limiting action.
It is preferred that, the present embodiment sets the height h of web 221=0.8d, height herein, can H profile steel 2 and steel pipe 1 it Between play the role of also play spacing steel pipe 1 well in the case of slightly gap, meanwhile, the height of web 22 adds flange plate 21 thickness makes the gross thickness of H profile steel 2 almost identical with the external diameter of steel pipe 1, makes the thickness of the diaphragm wall of shaping almost consistent, protects Demonstrate,prove the stability of diaphragm wall each position anti-pressure ability.
Further, because the position that H profile steel 2 plays the pressure for supporting side foundation soil of not constructing in the present embodiment is the wing Listrium 21, in order to ensure the intensity of flange plate 21, the thickness for also setting up flange plate 21 is 100-250mm, simultaneously, it is also considered that arrive Web 22 is smaller by vertical load herein, in order to further save steel, is ensureing the stable situation of the bulk strength of H profile steel 2 Under, the thickness h of web 22 is set3Scope is (1/4-1/3) h2, wherein, h2For the thickness of flange plate 21.
Further, as shown in figure 4, capping beam 5 is made up of concrete in the present embodiment, the lower end interval of capping beam 5 is set There are multiple projections 52 of first projection 51 and second, the first projection 51 and the second projection 52 are respectively sleeved at the first cavity 3 and described In second cavity 4.
Specifically, being that after the completion of steel pipe 1 and H profile steel 2 are fixed, the foundation soil in the first cavity 3 and the second cavity 4 is taken Go out a part, make reserved a part of space of the first cavity 3 and the second cavity 4, subsequent placing concrete, concrete is filled in The part of one cavity 3 and the second cavity 4 is the first projection 51 and the second projection 52, and makes the first projection 51 in the case where continuing to pour With the second projection 52 one entirety of formation, the capping beam 5 now formed is further ensured that interfixing for steel pipe 1 and H profile steel 2, It ensure that the stabilization of continuous underground wall structure.
Embodiment two
The embodiment of the present invention provides a kind of retaining design construction method, by using continuous underground wall structure described above Diaphram wall is designed, in turn included the following steps:
S1:Smooth location, marking out needs the specific region of construction diaphram wall;
S2:In the region of mark, steel pipe 1 and H profile steel 2 are sink to designated depth successively using high-frequency vibratory hammer, it is multiple The steel pipe 1 and H profile steel 2 of spaced design form continuous assembly, are joined end to end by multistage assembly, form going along with sb. to guard him for closing System;
S3:Capping beam 5 is poured on assembly, makes capping beam 5 while being fixedly connected with steel pipe 1 and H profile steel 2;
S4:The two ends of conventional shaped steel or concrete-pile are set to be detachably connected the adjacent or relative assembly respectively, For in closed area foundation soil hollow out after balance the do not construct earthwork of side of the assembly assembly applied Pressure;
S5:Foundation soil is excavated in the region that assembly is surrounded, basement structure of constructing;
S6:After basement completion, remove capping beam 5, remove conventional shaped steel or concrete-pile, and using high-frequency vibratory hammer according to Secondary extraction steel pipe 1 and H profile steel 2.
Retaining design construction method provided in an embodiment of the present invention, marks out the region for needing to construct, then at this first Steel pipe 1 and H profile steel 2 are sunk to by designated depth by high-frequency vibratory hammer successively in region, wherein, the high-frequency of high-frequency vibratory hammer is shaken Kinetic energy accelerates soft of soil, reduces steel pipe 1 and H profile steel 2 and the resistance of surrounding foundation soil, and efficiency is sunk in raising;Multiple intervals are set During the steel pipe 1 and H profile steel 2 of meter are sunk to, the cavity in steel pipe 1 and H profile steel 2 is gradually filled by foundation soil, specified until sinking to Depth, all without there is soil spilling, the process for reducing transport transfer foundation soil saves labour cost;Meanwhile, 2 pairs of H profile steel While steel pipe 1 plays position-limiting action, additionally it is possible to effectively prevent the foundation soil in cavity to be lost in.Then, in multiple assembly (generations The continuous underground wall structure that telogenesis section is set) adjacent formed on enclosed retaining design of head and the tail pour capping beam 5, capping beam 5 For concrete structure, it fixes steel pipe 1 and H profile steel 2 simultaneously after solidifying, it is ensured that the integrally-built stability of diaphragm wall;Then, Adjacent or relative assembly is removably connected by conventional shaped steel or concrete-pile again, it is ensured that the ground in closed area After soil is dug out, the pressure that the foundation soil on the outside of balance is caused to assembly.After the completion of basement construction, the conventional shaped steel of dismounting Or concrete-pile, the capping beam 5 of concrete structure can also be removed by percussion vibration from steel pipe 1 and H profile steel 2, now, then Extract steel pipe 1 and H profile steel 2 successively by high-frequency vibratory hammer, both are carried out to reclaim wait utilization next time after simply maintenance, completed Whole work progress.
In above-mentioned S4 steps, adjacent assembly refers to the assembly for forming certain angle around the corner, passes through conventional type After steel or concrete-pile connection, it is ensured that both will not be tilted to construction area under the pressure of the earthwork for side of not constructing.
Further, in order that steel pipe 1 and H profile steel 2 vertically sink to the position specified, the present embodiment is also in S2 steps Before, ground on the scene is installed with for ensureing steel pipe 1 and the vertical pile frame for sinking to underground of H profile steel 2, meanwhile, it is interval with pile frame The first through hole that can be passed through for steel pipe 1 and H profile steel 2 and the second through hole, make to sink to underground by first through hole and the second through hole Steel pipe 1 and H profile steel 2 can mutually abut, be further ensured that the stabilization of composite unit structure.
It is worth mentioning, the present embodiment is primarily adapted for use in the structure that ground is soft sandy soil, and sandstone is mixed with some Under ground environment, certain abrasion, or even difficulty of sinking may be caused to steel pipe 1 and the bottom of H profile steel 2, in order that this method The environment of sand stone layer in small, broken bits is also applied for, can be in steel pipe 1 and the sinking watching of H profile steel 2 in the first cavity 3 and the second cavity Poured water in 4, coordinate high-frequency vibratory hammer further to liquefy sand stone layer in small, broken bits, steel pipe 1 and H profile steel 2 is efficiently quickly sunk to finger Depthkeeping degree.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its according to The technical scheme described in foregoing embodiments can so be modified, or which part or all technical characteristic are entered Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology The scope of scheme.

Claims (10)

1. a kind of continuous underground wall structure, it is characterised in that including multiple support columns played a supportive role, multiple be used to prevent institute State the position-limited rack of support column relative movement and the capping beam (5) for fixing the support column and the position-limited rack;
The support column is provided with the first cavity (3) of bottom opening, and the support column and the position-limited rack are arranged at intervals and can Dismounting connection, forms the second cavity (4) of bottom opening between the support column and the adjacent position-limited rack, described first is empty It is filled with foundation soil in chamber (3) and second cavity (4), the capping beam (5) and multiple support columns and multiple described Position-limited rack is detachably connected.
2. continuous underground wall structure according to claim 1, it is characterised in that the support column is the steel pipe of both ends open (1), the cross section of the steel pipe (1) is annular.
3. continuous underground wall structure according to claim 2, it is characterised in that the position-limited rack is H profile steel (2), the H Shaped steel (2) includes the web (22) of two flange plates (21) arranged in parallel and the connection flange plate (21), two institutes Flange plate (21) is stated to abut with the lateral wall of the adjacent steel pipe (1) positioned at the edge of the web (22) homonymy.
4. continuous underground wall structure according to claim 3, it is characterised in that the end face at flange plate (21) edge with Angle between its adjacent inner face is obtuse angle.
5. continuous underground wall structure according to claim 3, it is characterised in that the external diameter of the steel pipe (1) is 800- 2000mm, wall thickness is 100-250mm.
6. continuous underground wall structure according to claim 5, it is characterised in that 0.5d < h1< d, wherein, h1For the abdomen The height of plate (22), d is the external diameter of the steel pipe (1).
7. continuous underground wall structure according to claim 6, it is characterised in that the height h of the web (22)1=0.8d.
8. continuous underground wall structure according to claim 3, it is characterised in that the thickness h of the flange plate (21)2Scope For 100-250mm, the thickness h of the web (22)3Scope is (1/4-1/3) h2
9. a kind of retaining design construction method, it is characterised in that utilize the diaphram wall described in claim any one of 1-8 Structure is designed to diaphram wall, is in turn included the following steps:
S1:Smooth location, marking out needs the specific region of construction diaphram wall;
S2:In the region of mark, steel pipe (1) and H profile steel (2) are sink to designated depth successively using high-frequency vibratory hammer, it is multiple The continuous assembly of steel pipe (1) and H profile steel (2) formation of spaced design, is joined end to end by assembly described in multistage, forms envelope The retaining design closed;
S3:Capping beam (5) is poured on the assembly, makes capping beam (5) while being fixedly connected with steel pipe (1) and H profile steel (2);
S4:Set the two ends of conventional shaped steel or concrete-pile to be detachably connected the adjacent or relative assembly respectively, be used for The assembly is balanced after foundation soil is hollowed out in closed area not construct the pressure that the earthwork of side applies the assembly;
S5:Foundation soil is excavated in the region that the assembly is surrounded, basement structure of constructing;
S6:After basement completion, capping beam (5) is removed, conventional shaped steel or concrete-pile is removed, and using high-frequency vibratory hammer successively Extract steel pipe (1) and H profile steel (2).
10. retaining design construction method according to claim 9, it is characterised in that before S2 steps, be installed with place Can be for the steel pipe for ensureing to be interval with the vertical pile frame for sinking to underground of steel pipe (1) and H profile steel (2), the pile frame And the first through hole that passes through of H profile steel (2) and the second through hole (1).
CN201710366481.1A 2017-05-23 2017-05-23 Continuous underground wall structure and retaining design construction method Pending CN106968241A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710366481.1A CN106968241A (en) 2017-05-23 2017-05-23 Continuous underground wall structure and retaining design construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710366481.1A CN106968241A (en) 2017-05-23 2017-05-23 Continuous underground wall structure and retaining design construction method

Publications (1)

Publication Number Publication Date
CN106968241A true CN106968241A (en) 2017-07-21

Family

ID=59327133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710366481.1A Pending CN106968241A (en) 2017-05-23 2017-05-23 Continuous underground wall structure and retaining design construction method

Country Status (1)

Country Link
CN (1) CN106968241A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877314A (en) * 2020-06-15 2020-11-03 浙江华展工程研究设计院有限公司 Construction method for constructing underground continuous wall by adopting chain precast concrete piles
CN114164841A (en) * 2021-12-14 2022-03-11 深圳中铁二局工程有限公司 Foundation pit self-stabilizing double-row enclosure and construction method thereof
CN114934535A (en) * 2022-06-02 2022-08-23 中铁十九局集团有限公司 Grooving structure of impervious wall section and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08333742A (en) * 1995-06-08 1996-12-17 Unyusho Kowan Gijutsu Kenkyusho Double sheet-pile structure
CN1508362A (en) * 2002-12-17 2004-06-30 株式会社德达渡 Supporting article for preventing sand from subsiding
CN102605800A (en) * 2012-04-06 2012-07-25 上海振中机械制造有限公司 Underground continuous wall construction method
CN206800371U (en) * 2017-05-23 2017-12-26 浙江省地矿建设有限公司 Continuous underground wall structure and retaining design

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08333742A (en) * 1995-06-08 1996-12-17 Unyusho Kowan Gijutsu Kenkyusho Double sheet-pile structure
CN1508362A (en) * 2002-12-17 2004-06-30 株式会社德达渡 Supporting article for preventing sand from subsiding
CN102605800A (en) * 2012-04-06 2012-07-25 上海振中机械制造有限公司 Underground continuous wall construction method
CN206800371U (en) * 2017-05-23 2017-12-26 浙江省地矿建设有限公司 Continuous underground wall structure and retaining design

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中国建设工程造价管理协会编: "《建设工程造价管理理论与实务(三)》", 31 December 2011, 中国计划出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877314A (en) * 2020-06-15 2020-11-03 浙江华展工程研究设计院有限公司 Construction method for constructing underground continuous wall by adopting chain precast concrete piles
CN114164841A (en) * 2021-12-14 2022-03-11 深圳中铁二局工程有限公司 Foundation pit self-stabilizing double-row enclosure and construction method thereof
CN114934535A (en) * 2022-06-02 2022-08-23 中铁十九局集团有限公司 Grooving structure of impervious wall section and construction method

Similar Documents

Publication Publication Date Title
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN102352590A (en) Method for splicing highfill roadbed by adopting pile-sheet retaining wall
CN105239578B (en) Water-rich sand layer deep foundation pit underwater construction method
CN106638640A (en) Modular coffer construction method for concrete without subsealing in the geologic condition of stratum
CN210086275U (en) Double-wall hollow open caisson foundation
CN108547641A (en) The bottom stab ilization system and its construction method in rich water soft stratum heavy haul railway tunnel
CN1952273A (en) Digging foundation with baffle and its construction method
CN105133558B (en) Deep water drift net platform and its construction method
CN106968241A (en) Continuous underground wall structure and retaining design construction method
CN105569051A (en) Foundation pit support system of sandy pebble boulder geological stratification and construction method
CN110258593A (en) Friction pile for slope treatment
CN104711931B (en) Temporary underwater pier manufacturing, assembling and disassembling method suitable for bridge erection
CN206800371U (en) Continuous underground wall structure and retaining design
CN203160254U (en) Pit support structure
CN101725147B (en) Construction process of first-inserting last-jetting type steel churning pile enclosing structure under low net space
CN107288147A (en) Rock foundation pole and tower foundation construction method
CN111622234A (en) Unloading type thin-wall box-type retaining wall supported by obliquely and vertically combined steel pipe pile and construction process
CN207109842U (en) A kind of rock foundation pole and tower foundation structure
CN203049588U (en) Pit-in-pit cylindrical mould
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN203834485U (en) Upheaval resisting earth pressure balance device for foundation pit
CN209779638U (en) Reinforced concrete blade wall supporting system for deep foundation pit support replacement construction
CN209798815U (en) It can dismantle cantilever type retaining wall to imitate sideslip prevention by force
CN103114594B (en) Supporting structure of adjacent two foundation trenches and construction method thereof
CN106522293B (en) Method for correcting error with raft foundation building

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170721