CN207671613U - A kind of lift cart of Pipe installing - Google Patents

A kind of lift cart of Pipe installing Download PDF

Info

Publication number
CN207671613U
CN207671613U CN201721609406.5U CN201721609406U CN207671613U CN 207671613 U CN207671613 U CN 207671613U CN 201721609406 U CN201721609406 U CN 201721609406U CN 207671613 U CN207671613 U CN 207671613U
Authority
CN
China
Prior art keywords
crane
fixed
pipe installing
lift cart
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721609406.5U
Other languages
Chinese (zh)
Inventor
黄利清
郭海云
宋丽君
张连伟
杨建峰
谭亨达
刘润清
石建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Second Metallurgy Group Co Ltd
Original Assignee
China Second Metallurgy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Second Metallurgy Group Co Ltd filed Critical China Second Metallurgy Group Co Ltd
Priority to CN201721609406.5U priority Critical patent/CN207671613U/en
Application granted granted Critical
Publication of CN207671613U publication Critical patent/CN207671613U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of lift cart for Pipe installing, including bottom support frame, lifting gear, fixing device;The bottom support frame is arranged in bottom, and can move freely, to support the lifting gear and the fixing device;The fixing device is arranged on the bottom support frame, to fixed -piping;The centre position in the bottom support frame wherein one end is arranged in the lifting gear, to lift the fixing device and pipeline.Compared with prior art, the beneficial effects of the utility model are, the utility model fixed frame can place more pipelines simultaneously, and therefore, the present apparatus can lift more pipelines simultaneously, save a large amount of manpowers.Secondly, it is provided with baffle on the utility model fixed frame, effectively pipeline is prevented to be slid in lifting process, improves safety, last the utility model bottom is provided with guide wheel, can freely adjust moving direction.

Description

A kind of lift cart of Pipe installing
Technical field
The utility model is related to metallurgical machinery equipment installation fields, in particular to a kind of liter of Pipe installing Trolley drops.
Background technology
In metallurgical construction engineering project, there are many large-scale mechanical equipments because of various reasons, construction site limitation, underground Synthesis is height-limited, crane and lifting equipment can not bring inconvenience and worry to engineering pipeline installation directly in place. So in exhaling city's Underground Urban Complex pipeline engineering to install, we have made a kind of lift cart for Pipe installing, complete The installation of Underground Urban Complex pipeline, previous construction method utilize chain block pipe laying, need to consider that suspension centre is arranged also first Operating platform need to be set up, single pipe can only be lifted every time, the time is slow, and manpower is caused to waste.
Utility model content
In consideration of it, the utility model proposes a kind of lift carts of Pipe installing, it is intended to which solution wastes in the prior art The technical issues of manpower.
On one side, the utility model proposes a kind of lift cart for Pipe installing, including bottom support frame, Lifting gear, fixing device;
The bottom support frame is arranged in bottom, and can move freely, to support the lifting gear and described Fixing device;
The fixing device is arranged on the bottom support frame, to fixed -piping;
The centre position in the bottom support frame wherein one end is arranged in the lifting gear, to lift the fixation Device and pipeline.
Further, the bottom support frame includes universal wheel and fixed frame;
The fixed frame is frame structure, and the first fixed link and second is additionally provided with above the fixed frame and is fixed Bar;
The universal wheel setting is in the fixed frame following four corners, to mobile and changed course.
Further, the fixed frame side is additionally provided with reinforcing rib, to increase the intensity of the fixed rack structure.
Further, the fixing device includes crane, directive wheel, adjustable baffle plate;
The crane is arranged on the fixed frame, to place pipeline;
The adjustable baffle plate is arranged two groups, is separately positioned on the corresponding position in the left and right both ends in crane upper surface It sets, to prevent pipeline in pipeline lifting process from sliding;
The directive wheel is arranged on the crane, to guide the direction in the crane lifting process.
Further, the lifting gear includes detachable guide rod, hoist engine, pulley blocks;
The detachable guide rod is arranged two, is symmetricly set in second fixed link, described two detachable guide rods Upper end is additionally provided with third fixed link;
The hoist engine is arranged between second fixed link and the crane, to control the lifting gear liter Drop;
The pulley blocks are arranged in the centre position of the third fixed link.
Further, the directive wheel is separately positioned on the outside of two detachable guide rods, to guide the liter Drop frame moves on the detachable guide rod axial direction.
Further, it is additionally provided with connection bolt on the crane, to be fixedly connected with the crane.
Further, it is additionally provided with lifting lug on the crane, is connected with the hoist engine by steel wire rope.
Further, the detachable guide rod upper end is additionally provided with steel wire rope;
Described steel wire rope one end is fixed on the fixed frame, and the other end is fixed on the top of the detachable guide rod, is used With the fixation detachable guide rod.
Further, the steel wire rope is additionally provided with strainer close to one end of the fixed frame, to locking steel wire rope.
Compared with prior art, the beneficial effects of the utility model are, the utility model fixed frame can be placed simultaneously More pipelines, therefore, the present apparatus can lift more pipelines simultaneously, save a large amount of manpowers.
Further, it is provided with baffle on the utility model fixed frame, effectively prevents pipeline sliding in lifting process It falls, improves safety.
Further, the utility model bottom is provided with guide wheel, can freely adjust moving direction.
Further, the utility model only needs just to can be repeated several times use after installation is primary, and by controlling hoist engine Can control pipeline lifting, save a large amount of construction times.
Description of the drawings
By reading the detailed description of hereafter preferred embodiment, various other advantages and benefit are common for this field Technical staff will become clear.Attached drawing only for the purpose of illustrating preferred embodiments, and is not considered as to this practicality Novel limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is the overall structure diagram of the lift cart for the Pipe installing that the utility model embodiment provides;
Fig. 2 is the A-A sectional views of the lift cart for the Pipe installing that the utility model embodiment provides;
Fig. 3 is the B-B sectional views of the lift cart for the Pipe installing that the utility model embodiment provides.
Specific implementation mode
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although showing the disclosure in attached drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure Completely it is communicated to those skilled in the art.It should be noted that in the absence of conflict, the implementation in the utility model Feature in example and embodiment can be combined with each other.It is below with reference to the accompanying drawings and in conjunction with the embodiments new this practicality is described in detail Type.
Refering to fig. 1, the overall structure diagram of the lift cart of the Pipe installing provided for the utility model embodiment, Including bottom support frame, lifting gear, fixing device;Bottom support frame is arranged in bottom, and can move freely, to Support the lifting gear and the fixing device;Fixing device is arranged on the bottom support frame, to fixed -piping; The centre position in the bottom support frame wherein one end is arranged in lifting gear, to lift the fixing device and pipeline.
Specifically, bottom support frame includes universal wheel 1 and fixed frame 2;Fixed frame 2 is frame structure, in this implementation Example in, surround rectangular frame by more channel steels, and fix by bolt 11, this field staff it is understood that this Place can also pass through welding;2 four corners in lower section of fixed frame are designed with universal wheel 1, are used for the walking road of flexibly control lift cart Line;As a kind of preferred embodiment, the side wall of fixed frame 2 is additionally provided with reinforcing rib, to increase the intensity of 2 structure of fixed frame, Improve stability;2 upper surface of fixed frame is further fixed on fixed link 21 and fixed link 22, to increase the contact surface with fixing device Product.
Specifically, fixing device includes crane 3, directive wheel 5, adjustable baffle plate 8.Crane 3 is arranged in fixed frame 2 On, to place pipeline, in the present embodiment, crane 3 is rectangular frame, and the area of crane 3 is less than the face of fixed frame 2 Product, prevents small car bottom discontinuity;Adjustable baffle plate 8 is arranged two groups, be separately positioned on 3 upper surface of the crane it is left, To prevent pipeline in pipeline lifting process from sliding, as a kind of preferred embodiment, gear is adjusted in the right corresponding position in both ends Plate 8 is connected to the side wall of crane 3, and can along crane 3 side wall it is free to slide so that, can be with when lifting more pipelines The position of adjustment adjustable baffle plate 8 as needed, to fixed -piping;Directive wheel 5 is arranged on the crane 3, to draw The direction led in 3 lifting process of the crane sees that in the present embodiment, directive wheel 3 is arranged eight.
Specifically, lifting gear includes detachable guide rod 4, hoist engine 6, pulley blocks 7, detachable guide rod 4 is pipe, if Two to be set, is symmetricly set in the second fixed link 22, two 4 upper ends of detachable guide rod are additionally provided with third fixed link 41, as A kind of preferred embodiment, 4 top of detachable guide rod are fixed on by steel wire rope on fixed frame 2.To increase the stabilization of fixed frame 2 Property, prevent fixed frame 2 from being tilted by external force in lifting process, further, the end of steel wire rope is additionally provided with strainer 9, to locking steel wire rope;Hoist engine 6 is arranged between the second fixed link 22 and crane 3, to control the lifting gear Lifting;Pulley blocks 7 are arranged in the centre position of the third fixed link 41, and directive wheel 5 is arranged in the outer of two detachable guide rods 4 Side, to guide crane 3 to be moved on 4 axial direction of detachable guide rod;It is additionally provided with lifting lug 10 on crane 3, passes through Steel wire rope is connected with the hoist engine 6;Hoist engine 6 drives crane 3 perpendicular by reeling the steel wire rope being arranged on pulley blocks 7 Histogram moves up, to drive the lifting of pipeline.
If this field staff it is understood that pipeline is long, can be used simultaneously multiple lift carts work controls System lifting pipeline.
The utility model lift cart application method is as follows:
First, pipeline lift cart is assembled by upper figure, guide rod height according to in-site installation actual conditions at any time It is adjusted, and pipeline lift cart is parked in the pipeline location that will be installed.One group or two can be used according to pipeline length Group pipeline lift cart combination construction.
Secondly, required pipeline is placed on crane, the pipeline of raising will be fixed by adjustable baffle plate.
Then, using the universal wheel under fixed frame by the pipeline transportation fixed to specific installation site, and determine After lifting direction, starts hoist engine and pipeline is raised to required mounting height.
Then, after pipeline is fixed on installation site by welded pipe line holder, you can fall crane after rise.
Finally, after crane is fallen after rise, next group of pipeline can be installed again by universal wheel moving trolley.
Obviously, those skilled in the art can carry out the utility model various modification and variations without departing from this practicality Novel spirit and scope.If in this way, these modifications and variations of the present invention belong to the utility model claims and Within the scope of its equivalent technologies, then the utility model is also intended to include these modifications and variations.

Claims (10)

1. a kind of lift cart for Pipe installing, which is characterized in that including bottom support frame, lifting gear, fixed dress It sets;
The bottom support frame is arranged in bottom, and can move freely, to support the lifting gear and the fixation Device;
The fixing device is arranged on the bottom support frame, to fixed -piping;
The centre position in the bottom support frame wherein one end is arranged in the lifting gear, to lift the fixing device And pipeline.
2. the lift cart according to claim 1 for Pipe installing, which is characterized in that the bottom support frame packet Include universal wheel (1) and fixed frame (2);
The fixed frame (2) is frame structure, and the first fixed link (21) and second are additionally provided with above the fixed frame (2) Fixed link (22);
Universal wheel (1) setting is in the fixed frame (2) following four corners, to mobile and changed course.
3. the lift cart according to claim 2 for Pipe installing, which is characterized in that fixed frame (2) side It is additionally provided with reinforcing rib, to increase the intensity of the fixed frame (2) structure.
4. the lift cart according to claim 3 for Pipe installing, which is characterized in that the fixing device includes rising Frame (3), directive wheel (5), adjustable baffle plate (8) drop;
The crane (3) is arranged on the fixed frame (2), to place pipeline;
The adjustable baffle plate (8) is arranged two groups, and it is corresponding to be separately positioned on the crane (3) left and right both ends in upper surface Position, to prevent pipeline in pipeline lifting process from sliding;
The directive wheel (5) is arranged on the crane (3), to guide the direction in the crane (3) lifting process.
5. the lift cart according to claim 4 for Pipe installing, which is characterized in that the lifting gear includes can Dismantle guide rod (4), hoist engine (6), pulley blocks (7);
The detachable guide rod (4) is arranged two, is symmetricly set on second fixed link (22), described two detachably to lead Bar (4) upper end is additionally provided with third fixed link (41);
The hoist engine (6) is arranged between second fixed link (22) and the crane (3), to control the lifting Device lifts;
The pulley blocks (7) are arranged in the centre position of the third fixed link (41).
6. the lift cart according to claim 5 for Pipe installing, which is characterized in that the directive wheel (5) is respectively It is arranged in the outside of two detachable guide rods (4), to guide the crane (3) in detachable guide rod (4) axis It is moved on direction.
7. the lift cart according to claim 6 for Pipe installing, which is characterized in that on the crane (3) also It is provided with connection bolt, to be fixedly connected with the crane (3).
8. the lift cart according to claim 7 for Pipe installing, which is characterized in that on the crane (3) also It is provided with lifting lug (10), is connected with the hoist engine (6) by steel wire rope.
9. the lift cart according to claim 6 for Pipe installing, which is characterized in that the detachable guide rod (4) Upper end is additionally provided with steel wire rope;
Described steel wire rope one end is fixed on the fixed frame (2), and the other end is fixed on the top of the detachable guide rod (4), To the fixation detachable guide rod (4).
10. the lift cart according to claim 9 for Pipe installing, which is characterized in that the steel wire rope is close to institute The one end for stating fixed frame (2) is additionally provided with strainer (9), to locking steel wire rope.
CN201721609406.5U 2017-11-27 2017-11-27 A kind of lift cart of Pipe installing Active CN207671613U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721609406.5U CN207671613U (en) 2017-11-27 2017-11-27 A kind of lift cart of Pipe installing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721609406.5U CN207671613U (en) 2017-11-27 2017-11-27 A kind of lift cart of Pipe installing

Publications (1)

Publication Number Publication Date
CN207671613U true CN207671613U (en) 2018-07-31

Family

ID=62966235

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721609406.5U Active CN207671613U (en) 2017-11-27 2017-11-27 A kind of lift cart of Pipe installing

Country Status (1)

Country Link
CN (1) CN207671613U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111362179A (en) * 2020-03-31 2020-07-03 绍兴市上虞区舜兴电力有限公司 Adjustable power equipment mounting frame
CN115241803A (en) * 2022-08-19 2022-10-25 国网黑龙江省电力有限公司七台河供电公司 Laying device for installing cable hanging rack in cable trench

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111362179A (en) * 2020-03-31 2020-07-03 绍兴市上虞区舜兴电力有限公司 Adjustable power equipment mounting frame
CN115241803A (en) * 2022-08-19 2022-10-25 国网黑龙江省电力有限公司七台河供电公司 Laying device for installing cable hanging rack in cable trench

Similar Documents

Publication Publication Date Title
CN103726421B (en) Height and span adjustable track paver for metro construction
CN207671613U (en) A kind of lift cart of Pipe installing
CN105071604A (en) Device and method for replacing vibration motors
CN109987546B (en) Self-propelled pipeline transportation installation vehicle in corridor and construction method thereof
CN105965685B (en) A kind of concrete tubular pile automatic open modular system
CN108343783B (en) The installation method and hanging apparatus of high-altitude large-diameter pipeline under complex environment
CN110747858A (en) Concrete pouring equipment
CN203865931U (en) Hoisting combination tool of distribution transformer
CN213738231U (en) Handling device is used in steel construction production
CN203684019U (en) Height and span adjustable track laying machine for subway construction
CN210884951U (en) Double-ring rail hoisting device for curtain wall
CN205916957U (en) Light piping erection hoisting frame
CN104627849B (en) Hoisting equipment and hoisting method for hoisting inner courtyard pipeline
CN204661163U (en) A kind of Multifunction transformer sleeve pipe lifting support
CN203890904U (en) Assembly construction platform equipment for steel pipe sheets of large-diameter corrugated steel pipe culvert
CN203628021U (en) Movable roadway pipeline installation trolley
CN103570125A (en) Dynamic aerating device for integrally lifting membrane-type aerator pipes
CN216512739U (en) Heavy well lid start-stop equipment of inspection shaft
CN202834387U (en) Pipe penetrating device
CN203530007U (en) Integral lifting and dynamic aeration device for membrane type aeration pipes
CN215755931U (en) Large transformer hoisting equipment in factory building
CN202279833U (en) Simple converter flue transition carriage
CN201849911U (en) Conveying device for heavy equipment
CN213059894U (en) Hoisting tool for motor transfer in limited space
CN212191214U (en) A transfer device for ferrosilicon molten iron crucible

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant