CN207582282U - A kind of cast-in-place balance swivel gate pier - Google Patents
A kind of cast-in-place balance swivel gate pier Download PDFInfo
- Publication number
- CN207582282U CN207582282U CN201721462097.3U CN201721462097U CN207582282U CN 207582282 U CN207582282 U CN 207582282U CN 201721462097 U CN201721462097 U CN 201721462097U CN 207582282 U CN207582282 U CN 207582282U
- Authority
- CN
- China
- Prior art keywords
- swivel
- pier
- pier stud
- cast
- bent cap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model is related to a kind of cast-in-place balance swivel gate pier, including swivel pier stud and non-swivel pier stud;Pier stud bottom is turned as pier stud basis, turns and is provided with Rotary ball hinge between pier stud and pier stud basis;Non- swivel pier stud bottom is pier stud basis;Bent cap is provided between the pier top of swivel pier stud and non-swivel pier stud, is consolidated between non-swivel pier stud pier top and bent cap by anchoring cast-in-place entity section;Using Rotary ball hinge, swivel implements the balanced structure being made of swivel pier stud, bent cap, counterweight beam section, by being turned along gate pier span line direction to non-swivel pier stud, completes construction.For the utility model due to turning concrete structure using cast-in-place balance, design and construction are simple and convenient, to span line Influence to operation minimum, can greatly save construction investment, while greatly reduce maintenance work and the difficulty in later stage, more economical rationality again.
Description
Technical field
The utility model is related to technical field of bridge engineering, and in particular to a kind of cast-in-place balance swivel gate pier.
Background technology
In recent years, China's traffic base engineering construction development is swift and violent, particularly using Line for Passenger Transportation as the high-speed railway of representative
And the development of highway engineering high speed highway is especially prominent, circuit and existing busy trunk lines railway, existing busy trunk lines highway
Inevitable multiple crossings on different level, when the two angle is smaller, gate pier becomes a kind of selection of economical rationality, it can be big
The big span reduced across existing road and bridge, cost saving, economic benefit clearly, obtain in Practical Project
It widely applies.
Mostly using support cast-in-place concrete in situ in existing gate pier design(Lid)Beam or steel(Lid)The type of attachment of beam.It is former
Position cast-in-place concrete(Lid)Beam needs set up stent, casting concrete above existing road, and the duration is longer and to existing road
The operation on road produces bigger effect, its influence is especially prominent for existing busy trunk lines, particularly across existing railway when,
Embodiment is difficult to obtain the accreditation of existing wire management side;Operation to reduce to existing road is interfered, and amplifies out another door
Type pier-steel(Lid)Beam scheme, the program is lighter using steel construction, dead weight, and generally using lifting construction, but there are engineerings for the program
It is of high cost, late maintaining heavy workload, and it is present in existing road(To existing railway in high-voltage contact net)Top checks dimension
Repair the shortcomings such as difficulty.
Invention content
The purpose of this utility model is to provide a kind of cast-in-place balance swivel gate pier, avoids support cast-in-place concrete in situ
(Lid)Beam or steel(Lid)The deficiency of beam in the case where reducing to span line operation interference, reduces project cost.
Technical solution is used by the utility model:
A kind of cast-in-place balance swivel gate pier, it is characterised in that:
Including swivel pier stud and non-swivel pier stud;
Pier stud bottom is turned as pier stud basis, turns and is provided with Rotary ball hinge between pier stud and pier stud basis;
Non- swivel pier stud bottom is pier stud basis;
Bent cap is provided between the pier top of swivel pier stud and non-swivel pier stud, is passed through between non-swivel pier stud pier top and bent cap
Anchor cast-in-place entity section consolidation.
Swivel pier stud pier top is symmetrical with bent cap and is provided with counterweight beam section, and before swivel, bent cap and counterweight beam section are relative to turning
Body pier stud forms balanced structure.
Bent cap is integral cast-in-situ structure.
Counterweight beam section is formed by being segmented prefabricated section assembling.
Steel beam hole road is reserved in bent cap and is disposed with steel beam, steel beam includes permanent steel beam and temporary steel beam.
Steel beam hole road is reserved in counterweight beam section and is disposed with steel beam, steel beam is temporary steel beam.
On the inside of non-swivel pier stud gate pier falsework is provided between bent cap.
The utility model has the following advantages:
1st, using along gate pier span line direction mounting bracket Cast-in-place Bent Cap, rotator construction is balanced, design and construction are simple
It is convenient, the construction period above existing road is greatlyd save, it is minimum to existing road operation interference effect;
2nd, cast-in-place concrete stent and the protecting canopy frame above existing road are eliminated, building height can be reduced, effectively
Reduce the elevation of circuit;
3 and steel(Lid)Beam is compared, and avoids Large-scale Hoisting equipment, due to using concrete structure, greatly reduces the later stage
Maintenance work and difficulty, save construction investment it is apparent.
For the utility model due to turning concrete structure using cast-in-place balance, design and construction are simple and convenient, can save the duration,
The most it is apparent that the influence to span line operation interference is minimum, the elevation of circuit is effectively reduced, saves construction investment, simultaneously
Greatly reduce maintenance work and the difficulty in later stage, more economical rationality again.
Description of the drawings
Fig. 1 is the utility model structure chart.
Fig. 2 is the structure chart before swivel.
Fig. 3 is structure chart after swivel dismounting counterweight section.
In figure, 1- pier studs basis, 2- Rotary ball hinges, 3- swivel pier studs, 4- bent caps, 5- counterweight beam sections, the first batch of tensioning of 6- is forever
Long steel beam, remaining permanent steel beam of 7-, 8- temporary steel beams, the non-swivel pier studs of 9-, 10- anchor cast-in-place entity section, 11- falseworks.
Specific embodiment
The utility model is described in detail With reference to embodiment.
The utility model is related to cast-in-place balance turn gate pier, including swivel pier stud 3 and it is non-swivel pier stud 9.Turn pier
3 bottom of column is pier stud basis 1, turns and is provided with Rotary ball hinge 2 between pier stud 3 and pier stud basis 1.9 bottom of non-swivel pier stud is
Pier stud basis 1.Bent cap 4, non-swivel 9 pier top of pier stud and bent cap 4 are provided between the pier top of swivel pier stud 3 and non-swivel pier stud 9
Between consolidated by anchoring cast-in-place entity section 10.On the inside of non-swivel 9 gate pier of pier stud falsework is provided between bent cap 4
11。
Swivel 3 pier top of pier stud is symmetrical with bent cap 4 and is provided with counterweight beam section 5, and before swivel, bent cap 4 and counterweight beam section 5 are opposite
Balanced structure is formed in swivel pier stud 3.
Bent cap 4 is integral cast-in-situ structure.Steel beam hole road is reserved in bent cap 4 and is disposed with steel beam, steel beam includes permanent steel
Beam and temporary steel beam.
Counterweight beam section 5 is formed by being segmented prefabricated section assembling.Steel beam hole road is reserved in counterweight beam section 5 and is disposed with steel
Beam, steel beam are temporary steel beam.
The construction method of above-mentioned cast-in-place balance swivel gate pier, includes the following steps:
Step 1:The pier stud basis 1 of swivel pier stud 3 and non-swivel pier stud 9 is performed in existing line arranged on left and right sides;Then
Non- swivel pier stud 9 is performed, along gate pier span line direction, Rotary ball hinge 2 is installed between swivel pier stud 3 and pier stud basis 1;
Then construction swivel pier stud 3;
Step 2:Along gate pier span line direction, cast in situs bent cap 4 reserves steel beam hole road;Maintenance reaches intensity
Afterwards, in the prefabricated counterweight beam section 5 of 4 symmetrical side Piecemeal erection of bent cap, tensioning temporary steel beam 8, makes in bent cap 4 and counterweight beam section 5
Bent cap 4 and counterweight beam section 5 form balanced structure relative to swivel pier stud 3;
Step 3:Falsework 11 is set up on the inside of non-swivel 9 gate pier of pier stud, is released interim solid at Rotary ball hinge 2
It sets down measures, using Rotary ball hinge 2, swivel implements the balanced structure being made of swivel pier stud 3, bent cap 4 and counterweight beam section 5, by suitable
Gate pier span line direction is turned to non-swivel pier stud 9;
Step 4:The permanent steel beam 6 of tensioning in bent cap 4 removes counterweight beam section 5 and all temporary steel beams 8, Yu Fei paragraph by paragraph
It turns 9 top cast in situs of pier stud and anchors cast-in-place entity section 10, make to be formed between bent cap 4 and non-swivel pier stud 9 affixed;
Step 5:Consolidation measure and the prestress hole path pressure grouting of Rotary ball hinge 2 are carried out later, remove falsework 11, it is complete
Into cast-in-place balance swivel gate pier.
Counterweight beam section 5 can be reused in remaining gate pier, can also be according to construction site situation, using angle bar frame
The counterweight mode of counterweight sandbag or water tank is placed, flexible processing forms balanced structure.Due to the part, concrete construction exists
It is carried out except existing road gauge, does not influence the operation of existing road.Prefabricated subsection can further be saved with pier stud parallel construction
The about duration.
The content of the utility model is not limited to cited by embodiment, and those of ordinary skill in the art are new by reading this practicality
Type specification and to any equivalent transformation that technical solutions of the utility model are taken, be the claim institute of the utility model
Cover.
Claims (7)
1. a kind of cast-in-place balance swivel gate pier, it is characterised in that:
Including turning pier stud(3)With non-swivel pier stud(9);
Turn pier stud(3)Bottom is pier stud basis(1), turn pier stud(3)With pier stud basis(1)Between be provided with Rotary ball hinge
(2);
Non- swivel pier stud(9)Bottom is pier stud basis(1);
Turn pier stud(3)With non-swivel pier stud(9)Pier top between be provided with bent cap(4), non-swivel pier stud(9)Pier top and bent cap
(4)Between by anchoring cast-in-place entity section(10)Consolidation.
2. the cast-in-place balance swivel gate pier of one kind according to claim 1, it is characterised in that:
Turn pier stud(3)Pier top is symmetrical with bent cap(4)It is provided with counterweight beam section(5), before swivel, bent cap(4)With counterweight beam section
(5)Relative to swivel pier stud(3)Form balanced structure.
3. the cast-in-place balance swivel gate pier of one kind according to claim 1, it is characterised in that:
Bent cap(4)For integral cast-in-situ structure.
4. the cast-in-place balance swivel gate pier of one kind according to claim 2, it is characterised in that:
Counterweight beam section(5)It is made of the section assembling for being segmented prefabricated.
5. the cast-in-place balance swivel gate pier of one kind according to claim 1, it is characterised in that:
Bent cap(4)In be reserved with steel beam hole road and be disposed with steel beam, steel beam includes permanent steel beam and temporary steel beam.
6. the cast-in-place balance swivel gate pier of one kind according to claim 2, it is characterised in that:
Counterweight beam section(5)In be reserved with steel beam hole road and be disposed with steel beam, steel beam is temporary steel beam.
7. the cast-in-place balance swivel gate pier of one kind according to claim 1, it is characterised in that:
Non- swivel pier stud(9)Gate pier inside and bent cap(4)Between be provided with falsework(11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721462097.3U CN207582282U (en) | 2017-11-06 | 2017-11-06 | A kind of cast-in-place balance swivel gate pier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721462097.3U CN207582282U (en) | 2017-11-06 | 2017-11-06 | A kind of cast-in-place balance swivel gate pier |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207582282U true CN207582282U (en) | 2018-07-06 |
Family
ID=62730850
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721462097.3U Active CN207582282U (en) | 2017-11-06 | 2017-11-06 | A kind of cast-in-place balance swivel gate pier |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207582282U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107780337A (en) * | 2017-11-06 | 2018-03-09 | 中铁第勘察设计院集团有限公司 | Cast-in-place balance swivel gate pier and its construction method |
-
2017
- 2017-11-06 CN CN201721462097.3U patent/CN207582282U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107780337A (en) * | 2017-11-06 | 2018-03-09 | 中铁第勘察设计院集团有限公司 | Cast-in-place balance swivel gate pier and its construction method |
CN107780337B (en) * | 2017-11-06 | 2023-06-27 | 中铁第一勘察设计院集团有限公司 | Cast-in-situ balance swivel door-shaped pier and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111945891B (en) | Ring truss high-altitude in-situ splicing construction method | |
CN103452039B (en) | Cast-in-situs type Inverted T beam and bridge pier and Bridge Pier Construction technique thereof | |
CN103981803B (en) | The combined gate pier of precast assembly and construction method thereof | |
CN103255726A (en) | Construction method for continuous beam and arch combination bridge | |
CN103046476A (en) | Railway long-span rotator T-shaped bridge construction method | |
CN103255717A (en) | Method for constructing hit-preventing wall | |
CN102936968A (en) | Inner steel frame reinforced structure of pseudo-classic architecture and construction method thereof | |
CN103711082B (en) | The cross-saddle single-track traffic construction method of overhead section | |
CN107780337A (en) | Cast-in-place balance swivel gate pier and its construction method | |
CN202131563U (en) | Combined gate type bridge pier for one-step suspension in position of steel crossbeam | |
CN203270461U (en) | Bailey beam support without buttress in soft foundation | |
CN207582282U (en) | A kind of cast-in-place balance swivel gate pier | |
CN110409318B (en) | Assembling and erecting method for large-span simply-supported steel-concrete composite beam | |
CN211141349U (en) | Track panel well gantry crane foundation fixing structure | |
CN207452687U (en) | A kind of section assembling balance swivel gate pier | |
CN109371820A (en) | A kind of rotator construction frame-type bridge pier and its construction method | |
CN203144907U (en) | Large-span dual-layer bailey truss structure | |
CN208934394U (en) | One kind can turnover type hydraulic climbing formwork wall-attaching equipment | |
CN104746434B (en) | Closure segment formwork system without dismantling outer formwork | |
CN111926691A (en) | Pier top rotating structure with power arranged on side pier and construction method | |
CN111794128A (en) | Construction method for accurately positioning steel cover beam of gate-type pier spanning existing railway | |
CN103469735A (en) | Method for mounting curve ultrahigh hollow column plate type pier top solid section template | |
CN207904783U (en) | Rotary body device in the middle part of the pier shaft of high-altitude | |
CN113756364B (en) | Non-column subway station structure and track panel construction method | |
CN212561134U (en) | Pier top rotating structure with power arranged on side pier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |