CN207582282U - A kind of cast-in-place balance swivel gate pier - Google Patents

A kind of cast-in-place balance swivel gate pier Download PDF

Info

Publication number
CN207582282U
CN207582282U CN201721462097.3U CN201721462097U CN207582282U CN 207582282 U CN207582282 U CN 207582282U CN 201721462097 U CN201721462097 U CN 201721462097U CN 207582282 U CN207582282 U CN 207582282U
Authority
CN
China
Prior art keywords
swivel
pier
pier stud
cast
bent cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721462097.3U
Other languages
Chinese (zh)
Inventor
刘彦明
吴少海
陈应陶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201721462097.3U priority Critical patent/CN207582282U/en
Application granted granted Critical
Publication of CN207582282U publication Critical patent/CN207582282U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of cast-in-place balance swivel gate pier, including swivel pier stud and non-swivel pier stud;Pier stud bottom is turned as pier stud basis, turns and is provided with Rotary ball hinge between pier stud and pier stud basis;Non- swivel pier stud bottom is pier stud basis;Bent cap is provided between the pier top of swivel pier stud and non-swivel pier stud, is consolidated between non-swivel pier stud pier top and bent cap by anchoring cast-in-place entity section;Using Rotary ball hinge, swivel implements the balanced structure being made of swivel pier stud, bent cap, counterweight beam section, by being turned along gate pier span line direction to non-swivel pier stud, completes construction.For the utility model due to turning concrete structure using cast-in-place balance, design and construction are simple and convenient, to span line Influence to operation minimum, can greatly save construction investment, while greatly reduce maintenance work and the difficulty in later stage, more economical rationality again.

Description

A kind of cast-in-place balance swivel gate pier
Technical field
The utility model is related to technical field of bridge engineering, and in particular to a kind of cast-in-place balance swivel gate pier.
Background technology
In recent years, China's traffic base engineering construction development is swift and violent, particularly using Line for Passenger Transportation as the high-speed railway of representative And the development of highway engineering high speed highway is especially prominent, circuit and existing busy trunk lines railway, existing busy trunk lines highway Inevitable multiple crossings on different level, when the two angle is smaller, gate pier becomes a kind of selection of economical rationality, it can be big The big span reduced across existing road and bridge, cost saving, economic benefit clearly, obtain in Practical Project It widely applies.
Mostly using support cast-in-place concrete in situ in existing gate pier design(Lid)Beam or steel(Lid)The type of attachment of beam.It is former Position cast-in-place concrete(Lid)Beam needs set up stent, casting concrete above existing road, and the duration is longer and to existing road The operation on road produces bigger effect, its influence is especially prominent for existing busy trunk lines, particularly across existing railway when, Embodiment is difficult to obtain the accreditation of existing wire management side;Operation to reduce to existing road is interfered, and amplifies out another door Type pier-steel(Lid)Beam scheme, the program is lighter using steel construction, dead weight, and generally using lifting construction, but there are engineerings for the program It is of high cost, late maintaining heavy workload, and it is present in existing road(To existing railway in high-voltage contact net)Top checks dimension Repair the shortcomings such as difficulty.
Invention content
The purpose of this utility model is to provide a kind of cast-in-place balance swivel gate pier, avoids support cast-in-place concrete in situ (Lid)Beam or steel(Lid)The deficiency of beam in the case where reducing to span line operation interference, reduces project cost.
Technical solution is used by the utility model:
A kind of cast-in-place balance swivel gate pier, it is characterised in that:
Including swivel pier stud and non-swivel pier stud;
Pier stud bottom is turned as pier stud basis, turns and is provided with Rotary ball hinge between pier stud and pier stud basis;
Non- swivel pier stud bottom is pier stud basis;
Bent cap is provided between the pier top of swivel pier stud and non-swivel pier stud, is passed through between non-swivel pier stud pier top and bent cap Anchor cast-in-place entity section consolidation.
Swivel pier stud pier top is symmetrical with bent cap and is provided with counterweight beam section, and before swivel, bent cap and counterweight beam section are relative to turning Body pier stud forms balanced structure.
Bent cap is integral cast-in-situ structure.
Counterweight beam section is formed by being segmented prefabricated section assembling.
Steel beam hole road is reserved in bent cap and is disposed with steel beam, steel beam includes permanent steel beam and temporary steel beam.
Steel beam hole road is reserved in counterweight beam section and is disposed with steel beam, steel beam is temporary steel beam.
On the inside of non-swivel pier stud gate pier falsework is provided between bent cap.
The utility model has the following advantages:
1st, using along gate pier span line direction mounting bracket Cast-in-place Bent Cap, rotator construction is balanced, design and construction are simple It is convenient, the construction period above existing road is greatlyd save, it is minimum to existing road operation interference effect;
2nd, cast-in-place concrete stent and the protecting canopy frame above existing road are eliminated, building height can be reduced, effectively Reduce the elevation of circuit;
3 and steel(Lid)Beam is compared, and avoids Large-scale Hoisting equipment, due to using concrete structure, greatly reduces the later stage Maintenance work and difficulty, save construction investment it is apparent.
For the utility model due to turning concrete structure using cast-in-place balance, design and construction are simple and convenient, can save the duration, The most it is apparent that the influence to span line operation interference is minimum, the elevation of circuit is effectively reduced, saves construction investment, simultaneously Greatly reduce maintenance work and the difficulty in later stage, more economical rationality again.
Description of the drawings
Fig. 1 is the utility model structure chart.
Fig. 2 is the structure chart before swivel.
Fig. 3 is structure chart after swivel dismounting counterweight section.
In figure, 1- pier studs basis, 2- Rotary ball hinges, 3- swivel pier studs, 4- bent caps, 5- counterweight beam sections, the first batch of tensioning of 6- is forever Long steel beam, remaining permanent steel beam of 7-, 8- temporary steel beams, the non-swivel pier studs of 9-, 10- anchor cast-in-place entity section, 11- falseworks.
Specific embodiment
The utility model is described in detail With reference to embodiment.
The utility model is related to cast-in-place balance turn gate pier, including swivel pier stud 3 and it is non-swivel pier stud 9.Turn pier 3 bottom of column is pier stud basis 1, turns and is provided with Rotary ball hinge 2 between pier stud 3 and pier stud basis 1.9 bottom of non-swivel pier stud is Pier stud basis 1.Bent cap 4, non-swivel 9 pier top of pier stud and bent cap 4 are provided between the pier top of swivel pier stud 3 and non-swivel pier stud 9 Between consolidated by anchoring cast-in-place entity section 10.On the inside of non-swivel 9 gate pier of pier stud falsework is provided between bent cap 4 11。
Swivel 3 pier top of pier stud is symmetrical with bent cap 4 and is provided with counterweight beam section 5, and before swivel, bent cap 4 and counterweight beam section 5 are opposite Balanced structure is formed in swivel pier stud 3.
Bent cap 4 is integral cast-in-situ structure.Steel beam hole road is reserved in bent cap 4 and is disposed with steel beam, steel beam includes permanent steel Beam and temporary steel beam.
Counterweight beam section 5 is formed by being segmented prefabricated section assembling.Steel beam hole road is reserved in counterweight beam section 5 and is disposed with steel Beam, steel beam are temporary steel beam.
The construction method of above-mentioned cast-in-place balance swivel gate pier, includes the following steps:
Step 1:The pier stud basis 1 of swivel pier stud 3 and non-swivel pier stud 9 is performed in existing line arranged on left and right sides;Then Non- swivel pier stud 9 is performed, along gate pier span line direction, Rotary ball hinge 2 is installed between swivel pier stud 3 and pier stud basis 1; Then construction swivel pier stud 3;
Step 2:Along gate pier span line direction, cast in situs bent cap 4 reserves steel beam hole road;Maintenance reaches intensity Afterwards, in the prefabricated counterweight beam section 5 of 4 symmetrical side Piecemeal erection of bent cap, tensioning temporary steel beam 8, makes in bent cap 4 and counterweight beam section 5 Bent cap 4 and counterweight beam section 5 form balanced structure relative to swivel pier stud 3;
Step 3:Falsework 11 is set up on the inside of non-swivel 9 gate pier of pier stud, is released interim solid at Rotary ball hinge 2 It sets down measures, using Rotary ball hinge 2, swivel implements the balanced structure being made of swivel pier stud 3, bent cap 4 and counterweight beam section 5, by suitable Gate pier span line direction is turned to non-swivel pier stud 9;
Step 4:The permanent steel beam 6 of tensioning in bent cap 4 removes counterweight beam section 5 and all temporary steel beams 8, Yu Fei paragraph by paragraph It turns 9 top cast in situs of pier stud and anchors cast-in-place entity section 10, make to be formed between bent cap 4 and non-swivel pier stud 9 affixed;
Step 5:Consolidation measure and the prestress hole path pressure grouting of Rotary ball hinge 2 are carried out later, remove falsework 11, it is complete Into cast-in-place balance swivel gate pier.
Counterweight beam section 5 can be reused in remaining gate pier, can also be according to construction site situation, using angle bar frame The counterweight mode of counterweight sandbag or water tank is placed, flexible processing forms balanced structure.Due to the part, concrete construction exists It is carried out except existing road gauge, does not influence the operation of existing road.Prefabricated subsection can further be saved with pier stud parallel construction The about duration.
The content of the utility model is not limited to cited by embodiment, and those of ordinary skill in the art are new by reading this practicality Type specification and to any equivalent transformation that technical solutions of the utility model are taken, be the claim institute of the utility model Cover.

Claims (7)

1. a kind of cast-in-place balance swivel gate pier, it is characterised in that:
Including turning pier stud(3)With non-swivel pier stud(9);
Turn pier stud(3)Bottom is pier stud basis(1), turn pier stud(3)With pier stud basis(1)Between be provided with Rotary ball hinge (2);
Non- swivel pier stud(9)Bottom is pier stud basis(1);
Turn pier stud(3)With non-swivel pier stud(9)Pier top between be provided with bent cap(4), non-swivel pier stud(9)Pier top and bent cap (4)Between by anchoring cast-in-place entity section(10)Consolidation.
2. the cast-in-place balance swivel gate pier of one kind according to claim 1, it is characterised in that:
Turn pier stud(3)Pier top is symmetrical with bent cap(4)It is provided with counterweight beam section(5), before swivel, bent cap(4)With counterweight beam section (5)Relative to swivel pier stud(3)Form balanced structure.
3. the cast-in-place balance swivel gate pier of one kind according to claim 1, it is characterised in that:
Bent cap(4)For integral cast-in-situ structure.
4. the cast-in-place balance swivel gate pier of one kind according to claim 2, it is characterised in that:
Counterweight beam section(5)It is made of the section assembling for being segmented prefabricated.
5. the cast-in-place balance swivel gate pier of one kind according to claim 1, it is characterised in that:
Bent cap(4)In be reserved with steel beam hole road and be disposed with steel beam, steel beam includes permanent steel beam and temporary steel beam.
6. the cast-in-place balance swivel gate pier of one kind according to claim 2, it is characterised in that:
Counterweight beam section(5)In be reserved with steel beam hole road and be disposed with steel beam, steel beam is temporary steel beam.
7. the cast-in-place balance swivel gate pier of one kind according to claim 1, it is characterised in that:
Non- swivel pier stud(9)Gate pier inside and bent cap(4)Between be provided with falsework(11).
CN201721462097.3U 2017-11-06 2017-11-06 A kind of cast-in-place balance swivel gate pier Active CN207582282U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721462097.3U CN207582282U (en) 2017-11-06 2017-11-06 A kind of cast-in-place balance swivel gate pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721462097.3U CN207582282U (en) 2017-11-06 2017-11-06 A kind of cast-in-place balance swivel gate pier

Publications (1)

Publication Number Publication Date
CN207582282U true CN207582282U (en) 2018-07-06

Family

ID=62730850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721462097.3U Active CN207582282U (en) 2017-11-06 2017-11-06 A kind of cast-in-place balance swivel gate pier

Country Status (1)

Country Link
CN (1) CN207582282U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107780337A (en) * 2017-11-06 2018-03-09 中铁第勘察设计院集团有限公司 Cast-in-place balance swivel gate pier and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107780337A (en) * 2017-11-06 2018-03-09 中铁第勘察设计院集团有限公司 Cast-in-place balance swivel gate pier and its construction method
CN107780337B (en) * 2017-11-06 2023-06-27 中铁第一勘察设计院集团有限公司 Cast-in-situ balance swivel door-shaped pier and construction method thereof

Similar Documents

Publication Publication Date Title
CN111945891B (en) Ring truss high-altitude in-situ splicing construction method
CN103452039B (en) Cast-in-situs type Inverted T beam and bridge pier and Bridge Pier Construction technique thereof
CN103981803B (en) The combined gate pier of precast assembly and construction method thereof
CN103255726A (en) Construction method for continuous beam and arch combination bridge
CN103046476A (en) Railway long-span rotator T-shaped bridge construction method
CN103255717A (en) Method for constructing hit-preventing wall
CN102936968A (en) Inner steel frame reinforced structure of pseudo-classic architecture and construction method thereof
CN103711082B (en) The cross-saddle single-track traffic construction method of overhead section
CN107780337A (en) Cast-in-place balance swivel gate pier and its construction method
CN202131563U (en) Combined gate type bridge pier for one-step suspension in position of steel crossbeam
CN203270461U (en) Bailey beam support without buttress in soft foundation
CN207582282U (en) A kind of cast-in-place balance swivel gate pier
CN110409318B (en) Assembling and erecting method for large-span simply-supported steel-concrete composite beam
CN211141349U (en) Track panel well gantry crane foundation fixing structure
CN207452687U (en) A kind of section assembling balance swivel gate pier
CN109371820A (en) A kind of rotator construction frame-type bridge pier and its construction method
CN203144907U (en) Large-span dual-layer bailey truss structure
CN208934394U (en) One kind can turnover type hydraulic climbing formwork wall-attaching equipment
CN104746434B (en) Closure segment formwork system without dismantling outer formwork
CN111926691A (en) Pier top rotating structure with power arranged on side pier and construction method
CN111794128A (en) Construction method for accurately positioning steel cover beam of gate-type pier spanning existing railway
CN103469735A (en) Method for mounting curve ultrahigh hollow column plate type pier top solid section template
CN207904783U (en) Rotary body device in the middle part of the pier shaft of high-altitude
CN113756364B (en) Non-column subway station structure and track panel construction method
CN212561134U (en) Pier top rotating structure with power arranged on side pier

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant